Generate Modernization Quote

Modernization Request SubmittedProfessional Quote Document Generated

Automatically calculate modernization costs, equipment specifications, and labor estimates based on existing elevator configurations and building requirements. Transform complex quote generation into a streamlined process that delivers accurate proposals instantly.

Quick Answer

An elevator modernization quote automation instantly generates detailed proposals by analyzing current equipment specifications, calculating compliance requirements, retrieving current equipment pricing, estimating labor costs, and producing formatted documents—reducing quote turnaround from days to minutes while ensuring pricing accuracy and code compliance.

How This Automation Works

Modernization Request SubmittedProfessional Quote Document Generated

1

Capture Modernization Request

Customer submits inquiry through web form, email, or sales team entry. The system captures building address, current elevator details, desired improvements, timeline requirements, and contact information. Data is validated and missing information is automatically requested.

2

Retrieve Equipment and Building Data

The system queries maintenance records, equipment databases, and building permit systems to gather historical information about the existing elevator installation. This includes original specifications, previous upgrades, maintenance history, and current condition assessments.

3

Calculate Compliance Requirements

Based on building location, current codes, and elevator age, the system identifies mandatory upgrades for ASME, ADA, and local code compliance. It determines which components must be replaced, updated, or certified, and flags any grandfathered exemptions.

4

Generate Equipment Specifications

The system matches customer requirements with available equipment options, considering capacity, speed, finishes, control systems, and energy efficiency. It retrieves current pricing from supplier databases and identifies compatible components based on building constraints.

5

Calculate Labor and Project Costs

Using historical project data and current labor rates, the system estimates installation hours, required permits, building protection costs, and project management time. It factors in building access limitations, work hour restrictions, and any special engineering requirements.

6

Assemble and Format Quote Document

All components are compiled into a professional proposal document including executive summary, equipment specifications, itemized pricing, project timeline, warranty details, payment terms, and ROI calculations. The document is branded and formatted according to company standards.

7

Deliver Quote and Update Systems

The completed quote is automatically emailed to the customer with a personalized message. Simultaneously, the CRM is updated with the opportunity details, the sales team is notified, a follow-up sequence is triggered, and the quote is archived in the document management system.

Automation Complete

How It Works

Elevator modernization quoting involves multiple variables: current equipment age, building codes, capacity requirements, accessibility standards, and component availability. Manual quote generation requires engineers to review site assessments, cross-reference equipment catalogs, calculate labor hours, and coordinate with suppliers—a process that can take days per quote. This automation transforms that complexity into an instant process. When a modernization request is submitted with building details and current equipment specifications, the system automatically retrieves relevant equipment options, calculates compliance requirements, estimates labor and materials, applies current pricing, and generates a comprehensive proposal document. The result is faster response times, consistent pricing accuracy, and the ability to handle higher quote volumes without adding staff.

The Trigger

Activates when a building manager, property owner, or consultant submits a modernization inquiry through a web form, email, or CRM system. The request includes current elevator specifications, building details, desired upgrades, compliance requirements, and project timeline.

The Action

The system produces a detailed modernization proposal including equipment specifications, compliance certifications, itemized cost breakdown, project timeline, warranty information, and financing options. The quote is automatically formatted, branded, and delivered to the customer while simultaneously updating the CRM and notifying the sales team.

Common Use Cases in Elevator

  • High-rise commercial buildings needing multiple elevator modernizations with coordinated pricing and phased implementation schedules
  • Property management companies requesting standardized modernization quotes across their entire building portfolio with volume pricing
  • Healthcare facilities requiring ADA-compliant elevator upgrades with specific infection control and emergency power specifications
  • Historic buildings seeking modernization solutions that preserve architectural features while meeting current safety codes
  • Shopping centers and retail properties needing quick modernization quotes to minimize tenant disruption and maintain operations
  • Municipal buildings and government facilities requiring detailed compliance documentation and prevailing wage calculations
  • Residential buildings with multiple service contracts seeking comprehensive modernization packages with resident communication plans
  • Educational institutions planning summer modernization projects with strict completion deadlines and budget constraints

Results You Can Expect

Accelerated Response Time

4 hours vs 3 days

Deliver comprehensive modernization proposals within hours of receiving inquiries instead of the typical multi-day turnaround. Faster responses significantly improve customer perception and competitive positioning, especially when multiple contractors are bidding.

Increased Quote Volume Capacity

5x more quotes handled

Process significantly more quote requests without adding estimating staff. Sales teams can pursue opportunities that were previously ignored due to resource constraints, expanding market reach and revenue potential while maintaining quality.

Improved Pricing Accuracy

98% quote accuracy rate

Eliminate calculation errors, outdated pricing, and inconsistent markups that lead to unprofitable projects or lost bids. Real-time equipment pricing and standardized labor calculations ensure every quote is both competitive and profitable.

Enhanced Proposal Quality

35% higher win rates

Present professional, comprehensive proposals that include detailed specifications, compliance documentation, visual renderings, ROI analysis, and financing options. Superior presentation quality differentiates your quotes from competitors and builds customer confidence.

Consistent Code Compliance

100% compliance verification

Automatically incorporate all applicable building codes, safety standards, and accessibility requirements into every quote. Reduce liability risk, avoid costly change orders, and ensure projects pass inspection on the first attempt.

Better Sales Pipeline Visibility

Complete quote tracking

Every quote is automatically logged in the CRM with full details, customer interactions, and follow-up schedules. Management gains real-time visibility into quote activity, conversion rates, and revenue forecasts without manual reporting.

Frequently Asked Questions About This Automation

Automated quote systems deliver 95%+ accuracy by pulling real-time equipment pricing, applying current labor rates, and calculating exact compliance requirements based on building codes. The system eliminates manual calculation errors and ensures consistent pricing across all proposals while allowing for custom adjustments when needed.

Powered by Fieldproxy

Set Up Automated Quote Generation in Minutes

Stop doing manual work that software can handle. Fieldproxy makes it easy to set up this automation and dozens more - no coding required. Our AI builder helps you customize everything to match your exact business process.

Time Saved
18 hours per week
ROI Impact
3x more quotes closed