Best software for a fencing company whose subcontractor crews claim progress payments against job quantities, not day rates, on ServiceM8 and Xero

ServiceM8 builds the client invoice from job items, but it has no step where a subcontractor crew claims against your rate card, so a fencing company on ServiceM8 and Xero needs that claim step somewhere. The options are a spreadsheet rate card with claims sent by email, which works while you have only a few crews; a construction pay-application tool, which is built for head contractors billing project contracts; or field service software that puts each crew's unit rates on the job card, caps every claim at the quantity left, and sends approved claims to Xero as draft bills. Fieldproxy is the third kind. Best for processes that don't fit a template, set up for you.

  • No rate, no claim: every sub line needs a unit rate agreed before work starts.
  • A claim can never exceed the quantity left on the line; partial progress is fine, over-claiming is blocked.
  • Extra work is a variation with photos and a number, approved before it is claimed, never added to a day rate.
  • Receipts are attached to the job at the time of purchase, not texted to someone in the office.
  • Send approved claims to accounting as draft bills tied to the job, so nobody re-keys them.
  • Run claims on a weekly cycle with a cutoff, and query on the line, not by email.

Book your demo

60 minute video call ยท Step 1 of 2: your details, then pick a time

Number of employees

This changes how subs get paid, so it needs their agreement and a rate card first. Software enforces the rule; it cannot negotiate the rates for you.

Facts checked as of November 2026. Sources at the end of the page.

Step by step

How it works, step by step

The same shape works for fencing, cabling, landscaping, solar, signage and any trade where the work can be counted.

1. Build a schedule of rates per sub (or per trade)

List every unit of work you pay for: supply and install a panel, dig and set a post in concrete, hang a gate, remove old fence per meter, travel over a set distance. Each line has a unit and a rate. Day rates stay only for work that truly cannot be counted (e.g. waiting on site by your request), and those need a reason code.

2. Put the quantities on the job card

When a job is booked, the sub side of the job card lists the lines and quantities to install: 50 panels, 52 posts, 2 gates. That is the sub's budget for the job. The client price sits on a separate side the sub cannot see.

3. Subs claim progress against lines, not hours

On site or at the end of the day, the sub ticks off what was done: 22 of 50 panels. The claim shows the running balance (28 left) and multiplies by the agreed rate. Partial completion is normal; the next claim can only take from what is left.

4. Block over-claims at entry

If a sub enters 30 panels when 28 are left, the claim does not submit. They either correct it or raise a variation. This one rule removes most of the back-and-forth, because the office never sees a claim that does not fit the job card.

5. Variations need photos and approval first

Rock in the post holes, a longer run than measured, a gate moved by the client: the sub raises a variation with photos, a description, a quantity and a rate or amount. A manager approves or rejects it. Approved variations become new claimable lines; rejected ones never reach a claim.

6. Receipts go on the job

Materials a sub buys on your behalf are photographed and attached to the job with supplier, amount and what it was for. They count against the job budget the same day, so job cost is visible before the job closes.

7. Approve the claim, then send it to accounting

Each claim has a status: submitted, queried, approved, sent to accounting, paid. Approved claims go to Xero or QuickBooks as draft bills against the sub's contact, with the job number on each line, so accounts payable reviews and pays as normal.

Where it breaks

Why it goes wrong

These are the problems buyers described on our sales calls, mainly from a fencing contractor that installs through subcontractor crews.

Day rates are easier for the sub to write

Subs bill what they remember: three days, two workers. It takes less effort than counting what they installed. The office then has to work out what the days paid for, and the fencing contractor on our call said that querying claims took up most of their working week.

Partial work is invisible

If a sub installs 22 panels of 50 and bills for the job, nobody knows 28 are left until a client complains. Without a running balance on each line, the next crew gets sent to a job that looks finished.

The job card tool has no claim step

Many trade tools track materials and labor on a job for the client invoice, but have no step where a sub submits a claim against those lines. In ServiceM8, for example, items are added to a job from the Billing screen with a quantity, which builds the client invoice. A sub working in the Contractor role can quote and invoice clients, and the Strict Contractor role has no access to pricing at all, so neither is a claim against your rate card.

Sub cost is recorded as hours

Some FSM tools record a sub as a material with hours and an hourly rate. ServiceTitan's guide to adding subcontractor cost uses a purchase order line where Qty is the hours logged and Unit Cost is the sub's hourly rate. That tracks cost, but it bakes in the day-rate habit you are trying to remove.

Receipts arrive by text message

Subs text photos of receipts to whoever answers. They sit in a phone, get typed in weeks later, or never. The job looks profitable until the receipts land.

Claim software built for head contractors

Construction claim tools are built around big contracts and a schedule of values per project. Small trade businesses on our calls were told they were too small for that kind of system, and their subs already dislike the claim portals their upstream builders make them use.

The options

Ways to do it

ApproachHow quantities are claimedWeak spotGood for
Rate card in a spreadsheet, sub claims by emailSub fills a claim template; office checks against the job card by handNothing stops an over-claim; checking is the whole jobA few subs and a few jobs a month
Construction pay applications (AIA G702 and continuation sheet, ConsensusDocs)Percent complete per schedule of values line, minus retainageBuilt for project contracts, heavy for many small jobs a weekLarger projects with a formal contract and retainage
Procore progress billingsSub schedule of values by amount; Unit/Quantity based commitments do not support adding the sub SOV in this toolAmount based, not unit based; a project tool, US only for this featureBuilders and GCs already on Procore
Sub cost as a material on a PO (ServiceTitan)Qty is hours, Unit Cost is the hourly rateTracks cost, not progress; no running balance per lineOccasional subs on service jobs
Job card lines with claim limits and a sub portal or link (Fieldproxy)Sub ticks off quantity per line; claim capped at what is left; variations approved firstNeeds a rate card agreed with each sub before go-liveTrades with many subbed jobs a week

As of November 2026, from each vendor's own help pages and guides (sources below). Check the current version before you rely on any one setting.

Worked example

A worked example: one fence job, two claims

Say a fencing contractor books a 50-panel boundary fence and sends it to a sub crew on an agreed rate card. Made-up numbers.

LineQty on job cardRateClaim 1Claim 2Left
Supply and install panel50$4522 ($990)28 ($1,260)0
Set post in concrete52$3024 ($720)28 ($840)0
Hang gate2$12002 ($240)0
Variation V1: rock in post holes (approved, photos)8 holes$3508 ($280)0
Receipt: concrete bags (attached day 1)1$186$18600
Total$1,896$2,620

Under day rates the same job might arrive as "4 days x 2 men", and the office has to guess whether the gates were hung. Here, claim 1 shows 28 panels left, so the job stays open. If the crew had entered 30 panels in claim 2, it would not submit. Total paid to the sub is $4,516: the $4,050 rate card budget, plus the $280 approved variation and the $186 receipt, all visible in the job cost report before the client is invoiced.

Claims and invoices

Managing sub claims and invoices against jobs in one pass

The days of back and forth come from checking a paper job card, a sub's invoice and a text full of receipts against each other after the work is done. Every mismatch becomes an email, every email waits for a reply, and the sub waits for money. The fix is to do the checks at the moment the claim is entered, and to give the office one weekly pass instead of a running conversation.

Accountants call the general idea matching. A two-way match checks the invoice against the purchase order; a three-way match also checks it against what was actually received, which catches quantities billed that were never delivered. For subcontracted work, the job card plays the role of the order, and the sub's completed quantities with photos play the role of the receipt.

The checks a claim or sub invoice should pass before anyone in the office reads it.

CheckComparesIf it fails
Job and POThe claim names a job and your PO number that exist and are assigned to this subCannot submit: pick the job
RateEach line's rate against the sub's rate cardCannot submit at a different rate; raise a variation
QuantityClaimed quantity against what is left on the lineCannot submit above the balance
EvidenceRequired photos or a completed checklist for the lines claimedCannot submit until attached
VariationsExtra lines against approved variationsUnapproved extras are held, not paid
ReceiptsReceipts attached to the job, with supplier and amountReceipts not on the job are not reimbursed
Sub's own invoice (if they send one)Its total against the approved claim for the same periodDifferences go back to the sub as a line query

If every check runs at entry, the claims that reach the office are already right, and approving them is a weekly task rather than four days of email.

A weekly cycle that keeps it to one pass:

Cutoff

Claims for the week close at a set time, e.g. Thursday 5 pm. Anything later rolls to next week. Subs know when to claim and when they will be paid.

One review pass

Friday morning, the office works a single list: approve, or query a specific line with a reason (wrong quantity, missing photo, rate not on card). The query goes to the sub on that line, not as a free-text email.

Bills, not retyping

Approved claims go to accounting as bills against the sub's contact with the job on each line. In QuickBooks Online, bills can be marked billable to a customer or project (on Plus or Advanced); in Xero, an approved claim can go as a draft bill for your usual approval.

Pay run and paperwork

Pay on the agreed date. In the US, collect a conditional lien waiver with the claim and an unconditional one once paid; a conditional waiver only binds once payment is received. In Australia, consider recipient-created tax invoices so the sub does not have to write an invoice at all.

Before you buy

What to check before you buy

Good signs

  • Job card lines carry a quantity and a sub rate, separate from the client price
  • A claim cannot exceed the quantity left on a line, checked when the sub submits, not later by the office
  • Partial claims keep a running balance per line across several claims
  • Variations need photos and an approval before they become claimable
  • Receipts attach to the job from the sub's phone and show in job cost the same day
  • Approved claims reach Xero or QuickBooks as draft bills with the job number, not as a PDF to re-key
  • Subs claim from a link or portal and do not need a paid seat

Red flags

  • Sub cost can only be entered as hours times a rate
  • Over-claims are only caught by a report someone has to run
  • The sub role can also quote or invoice your client
  • Variations are a free-text note on the claim with no approval step
  • You pay per user, so every sub crew becomes a licence
  • The claim tool needs a full project contract for a two-day job

In Fieldproxy

Setting it up in Fieldproxy

Fieldproxy is set up around your process, so the rate card, claim rules and statuses below are configured with you. Field and status names are examples.

Rate card and job card lines

Each sub (or trade) has a rate card of unit lines (e.g. panel_install, post_set, gate_hang). When a job is booked, its sub lines are created with a quantity and the sub rate. The client price and quote stay on the client side, which subs cannot see. Job cards are ordinary work orders and jobs with sub lines on them. Open job cards from your current tool or paper are imported at setup, and Fieldproxy replaces that tool rather than sitting beside it.

Claims capped at what is left

Subs claim from a portal login (regular crews) or a job link (one-off subs) by ticking off quantities per line. The claim screen shows each line's remaining balance and refuses a quantity above it. Fieldproxy is one price per company with unlimited users, so sub crews do not add seats.

Variations with photos and approval

A variation form takes photos, a reason, a quantity and an amount. It goes through an approval step, e.g. a manager for anything over $500. Once approved it becomes a claimable line on that job only.

Receipts read from a photo

Subs photograph a receipt on the job. The Vision agent reads supplier, date and amount into a receipt record on the job, so it counts in job cost the same day. Supplier PDFs emailed in can be read by the Document intelligence agent.

Approved claims to Xero or QuickBooks

Claim statuses run submitted, queried, approved, sent to accounting, paid. On approval, the claim is sent through the Xero or QuickBooks sync as a bill against the sub's contact, with the job number on each line, and your normal approval and payment run carries on from there.

Queries on the line, not by email

When the office queries a claim, the query sits on the line with a reason, and the sub answers there with a corrected quantity or a photo. Each claim keeps its history, so nobody searches an inbox to find out what was agreed. The agents doing this follow the same permissions as your staff; see AI field service software.

Someone watching the gaps

The Watcher agent flags jobs where lines are still open after the crew has left site, claims queried for more than a few days, and jobs whose cost passes their budget. Autopilot drafts the chase to the sub, and a person approves before it sends.

By country

Regional notes: payment claim rules

If your subs do construction work, a claim can carry legal weight. The software should keep the dates. This is general information, not legal advice.

Australia (NSW example)

Under the NSW Security of Payment Act, a payment claim must be in writing, state the amount and describe the work, and only one claim can be made per reference date (the last day of the month if the contract sets none). The respondent has 10 business days to give a payment schedule or becomes liable for the full claimed amount, and a subcontractor's payment is due 20 business days after the claim unless the contract says earlier (10 for related exempt residential work). Other states have their own acts.

Australia: recipient-created tax invoices

If you, not the sub, generate the invoice from an approved claim, that is a recipient-created tax invoice (RCTI). Both parties must be registered for GST when it is issued and you need a written RCTI agreement with each sub.

New Zealand

Under the Construction Contracts Act 2002, the payer can reply with a payment schedule up to 20 working days after the claim is served, or by the date in the contract, and the schedule must explain why it differs from the claim.

United Kingdom

Under the Construction Act and the Scheme for Construction Contracts, if you intend to pay less than the notified sum you must give a pay less notice with the basis of your calculation, by default no later than seven days before the final date for payment. A rejected quantity needs to be in that notice.

United States

On larger contracts, subs bill with pay applications (often the AIA G702 with a continuation sheet based on the schedule of values), minus retainage. Line-based claims map well onto that format when a builder upstream asks for it.

How switching works

How switching to Fieldproxy works

We move your data over and set the system up to the way you already work. Fieldproxy replaces the old tool; it does not run alongside it.

  1. Show us a job card and a sub invoice

    One real job, the rate (or day rate) you paid, and the claim or invoice the sub sent. We map it to lines and quantities.
  2. We build the rate card and claim rules

    Unit lines per sub or trade, claim caps, variation approval limits and the receipt step, set to your thresholds.
  3. We connect accounting

    Approved claims go to Xero or QuickBooks as bills with the job number. We test one end to end with you.
  4. Subs start claiming

    Regular crews get a portal login, one-off subs get a job link. Your office approves claims instead of querying them.

FAQ

Questions people ask

Best software for a fencing company that uses subcontractor crews to claim progress payments against job quantities instead of day rates? We use ServiceM8 and Xero.
ServiceM8 builds the client invoice from job items but has no step where a sub claims against your rate card. You need a claim step: a spreadsheet and email for a few crews, a construction pay-application tool if you bill project contracts as a head contractor, or field service software with a unit rate and a remaining quantity on each job card line. Approved claims should reach Xero as draft bills with the job number, so nobody re-keys them.
Can a sub claim part of a job and the rest later?
Yes. Each claim ticks off quantities per line and the job card keeps a running balance, so 22 of 50 panels this week and 28 next week is two normal claims.
What if the real quantity is more than the job card?
The sub raises a variation with photos and the extra quantity. Once approved it becomes a new line they can claim. Without approval the extra cannot be claimed.
Do I need a rate card with every sub?
Yes, or one per trade that subs accept. Claims against quantities only work when each unit has an agreed price before the work starts.
Can approved claims go to Xero as bills?
Yes. Xero's API creates a bill as an invoice of type ACCPAY, and a bill can be sent as a draft or submitted for approval, with up to two tracking categories per line for job or region.
How do receipts get onto the job?
The sub photographs the receipt on the job from their phone. It is stored with the job and counted in job cost, instead of being texted to someone in the office.
Do I keep my existing job card tool?
No. Claims only work when the quantities, the sub lines and the schedule are on the same job, so Fieldproxy replaces the job card tool rather than sitting beside it. Your open job cards are imported at setup, and it is live within a day.
How do I manage subcontractor claims and invoices against jobs?
Put each sub's lines, rates and quantities on the job, have subs claim against those lines with photos, block anything over the balance or off the rate card at entry, and approve in one weekly pass. Approved claims go to accounting as bills with the job on every line.
What is a three-way match for subcontractor invoices?
Checking the invoice against the order and against what was actually received before paying. For sub work, the order is the job card and its rates, and the receipt is the completed quantities with photos.
How do we move sub job cards and claims off paper?
Give subs a portal login or a job link where the job card lines are listed, and make claiming a tick against those lines with a photo. Once subs claim through the link, the paper card has no job left to do; keep scans of old cards on the job for reference.
Do subs have to pay for an account?
Not in Fieldproxy. Subs claim through a portal login or a job link, and Fieldproxy is one price per company with unlimited users. See /pricing.
Is a claim through software still a valid payment claim?
It can be, if it meets the rules in your state or country, such as being in writing, stating the amount and describing the work. Check the wording with your lawyer or industry association.

Sources

Competitor details on this page come from the vendors' own pages and documentation, checked as of November 2026. Plans and prices change, so check the vendor's current page before you decide.

See it built on your workflow

Tell us how your jobs run today. We build a demo on your stages, forms and pricing before the call.