HVAC Cooling Tower Treatment Alert

Treatment Schedule Reached or Water Quality Threshold ExceededTreatment Alert Sent with Task Assignment and Documentation

Automatically schedule and send cooling tower chemical treatment reminders based on water quality monitoring, operating hours, and seasonal demand to maintain optimal system performance and extend equipment lifespan.

Quick Answer

An automated cooling tower treatment alert monitors operating hours, water quality parameters, and treatment schedules to send timely notifications for chemical dosing and maintenance interventions, ensuring optimal tower performance and preventing scale, corrosion, and biological contamination.

How This Automation Works

Treatment Schedule Reached or Water Quality Threshold ExceededTreatment Alert Sent with Task Assignment and Documentation

1

Monitor Cooling Tower Operating Conditions and Treatment Schedule

The system continuously tracks cooling tower runtime hours, seasonal operating mode, and scheduled treatment intervals from the facility maintenance calendar. It monitors water quality sensor data including pH, conductivity, temperature, and biocide residuals, comparing readings against preset acceptable ranges. Calendar-based schedules, hour-meter readings, and real-time sensor inputs are evaluated to determine when the next treatment intervention is required.

2

Evaluate Treatment Trigger Conditions

When operating hours reach the scheduled interval, water quality parameters exceed threshold limits, or calendar-based treatment dates arrive, the system evaluates the specific conditions requiring intervention. It considers factors like seasonal load, makeup water quality changes, recent weather patterns affecting evaporation rates, and historical treatment effectiveness to determine the appropriate chemical treatment protocol and urgency level.

3

Generate and Send Treatment Alert with Specifications

The automation creates a detailed treatment alert containing specific chemical dosing instructions, current water quality readings, safety information, and compliance documentation requirements. Alerts are sent via multiple channels (SMS, email, mobile app notifications) to designated technicians, and work orders are automatically created in the facility management system with appropriate priority levels based on condition severity.

4

Create Task Assignment and Schedule Follow-up Verification

The system assigns treatment tasks to available qualified technicians based on skill certifications, current workload, and location. It schedules post-treatment verification checks to confirm chemical application was completed correctly and water quality parameters returned to acceptable ranges. Automated follow-up reminders ensure testing occurs at proper intervals after treatment to verify effectiveness.

5

Log Treatment Activity and Update Compliance Records

All treatment alerts, technician responses, chemical usage quantities, water test results, and completion confirmations are automatically logged in the maintenance database. The system updates compliance documentation for regulatory reporting, tracks chemical inventory consumption, identifies recurring issues or seasonal patterns, and adjusts future treatment schedules based on historical performance data and system optimization algorithms.

Automation Complete

How It Works

HVAC cooling towers require consistent chemical treatment to prevent scale buildup, corrosion, and biological growth that can reduce efficiency by up to 35% and lead to costly equipment failures. This automation monitors cooling tower operating parameters, water quality data, and treatment schedules to generate timely alerts for chemical dosing, water testing, and maintenance interventions. The system tracks treatment history, adjusts reminder frequency based on load conditions and seasonal factors, and notifies technicians when water chemistry falls outside acceptable ranges. By automating treatment scheduling and compliance tracking, facility managers ensure optimal tower performance, reduce energy consumption, prevent Legionella contamination risks, and maintain regulatory compliance without manual calendar management or spreadsheet tracking.

The Trigger

The automation activates when a scheduled treatment interval arrives (based on operating hours, calendar days, or cycles of concentration), when water quality sensors detect chemical imbalances exceeding preset thresholds, or when seasonal operating mode changes require treatment protocol adjustments.

The Action

The system immediately sends formatted alerts to designated technicians via SMS, email, or work order system containing specific treatment requirements, chemical dosing instructions, and water test parameters. It creates or updates maintenance tasks in facility management software, logs the alert in compliance records, and schedules follow-up verification checks.

Common Use Cases in Hvac

  • Commercial office buildings with central chilled water plants automatically alerting technicians when cooling tower conductivity exceeds 3.5 cycles of concentration, triggering immediate blowdown and chemical adjustment to prevent scale formation during peak summer demand
  • Hospital facilities maintaining critical temperature control by scheduling biocide treatment alerts every 72 hours during cooling season with automatic escalation to facility management when treatments are not confirmed within 4 hours of scheduled time
  • Manufacturing plants with multiple cooling towers generating customized treatment alerts based on individual tower operating hours and production schedules, adjusting chemical dosing frequency automatically when processes shift between high and low cooling loads
  • Data centers requiring precise temperature control receiving immediate alerts when cooling tower pH drops below 7.5 or rises above 9.0, preventing corrosion in expensive heat exchange equipment and maintaining uptime for critical IT infrastructure
  • Universities and school campuses scheduling seasonal treatment protocols that automatically adjust alert frequency when transitioning between cooling and heating modes, ensuring proper layup procedures and restart chemical treatments
  • Hotels and hospitality facilities coordinating cooling tower treatment with guest occupancy patterns, increasing treatment frequency during high-occupancy periods and reducing to minimum maintenance schedules during off-season to optimize chemical costs
  • Shopping malls and retail centers integrating treatment alerts with tenant HVAC operating schedules, triggering treatments based on actual cooling demand rather than calendar dates to match chemical usage with system utilization

Results You Can Expect

Prevent Equipment Damage and Extend Lifespan

40% reduction in corrosion-related failures

Consistent, timely chemical treatment prevents scale formation, corrosion, and biological fouling that damage heat exchange surfaces, pumps, and distribution systems. Automated alerts ensure treatments never get missed during busy periods or staff transitions, maintaining protective chemical residuals that can extend cooling tower lifespan by 5-10 years and reduce catastrophic failure risks.

Improve Energy Efficiency and Reduce Operating Costs

15-25% energy savings

Properly treated cooling towers maintain optimal heat transfer efficiency, reducing compressor energy consumption and overall HVAC operating costs. Scale buildup of just 1/16 inch can reduce heat transfer efficiency by 12%, while biological fouling creates insulating layers that force systems to work harder. Automated treatment maintains peak efficiency, reducing monthly energy bills and improving sustainability metrics.

Ensure Legionella Compliance and Reduce Health Risks

100% treatment documentation

Automated alerts and documentation provide complete audit trails for Legionella prevention programs required by ASHRAE 188, CDC, and OSHA guidelines. Consistent biocide application and water quality monitoring prevent conditions conducive to bacterial growth, reducing liability risks and protecting building occupants. Automated compliance reporting simplifies regulatory inspections and demonstrates due diligence in water safety management.

Eliminate Manual Scheduling and Reduce Labor Costs

8 hours saved monthly per tower

Automated alert generation eliminates spreadsheet tracking, manual calendar management, and routine reminder calls to technicians. Facility managers save time previously spent creating schedules, tracking completion, and compiling treatment logs. Technicians receive only necessary alerts based on actual conditions rather than arbitrary calendar dates, optimizing labor deployment and reducing unnecessary site visits during low-demand periods.

Frequently Asked Questions About This Automation

Treatment alert frequency depends on tower operating conditions, but typically ranges from daily checks during peak cooling season to weekly during shoulder seasons. The automation should trigger based on actual operating hours (every 200-500 hours), cycles of concentration (when conductivity reaches 3-5 times makeup water), or calendar intervals (minimum weekly during operation). High-load facilities may require multiple daily treatments, while lower-demand systems need less frequent interventi

Powered by Fieldproxy

Set Up Scheduled Maintenance Alerts in Minutes

Stop doing manual work that software can handle. Fieldproxy makes it easy to set up this automation and dozens more - no coding required. Our AI builder helps you customize everything to match your exact business process.

Time Saved
8 hours per month
ROI Impact
25% efficiency improvement

Related Automations

View all hvac automations