Guide for elevator service companies ยท checked 31 October 2026
Elevator service, run per car, to the MCP, the Category tests and the entrapment clock
An elevator contractor is judged by three records: the Maintenance Control Program logbook in the machine room, the Category test reports the inspector witnesses, and the minutes between an entrapment call and a mechanic in the lobby. This guide covers ASME A17.1 section 8.6, Category 1, 3 and 5 tests, NYC filing deadlines and fees, the 2019 emergency phone rules, single-bottom hydraulic jacks, takeover contracts and how to run it all per car.
See your own jobs set up this way
A 30-minute call. We show you elevator service companies workflows running in Fieldproxy, built around how you work.
Short answer
Elevator service companies use field service software that holds every car, escalator and lift as its own asset, generates the monthly MCP visits and the Category 1 (annual) and Category 5 (five-year) tests per unit, and logs every callback and entrapment against the unit with response times. Elevator-focused options include Smart Service (a QuickBooks add-on with per-car records), FIELDBOSS (built on Microsoft Dynamics 365) and Shifton; OEMs such as Otis run their own monitoring portals. Fieldproxy is a configurable option built around the contractor's own MCP checklists, test sheets, deficiency deadlines and callback stages.
ASME A17.1 8.6
Every unit needs a written Maintenance Control Program; records cover tasks, tests, callbacks and firefighters' service findings
90 days
NYC: CAT1 and periodic inspection defects must be corrected within 90 days and the AOC filed within 14 days of the fix
45 seconds
A17.1-2019: an unanswered in-car emergency call must roll to an alternate location within 45 s
1 Jan 2027
NYC deadline for traction elevators with single-plunger brakes: dual-plunger or unintended movement protection
How a job runs
One elevator service job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Take over the account
Walk every unit before you sign. Note type (traction, hydraulic, MRL, escalator, platform lift), controller make and whether it is proprietary or non-proprietary, the code data plate edition, whether the MCP and on-site documentation are in the machine room, and any single-bottom jack. One 2026 university RFP made bidders disclose every unit they could not fully diagnose because of proprietary controllers, tools or parts.
- 2
Price the contract per unit
Quote a monthly price per unit, not per building: oil-only, parts-and-labor or full-service, with the hourly straight-time, overtime and holiday rates for out-of-scope work, the annual escalation index and the entrapment and callback response times you can actually meet. Say what is 'work by others' (code upgrades that need capital).
- 3
Build the unit's MCP
For each unit, list the tasks, intervals and code tests that apply, plus unique procedures for that equipment (for example traction-loss or broken-suspension-member detection) and the written evacuation procedure. In Colorado the MCP belongs to the owner, and a contractor who loses the account must leave the on-site documentation and records behind.
- 4
Run the monthly maintenance visit
Work the unit's MCP checklist in the machine room, on the car top and in the pit, record each task as done in the logbook, and record oil added on hydraulic units. Where the jurisdiction wants hard copy (Nova Scotia, Manitoba, Washington), the signed page stays in the machine room even if your app holds the data.
- 5
Firefighters' service and phone checks
Phase I recall by key switch and at least one floor of Phase II operation, on the interval the adopted code sets (monthly in older A17.1 text, annually in British Columbia), with the findings recorded. Check the in-car phone dials out and, on 2019-code units, the daily line verification and the 'ELEVATOR COMMUNICATIONS FAILURE' signal.
- 6
Answer callbacks and entrapments
Log the call time, unit, whether anyone is trapped, and whether the car is shut down. Dispatch against the contract clock: public RFPs ask for a mechanic on site within 60 minutes for an entrapment, 24/7, and within 4 business hours for a car out of service. Record cause, fix, parts and time released on the unit's history.
- 7
Category tests with a witness
Book the annual Category 1 test and, every five years, the Category 5 full-load test (safeties, governors, buffers) with the inspector or third-party agency. In NYC the testing agency must give the DOB 5 days' notice and file the report within 21 days. Hydraulic units add Category 3 items (unexposed piston, pressure vessels) where the code calls for them.
- 8
Close the deficiencies on time
Each item on the inspector's report becomes a job with its code reference and due date. In NYC that is 90 days to fix, 14 days to file the Affirmation of Correction, and a Failure to Correct violation at day 104. Texas inspectors must hand the owner the report within 5 days.
- 9
Quote repairs and modernization
Wear items found on visits, inspector deficiencies and retroactive code items (door lock monitoring, single-plunger brakes in NYC, single-bottom jacks) become priced quotes on the unit. Relay controllers with obsolete parts become a modernization proposal with a year attached.
- 10
Report and invoice
Invoice the monthly contract per unit, bill callbacks outside scope at the contract's rates, and send the owner a per-unit report: visits done, callbacks with response times, tests passed, open deficiencies with their deadlines.
What to record
The fields every elevator service job should capture
Unit profile (one per car, escalator or lift)
- State or city device number and certificate expiry; building, bank and car number
- Type: traction (geared, gearless), hydraulic (in-ground, holeless, roped), MRL, escalator, moving walk, platform lift
- Controller make and model, relay or microprocessor, proprietary or non-proprietary, service tool on site yes/no
- Code data plate: A17.1 edition at installation and at each alteration
- Capacity, speed (fpm), stops and openings; rise in feet (60 ft or more triggers the 2019 emergency-personnel comms rule)
- Hydraulic: single-bottom or bulkhead cylinder, in-ground or above, PVC-protected yes/no, plunger gripper yes/no
- Emergency phone: line type (POTS, VoIP, cellular), monitoring company, 2019-code video and text yes/no
- Contract coverage, visit interval, response-time terms, and where the MCP is kept on site
Each maintenance visit (the MCP record)
- Site name and address, service provider, conveyance ID and type, date (the Nova Scotia minimum)
- Each MCP task with its interval and a completion mark
- Hydraulic oil added (quarts or gallons) for the written oil-usage record
- Firefighters' service Phase I and Phase II result and who did it
- Phone test result and line-verification indicator status
- Deficiencies found, photos, and whether the unit was taken out of service under 8.6.1.2.2
Callbacks, tests and inspections
- Callback: time reported, dispatched, on site, passengers released, returned to service; trapped yes/no; symptom, cause, fix, parts
- Category test: category (1, 3 or 5), each item pass, fail or N/A with code section, test weights used, witness and agency
- Hydraulic Category 1: recorded working pressure and relief pressure
- Inspection: inspector, agency, date, each deficiency with code reference and due date
- NYC filings: report filed date, AOC filed date, any 45-day extension requested
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| ASME A17.1 8.6.1.2: the Maintenance Control Program | A written MCP must keep the equipment compliant with 8.6. Intervals are based on equipment age, condition and wear, design, usage, environment, technology and the manufacturer's recommendations for SIL-rated devices. Product-specific test procedures must be in it, and instructions for locating it go on or in the controller. A defective part that directly affects safety takes the unit out of service until fixed (8.6.1.2.2). source: Illinois Office of the State Fire Marshal, Maintenance Control Program (ASME A17.1-2007 8.6.1.2-8.6.1.5) |
| ASME A17.1 8.6.1.4: maintenance records | Records must show maintenance tasks and dates; examinations, tests, adjustments, repairs and replacements; callbacks reported by any means with the corrective action; and the findings of the firefighters' service operation check. The code data plate shows the edition at installation and at every alteration. source: Illinois Office of the State Fire Marshal, Maintenance Control Program (ASME A17.1-2007 8.6.1.2-8.6.1.5) |
| Colorado: who owns the MCP, and for how long | The MCP is provided by the maintaining contractor or the owner but owned by the owner. A replaced contractor must leave the on-site documentation and maintenance records. Maintenance records stay on site for 5 years; acceptance test reports and tags are kept permanently. Callback records must be available but need not be on site. Electronic form is allowed if it is viewable at all times. source: Colorado Division of Oil and Public Safety, Conveyance Maintenance Control Program guidance (rev. 2017) |
| Hard copy on site (Washington, Nova Scotia, Manitoba) | Washington cites 8.6.1.4.1(3): MCP records viewable on site in hard copy acceptable to the AHJ, left in the machine room. Nova Scotia (directive of 9 Mar 2026) rejects electronic documents outright and wants posted locating instructions in letters at least 3 mm high. Manitoba (ITS 26-005, 1 Jun 2026) keeps the MCP in the unit's logbook and says the records belong to the equipment and must not be removed. source: Nova Scotia Safety Directive 00012, Maintenance Control Program (9 Mar 2026) |
| Firefighters' emergency operation tests | The base A17.1 text has authorized personnel run Phase I recall by key switch and at least one floor of Phase II operation monthly, with a record of findings. Montana's log form makes the owner or designee do it monthly, logs date, Phase I, Phase II, initials, pass or fail, reason and repair date, and keeps the log in the machine room. British Columbia amends the interval to annually (IB-ED 2020-04). source: Montana Building Codes, Monthly fire service test log (ASME A17.1a-2005 8.6.10.1) |
| Hydraulic Category 1, 3 and 5 test items | On the Alaska form (2013 A17.1), Category 1 covers relief valve setting and system pressure, cylinders and piping, terminal stopping devices, governors, safeties, oil buffers, firefighters' service, standby power, door operation, low oil protection, flexible hoses and pressure switch. Category 3 covers unexposed portions of pistons and pressure vessels. Category 5 covers safeties, governor tripping speed, oil buffers, coated ropes by magnetic flux, rope fastenings, plunger gripper and overspeed valve. The form must be kept in the machine room, in ink. source: Alaska Mechanical Inspection, Periodic test requirements and results, 2013 A17.1 hydraulic elevator |
| Michigan: hydraulic cylinders every 36 months | Michigan adds 8.6.5.15.3: cylinders tested at intervals of not more than 36 months, with the relief valve tested by inching the empty car up onto the plunger stop ring and applying pump pressure. Test forms are kept in the machine room for elevator personnel. source: Mich. Admin. Code R. 408.7060, Three-year inspection and test requirements |
| NYC: periodic, CAT1, CAT5 and corrections | Periodic inspection and CAT1 once each calendar year; the periodic inspection agency cannot be affiliated with the maintaining company. Periodic filings within 14 days, CAT1 and CAT5 within 21 days. CAT5 within 5 years of the month of the last one. Defects corrected within 90 days, AOC filed within 14 days of the fix, Failure to Correct violations at day 104. Under Local Law 126 of 2021 the agency gives the DOB 5 days' notice of a test. source: NYC Department of Buildings, Elevator Compliance (periodic, CAT1, CAT5, AOC deadlines and fees) |
| NYC: retroactive items (door locks, single-plunger brakes) | Appendix K3 required door lock monitoring on all automatic passenger and freight elevators by 1 Jan 2020, filed by an Elevator Director with third-party witnessing. Traction elevators with single-plunger brakes must convert to dual-plunger or comply with A17.1 2.19.2 unintended car movement protection by 1 Jan 2027 (per the DOB's 2019 presentation; confirm current text). source: NYC Department of Buildings, Elevators: door monitoring and other retroactive requirements (2019) |
| Single-bottom hydraulic cylinders | North Carolina (2017) requires owners of single-bottom jacks to pressure test and static leak-down test every 6 months, and to replace a compromised system. Connecticut requires below-ground single-bottom cylinders to be replaced or fitted with safeties or a plunger gripper. British Columbia's safety order notes most had been in the ground 30 years or more and the risk of the bottom separating rises with age. source: North Carolina Department of Labor, Elevator Bureau memo: single bottom jacks (24 Apr 2017) |
| ASME A17.1-2019 2.27.1: emergency communications | Calls go to staffed authorized personnel, never an automated answering system, and roll to an alternate location if not acknowledged in 45 seconds. No handset in the car. Text messages and video of the whole car floor for entrapment assessment. 4 hours of backup power for the comms. Line operability checked at least daily, with an 'ELEVATOR COMMUNICATIONS FAILURE' light and sound at the recall switch. Rises of 60 ft or more also need a means for emergency personnel in the building to reach each car. source: Avire, ASME A17.1-2019 / CSA B44-19 clause 2.27.1 car emergency signaling devices (code text) |
| When a phone change triggers the video upgrade | Per the AEIS handout: swapping POTS for VoIP or cellular on the same phone type, or replacing like for like, does not require video. Alarm bell to phone, intercom to phone, adding line monitoring, adding comms where none existed, a controller alteration changing motion or operation control, and a change of service type all do. Freight elevators are covered too. source: AEIS handout, 2.27.1.1 emergency communications: when is a video and text upgrade required? |
| Texas: annual inspection filed with TDLR | Under Health & Safety Code 754.019, each unit's annual Elevator Equipment Report of Inspection is filed with a $20 fee per piece of equipment; the inspector must give the owner the report within 5 days; delay or waiver requests cost $50 per violation; administrative penalties can reach $5,000 per day per violation. source: Texas Department of Licensing and Regulation, Notice of past due annual inspection report and fees (2024) |
| Inspector qualification: ASME QEI-1 | States license elevator inspectors against the ASME QEI-1 standard; Mississippi, for example, requires inspector license applicants to meet the current QEI-1 standard or an equivalent state standard. source: 19 Miss. Code R. 8-1.11, Qualifications to be licensed as an elevator inspector (ASME QEI-1) |
| Mechanic training: IUEC / NEIEP | Union apprentices complete eight NEIEP semesters of 72 hours each (one 4-hour night a week for 18 weeks) alongside on-the-job learning, then sit the Mechanic's Exam to become IUEC mechanics. source: NEIEP Help Center (IUEC apprenticeship semesters and Mechanic's Exam) |
Rules vary by state, council and contract. Checked 31 October 2026; confirm against the source for your area before relying on it.
Numbers
Intervals, deadlines and response times an elevator contractor schedules to
ASME rows follow the base code text; your state or city's adopted edition and amendments decide the details. NYC and Texas rows are local. Response-time rows come from real public RFPs, not from code.
| Task, deadline or term | Interval or value | Basis |
|---|---|---|
| Preventive maintenance visit | Monthly per unit (typical institutional contract) | USAO RFP 2026 4.1 |
| Firefighters' service Phase I + Phase II | Monthly (base text); annually in BC | A17.1 8.6.11.1; BC EDSR |
| Category 1 test | Annually | A17.1 8.6; NYC DOB |
| Hydraulic cylinder test (Michigan) | At most every 36 months | Mich. R 408.7060 |
| Category 5 full-load test | Every 5 years from month of last CAT5 | A17.1 8.6; NYC DOB |
| Single-bottom jack pressure + leak-down test (NC) | Every 6 months | NC DOL memo 2017 |
| Maintenance records kept on site (Colorado) | 5 years; acceptance tests permanently | CO MCP guidance |
| NYC test notice to DOB | 5 days before | LL 126/2021 |
| NYC CAT1 / CAT5 report filed | Within 21 days | NYC DOB |
| NYC defects fixed / AOC filed | 90 days / 14 days after fix; FTC at day 104 | NYC DOB |
| NYC CAT5 late filing fee | $250 per month per device, max $3,000 a year | NYC DOB |
| Texas inspection report to owner | Within 5 days of inspection | TDLR |
| Unanswered in-car call rolls over | 45 seconds | A17.1-2019 2.27.1.1.2 |
| Emergency comms backup power | 4 hours (alarm bell 1 hour) | A17.1-2019 2.27.1.1.5 |
| Entrapment, mechanic on site | 60 min 24/7 (USAO); โค1 hour, tech calls city โค15 min (Powder Springs) | Public RFPs |
| Car out of service, not entrapment | On site within 4 business hours | USAO RFP 2026 4.2 |
source: University of Science and Arts of Oklahoma, RFP USAO-ELEV-RFP-2026-01, campus elevator maintenancesource: City of Powder Springs, GA, RFP 25-010 Elevator Service Agreementsource: Montana Building Codes, Monthly fire service test log (ASME A17.1a-2005 8.6.10.1)source: Technical Safety BC, IB-ED 2020-04 Firefighters' emergency operation testing requirementssource: NYC Department of Buildings, Elevator Compliance (periodic, CAT1, CAT5, AOC deadlines and fees)source: SiteCompli, DOB reminders: changes to periodic elevator and boiler inspections (Local Law 126 of 2021)source: Mich. Admin. Code R. 408.7060, Three-year inspection and test requirementssource: North Carolina Department of Labor, Elevator Bureau memo: single bottom jacks (24 Apr 2017)source: Colorado Division of Oil and Public Safety, Conveyance Maintenance Control Program guidance (rev. 2017)source: Texas Department of Licensing and Regulation, Notice of past due annual inspection report and fees (2024)source: Avire, ASME A17.1-2019 / CSA B44-19 clause 2.27.1 car emergency signaling devices (code text)
Where it breaks
Where spreadsheets and generic software fall over
Work orders hang off the building, so car 3's door operator failures mix with car 1's and nobody sees that one unit is eating the contract margin.
Make the unit the record: every visit, callback, test, part and hour is posted to one car, and margin is reported per unit per contract.
The MCP is a binder the previous contractor left (or took). Visits are logged as 'PM done' with no tasks, so the inspector can't see which 8.6 tasks were done, and the owner can't prove the contract was delivered.
Build each unit's MCP as a task list with intervals; the tech ticks each task, and the app prints the signed hard-copy page for jurisdictions that want paper in the machine room.
Inspector deficiencies sit in a PDF in someone's inbox. In NYC, day 104 arrives as a Failure to Correct violation on the owner, who then calls a competitor.
Every deficiency becomes a dated job with its code reference; the due date counts from the inspection date, and the AOC filing date is a required field to close it.
Entrapments enter the same queue as a squeaky door. Nobody can show the owner the minutes from call to release, so the response-time clause in the contract is unprovable either way.
Callbacks carry a trapped yes/no flag and four timestamps; entrapments jump the board and the response clock is reported per building against the contract term.
Five-year Category 5 dates live in one dispatcher's spreadsheet. A unit misses its window, test weights and the witness are booked late, and the late fee lands on the owner.
Generate Category 1, 3 and 5 tasks from each unit's last test date, with the witness agency and test weights booked as resources on the same job.
Retroactive code items (single-bottom jacks, NYC single-plunger brakes, 2019 phone upgrades on alteration) are spotted on site and forgotten, so the modernization pipeline is empty.
Store those attributes on the unit, report every unit still exposed to a deadline, and turn each into a quote with the deadline on it.
Checklist
The elevator service operations checklist
Print it, or hand it to whoever runs the office side.
- Every unit recorded with device number, type, controller (proprietary or not) and code data plate edition
- MCP on file per unit with tasks, intervals and unique procedures, and its on-site location posted on the controller
- Monthly visit records show each MCP task ticked, not 'PM done'
- Hydraulic oil added recorded every visit (written oil-usage record)
- Firefighters' service tested on the adopted interval and findings recorded
- Emergency phone tested; 2019-code units show daily line verification working
- Category 1 date booked for every unit this year; Category 5 dates known for the next 5 years
- Single-bottom jacks identified, with leak-down test dates where the state requires them
- Every inspector deficiency open as a job with code reference and due date
- NYC units: 21-day filing and 90-day correction dates tracked, AOC filed within 14 days
- Callbacks logged with trapped flag and call, dispatch, arrival and release times
- Contract response times per building stored and reported monthly
- Units you cannot fully service (proprietary tools or parts) listed per contract
- Records left on site when an account is lost, as the jurisdiction requires
Software options
What software elevator service companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Smart Service
Independent elevator contractors already running QuickBooks
A QuickBooks add-on with a page built for elevator work: per-car equipment records under each building, PM agreement cycles per car, entrapment callbacks slotted into routes, shift hand-off notes on multi-day repairs, and a portal where property managers request callbacks and pay. The native app is iPhone/iPad; Android uses the browser.
FIELDBOSS
Larger elevator contractors that want field service, finance and payroll in Microsoft Dynamics 365
Field service and business management built inside Microsoft Dynamics 365, with an elevator industry edition, pre-built elevator reports and dashboards, and a Toronto independent manufacturer (Selco Elevators) as its named case study.
Shifton
Lift and elevator maintenance firms that want planned visits, callouts and entrapments on one board
Holds maintenance history per lift rather than per building, puts planned maintenance, callouts and entrapments on one board, and reports coverage per unit and per contract.
Otis ONE (and other OEM portals)
Owners and OEM-maintained portfolios; independents meet it when they take over an Otis account
IoT monitoring in the cab, machine room, hoistway and pit with real-time alerts, a customer portal and an API. Otis says it is not compatible with all controllers. It holds equipment data for the OEM's service, not an independent contractor's jobs or MCP.
Paper logbook plus a generic FSM
Small independents with a few hundred units
Common and legal in many places, and required in hard copy in some (Nova Scotia, Manitoba). It breaks when callbacks, test dates and deficiency deadlines need adding up across units, which is where the software above earns its keep.
Leaving FIELDBOSS? Our step-by-step guide covers why elevator service companiesswitch, what to export, what doesn't export and how to run both during cutover: how to switch from FIELDBOSS.
Questions to ask any vendor
- Is the car (not the building) the record that visits, callbacks, tests, parts and hours post to?
- Can each unit carry its own MCP task list with intervals, and can the tech's completed checklist print as a signed hard-copy page for the machine room?
- Will it generate Category 1, 3 and 5 tests from each unit's last test date and book the witness and test weights?
- Does every inspector deficiency get a due date from the inspection date (for example NYC's 90 days), with the AOC filing date tracked?
- Can a callback carry a trapped flag and call, dispatch, arrival and release times, reported against each contract's response terms?
- Can I report margin per unit per contract, including callbacks and parts, to see which units need repricing or modernization?
Bring one real elevator service job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Elevator service on Fieldproxy: built around how you already work
A Fieldproxy setup for an elevator contractor is built around the car: every unit carries its device number, controller, code edition, MCP task list, test dates and open deficiencies, and every visit, callback and test posts to it. Mechanics work from an offline app in machine rooms and pits that prints the signed MCP page where the jurisdiction wants paper, and the dispatch board treats an entrapment as a clock, not a ticket.
Module 1
Account takeover survey
Most independent growth comes from taking accounts off another contractor, and the risk is in what you didn't see on the walk.
- Record: Survey linked to Building, with one Unit line per car, escalator or lift
- Per unit: type, controller make, relay or microprocessor, proprietary or non-proprietary, service tool on site yes/no, code data plate edition, single-bottom jack yes/no, MCP and wiring diagrams present yes/no, phone line type
- Photos required: controller, data plate, machine room, pit, phone panel
- Output: a takeover report listing units you can't fully service and retroactive items due, attached to the proposal
Module 2
Contract and per-unit pricing
Contracts are sold per building but earned or lost per car.
- Contract: coverage type (oil-only, parts-and-labor, full-service), units covered with monthly price each, exclusions ('work by others'), hourly ST/OT/holiday rates, escalation index, renewal and notice dates
- Response terms per contract: entrapment on-site minutes (e.g. 60), car out of service (e.g. 4 business hours), routine (e.g. next business day), callbacks included or billable after hours
- Adding or removing a unit mid-term pro-rates the price (e.g. a newly modernized car added at the per-unit rate)
- Status: Proposal, Signed, Active, Notice given, Lost (records-left-on-site checklist required)
Module 3
Unit register and MCP
The inspector, the owner and the next mechanic all ask questions about one car.
- Unit: device number and certificate expiry, building, bank, car, type, capacity, speed, stops, rise, controller, code edition at install and alterations, hydraulic cylinder type, phone line and 2019-comms status
- MCP task list per unit: task, interval (monthly, quarterly, semi-annual, annual), code section, unique procedure notes; versioned when the unit is altered
- QR label on the controller opens the unit's MCP and history on the mechanic's phone
- Retroactive flags with deadlines, e.g. single-plunger brake (NYC 1 Jan 2027), single-bottom jack, door lock monitoring
Module 4
Monthly visits from the MCP
A missed monthly visit on one car in a six-car bank is invisible on a building-level repeat.
- Visits generated per unit from the contract interval; the next one counts from the last completed visit
- Each visit pulls only the MCP tasks due that month for that unit
- Status: Due, Booked, In progress, Done, Missed (reason required)
- Coverage report per contract: visits due vs done per unit per month
Module 5
Mechanic app: MCP checklist and logbook page
If the task isn't ticked, the inspector reads it as not done.
- Opens on a QR scan; works offline in machine rooms, hoistways and pits; syncs on the way out
- Each due MCP task ticked with initials; hydraulic oil added (quantity) required on hydraulic units
- Firefighters' service Phase I and II pass/fail, phone test and line-verification light status
- Deficiency found: photo, code reference, severity; 'safety-critical' forces a Shut down / Left running choice with a reason
- Prints or emails the signed MCP page (site, provider, unit ID and type, date, tasks and completion) for jurisdictions requiring hard copy
Module 6
Callback and entrapment board
The entrapment clause is the one owners remember.
- Callback: unit, caller, trapped yes/no, car shut down yes/no, symptom; timestamps reported, acknowledged, dispatched, on site, released, returned to service
- Entrapments go to the top of the board and page the nearest qualified mechanic; the clock shows minutes against the contract term
- Close requires cause code (door operator, leveling, controller fault, power, misuse, other), fix and parts
- Repeat flag: e.g. 3 callbacks on the same unit in 30 days opens a review job
Module 7
Category tests and inspections
Category 5 days need test weights, a witness and the car out of service, booked months ahead.
- Tasks generated per unit: Category 1 yearly, Category 3 where the code applies (hydraulic pistons, pressure vessels, Michigan cylinders every 36 months), Category 5 at 5 years from the last
- Test job resources: mechanic, helper, test weights, witnessing agency and inspector; NYC: DOB notice 5 days ahead
- Test sheet with every item, code section and pass, fail or N/A; hydraulic working and relief pressure fields
- Filing fields: report filed date (NYC 21 days), certificate number and expiry
Module 8
Deficiencies and corrections
Correction deadlines are where an owner's fines and a contractor's reputation are made.
- Deficiency record: unit, source (inspection, Category test, mechanic), code reference, description, photo, due date computed from the inspection date (e.g. NYC 90 days)
- Status: Open, Quoted, Approved, Scheduled, Corrected, AOC filed; closing needs the correction date and AOC filing date
- Within-scope items go straight to a job; out-of-scope items go to a quote
- Owner report: open deficiencies per unit with days left
Module 9
Repairs, modernization quotes and invoicing
Most margin above the contract is in repairs and modernization the visits uncovered.
- Quote from a deficiency or a retroactive flag: parts, labor hours, rate type, car-out-of-service days
- Modernization proposal per unit: controller, door operator, machine or power unit, phone; target year
- Monthly contract invoice per unit; billable callbacks and repairs invoiced at contract rates
- QuickBooks or Xero sync; margin per unit per contract (contract revenue minus callbacks, parts and hours)
Module 10
Owner portal and reports
Property managers renew contractors who can show what was done to every car.
- Portal per owner: each unit with last visit, callbacks this year with response times, last Category 1 and 5, certificate expiry, open deficiencies with due dates, quotes to approve
- Monthly report per building, sent automatically
- Dashboards: units overdue by task, entrapment response vs contract, callbacks per unit, deficiencies near deadline, margin per contract
The AI agents, set up for elevator service companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Calling agent | An inbound call to the after-hours line from a building or its monitoring company | Finds the building and asks which car, whether anyone is trapped, and whether the car is shut down; checks the contract's response terms | A callback on the right unit with the trapped flag and the call time, placed on the board; an entrapment pages the on-call mechanic at once |
| Watcher agent | An entrapment passes e.g. 45 minutes with no on-site time, a NYC deficiency reaches day 75 uncorrected, a Category 5 window is 60 days out with no test booked, or a unit logs its 3rd callback in 30 days | Reads the unit, the contract terms and the deadline, and decides who must act: dispatcher, service manager or sales | An alert on the unit and the right person's list, with a draft test job or review job ready to book |
| Vision agent | A mechanic photographs a code data plate, controller label or the inspector's report on a takeover survey | Reads the code edition, controller make and model, device number and each listed deficiency with its code reference | Unit fields filled and one deficiency record per inspector item, with the due date computed |
| Knowledge agent | A mechanic asks about a fault code, an adjustment or a test procedure on a unit they don't know | Searches the controller manuals, the unit's MCP unique procedures and its own callback history that you have loaded | An answer on the phone with the manual page and what fixed this car last time |
| Scheduler agent | First business day of each month | Pulls, per owner, visits done vs due per unit, callbacks with response times, tests due in the next 90 days and open deficiencies with days left | A per-building service report emailed to each property manager and a due list to your service manager |
| Autopilot | A repair or modernization quote sits in Sent for 10 days, a contract is 90 days from its renewal notice date, or an invoice passes terms | Drafts the chase with the reason it matters (for example the deficiency's correction deadline or a retroactive code date), or the renewal with last year's callbacks and response times | A draft email that a person approves before it is sent |
Straight answers
Elevator service: FAQ
What software do elevator service companies use?
Most use field service software that treats each car, escalator and lift as its own asset and generates MCP visits and Category tests per unit. Elevator-focused options include Smart Service (a QuickBooks add-on), FIELDBOSS (built on Microsoft Dynamics 365) and Shifton; OEMs such as Otis run their own monitoring portals like Otis ONE. Many small independents still keep a paper logbook, which some jurisdictions require. Fieldproxy is configured around a contractor's own MCP checklists, test sheets and callback stages.
What is an elevator Maintenance Control Program (MCP)?
Under ASME A17.1 section 8.6, it is a written, unit-specific program of examinations, maintenance tasks and tests at set intervals, plus records of what was done: tasks and dates, tests, repairs, callbacks with corrective action, and firefighters' service findings. Colorado treats it as the owner's property, kept on site, with maintenance records retained 5 years.
Can MCP records be kept electronically?
It depends on the jurisdiction. Colorado allows hard copy or electronic form if it is always viewable. Washington asks for hard copy acceptable to the AHJ in the machine room. Nova Scotia (2026 directive) does not accept electronic documents at all, and Manitoba keeps the MCP in the unit's logbook on site. A common approach is to record in an app and print the signed page.
What is the difference between a Category 1 and a Category 5 elevator test?
Category 1 is the annual no-load test of safety devices such as terminal stopping devices, governors, safeties, buffers, relief valve pressure on hydraulics, firefighters' service and door operation. Category 5 is the five-yearly test with rated load and speed for safeties, governor tripping speed and buffers, plus items such as coated ropes and plunger grippers. Category 3 covers hydraulic items such as unexposed pistons and pressure vessels.
How long do NYC building owners have to fix elevator inspection defects?
Defects from CAT1 tests and periodic inspections must be corrected within 90 days of the inspection, and the Affirmation of Correction filed within 14 days of the fix. Anything not corrected and filed within 104 days draws a Failure to Correct violation. CAT1 and CAT5 reports must be filed within 21 days, periodic inspections within 14.
What is the NYC 2027 elevator deadline?
According to the NYC Department of Buildings' 2019 presentation on retroactive requirements, existing traction elevators with single-plunger brakes must, by 1 January 2027, either be altered to dual-plunger brakes or comply with ASME A17.1 2.19.2 unintended car movement protection. Door lock monitoring was due 1 January 2020. Confirm the current rule text with the DOB.
How fast must an elevator company respond to an entrapment?
No national code sets a number; the contract does. Public RFPs commonly ask for a mechanic on site within 60 minutes, 24 hours a day, 365 days a year (a 2026 Oklahoma university RFP), and some ask the technician to call the owner within 15 minutes (Powder Springs, Georgia). A car out of service without an entrapment is often 4 business hours.
Do elevator emergency phones need video now?
Under ASME A17.1-2019 2.27.1, new and altered installations need text messaging and a video view of the car floor for entrapment assessment, daily line checks and 4 hours of backup power. Simply switching an existing phone from a copper line to VoIP or cellular does not trigger video under the AEIS guidance, but adding line monitoring or replacing an intercom or alarm bell with a phone does.
What is a single-bottom hydraulic jack and why do inspectors care?
It is an older in-ground hydraulic cylinder with one bottom and no safety bulkhead; if the bottom separates, the car can fall. North Carolina requires pressure and static leak-down tests every 6 months, Connecticut requires replacement or added safeties or a plunger gripper on below-ground ones, and British Columbia ordered them modified by 2015.
How are elevator mechanics trained and certified?
Union mechanics come through the IUEC's NEIEP apprenticeship: eight semesters of 72 classroom hours alongside on-the-job learning, then the Mechanic's Exam. Many states also license elevator mechanics and contractors. Inspectors are typically certified to ASME QEI-1, which states such as Mississippi require for an inspector's license.
Can an independent contractor service a unit with a proprietary controller?
Sometimes not fully. Some controllers need the OEM's service tool, software or parts to diagnose or adjust, which is why buyers now ask bidders to list any unit they cannot fully maintain and how they will source obsolete parts, as a 2026 Oklahoma university RFP did. Non-proprietary controllers such as SmartRise can be serviced by multiple providers.
Related guides
All sources on this page (30)
- source: Illinois Office of the State Fire Marshal, Maintenance Control Program (ASME A17.1-2007 8.6.1.2-8.6.1.5)
- source: NYC Department of Buildings, Elevator Compliance (periodic, CAT1, CAT5, AOC deadlines and fees)
- source: Avire, ASME A17.1-2019 / CSA B44-19 clause 2.27.1 car emergency signaling devices (code text)
- source: NYC Department of Buildings, Elevators: door monitoring and other retroactive requirements (2019)
- source: Colorado Division of Oil and Public Safety, Conveyance Maintenance Control Program guidance (rev. 2017)
- source: Nova Scotia Safety Directive 00012, Maintenance Control Program (9 Mar 2026)
- source: Montana Building Codes, Monthly fire service test log (ASME A17.1a-2005 8.6.10.1)
- source: Alaska Mechanical Inspection, Periodic test requirements and results, 2013 A17.1 hydraulic elevator
- source: Mich. Admin. Code R. 408.7060, Three-year inspection and test requirements
- source: North Carolina Department of Labor, Elevator Bureau memo: single bottom jacks (24 Apr 2017)
- source: AEIS handout, 2.27.1.1 emergency communications: when is a video and text upgrade required?
- source: Texas Department of Licensing and Regulation, Notice of past due annual inspection report and fees (2024)
- source: 19 Miss. Code R. 8-1.11, Qualifications to be licensed as an elevator inspector (ASME QEI-1)
- source: NEIEP Help Center (IUEC apprenticeship semesters and Mechanic's Exam)
- source: University of Science and Arts of Oklahoma, RFP USAO-ELEV-RFP-2026-01, campus elevator maintenance
- source: City of Powder Springs, GA, RFP 25-010 Elevator Service Agreement
- source: Technical Safety BC, IB-ED 2020-04 Firefighters' emergency operation testing requirements
- source: SiteCompli, DOB reminders: changes to periodic elevator and boiler inspections (Local Law 126 of 2021)
Run elevator service work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.