Guide for medical equipment service companies · checked 1 November 2026

Medical equipment service, run per device, to the AEM rules, the 100% PM line and the surveyor's sample

An independent biomed or HTM contractor is judged on a hospital's survey day: is every device on the inventory, is critical equipment flagged, is high-risk PM at 100%, and does each electrical safety test name the analyzer that ran it. This guide covers CMS S&C 14-07, the Joint Commission's 2026 move from EC to PE standards, IEC 62353 limits, FDA's servicing-versus-remanufacturing line, Form FDA 2579 and the contract terms hospitals actually write.

See your own jobs set up this way

A 30-minute call. We show you medical equipment service companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Medical equipment service companies use a CMMS or field service tool that holds every device on each client's inventory, flags critical and high-risk equipment, schedules PM at manufacturer intervals or an approved AEM interval, and stores each electrical safety and performance test with the analyzer used. Hospital-side HTM systems include AIMS (Phoenix Data Systems), Accruent TMS and HEMS One (TMA Systems, formerly EQ2); test-automation software such as Fluke Ansur runs alongside. Fieldproxy is a configurable option built around an ISO's own client contracts, device procedures, test sheets and response-time terms.

100%

PM completion below 100% on high-risk equipment was a top Joint Commission finding in 2025; from 2026 it is scored under PE 04.01.01 EP 2

source: ACCE webinar, Joint Commission 2026 Physical Environment Standards (12 Feb 2026)

S&C 14-07

CMS lets hospitals move off manufacturer PM intervals via an AEM program, except imaging, medical lasers and new equipment

source: CMS S&C 14-07-Hospital, Hospital Equipment Maintenance Requirements (20 Dec 2013)

15 days

An assembler who installs certified diagnostic X-ray components files Form FDA 2579 within 15 days

source: 21 CFR 1020.30, Diagnostic x-ray systems and their major components (Cornell LII)

300 mΩ

IEC 62353 protective earth limit for a Class I device including its power cord (up to 3 m)

source: EBME, IEC 62353 Ground Bond Testing

How a job runs

One medical equipment service job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Take over the inventory

    Start from the client's inventory export, then walk the floors. CMS expects every piece of facility and medical equipment, leased or owned, to be on an inventory, and critical equipment to be identified as such whether or not it is in an AEM program. Rentals and vendor-owned devices count, which is where a takeover inventory usually comes up short.

  2. 2

    Set the maintenance strategy per device

    For each device type, record whether it follows the manufacturer's PM interval and procedure or an AEM interval the hospital's qualified person approved. Imaging and radiologic equipment, medical lasers and new equipment without enough history stay on manufacturer recommendations. Write down who approved each AEM decision and when.

  3. 3

    Price the contract

    Quote per device class or per site: on-site technician hours, PM coverage, call-in repairs, parts inclusion, depot or loaner terms, and the response clock. Public contracts state it plainly. Texas Tech HSC asked for on-site response within 4 hours for emergencies and by the next business day for non-emergencies, plus a 24-hour answering service.

  4. 4

    Plan the month's PM

    Generate the PM list per device from its interval and last completion, grouped by department, so a unit's devices can be pulled together. A VA biomed contract (36C26026Q0785) gets its PM projection by the end of the previous month, must finish by the 15th, and uses the last two weeks for devices that were in use or couldn't be found.

  5. 5

    Run the PM and safety test

    Scan the device tag, follow its procedure, run the IEC 62353 (or NFPA 99 / ANSI/AAMI ES-1) electrical safety test, protective earth first and then leakage, and run the performance checks against the analyzer or simulator. Record each value against its limit, plus the analyzer's serial and calibration due date.

  6. 6

    Document what couldn't be done

    A device in use, out for repair or missing is not a completed PM. Record the attempts and the reason. The VA contract wants a month-end field service report listing every incomplete PM and why the equipment was unavailable. Missing devices go to the client as a search list, not a silent skip.

  7. 7

    Answer repair calls

    Log the device, department, the user's description, whether a patient was involved, and the time reported. Dispatch against the contract clock, give a loaner where the contract says so, and close with cause, fix and parts. The VA contract targets an average corrective turnaround of 8 days from work order to completion, and wants a field service report on cause and corrective action for every job.

  8. 8

    Post-repair checks and imaging paperwork

    Repairs end with a safety and performance check before the device goes back to the floor (an incoming and post-repair check is its own Joint Commission element). On diagnostic X-ray, installing certified components means a Form FDA 2579 report of assembly within 15 days. On mammography, a major repair triggers an equipment evaluation by a medical physicist before patient use.

  9. 9

    Work recalls and alerts

    When a manufacturer recall or safety notice arrives, find every affected model and serial across every client, record the action per device (inspected, updated, removed, not affected) and the date, and report back to each client's HTM lead. FDA classes recalls I, II and III by health hazard, with Class I meaning a reasonable probability of serious harm or death.

  10. 10

    Report and invoice

    Send each client a monthly report: PM completion for high-risk and non-high-risk devices separately, incomplete PMs with reasons, repairs with response and turnaround times, failed safety tests, open recalls. Invoice the contract, plus out-of-scope repairs and parts at the contract's rates.

What to record

The fields every medical equipment service job should capture

Device record (one per serial, per client)

  • Client, site, department, room; client asset tag and your own ID
  • Device type, manufacturer, model, serial, software or firmware version, install date
  • Owned, leased, rental or vendor-owned (all go on the CMS inventory)
  • Risk flags: critical (failure risks serious injury or death), high-risk / life support, in AEM yes/no
  • Strategy: manufacturer interval or AEM interval, with the approver and approval date
  • Electrical class (Class I or II) and applied part type (B, BF, CF); defib paddles noted
  • Imaging-specific: X-ray components certified yes/no, mammography yes/no, physicist survey date
  • Status: in service, out of service, missing, retired; open recalls against this serial

Each PM and electrical safety test

  • Technician, date, procedure version, time on device
  • Analyzer and simulators used: model, serial, calibration due date (the ESA615 runs IEC 62353, ANSI/AAMI ES-1 / NFPA 99 and IEC 60601-1 sequences)
  • Protective earth resistance (mΩ) and test current; insulation resistance where tested
  • Leakage method (direct, differential, alternative) and each leakage value in µA against its limit
  • Performance checks: expected, measured, tolerance, pass/fail (for example flow rate, delivered energy, NIBP, SpO2)
  • Visual inspection: cord, plug, housing, labels, alarms; overall pass/fail
  • If not completed: reason (in use, not found, out for repair) and attempt dates

Repairs, recalls and imaging filings

  • Repair: time reported, responded, on site, completed, returned to service; patient involved yes/no; loaner serial out and back
  • Cause, corrective action, parts by part number; post-repair safety check result
  • Servicing vs remanufacturing note: work returned the device to OEM specifications (and nothing more)
  • Recall: notice reference, FDA class, action per serial, date, client notified
  • X-ray: Form FDA 2579 filed date and recipients (purchaser, state radiation agency)
  • Mammography: physicist evaluation date after major repair; cleared for patient use date

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
CMS 42 CFR 482.41(d)(2): equipment maintained for safety and quality"Facilities, supplies, and equipment must be maintained to ensure an acceptable level of safety and quality." The 2013 CMS memo cites this as 482.41(c)(2) (tag A-0724); in the current CFR it sits at (d)(2), and (c)(2) is now the Health Care Facilities Code waiver. source: 42 CFR 482.41, Condition of participation: Physical environment (Cornell LII)
CMS S&C 14-07-Hospital: Alternate Equipment Management (AEM)Hospitals may change PM frequencies and activities from the manufacturer's recommendations based on a risk-based assessment by qualified personnel, whether employees or contractors. Not allowed for imaging/radiologic equipment (42 CFR 482.26(b)(2)), medical lasers, or new equipment until there is enough maintenance history. Hospitals that do this need policies, documentation, and must strictly follow the AEM activities and frequencies they set. source: CMS S&C 14-07-Hospital, Hospital Equipment Maintenance Requirements (20 Dec 2013)
CMS S&C 14-07: inventory and critical equipmentAll facility and medical equipment, leased or owned, is expected to be on an inventory. Critical equipment is equipment whose failure risks serious injury or death to a patient or staff member, must be readily identified, and is where surveyors focus: their sample is mostly critical items such as ventilators, defibrillators and robotic surgery devices. source: CMS S&C 14-07-Hospital, Hospital Equipment Maintenance Requirements (20 Dec 2013)
Joint Commission 2026: EC.02.04.01 / EC.02.04.03 become PE 04.01.01 EP 2From 1 January 2026 the Environment of Care chapter became Physical Environment. The written inventory, high-risk inventory, AEM decisions, incoming and post-repair checks, high-risk and non-high-risk maintenance, sterilizers, dialysis water and anesthesia equipment now roll into PE 04.01.01 EP 2 (CoP 482.41(d)(2)). PM completion below 100% for high-risk equipment was among the top findings in 2025. Annual physicist evaluation of fluoroscopy moved to PE 05.01.01. source: ACCE webinar, Joint Commission 2026 Physical Environment Standards (12 Feb 2026)
ASCs: 42 CFR 416.44An ambulatory surgery center must be equipped and maintained to protect patient health and safety, and its operating-room emergency equipment must be immediately available and "maintained by appropriate personnel" (416.44(d)(3)). The rule itself has no AEM language. source: 42 CFR 416.44, ASC Condition for coverage: Environment (Cornell LII)
FDA: servicing is not remanufacturingServicing is repair or preventive maintenance that returns a device to the OEM's safety and performance specifications. Remanufacturing significantly changes performance, safety specifications or intended use, and makes you a manufacturer: registration and listing, MDR (Part 803), corrections and removals (Part 806) and the QMSR (Part 820, which incorporates ISO 13485:2016 from 2 Feb 2026). FDA judges the activity, not what the company calls itself. source: FDA final guidance, Remanufacturing of Medical Devices (10 May 2024)
FDA's 2018 servicing reportFDA concluded that the available objective information was not sufficient to justify imposing additional or different, burdensome requirements on servicers at that time, which is why ISOs are not registered the way remanufacturers are. source: FDA Law Blog, FDA issues report on medical device servicing (18 May 2018)
21 CFR 1020.30(d): Form FDA 2579 report of assemblyAnyone who assembles, replaces or installs certified diagnostic X-ray components (including an owner's employee or agent) must install and test them to the manufacturer's instructions and file a report of assembly on Form FDA 2579 to the purchaser and, where applicable, the state radiation agency within 15 days of completing the assembly. Replacement tube housing assemblies are among the listed exceptions. source: 21 CFR 1020.30, Diagnostic x-ray systems and their major components (Cornell LII)
21 CFR 900.12 (MQSA): mammography after a repairEach mammography facility has a medical physicist survey at least once a year. An equipment evaluation is required when major components are changed or repaired, and all problems must be corrected before the equipment returns to service. Other failed QC tests get 30 days. source: 21 CFR 900.12, MQSA quality standards (Cornell LII)
IEC 62353: recurrent test and test after repairApplies before equipment goes into service, at routine intervals and after repair. Protective earth resistance is measured before leakage. Limits: 300 mΩ for a Class I device with its cord up to 3 m, 100 mΩ for a detachable cord, 500 mΩ for a medical system, with at least 200 mA test current. Leakage is measured by direct, differential or alternative method. source: EBME, IEC 62353 Ground Bond Testing
NFPA 99-2012 chapter 10 and facility policyCMS adopted the 2012 NFPA 99. Chapter 10 covers patient care related electrical equipment (ground wire resistance and leakage current tests). New York's DOH tells facilities a written PCREE testing policy is required, based on the manufacturer's service manual recommendations. source: New York State DOH, DAL NH 18-04 Inspection & Maintenance of Patient Care Related Electrical Equipment
DMCA section 1201: medical device repair exemptionRenewed effective 28 October 2024 (first granted in 2021): circumventing access controls on the software of a lawfully acquired medical device or system is allowed when it is a necessary step for diagnosis, maintenance or repair to the original specifications. Three groups opposed renewal, citing FDA standards; the Register noted it doesn't excuse other laws. ISOs such as East Coast Medical Systems have petitioned to renew it again. source: Federal Register 2024-24563, Exemptions to permit circumvention of access controls (effective 28 Oct 2024)
FDA recall classes (21 CFR 7.3(m))Class I: reasonable probability of serious adverse health consequences or death. Class II: temporary or medically reversible consequences, or a remote chance of serious harm. Class III: not likely to cause adverse health consequences. source: 21 CFR 7.3, Recall definitions and classification (Cornell LII)

Rules vary by state, council and contract. Checked 1 November 2026; confirm against the source for your area before relying on it.

Numbers

Limits, deadlines and contract terms a biomed contractor works to

Electrical safety rows are IEC 62353 values as published by EBME; your hospital's policy may test to NFPA 99 / ANSI/AAMI ES-1 instead. Contract rows come from two real public solicitations, not from any code.

Test, deadline or termValueBasis
Protective earth, Class I device with cord (≤3 m)≤ 300 mΩIEC 62353
Protective earth, detachable cord alone (≤3 m)≤ 100 mΩIEC 62353
Protective earth test current≥ 200 mA, AC or DCIEC 62353
Equipment leakage, Class I, direct/differential≤ 500 µA (alternative method ≤ 1,000 µA)IEC 62353
Equipment (touch) leakage, Class II, direct/differential≤ 100 µA (alternative ≤ 500 µA)IEC 62353
Applied part leakage, Type BF≤ 5,000 µAIEC 62353
Applied part leakage, Type CF / CF defib paddles≤ 50 µA / ≤ 100 µAIEC 62353
Older NFPA 99 / AAMI ES-1 ground resistance0.50 ΩFluke white paper (older text)
High-risk equipment PM completion100% (below it was a top 2025 finding)TJC, PE 04.01.01 EP 2
Form FDA 2579 after X-ray assemblyWithin 15 days21 CFR 1020.30(d)
Mammography physicist surveyAt least once a year21 CFR 900.12(e)(9)
Emergency on-site responseWithin 4 hours; non-emergency next business dayTTUHSC solicitation
Monthly PM windowDone by the 15th; last 2 weeks for in-use / not-found devicesVA 36C26026Q0785
Corrective maintenance turnaroundAverage 8 days, work order to completionVA 36C26026Q0785
IEC 62353 minimum for life support and critical equipmentEvery 24 months (Fluke's reading)Fluke Biomedical

source: EBME, IEC 62353 Ground Bond Testingsource: EBME, IEC 62353 Leakage Measurements (updated 18 Nov 2019)source: Fluke Biomedical white paper, Introduction to Electrical Safety: Part II (D. McMahon)source: ACCE webinar, Joint Commission 2026 Physical Environment Standards (12 Feb 2026)source: 21 CFR 1020.30, Diagnostic x-ray systems and their major components (Cornell LII)source: 21 CFR 900.12, MQSA quality standards (Cornell LII)source: Texas Tech University HSC, Biomedical Equipment Maintenance and Repair Services (BidNet)source: VA solicitation 36C26026Q0785, Biomedical Technician/Engineering PM and Service Support (Vancouver, WA)source: Fluke Biomedical, Electrical Safety Standards and Basic Testing

Where it breaks

Where spreadsheets and generic software fall over

PMs are scheduled per client site as one repeat visit, so the surveyor asks for the high-risk PM completion rate and the answer is a count of visits, not of devices.

Make the serial the record. Every PM, test and repair posts to one device, and completion is reported per client with high-risk and non-high-risk devices split.

The AEM decision lives in an email from the hospital's clinical engineer, so nobody can show why a pump is on a 24-month interval when the manual says 12, or the tech applies AEM to an imaging device it can't cover.

Store the strategy on the device type with approver and date, and block AEM on imaging, lasers and devices without enough history.

The safety test result is typed in, but the analyzer serial and its calibration date are not, so a reading can't be traced to a calibrated instrument at audit.

Make the analyzer a required pick from your own test-equipment list; an analyzer past its calibration due date can't be selected.

Devices that were in use or couldn't be found drop off the month's list, and the completion number quietly goes up.

'Not completed' is a status with a reason and attempt dates; the month-end report lists every one, as VA-style contracts require.

A recall arrives and someone searches five client spreadsheets for the model, missing the rentals and the devices recorded under a slightly different model name.

Normalize manufacturer and model on the device record, include rented and vendor-owned units, and open one recall task per affected serial with a client report.

An X-ray tube or generator swap gets done and invoiced, and the Form FDA 2579 never goes out within 15 days.

Mark certified X-ray components on the device; a repair that replaces one can't close until the 2579 filed date is entered.

Checklist

The medical equipment service operations checklist

Print it, or hand it to whoever runs the office side.

  • Every client's inventory includes leased, rented and vendor-owned devices
  • Critical and high-risk devices flagged on every record
  • Each device type shows manufacturer or AEM strategy, with approver and date
  • No AEM intervals on imaging, medical lasers or new equipment
  • PM list for the month generated per device by the end of the previous month
  • Safety tests record method, each value, limit, and analyzer serial and calibration date
  • Analyzers and simulators have calibration due dates tracked
  • Incomplete PMs carry a reason and attempt dates; month-end list sent to the client
  • High-risk PM completion at 100% per client, reported separately
  • Every repair closes with a post-repair safety check
  • Repair response and turnaround times measured against each contract's terms
  • Form FDA 2579 tracked on X-ray component installs; MQSA evaluations after mammography repairs
  • Recalls worked per serial across all clients, with action and date
  • Work stays within servicing (back to OEM specs), not remanufacturing

Software options

What software medical equipment service companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

AIMS 3 (Phoenix Data Systems)

Hospital HTM departments and the contractors who work inside them

Healthcare-only asset management software; Phoenix says AIMS dates back almost 40 years and lists 3,000 hospitals and 8 million pieces of equipment under management. Often the system your client already runs, so ask whether you work in theirs or yours.

source: AIMS 3 (Phoenix Data Systems)

Accruent TMS

Health systems' clinical engineering and facilities teams

A cloud CMMS Accruent describes as built for healthcare facilities and clinical engineering teams, with Joint Commission compliance reporting. Strong on the hospital side of the inventory; less about an ISO's own dispatch, contracts and billing.

source: Accruent TMS

HEMS One (TMA Systems, formerly EQ2)

Hospitals running HTM/biomed, facilities, EVS and IT on one CMMS

EQ2 served hospitals only for over 30 years and was bought by TMA Systems in March 2025. Like AIMS and TMS, it is a hospital-owned system of record more than a service company's business system.

source: HEMS One (TMA Systems, formerly EQ2)

Fluke Biomedical Ansur and analyzers (ESA615 and others)

Any biomed team that wants test sequences automated and results captured

Not a CMMS: the ESA615 runs IEC 62353, ANSI/AAMI ES-1 (NFPA 99) and IEC 60601-1 sequences with pass/fail, and Ansur ties test tools together. The results still need a home on the device and job record.

source: Fluke Biomedical Ansur and analyzers (ESA615 and others)

Client CMMS access plus a generic FSM and spreadsheets

Small ISOs with a handful of clinics, surgery centers and imaging sites

Common: work orders typed into each hospital's system, your own scheduling elsewhere, test results in analyzer exports. It breaks on cross-client recall searches, contract response reporting and per-device completion for clients without their own CMMS.

Leaving AIMS? Our step-by-step guide covers why biomed service companiesswitch, what to export, what doesn't export and how to run both during cutover: how to switch from AIMS.

Questions to ask any vendor

  • Is the serial (not the site or the visit) the record every PM, safety test, repair and recall action posts to?
  • Can each device type carry a manufacturer or AEM strategy with approver and date, and block AEM on imaging, lasers and new equipment?
  • Does the safety test form require the analyzer serial and refuse an analyzer past its calibration date?
  • Can a PM be closed as 'not completed' with a reason, and does month-end reporting list those per client?
  • Can I report high-risk PM completion per client and repair response times against each contract's own terms?
  • When a recall lands, can I find every affected model and serial across all clients, including rentals, in one search?

Bring one real medical equipment service job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Medical equipment service on Fieldproxy: built around how you already work

A Fieldproxy setup for a medical equipment service company is built around the serial: every device on every client's inventory carries its risk flags, manufacturer or AEM strategy, electrical class, test history and open recalls, and every PM, safety test and repair posts to it. Technicians work from an offline app in basements and imaging suites, scan the tag, and can't close a test without the analyzer that ran it; clients get per-device completion and response reports they can hand a surveyor.

Module 1

Client contracts and response terms

Hospitals buy coverage per device class but judge you on the clock and the completion number.

  • Contract: client, sites, coverage (PM only, PM + repair, full service with parts), device classes in and out of scope, on-site tech hours, parts and loaner terms, rates for out-of-scope work
  • Response terms per priority, e.g. emergency on site 4 hours, non-emergency next business day, corrective turnaround target e.g. 8 days
  • PM window rules per client, e.g. projection by month-end, complete by the 15th
  • Status: Proposal, Active, Renewal due, Ended (inventory and records handed back checklist required)
How this works

Module 2

Device inventory per client

The surveyor's first question is whether the inventory is complete and the critical devices are flagged.

  • Device: client, site, department, room, client tag, serial, manufacturer, normalized model, firmware, ownership (owned, leased, rental, vendor-owned)
  • Flags: critical, high-risk / life support, in AEM; electrical Class I/II and applied part B/BF/CF
  • Imaging flags: certified X-ray components, mammography, last physicist survey date
  • Status: In service, Out of service, Missing, Retired; QR label opens the device and its history
  • Bulk import from the client's CMMS export; duplicates flagged by serial
How this works

Module 3

Maintenance strategies (manufacturer vs AEM)

CMS allows AEM only with a documented decision, and never on imaging, lasers or new equipment.

  • Strategy per device type per client: interval, procedure version, source (manufacturer or AEM), approver name and role, approval date
  • Rule: AEM can't be set on device types flagged imaging, laser, or with less than e.g. 12 months of history
  • Change log: every interval change with old value, new value and approver

Module 4

Monthly PM planning

Completion is counted per device, and the devices that hide are the ones that sink the number.

  • PMs generated per device from its strategy and last completion, grouped by department
  • Status: Due, Scheduled, In progress, Done, Not completed (reason: in use, not found, out for repair), with attempt dates
  • Board per client: high-risk vs non-high-risk due and done this month; missing-device search list sent to the client
How this works

Module 5

Technician app: PM, safety test and performance checks

A reading without the analyzer behind it doesn't hold up in an audit.

  • Opens on a tag scan; works offline; procedure checklist per device type
  • Analyzer and simulators picked from your test-equipment list; past-due calibration blocks the pick
  • Electrical safety: protective earth (mΩ), test current, leakage method and values (µA) with limits set by class and applied part type; auto pass/fail
  • Performance checks with expected, measured and tolerance; visual inspection; photos of the label and any damage
  • Fail: device set Out of service with a tag photo, repair job opened
How this works

Module 6

Repair calls, loaners and depot

The response clause and the turnaround average are what the client's HTM manager reports upward.

  • Repair: device, department, caller, description, patient involved yes/no, priority; timestamps reported, responded, on site, completed, returned to service
  • Loaner: serial out, date out, date back; depot: shipped, received, quoted, approved, returned
  • Close requires cause, corrective action, parts and a post-repair safety check
  • Servicing check: 'returned to OEM specifications' confirmed, so no remanufacturing slips through
How this works

Module 7

Imaging and regulatory filings

Two federal paperwork deadlines hide inside ordinary repair jobs.

  • Repair on a certified X-ray component can't close without the Form FDA 2579 filed date and recipients (purchaser, state agency); due 15 days after assembly
  • Mammography major repair: physicist evaluation date and 'cleared for patient use' required before status returns to In service
  • Physicist survey due dates per imaging device on the client dashboard
How this works

Module 8

Recalls and safety notices

A Class I recall needs every affected serial, at every client, today.

  • Recall record: manufacturer notice reference, FDA class, affected models and serial ranges, required action
  • Matching across all clients' inventories, including rentals and vendor-owned units; one task per serial
  • Per-serial status: Not affected, Inspected, Updated, Removed; date and tech
  • Client report per recall with every serial and its status

Module 9

Test equipment register

Your analyzers are the measuring instruments every client report depends on.

  • Analyzer, simulator and meter records: model, serial, assigned tech, calibration date, due date, certificate PDF
  • Reminder e.g. 30 days before calibration due; overdue units can't be picked on a test
  • Report of every test run with a given analyzer, for when one comes back out of tolerance

Module 10

Client portal and survey-ready reports

The client's survey binder is your renewal pitch.

  • Portal per client: inventory, high-risk and non-high-risk PM completion by month, incomplete PMs with reasons, failed tests, open repairs, recall status
  • Monthly report emailed automatically; per-device service history PDF on request
  • Dashboards: completion per client, response vs contract, turnaround average, analyzers due, recalls open
  • Invoices for contract and out-of-scope work; QuickBooks or Xero sync
How this works

The AI agents, set up for medical equipment service companies

AgentWhenWhat it doesWhat you get
Document intelligence agentA client sends an inventory export, a manufacturer recall letter or a PO for a depot repairReads the device lines, or the affected models and serial ranges, and matches them to existing devices by serial and normalized modelNew or updated device records, a recall record with one task per affected serial, or a repair job with the PO attached
Watcher agentA high-risk PM is still open on e.g. the 20th of the month, an emergency repair passes the contract's response time, a test is about to run with an analyzer due for calibration, or a repaired X-ray job reaches day 10 with no Form FDA 2579Reads the device, contract terms and deadline, and decides who acts: tech, dispatcher or the client's HTM contactAn alert on the job and the right person's list, with the device and deadline named
Vision agentA tech photographs a device label or nameplate during an inventory walkReads manufacturer, model, serial and date of manufacture, and checks whether the serial is already on the inventoryThe device record filled or flagged as a duplicate, ready for the tech to confirm
Knowledge agentA tech asks about an error code, a PM step or a performance tolerance on a model they don't see oftenSearches the service manuals, procedures and this model's repair history you have loadedAn answer on the phone with the manual page and what fixed this model last time
Scheduler agentLast business day of each monthPulls per client: high-risk and non-high-risk completion, incomplete PMs with reasons, repairs with response and turnaround, failed tests, open recallsA monthly service report emailed to each client's HTM or facilities lead, and a next-month PM projection to your service manager
AutopilotA depot repair quote sits unapproved for e.g. 5 days, a contract is 90 days from renewal, or an invoice passes termsDrafts the chase with the device and why it matters (out of service, loaner out), or the renewal with this year's completion and response numbersA draft email a person approves before it sends

Straight answers

Medical equipment service: FAQ

What software do medical equipment service companies use?

Most use a CMMS or field service tool that holds each client's device inventory by serial, flags critical and high-risk equipment, schedules PM at manufacturer or AEM intervals, and stores electrical safety tests with the analyzer used. Hospital-side systems include AIMS (Phoenix Data Systems), Accruent TMS and HEMS One (TMA Systems, formerly EQ2), and ISOs often work inside the client's system. Test automation such as Fluke Ansur sits alongside. Fieldproxy is configured around an ISO's own contracts, procedures, test sheets and response terms.

What is an AEM program in hospital equipment maintenance?

Alternate Equipment Management, allowed by CMS memo S&C 14-07-Hospital, lets a hospital change PM frequency or activities from the manufacturer's recommendations based on a risk assessment by qualified personnel. It can't be used for imaging/radiologic equipment, medical lasers or new equipment without enough maintenance history, and the hospital must document the program and follow the intervals it sets.

What changed in the Joint Commission medical equipment standards in 2026?

From 1 January 2026, the Environment of Care chapter became Physical Environment. Per a 2026 ACCE webinar reproducing Joint Commission slides, the old EC.02.04.01 and EC.02.04.03 elements (inventory, high-risk inventory, AEM, incoming and post-repair checks, high-risk maintenance) now sit under PE 04.01.01 EP 2. The 100% PM completion expectation for high-risk equipment carries over.

Do high-risk medical devices need 100% PM completion?

Yes, in practice. 'Reported PM completion rates less than 100%' for high-risk equipment was one of the most-cited Joint Commission findings in 2025 and is now scored under PE 04.01.01 EP 2. Devices that were in use or missing still count as not done, so document the attempts and the reason.

What are the IEC 62353 electrical safety limits?

Protective earth resistance is at most 300 mΩ for a Class I device with its cord (up to 3 m) and 100 mΩ for a detachable cord, tested at 200 mA or more. Equipment leakage by the direct or differential method is at most 500 µA for Class I and 100 µA for Class II. Applied part leakage is at most 5,000 µA for Type BF and 50 µA for Type CF (100 µA for CF defibrillator paddles).

Does an independent service organization need FDA registration?

Not for servicing alone. FDA's 2024 remanufacturing guidance defines servicing as repair or maintenance that returns a device to the OEM's specifications. Remanufacturing (significantly changing performance, safety specifications or intended use) makes you a manufacturer, with registration and listing, MDR, corrections and removals, and QMSR duties. FDA looks at what you did, not what you call yourself.

When must Form FDA 2579 be filed?

Under 21 CFR 1020.30(d), anyone who installs certified diagnostic X-ray components, including an owner's employee or agent, files a report of assembly on Form FDA 2579 within 15 days of completing the assembly, to the purchaser and, where applicable, the state radiation control agency. Some items, such as replacement tube housing assemblies, are listed exceptions.

What happens after a mammography unit is repaired?

Under MQSA (21 CFR 900.12(e)(10)), when major components are changed or repaired, the unit needs an equipment evaluation, typically by a medical physicist, and every problem found must be corrected before it is used on patients again. The facility also needs a physicist survey at least once a year.

Can a third party legally bypass software locks to repair medical devices?

Under the US Copyright Office's section 1201 exemption, renewed effective 28 October 2024, yes, when circumvention is a necessary step to diagnose, maintain or repair a lawfully acquired medical device or system to its original specifications. It does not excuse other laws, including FDA rules, and ISOs have already petitioned to renew it in the next cycle.

What response times do hospitals put in biomed service contracts?

No code sets them; the contract does. Texas Tech HSC asked for on-site response within 4 hours for emergencies and by the next business day otherwise. A VA biomed support contract set PM completion by the 15th of each month and an average corrective turnaround of 8 days from work order to completion.

Related guides

All sources on this page (26)

Run medical equipment service work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.