Send Load Test Reminder

Load Test Due Date ApproachingMaintenance Team Notified with Test Checklist

Automatically schedule and send load test reminders for backup generators, ensuring compliance with NFPA 110 standards and preventing unexpected power system failures during critical moments.

Quick Answer

An automated generator load test reminder system monitors your testing schedule and sends notifications to maintenance teams 7-14 days before each required test. It tracks compliance with NFPA 110 standards, escalates overdue tests to supervisors, and maintains digital records of all completed tests for regulatory audits.

How This Automation Works

Load Test Due Date ApproachingMaintenance Team Notified with Test Checklist

1

Configure Generator Testing Schedule

Input each generator's specifications, required testing frequency (based on NFPA 110 classification), notification recipients, and compliance standards. Set reminder lead times (typically 7-14 days) and escalation procedures for overdue tests.

2

System Monitors Test Due Dates

The system continuously tracks all generator maintenance calendars, comparing current dates against scheduled test intervals. It accounts for previously completed tests, runtime hours, and regulatory compliance deadlines specific to your facility.

3

Automatic Reminder Notification Sent

When a load test approaches its due date, the system automatically sends detailed reminders to designated maintenance personnel. Notifications include generator location, last test date, required test parameters, safety procedures, and a digital documentation checklist.

4

Test Completion Documented

Maintenance staff complete the digital checklist during testing, recording load percentages, runtime duration, voltage, frequency, and observations. The system timestamps completion and stores results for compliance reporting.

5

Escalation for Overdue Tests

If tests aren't completed within the compliance window, the system automatically escalates notifications to supervisors or facility managers. It tracks overdue items and highlights compliance risks for immediate attention.

6

Next Test Automatically Scheduled

Upon test completion, the system calculates the next required test date based on regulatory intervals and equipment specifications. The new reminder is queued automatically, ensuring continuous compliance without manual calendar management.

Automation Complete

How It Works

Generator load testing is a critical maintenance requirement that's often overlooked until it's too late. This automation ensures your facility never misses a scheduled load test by automatically tracking test intervals, sending timely reminders to maintenance teams, and documenting compliance for regulatory audits. Whether you manage healthcare facilities, data centers, or commercial buildings, consistent load testing prevents catastrophic failures during power outages and extends generator lifespan by identifying mechanical issues before they become emergencies. The system monitors your testing schedule based on NFPA 110, JCAHO, or custom intervals, and automatically notifies relevant personnel with detailed test procedures and documentation requirements.

The Trigger

The system monitors your generator maintenance calendar and activates when a scheduled load test date approaches within your configured threshold (typically 7-14 days before due date). It can also trigger based on runtime hours, previous test completion dates, or regulatory compliance deadlines specific to your industry requirements.

The Action

The system automatically sends detailed reminder notifications to designated maintenance personnel via email, SMS, or internal communication channels. Each reminder includes the generator identification, last test date, required test duration, safety procedures, and a digital checklist for documenting results. Follow-up reminders escalate to supervisors if tests aren't completed within the compliance window.

Common Use Cases in Generator

  • Healthcare facilities maintaining JCAHO accreditation with monthly 30% load tests and annual full-capacity testing for emergency power systems supporting life safety equipment
  • Data centers ensuring 99.999% uptime SLAs by scheduling quarterly load tests at various capacity levels and documenting performance metrics for client reporting
  • Commercial high-rise buildings meeting local fire codes with monthly generator testing and maintaining compliance documentation for annual building inspections
  • Manufacturing plants preventing production losses by testing backup generators monthly during planned maintenance windows and tracking runtime hours for service intervals
  • Municipal water treatment facilities maintaining EPA compliance with weekly generator exercise periods and monthly load tests for critical infrastructure protection
  • Telecommunications sites ensuring network uptime with automated testing schedules coordinated across hundreds of remote tower locations with cellular backup power
  • University campuses managing multiple emergency generators across research facilities, dormitories, and critical systems with centralized compliance tracking
  • Retail distribution centers protecting refrigerated inventory with regular load testing of backup generators and documenting reliability for insurance and stakeholder reporting

Results You Can Expect

Guaranteed Regulatory Compliance

100% documentation accuracy

Never miss required load tests and maintain complete audit trails for NFPA 110, JCAHO, or insurance compliance. Digital records with timestamps and test parameters are automatically organized and retrievable for inspections.

Prevent Catastrophic Power Failures

Reduce failure risk 85%

Regular load testing identifies mechanical issues, fuel system problems, and cooling deficiencies before they cause emergency power system failures during critical outages. Early detection prevents equipment damage and ensures reliability when power is needed most.

Eliminate Manual Schedule Tracking

4 hours saved monthly

Remove spreadsheets, paper calendars, and manual reminder systems. The automation tracks all generators, calculates due dates automatically, and sends notifications without facilities manager intervention.

Extend Generator Service Life

30% longer equipment life

Consistent load testing under controlled conditions prevents wet stacking, carbon buildup, and mechanical deterioration. Regular exercise keeps generators ready and extends the time between major overhauls or replacements.

Reduce Insurance and Liability Costs

Lower premiums 15-20%

Documented preventive maintenance demonstrates due diligence to insurers and reduces liability exposure. Many carriers offer premium reductions for facilities with automated compliance tracking and consistent testing records.

Streamline Multi-Site Management

Manage 50+ generators easily

Facilities managers overseeing multiple locations receive consolidated dashboards showing all upcoming tests, overdue items, and compliance status across their entire generator fleet from a single interface.

Frequently Asked Questions About This Automation

NFPA 110 requires monthly load tests at 30% capacity for Level 1 systems (hospitals, life safety) and annual tests at 100% capacity for 2 hours. Level 2 systems (commercial buildings) typically require monthly tests at minimum load and annual full-load tests. Your specific requirements depend on generator classification, local codes, and industry regulations.

Powered by Fieldproxy

Set Up Scheduled Maintenance Alerts in Minutes

Stop doing manual work that software can handle. Fieldproxy makes it easy to set up this automation and dozens more - no coding required. Our AI builder helps you customize everything to match your exact business process.

Time Saved
4 hours per month
ROI Impact
Prevents $50K+ failures