Schedule Preventive Maintenance
Automate preventive maintenance scheduling for your facilities to reduce equipment downtime, extend asset lifespan, and eliminate manual scheduling errors. Keep critical systems running smoothly with timely, scheduled maintenance.
When
Equipment Threshold or Date Reached
Then
Maintenance Work Order Created and Scheduled
15 hours weekly
Time Saved
60% less downtime
ROI Impact
Automated preventive maintenance scheduling uses equipment run hours, calendar intervals, or condition triggers to automatically generate work orders, assign qualified technicians, and schedule maintenance tasks. This eliminates manual scheduling, reduces equipment downtime by up to 60%, and ensures no critical PM activities are missed.
How This Automation Works
Equipment Threshold or Date Reached → Maintenance Work Order Created and Scheduled
Monitor Equipment and Time Triggers
The system continuously monitors equipment operating hours, calendar dates, meter readings, and condition sensor data across all facility assets. When any asset approaches a PM threshold based on manufacturer recommendations or custom schedules, the trigger activates to begin the maintenance scheduling process.
Generate Maintenance Work Order
A detailed work order is automatically created containing asset identification, location details, PM task checklist based on equipment type, required parts and materials, estimated duration, safety requirements, and historical maintenance notes. The system pulls data from asset records and standard PM procedures.
Assign Qualified Technician
The system matches work order requirements with technician skills, certifications, current workload, and geographic location. It automatically assigns the most appropriate available technician, considering specialized training needs, union rules, and contractor availability if internal resources are insufficient.
Schedule Optimal Time Window
The system analyzes facility operations calendar, equipment usage patterns, technician availability, and parts delivery schedules to identify the optimal maintenance window. It automatically reserves the time slot, blocks equipment from operational scheduling, and coordinates with facility managers if production impact occurs.
Send Notifications and Updates
Automated notifications are sent to assigned technicians, facility managers, operations staff, and other stakeholders via email, SMS, or mobile app. Reminders are sent at configured intervals (7 days, 3 days, 1 day before) with work order details, location information, and any special instructions or safety requirements.
Track Completion and Update Records
As technicians complete work, they update task status via mobile device or workstation. The system captures completion time, parts used, findings, photos, and next recommended maintenance date. All data is logged to the asset maintenance history, compliance records are updated, and the next PM is automatically scheduled based on completion date.
How It Works
Transform your facilities maintenance operations by automating preventive maintenance scheduling. This solution automatically generates and schedules PM tasks based on equipment run hours, calendar intervals, or condition triggers, ensuring no critical maintenance window is missed. The system creates work orders, assigns technicians based on skill sets and availability, sends advance notifications to relevant stakeholders, and maintains comprehensive maintenance history logs. By eliminating manual scheduling bottlenecks and human error, facilities teams can shift from reactive firefighting to proactive asset management. The automation integrates with your existing CMMS, asset management systems, and calendar tools to provide a unified view of all scheduled maintenance activities. Track compliance requirements, generate audit trails, and optimize resource allocation while extending equipment life and reducing emergency repair costs. Perfect for multi-site operations, manufacturing facilities, healthcare institutions, commercial real estate, and any organization managing critical infrastructure.
The Trigger
The automation initiates when equipment reaches specified operating hours, a calendar-based interval arrives (daily, weekly, monthly, quarterly), a condition monitoring sensor detects deviation, or when manually triggered by facilities staff. Multiple trigger types can be configured for different asset classes.
The Action
The system automatically generates a detailed preventive maintenance work order with asset specifications, required tasks from PM checklists, assigns qualified technicians based on skills and availability, schedules the optimal time window, sends notifications to all stakeholders, updates asset maintenance logs, and tracks completion status with full documentation.
Common Use Cases in Facilities
- Manufacturing facilities scheduling PM for production equipment, conveyors, and robotics to maintain uptime and meet production targets
- Healthcare institutions maintaining HVAC, medical gas systems, emergency power, and life safety equipment for regulatory compliance and patient safety
- Commercial real estate managing elevator maintenance, fire systems, HVAC equipment, and building automation across multiple properties
- Educational campuses coordinating maintenance for classroom equipment, laboratories, athletic facilities, and dormitory systems during optimal scheduling windows
- Data centers scheduling critical infrastructure maintenance for cooling systems, power distribution, generators, and environmental controls with zero-downtime requirements
- Hospitality properties maintaining guest room equipment, kitchen appliances, pool systems, and building infrastructure to ensure guest satisfaction
- Municipal facilities managing parks equipment, water treatment plants, public buildings, and fleet vehicles across distributed locations
- Warehouse operations maintaining material handling equipment, dock doors, HVAC systems, and safety equipment to prevent operational disruptions
Results You Can Expect
Eliminate Equipment Downtime
Proactive scheduling prevents unexpected failures and emergency breakdowns. By performing maintenance before equipment fails, facilities experience significantly fewer disruptions, extended asset lifespans, and predictable operating costs. Critical systems maintain peak performance with scheduled interventions at optimal intervals.
Reduce Administrative Workload
Eliminate manual calendar management, spreadsheet tracking, and follow-up emails. The automation handles work order creation, technician assignment, scheduling coordination, and notification delivery. Facilities managers regain time for strategic planning, vendor management, and continuous improvement initiatives rather than administrative tasks.
Improve Maintenance Compliance
Ensure regulatory requirements, warranty obligations, and industry standards are consistently met. Automated scheduling prevents missed maintenance windows, maintains comprehensive audit trails, and generates compliance reports. Reduce liability exposure and pass inspections with documented proof of systematic maintenance programs.
Optimize Resource Allocation
Balance technician workloads, reduce overtime costs, and improve parts inventory management through predictive planning. The system identifies scheduling patterns, optimizes routes for multi-site operations, and ensures the right skills are matched to each job. Maximize productivity while minimizing labor and material waste.
Frequently Asked Questions About This Automation
Automated PM scheduling monitors equipment operating hours, calendar dates, and condition indicators to trigger maintenance activities. When thresholds are reached, the system generates work orders with detailed task lists, assigns technicians with appropriate skills, schedules optimal time windows to minimize disruption, and sends notifications to all stakeholders. All activities are logged for compliance and historical analysis.
Set Up Automated PM Scheduling in Minutes
Stop doing manual work that software can handle. Fieldproxy makes it easy to set up this automation and dozens more - no coding required. Our AI builder helps you customize everything to match your exact business process.
Related Automations
View all facilities automationsOptimize Facilities Routes Automatically to Cut Fuel Costs and Improve Service Times
Automatically calculate the most efficient routes for facilities teams based on location, priority, and technician availability. Reduce travel time, lower fuel costs, and complete more service calls per day.
Streamline Landscaping Scheduling and Dispatch with Automated Coordination
Automate landscaping crew scheduling, dispatch notifications, and service tracking to eliminate manual coordination and improve grounds maintenance efficiency.
Automate Lock Re-key Scheduling and Dispatch for Facilities Management
Streamline lock re-key scheduling by automatically creating service tickets, dispatching technicians, and notifying stakeholders when access control changes are needed across your facilities.
Automate Pest Control Scheduling and Dispatch for Facilities Management
Streamline pest control appointments, technician dispatch, and service tracking with automated scheduling. Eliminate double-bookings, reduce response times, and ensure compliance with automated notifications and documentation.