Guide for overhead crane and hoist inspection companies · checked 6 November 2026

Software for overhead crane and hoist inspection companies to replace Service Fusion and SafetyCulture

Crane service companies that run Service Fusion for jobs, SafetyCulture (now Mitti) for checklists and QuickBooks Online for invoices end up typing the same crane, the same deficiency and the same scope three times. The work itself is per crane: a 10 ton double girder bridge in a fab shop on a semiannual periodic, a 1 ton jib on an annual, a hoist whose hook throat and load chain need a signed monthly record. This guide covers OSHA 1910.179, ASME B30.2 and B30.16, CMAA classes, Ontario, BC and New Brunswick rules on CSA B167, and the path from deficiency to tag-out, quote, repair, load test and invoice.

See your own jobs set up this way

A 30-minute call. We show you overhead crane and hoist inspection companies workflows running in Fieldproxy, built around how you work.

Fieldproxy

Short answer

Overhead crane and hoist inspection companies that outgrow Service Fusion plus SafetyCulture usually look at inspection platforms built for cranes (InspectAll, CraneRep.com) or commercial service platforms (ServiceTrade), and keep QuickBooks Online for accounting. What matters is a record per crane and hoist with its own service class and inspection clock, checklists that branch for electric versus manual and rope versus chain hoists, deficiencies that turn into tag-outs and quotes without retyping, and load test certificates on file. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: it is built around your crane register, inspection intervals per service class, deficiency-to-quote flow and QuickBooks Online sync.

125%

Most a rated load test may use on an overhead crane under OSHA unless the manufacturer says otherwise; test reports go on file

source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))

1 to 12 months

OSHA's periodic inspection interval for cranes in regular service; frequent inspections run daily to monthly

source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))

15% / 10°

Hook throat opening beyond normal, or twist from the plane of the hook, that takes a hook out of service

source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))

Once a year

Minimum thorough examination of a lifting device in Ontario, with a permanent record signed by the competent person

source: University of Waterloo Safety Office, Lifting devices: extract of Ontario Regulation 851, s.51

How a job runs

One overhead crane and hoist inspection job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Build the crane register at the first visit

    A plant with eight cranes is eight records, not one customer. Each bridge, gantry, jib, monorail and workstation crane gets its bay or column line, rated capacity (OSHA wants it marked on each side of the crane), CMAA class, span and runway, and every hoist on it with make, model, serial, rope or chain, hook ID and controls (pendant or radio). The service class the customer actually runs (normal, heavy or severe) sets the clock.

  2. 2

    Set each crane's inspection clock

    OSHA splits inspections into frequent (daily to monthly) and periodic (1 to 12 months). The Overhead Alliance publishes periodic inspections as annual, semiannual or quarterly by service, and hoists under ASME B30.16 follow the same yearly, semiannual and quarterly pattern for normal, heavy and severe service. A crane idle 1 to 6 months needs an inspection before use; idle over 6 months, a complete one.

  3. 3

    Book the visit around production

    Cranes are inspected when the customer can stop lifting. Booking means a date the plant agrees to, the lift or manlift needed to reach the bridge and runway, lockout of the crane's main or emergency switch, and enough techs with the right skills for the bay. A tech should not see the whole client list or next quarter's board, just the visit.

  4. 4

    Inspect crane by crane, hoist by hoist

    The checklist changes with the equipment: electric versus manual hoist, wire rope versus load chain, top-running versus underhung. Periodic items include deformed, cracked or corroded members, loose bolts or rivets, cracked or worn sheaves and drums, and brake linings, pawls and ratchets. Hooks get a throat measurement against the baseline, and ropes and chains get gauged.

  5. 5

    Sign the hook, rope and chain records

    OSHA asks for a monthly certification record on hooks and hoist chains that identifies the item, and a monthly rope inspection record with the date and the inspector's signature. The Overhead Alliance says frequent reports are kept three years. Those records are what an auditor asks for, and paper ones go missing first.

  6. 6

    Tag out what is unsafe

    Unsafe conditions found under OSHA's inspection rules must be corrected before the crane runs again. During repairs, warning or out-of-order signs go on the crane and the main or emergency switch is locked open. The customer's maintenance lead needs to know the same day which crane is down and why.

  7. 7

    Quote the deficiencies

    Each finding (worn brake, cracked festoon trolley, kinked rope, missing hook latch, bent pendant) becomes a quote line with parts, labor and access equipment. Office staff should not be copying the scope from the inspection report into a quote and then again into the repair job.

  8. 8

    Repair or fabricate, then load test

    Approved quotes become repair jobs, some with shop fabrication (new end trucks, runway stops, below-the-hook frames). OSHA confirmed in 2009 that new and altered cranes need a rated load test before use, at no more than 125% of rated load unless the manufacturer says otherwise. In BC, overhead cranes installed after 1 Jan 1999 are tested at 125% before first use and the record goes in the equipment record system.

  9. 9

    Issue the certificate and report

    The customer gets a report per crane with each deficiency, its photo and its status, plus the inspection or load test certificate. Internal notes (labor estimate, tech comments, upsell ideas) stay off the customer copy. In Ontario the annual examination record is signed by the competent person who did it.

  10. 10

    Invoice the same week and roll the clock

    The inspection, the repair and the load test each invoice from what was done in the app, and sync to QuickBooks Online with the right GST/HST or sales tax. Closing the periodic inspection sets that crane's next due date, so the recurring work belongs to the crane and survives staff changes.

What to record

The fields every overhead crane and hoist inspection job should capture

Each crane and each hoist

  • Customer, site, bay or column line; crane type (top-running single or double girder bridge, underhung, gantry, jib, monorail, workstation)
  • Rated capacity and where it is marked; CMAA class (A to F); span; runway and stops; year built; manufacturer
  • Each hoist: make, model, serial, capacity, rope or chain, hook ID and baseline throat dimension, control type, upper and lower limit switches
  • Service class the customer runs (normal, heavy, severe), frequent and periodic interval, next due date
  • Jurisdiction: OSHA 1910.179, Ontario Reg. 851 s.51, BC Part 14, NB Reg. 91-191; CSA B167 edition named by that province
  • OEM manual and parts list attached to the hoist, so the tech sees it on the job

Each inspection

  • Type: initial, frequent, periodic, idle-crane return, post-repair
  • Per item result: OK, deficiency, N/A, not accessible (with reason)
  • Hook throat measured vs baseline (flag above 15%), twist (flag above 10°), latch; chain gauge reading; rope diameter and broken wires
  • Brake, limit switch and controls function test results
  • Photos per deficiency, inspector name and signature, date, client contact who received the report
  • Internal-only fields (labor guess, notes for the coordinator) kept off the client PDF

Deficiencies, tag-outs and load tests

  • Deficiency: crane, hoist, component, severity (remove from service, repair soon, monitor), photo, quote line, status
  • Tag-out: tag number, time, switch locked open yes/no, who at the plant was told, cleared by and when
  • Load test: reason (new, altered, repaired load-bearing part), rated load, test load and % of rated, test weights and their certification, functions tested, hold, result
  • Certificate number and PDF, signed by the inspector

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
OSHA 1910.179(j): frequent and periodic inspectionsCranes in regular service get frequent inspections at daily to monthly intervals and periodic inspections at 1 to 12 month intervals. Functional operating mechanisms and air or hydraulic systems are checked daily. Periodic inspections add deformed, cracked or corroded members, loose bolts or rivets, worn sheaves and drums, and brake system parts. source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))
OSHA 1910.179(j)(2) and (m)(1): monthly hook, chain and rope recordsHooks are visually inspected daily, with a monthly inspection and certification record. Hooks over 15% beyond normal throat opening or with more than 10° twist are taken out of service and replaced. Hoist chains get the same monthly certification record. All running ropes get a thorough inspection at least once a month, recorded with the date and the inspector's signature. source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))
OSHA 1910.179(j)(4): idle cranesA crane idle 1 month or more but less than 6 months is inspected before it goes back into service. A crane idle over 6 months gets a complete inspection. source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))
OSHA 1910.179(k): load testsAll new and altered cranes are tested before initial use. Test loads may not exceed 125% of rated load unless the manufacturer recommends otherwise, and test reports are placed on file where appointed personnel can reach them. source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))
OSHA interpretation, 28 Aug 2009OSHA wrote that rated load tests are required for new and altered cranes, and that ANSI B30.2-2005's load test provisions are not as protective as 1910.179(k), so following the ANSI text is not a defense. source: OSHA standard interpretation, 28 Aug 2009: rated load tests are required for new and altered overhead cranes under 1910.179(k)
OSHA 1910.179(l): repairs and tag-outUnsafe conditions found by the (j) inspections are corrected before operation resumes, and only by designated personnel. During maintenance, warning or out-of-order signs go on the crane and the main or emergency switch is opened and locked. source: OSHA 29 CFR 1910.179, Overhead and gantry cranes (inspection (j), testing (k), maintenance (l), rope inspection (m))
ASME B30.2 inspection types and records (as summarized by CMAA, HMI and MMA)Four types: initial, pre-shift, frequent and periodic. Frequent: normal service semiannually to semimonthly, heavy monthly to weekly, severe weekly to daily. Periodic: annual, semiannual or quarterly. Frequent reports kept 3 years; hook, wire rope and load chain records carry the date, signature and component serial or ID. source: Overhead Alliance (CMAA, HMI, MMA), Overhead and gantry inspections 101: initial, pre-shift, frequent and periodic
ASME B30.16 hoists and B30.10 hooksFrequent: normal service monthly, heavy weekly to monthly, severe daily. Periodic: normal yearly, heavy semiannually, severe quarterly. Records are required for periodic inspections, not frequent ones; an external coded mark on the hoist is accepted in place of records. source: Mazzella Companies, Lifting and rigging inspection frequencies and records guide (ASME B30.16, B30.10, B30.20, B30.9)
ASME B30.16: who inspects hoists, and which records stayB30.16 calls for regular inspections by qualified persons. Frequent inspections run monthly for normal use, weekly for heavy and daily for severe; periodic inspections yearly, semiannually and quarterly. Records of periodic inspections must be kept. source: Overhead Alliance, Hoist inspections 101: covering the basics (frequent and periodic intervals by service)
CMAA Specification 70 service classesClass A standby or infrequent (installation and maintenance cranes), B light (repair shops, light assembly), C moderate (machine shops; most cranes are built to C), D heavy (foundries, fabricating plants, steel warehouses), E severe (scrap yards, cement mills; 20 or more lifts an hour near capacity), F continuous severe. source: Ace Industries, CMAA duty classifications (Specification 70 service classes A to F)
CMAA Specification 78: who may inspectThe 2016 revision set measurable experience: a crane technician and crane inspector should have at least 2,000 hours of relevant work experience and training in maintaining, inspecting, servicing, repairing and modifying cranes. source: Wire Rope Exchange (Apr 2016), CMAA revises Specification 78 for services performed on overhead lifting equipment
Ontario Regulation 851, s.51A lifting device is thoroughly examined by a competent person before first use and as often as necessary, never less often than the manufacturer recommends and at least once a year. A permanent record is signed by the competent person. The device is marked so the operator can tell its maximum rated load. source: University of Waterloo Safety Office, Lifting devices: extract of Ontario Regulation 851, s.51
British Columbia OHS Regulation Part 1414.2(4) names CSA B167-96 for bridge, gantry, jib, monorail and overhead travelling cranes. 14.54.1 requires inspection by a qualified person to the manufacturer and that standard. 14.54 load tests overhead cranes installed after 1 Jan 1999 at 125% before first use. 14.14 requires inspection and maintenance records for cranes of 900 kg or more. source: WorkSafeBC, OHS Regulation Part 14: Cranes and hoists (14.2, 14.14, 14.54, 14.54.1)
New Brunswick Regulation 91-191 and CSA B167-08Operators inspect overhead cranes daily when in use and record it in the logbook. A competent person inspects every 12 months and certifies in writing. The annual inspection follows CSA B167-08 (R2015) clauses 5.5.3.2, 5.5.4.2 and 5.5.4.3, and WorkSafeNB recommends the frequency in 5.5.4.1, which rises with use. source: WorkSafeNB, Overhead hoist logbook: permanent record (Regulation 91-191, CSA B167-08 clauses 5.5.3.2, 5.5.4.2, 5.5.4.3), rev. July 2024
CSA B167 editionsB167-16 (R2021) covers overhead travelling, jib, gantry and wall cranes, monorails and hoists, and excludes mobile and tower cranes and below-the-hook devices. CSA lists it as withdrawn with an update available. Provinces name different editions, so record which one each site falls under. source: CSA Group store, B167-16 (R2021): Overhead cranes, gantry cranes, monorails, hoists, and jib cranes (scope, status)

Rules vary by state, council and contract. Checked 6 November 2026; confirm against the source for your area before relying on it.

Numbers

What crane inspection is priced at

Two public price sources, not market rates: one crane service company's published per-crane list, and a 2011 water utility bid that bundled inspection and load testing. Use them to see the price lines a contract needs (per crane by capacity, extra hoist, hourly repair) rather than as a benchmark.

Line itemPriceWhere
Bridge crane, 5 tons or less, annual inspection$108 to $141 per craneMazzella published list
Same crane, monthly inspection$72 to $94 per craneMazzella published list
Double girder bridge, over 5 up to 30 tons, annual$151 to $197 per craneMazzella published list
Double girder bridge, over 30 under 40 tons, annual$194 to $253 per craneMazzella published list
Each extra auxiliary hoist or trolley, annual$86 to $113Mazzella published list
Jib or monorail, annual$86 to $113Mazzella published list
Hourly rate$115 to $150 per hourMazzella published list
Class E and F cranes, or over 40 tonsCustom pricingMazzella published list
Inspect and load test, 1,000 lb to 5 ton hoist or crane$75 and $150 per unit (two groups)San Antonio Water System, 2011
Inspect and load test, 5 to 15 ton$220 and $300 per unit (two groups)San Antonio Water System, 2011
Inspect and load test, 30 ton$750 per unitSan Antonio Water System, 2011
Truck-mounted crane, 1 to 6 ton, 115 units$70 per unitSan Antonio Water System, 2011

source: Mazzella Companies, How much does an overhead crane inspection cost? (published price ranges per crane)source: San Antonio Water System, tabulation of bids 11-0053: annual contract for overhead hoist, crane and monorail inspection and testing (Aug 2011)

Where it breaks

Where spreadsheets and generic software fall over

History is kept per client, not per crane. Nobody can say which of a plant's nine hoists had its brake relined, or which one fails its chain gauge every year.

Each crane and each hoist is its own record with its own inspections, deficiencies, repairs and load tests. The client view rolls them up; the history never mixes them.

Recurring inspections live as a repeating job pattern on a customer or a user. A canceled job, a deleted account or a changed pattern and next year's periodic quietly disappears or runs on the wrong date. Service Fusion's own help notes that deleting a job does not stop its repeating settings.

The clock lives on the crane: service class sets the interval, and closing a periodic inspection writes the next due date. A watch list shows every crane with no future visit booked.

The inspector fills a SafetyCulture form, the office copies the deficiencies into an Excel estimate, then copies the scope again into a Service Fusion job, then again into QuickBooks. Weeks pass between the work and the invoice.

One chain of records: deficiency to quote line to repair job to invoice line. Each step is created from the last, and the invoice syncs to QuickBooks Online when the job closes.

The checklist is one long form for every crane. Manual chain hoists show electrical questions, rope hoists show chain gauge fields, and techs tick N/A forty times.

Checklists branch on the hoist record: electric or manual, rope or chain, pendant or radio, top-running or underhung. Only the items that apply show, and measurements are required fields.

A crane is tagged out on Tuesday and the plant manager hears about it on the report three weeks later. The quote to fix it is still being typed.

Choosing 'remove from service' on a deficiency creates a tag-out record with tag number and photo, notifies the site contact that day, and opens a draft quote for the coordinator.

Load test weights, percentage and functions tested sit in a tech's notebook. When an auditor asks for the test report on the crane altered last spring, nobody can find it.

Altering or repairing a load-bearing part flags the job 'load test required'. The job cannot close until the load test record (test load, % of rated, weights and their certificates, functions, result) is filled and the certificate PDF is on the crane.

Checklist

The overhead crane and hoist inspection operations checklist

Print it, or hand it to whoever runs the office side.

  • Every crane and hoist on its own record with capacity, CMAA class, serial and hook ID
  • Service class (normal, heavy, severe) recorded per crane and driving its intervals
  • Province or OSHA rule recorded per site, with the CSA B167 edition it names
  • Monthly hook, chain and rope certification records signed and dated
  • Baseline hook throat dimension stored so each measurement compares against it
  • Idle-crane rule handled: inspection before return after 1 month, complete after 6
  • Checklists branch by hoist type and drive method
  • Remove-from-service deficiencies create a tag-out and same-day customer notice
  • Deficiencies become quote lines without retyping
  • Altered or repaired load-bearing parts force a load test before the job closes
  • Load test certificates and annual examination records stored per crane
  • Internal fields hidden from the customer report
  • Inspectors' experience and training hours on file (CMAA 78)
  • Days from work done to invoice tracked every week

Software options

What software overhead crane and hoist inspection companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

InspectAll

Overhead crane and hoist service providers, site crane crews and maintenance teams

Inspection platform that tracks each crane as an asset and picks the form from it. Covers frequent and periodic inspections, load testing, wire rope certification and gearbox and brake PM, and prints a certificate per crane. Positioned around OSHA 1910.179, ASME B30.2 and CMAA 75. Ask how quoting and invoicing connect.

source: InspectAll

CraneRep.com

Crane service companies and lifting equipment owners

Equipment lists with over 500 customizable components, frequent and periodic inspections, operator pre-use checks, service and repair reports, and PDF or Excel exports. Its site lists scheduling tied to service requests as an upcoming project, so check where jobs and quotes live today.

source: CraneRep.com

Mitti (formerly SafetyCulture iAuditor)

Teams that want checklist templates and action tracking

SafetyCulture renamed itself Mitti on 11 August 2026. Strong for forms, photos, actions and reports, with crane checklist templates. It is not a job, quote and invoice system, which is why crane companies pair it with an FSM and retype findings.

source: Mitti (formerly SafetyCulture iAuditor)

Service Fusion

Small to mid-size home and commercial service trades

Scheduling, dispatch, estimates that convert to work orders, service agreements with recurring billing, GPS and a QuickBooks integration. Built mainly for home-service trades; check per-crane asset history, branching inspection forms and how recurring jobs behave when jobs or users change.

source: Service Fusion

ServiceTrade

Commercial mechanical, fire and life safety contractors running inspection-driven service

Turns inspection findings into deficiencies and repairs, with estimating, proposals, asset service history and customer portals. Not crane-specific; ask for a demo with your own hook, chain and load test forms.

source: ServiceTrade

Published prices, compared:source: Service Fusion help center, Deleting a job (repeating and recurring settings)source: Startland News (11 Aug 2026), SafetyCulture rebrands to Mitti

Questions to ask any vendor

  • Is every crane and every hoist its own record, with its own service class, intervals and history?
  • Where does the recurring schedule live? What happens to next year's periodic if a job is deleted or a tech leaves?
  • Can one checklist branch for electric vs manual and rope vs chain hoists, with required hook and chain measurements?
  • Can a 'remove from service' finding create a tag-out and notify the customer the same day?
  • Does a deficiency become a quote line and then a repair job without anyone retyping the scope?
  • Can a job that altered a load-bearing part be blocked from closing until a load test record and certificate exist?

Bring one real overhead crane and hoist inspection job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Overhead crane and hoist inspection on Fieldproxy: built around how you already work

A Fieldproxy setup for a crane and hoist company is built around the crane, not the client: every bridge, jib, monorail and hoist carries its own service class, inspection clock, measurements, tag-outs and load tests. Inspection, quote, repair, fabrication and invoice are one chain of records, so the scope is written once, coordinators run their own pod's board, and QuickBooks Online gets the invoice the day the job closes.

Module 1

Crane and hoist register

Contracts, standards and history all attach to a crane or a hoist, and the plant asks about 'the 10 ton in bay 3', not the account.

  • Records: Customer > Site > Bay > Crane > Hoist (and below-the-hook devices if you inspect them)
  • Crane fields: type, rated capacity and marking, CMAA class A to F, span, runway, year, manufacturer, service class (normal, heavy, severe), jurisdiction (OSHA, ON 851, BC Part 14, NB 91-191) and CSA B167 edition
  • Hoist fields: make, model, serial, rope or chain, hook ID, baseline hook throat dimension, control type, limit switches
  • OEM manual and parts list attached to the hoist; QR label on the pendant opens its history
How this works

Module 2

Inspection program per crane

The interval belongs to the crane's service class, and it must survive deleted jobs and staff turnover.

  • Frequent and periodic intervals set from service class (e.g. periodic annual for normal, semiannual for heavy, quarterly for severe), editable per crane with a reason
  • Monthly hook, chain and rope certification tasks where the customer contracts you for them
  • Idle-crane flag: return-to-service inspection after 1 month idle, complete inspection after 6
  • Statuses: Due, Booked, In progress, Done, Overdue; closing a periodic writes the next due date
  • Watch list: cranes with no future visit, cranes overdue by site and by pod
How this works

Module 3

Branching inspection checklists

A manual chain hoist and a 20 ton double girder crane should not share one form.

  • Checklist built from the hoist record: electric or manual, rope or chain, pendant or radio, top-running or underhung
  • Required measurements: hook throat vs baseline (flag over 15%), twist (flag over 10°), chain gauge, rope diameter and broken wires
  • Each item: OK, deficiency, N/A, not accessible (reason required); photo required on any deficiency
  • Internal-only fields (labor guess, coordinator notes) hidden from the client PDF, which shows deficiencies
  • Works offline in plants and on runways; inspector signs on the phone
How this works

Module 4

Deficiencies and tag-outs

An unsafe crane has to be stopped and the plant told now, not when the report is typed.

  • Deficiency record: crane, hoist, component, severity (remove from service, repair soon, monitor), photo, measurement, status (Found, Quoted, Approved, Repaired, Declined)
  • 'Remove from service' opens a Tag-out: tag number, photo of the tag, switch locked open yes/no, plant contact told, time
  • Tag-out clears only when the linked repair job closes and the post-repair check passes
  • Declined deficiencies keep the decliner's name and date on the crane
How this works

Module 5

Estimates from deficiencies

Estimating in Excel is where crane companies lose the most days.

  • Quote built by ticking deficiencies; each line pulls parts and labor from templates (e.g. hoist brake reline, contactor kit, rope by diameter and length, hook and latch, festoon trolleys, pendant)
  • Access lines: scissor or boom lift rental, after-hours or shutdown labor, travel
  • Price book per customer if they have contract rates; multi-currency and GST/HST or sales tax by site
  • Approval from the customer portal or email; statuses Draft, Sent, Approved, Partially approved, Declined
How this works

Module 6

Repair and fabrication jobs

Approved scope should arrive in the field and the shop exactly as quoted.

  • Approved quote lines become the repair job's tasks and parts, no copy and paste
  • Shop work orders for fabricators: drawing, materials, welding procedure, hours, linked to the field job
  • Parts reserved from warehouse or truck stock; shortfalls create a purchase request
  • Flag 'load test required' when a load-bearing part is replaced or the crane altered
How this works

Module 7

Load tests and certificates

The test report is the document an auditor asks for after an alteration.

  • Load test record: reason, rated load, test load and % of rated (blocked above 125% unless manufacturer allows), test weights and their certificates, functions tested, hold time, result
  • Certificate PDF from your template with crane ID, capacity, date, inspector and signature
  • Annual examination record per crane for Ontario sites, signed by the competent person
  • All certificates stored on the crane and visible in the customer portal
How this works

Module 8

Pod dispatch board

Coordinators each run a pod of techs and clients; techs need their day, not the company.

  • Board filtered by pod; PTO greyed out; weekly hour limit per tech warns before overbooking
  • Skills on each tech: load testing, electrical troubleshooting, rigging, fabrication; CMAA 78 hours and training on file
  • Tech app shows only their jobs and e.g. the next 7 days; no client lifetime value or pricing
  • Timesheets from job clock-in and clock-out
How this works

Module 9

Invoicing and QuickBooks Online

Work-to-invoice time is cash, and retyping into QuickBooks is where it stalls.

  • Invoice built from the closed job: inspection price per crane by capacity, repair labor, parts, lift rental
  • Sync to QuickBooks Online with customer, tax code and class; timesheets sync for payroll
  • Dashboard: days from job closed to invoice sent, by pod
How this works

Module 10

Customer portal and reporting

Plant managers want every crane's status in one place, and the owner wants to know where the backlog is.

  • Portal per customer: cranes by site, last and next inspection, certificates, open deficiencies to approve, tag-outs
  • Dashboards: cranes overdue, deficiencies not yet quoted, quote approval rate, tag-outs open by age, revenue per pod
How this works

The AI agents, set up for overhead crane and hoist inspection companies

AgentWhenWhat it doesWhat you get
Vision agentA tech photographs a hoist nameplate or a crane capacity sign while building the registerReads make, model, serial, capacity and voltage from the photoThe hoist record filled in, flagged for the coordinator to confirm the service class
Voice agentAn inspector on a manlift talks through findings instead of typing, e.g. 'bay 3 main hoist, hook throat 2 and 5/8, latch missing'Matches the crane and hoist, fills the measurement fields and splits each problem into its own deficiencyChecklist items and deficiency rows on the open inspection, ready for photos
Watcher agentA crane passes its periodic due date with nothing booked, a monthly hook or rope record is missing, or a tag-out stays open e.g. 5 days with no approved quoteChecks the crane's interval, last record and linked quoteAn alert to the pod coordinator with the crane, the gap and a one-click booking or quote task
AutopilotA deficiency quote sits unapproved for e.g. 7 daysDrafts a follow-up to the plant contact naming the crane, the finding, the photo, and whether it is tagged outA draft email a person approves before it sends
Knowledge agentA tech asks on site, e.g. 'what is the brake air gap on this hoist?'Searches the OEM manual attached to that hoist and its service historyThe spec with the manual page, and the last time that brake was adjusted
Document intelligence agentA customer emails a purchase order PDF against a repair quoteReads PO number, lines and amounts and matches them to the quoteQuote marked approved with the PO attached, repair job created, mismatches flagged

Straight answers

Overhead crane and hoist inspection: FAQ

What software do overhead crane and hoist inspection companies use?

Many run a general FSM like Service Fusion for jobs, an inspection app like SafetyCulture (now Mitti) for checklists and QuickBooks Online for invoices. Crane-specific platforms include InspectAll and CraneRep.com, and ServiceTrade covers inspection-driven commercial service. What matters is a record per crane and hoist with its own inspection clock, branching checklists, deficiencies that become quotes, and load test records. Fieldproxy is set up around your own crane register and deficiency-to-invoice flow.

How do I replace Service Fusion and SafetyCulture with one system?

Start from the crane register: export customers and sites from Service Fusion, then load each crane and hoist with capacity, service class and next due date. Rebuild your SafetyCulture forms as checklists that branch by hoist type. Then connect deficiencies to quotes and jobs, and turn on the QuickBooks Online sync. Run one pod on the new system first.

How often must an overhead crane be inspected?

Under OSHA 1910.179, frequent inspections run daily to monthly and periodic inspections every 1 to 12 months, depending on activity, severity of service and environment. The Overhead Alliance publishes periodic intervals of annual for normal, semiannual for heavy and quarterly for severe service. In Ontario, a lifting device is examined at least once a year.

What is the difference between a frequent and a periodic crane inspection?

Frequent inspections are visual and operational checks (operating mechanisms, air or hydraulic systems, hooks, chains, rope reeving) at daily to monthly intervals. Periodic inspections are complete inspections every 1 to 12 months that add structural members, bolts and rivets, sheaves and drums, and brake parts. ASME B30.2 also names initial and pre-shift inspections.

What records does OSHA require for crane hooks and ropes?

A monthly certification record for hooks and hoist chains that identifies the item inspected, and a monthly rope inspection record with the date and the inspector's signature. The Overhead Alliance says frequent inspection reports are kept 3 years.

When does an overhead crane need a load test?

OSHA requires new and altered cranes to be tested before initial use, with test loads no more than 125% of rated load unless the manufacturer says otherwise, and the report kept on file. OSHA's 2009 interpretation confirmed rated load tests apply. In BC, overhead cranes installed after 1 January 1999 are load tested at 125% before first use.

Which CSA standard covers overhead cranes in Canada?

CSA B167. Provinces name different editions: BC's Part 14 names B167-96, New Brunswick's logbook guidance names B167-08 (R2015), and CSA lists B167-16 as withdrawn with an update available. Ontario's Regulation 851 s.51 requires an examination at least once a year and a signed permanent record.

What are CMAA crane service classes?

CMAA Specification 70 classes run from A (standby or infrequent) through B light, C moderate, D heavy and E severe to F continuous severe. Most cranes are built to Class C. The class is a design rating; the service class the customer actually runs (normal, heavy, severe) is what sets inspection frequency.

What happens when an inspector finds an unsafe crane?

OSHA says unsafe conditions found in inspection are corrected before the crane runs again, by designated personnel. During repairs, warning or out-of-order signs go on the crane and the main or emergency switch is locked open. Your system should record the tag, tell the plant that day and open the repair quote.

What does an overhead crane inspection cost?

One crane service company publishes $108 to $141 for an annual inspection of a 5 ton or smaller bridge crane and $151 to $197 for a 5 to 30 ton double girder, with $115 to $150 an hour for repair work. San Antonio Water System's 2011 annual contract paid $75 to $750 per unit for inspection and load testing, by capacity.

Related guides

All sources on this page (23)

Run overhead crane and hoist inspection work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.