Guide for generator service companies ยท checked 13 November 2026
Generator service, run to NFPA 110, the EPA hour meter and the outage
A generator dealer sells a unit once and services it for twenty years, and the hospital surveyor, the fire marshal and the air district each read a different part of the record. This guide covers the dealer's sale from load evaluation to proposal, contract, install and maintenance plan, NFPA 110 Level 1 and Level 2 test intervals, load bank steps, transfer switch tests, the EPA 100-hour rule, fuel testing, residential install clearances, and how to run a book of units through a storm.
See your own jobs set up this way
A 30-minute call. We show you generator service companies workflows running in Fieldproxy, built around how you work.
Short answer
Generator service companies use field service software that tracks every generator and transfer switch as an asset, schedules it on its NFPA 110 cadence (weekly inspection, monthly 30-minute load run, annual load bank where the monthly run can't reach 30% of nameplate, and a 4-hour test every 36 months for Level 1 systems), and logs run hours for the EPA's 100-hour annual limit on emergency engines. Generator-focused options include Smart Service and Commusoft for Generac, Kohler and Cummins dealers, Tinnacity for power generation distributors, and Genspector for NFPA 110 test records. Fieldproxy is a configurable option built around the dealer's own flow, from the lead worksheet and load evaluation to proposal, contract, install, test sheets and outage triage.
30% / 30 min
NFPA 110 monthly exercise: at least 30 minutes at 30% of nameplate kW, or the manufacturer's minimum exhaust temperature
4 hours / 36 mo
Level 1 continuous test every 36 months, at least 30% of nameplate (last hour at 75% when combined with the annual load bank)
100 hours
EPA cap per calendar year on maintenance and readiness running of an emergency engine, logged on a non-resettable hour meter
source: 40 CFR ยง 63.6640 (RICE NESHAP), emergency engine operating limits
10 seconds
Type 10: the longest a Level 1 load may go without power; a 1-second start delay leaves the engine about 9
source: Consulting-Specifying Engineer, The role of NFPA 110 and its interaction with other codes
How a job runs
One generator service job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Classify the system before you quote it
Ask what the generator feeds. Egress lighting, fire alarm and fire pumps make it Level 1 (NEC 700, 10 seconds); smoke removal and sewage pumps are Level 2 (NEC 701, 60 seconds); a house or a data hall is usually optional standby (NEC 702). The level sets the test cadence, the paperwork and who reads it, so it goes on the unit record first.
- 2
Take the lead on a worksheet, not a scratch pad
Most residential and light commercial sales start with a phone call. The dealer notes what the customer wants backed up, the service size, fuel available, rough location and budget, often on paper, then types it again into the manufacturer's dealer sizing tool. As one dealer put it: "I write it down on paper, but then I transfer it into what the dealer program has already outlined for me." A worksheet on the phone that anyone in the office can fill in removes the second entry and keeps the lead even if it goes quiet.
- 3
Run the load evaluation
The load evaluation (manufacturer sizing tool, or a load calculation per NEC 220 for the circuits to be backed up, including motor starting loads for AC compressors and well pumps) sets the kW and the transfer switch: whole-house service-rated ATS, or a managed or essential-circuits switch. Keep the evaluation PDF on the lead. Manufacturer tools often email it to the customer and keep nothing on the dealer's side.
- 4
Send a proposal, then a contract
Many dealers price remotely first and only drive out once the customer agrees the range, because a site visit can mean hours of driving for a lead that never buys. The proposal shows two or three options built from the product list: unit size, ATS type, extended warranty package and a first-year maintenance plan. Once the customer picks one, the same lines become the contract with terms, exclusions, deposit and schedule. Financing, where offered, runs through the dealer's lender.
- 5
Survey the site
For an install: load calculation, service size, fuel type and meter or tank size, pad location with measured clearances (Generac: 5 ft from operable windows, doors and vents, 3 ft at the front and ends, 5 ft above, never under a wooden deck), and permit triggers. For a takeover service contract: nameplate kW, engine hours, ATS make and rating, fuel tank size, and the last load bank and fuel test dates.
- 6
Quote the unit or the agreement
Installs are priced as unit, ATS, pad, gas or fuel line, electrical, permit and startup. Service agreements are priced per unit by visit frequency, kW class, travel and whether the annual load bank and fuel sample are included. Spell out what the customer's own staff do (weekly walk-throughs) and what you do.
- 7
Permit, install and start up
Pull the electrical and gas permits, set the unit, connect, pass the inspections, and run startup: voltage and frequency at no load and under load, transfer and retransfer, exercise schedule set, and the remote monitor registered with your company as the dealer. Commercial Level 1 systems also go through an acceptance test witnessed by the authority having jurisdiction.
- 8
Put the unit on its test cadence
Weekly inspection (usually the owner's staff), monthly 30-minute run at 30% of nameplate or minimum exhaust temperature with an ATS transfer, semi-annual or annual PM visits, the annual load bank where the monthly run can't reach 30%, a fuel quality test at least once a year, and the 4-hour run every 36 months for Level 1.
- 9
Run the PM visit
Record hours at arrival, oil, filters, coolant, belts and hoses, battery voltage and load test, block heater, controller fault log, then a run under load with voltage, frequency, amps per phase, oil pressure and coolant temperature. Watch for continuous black smoke: under NFPA 110's annex that signals wet stacking from light loading.
- 10
Load bank and ATS tests
Connect the load bank, step the load and hold it, logging readings every step. Operate every transfer switch from normal to emergency and back, recording transfer and retransfer time. A hospital needs 12 ATS tests a year, no more than 40 days apart.
- 11
Deficiencies and quotes
A battery under spec, an ATS that took 14 seconds, water in the fuel sample, a block heater out, or a monthly run that never reaches 30% each get a photo, a reading and a quote. On a Level 1 system a failed test also needs a written measure for the gap and a retest after repair.
- 12
Outage response
When the grid goes down, every unit that fails to start or transfer becomes a call at once. Hospitals, nursing homes and agreement customers go first; units nobody has serviced in years go last. Each call lands on the unit's history with the fault code, cause and parts.
- 13
Report, invoice, log the hours
Send the customer the test report in the format their surveyor or AHJ expects, invoice the visit or the agreement, and add the run time to the unit's EPA hours for the calendar year with the reason it ran (test, maintenance, emergency).
What to record
The fields every generator service job should capture
Unit and site profile
- Generator make, model, serial, nameplate kW, fuel (diesel, natural gas, LP), engine make and serial, install date, warranty end
- NFPA 110 Level (1, 2 or optional standby), Type (for example Type 10) and Class (fuel hours, for example Class 48 or Class X)
- Every ATS: make, amperage, open or closed transition, loads served (life safety, critical, equipment), NEC article (700, 701, 702)
- Fuel tank size and type, last fuel test date and result, polishing system yes/no
- EPA status: emergency engine under 40 CFR 63 ZZZZ or 60 IIII, hour meter type, calendar-year hours so far and by purpose
- Remote monitoring (Generac Mobile Link, OEM cloud) and whether your company is the registered dealer
Each test or PM visit
- Hour meter at arrival and departure
- Monthly run: minutes under load, kW and % of nameplate, or exhaust temperature reached versus the manufacturer's minimum
- Voltage, frequency, amps per phase, oil pressure, coolant temperature at each load step
- ATS test: transfer time and retransfer time in seconds per switch, and seconds to available power
- Battery voltage and load test, battery date code; block heater and charger status
- Fluids, filters, belts, hoses and leaks; controller fault log photo; black smoke yes/no
Paperwork that leaves the site
- Load bank sheet: steps (for example 50% for 30 min then 75% for 60 min), readings every step, technician and load bank serial
- 36-month 4-hour test record for Level 1 systems, with load per hour
- Fuel quality result against ASTM D975 and the sampling point
- Deficiency list with photos, quotes, and on Level 1 systems the interim measure and retest date
- EPA hours log line: date, start, end, purpose (testing, maintenance, emergency, non-emergency)
- Customer signature and the report in the format their surveyor, fire marshal or insurer asks for
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| NFPA 110 Level 1 and Level 2 | Level 1: failure could cause loss of human life or serious injury (egress lighting, fire alarm, fire pumps, emergency communication), matching NEC Article 700. Level 2: failure could cause hazards or hamper rescue or firefighting (HVAC, smoke removal, sewage disposal), matching NEC 701. Optional standby under NEC 702 is neither. NFPA 110 does not decide which systems fall into which level; other codes do. source: Consulting-Specifying Engineer, The role of NFPA 110 and its interaction with other codes |
| Type and Class | Type is the maximum time the transfer switch load terminals may be without acceptable power: Type 10 (10 seconds) for health care essential systems under NFPA 99, Type 60 for smoke-proof enclosure ventilation under NFPA 101. Class is hours at rated load without refuelling, from Class 0.083 (5 minutes) to Class X, which is usually 48 to 96 hours as set by another code or the designer. source: Consulting-Specifying Engineer, The role of NFPA 110 and its interaction with other codes |
| Monthly exercise under load | At least 30 minutes under load, at not less than 30% of nameplate kW or the manufacturer's recommended minimum exhaust gas temperature. NFPA 99 adds intervals of not more than 30 days for health care generators. source: Health Facilities Management, Complying with inspection, testing and maintenance for electrical systems (Jun 2022) |
| Annual load bank when the monthly run is too light | If the monthly exercise can't reach 30% of nameplate or the minimum exhaust temperature, an annual supplemental load bank test is required: 50% of nameplate for 30 minutes then 75% for 60 minutes in recent summaries. An older description cited by Avtron steps 25%, 50% and 75% for 30, 30 and 60 minutes. Check the edition your AHJ enforces. source: Bell Performance, NFPA 110 generator fuel testing (Jan 2026) |
| 36-month 4-hour test (Level 1) | Every 36 months, a 4-hour continuous run at no less than 30% of nameplate or the minimum exhaust temperature. When combined with the annual load bank, the first 3 hours are at 30% and the last hour at no less than 75%. HFM says documentation should cite section 8.4.9.7. source: Health Facilities Management, Complying with inspection, testing and maintenance for electrical systems (Jun 2022) |
| Weekly inspection and monthly transfer switch tests | Level 1 systems get a weekly inspection; monthly operation under load is started by simulating an outage at the ATS. Every EPSS transfer switch is tested monthly by operating it from normal to emergency and back (NFPA 110-2010 8.4.6). Joint Commission EC.02.05.07 EP 6 counts it as 12 times a year, not more than 40 days apart. source: ASHE, Tip #20: NFPA 110-2010, Transfer the blame (monthly transfer switch tests) |
| Transfer switch endurance | A UL 1008 listed switch can transfer at least 3,000 times, at least 1,000 of them at 100% of rated load. EC&M worked out that 12 monthly transfers a year would take over 83 years to reach that full-load count, which is the answer to owners who refuse monthly ATS tests on wear grounds. source: EC&M, Test that transfer switch (NFPA 110 monthly transfer, UL 1008 endurance) |
| Annual fuel quality test | NFPA 110 section 8.3.7: a fuel quality test at least annually using appropriate ASTM standards (in practice ASTM D975 properties that degrade in storage). Quarterly microbial checks are recommended, not required. Bell suggests sampling 3-6 inches off the tank bottom. source: Bell Performance, NFPA 110 generator fuel testing (Jan 2026) |
| Wet stacking | NFPA 110 annex A.8.4.2: light loading causes wet stacking, unburned fuel or carbon in the exhaust, shown by continuous black smoke while running. Cummins puts it at no load or under 30% of standby rating. It is why a no-load weekly start is not a substitute for the monthly load run. source: EC&M, Running without load (NFPA 110 A.8.4.2 wet stacking) |
| Hospitals: CMS 42 CFR 482.15(e) | Hospitals must locate generators per NFPA 99, NFPA 101 and NFPA 110, follow their inspection, testing and maintenance requirements, and, if they keep fuel on site, have a plan to keep power running in an emergency unless they evacuate. The incorporated editions are NFPA 99 and 101 (2012) and NFPA 110 (2010). source: 42 CFR ยง 482.15, Condition of participation: Emergency preparedness (hospitals) |
| Joint Commission EC.02.05.07 | EP 6 monthly transfer switch tests; EP 7 a 4-hour continuous generator test every 36 months; EP 8 at least 30% of nameplate or manufacturer's exhaust temperature; EP 9 and 10 cover what to do when a test fails and the retest after repair. source: Avtron Power Solutions, Using load banks to meet emergency power generating system codes and standards |
| EPA: 100 hours for maintenance and testing | An emergency stationary engine has no limit in a real emergency, but maintenance checks and readiness testing are capped at 100 hours per calendar year. Up to 50 of those may be non-emergency use, which cannot be peak shaving, non-emergency demand response or income, apart from narrow local grid dispatch conditions. source: 40 CFR ยง 63.6640 (RICE NESHAP), emergency engine operating limits |
| EPA records: the hour meter and why it ran | Owners of emergency engines keep hours from a non-resettable hour meter and must document how many hours were emergency use, what made it an emergency, and how many were non-emergency. Grid-dispatch runs need the notice, date, start and end time. source: 40 CFR ยง 63.6655 (RICE NESHAP), records for emergency engines |
| New diesel engines: NSPS IIII | For stationary compression-ignition engines under 40 CFR 60 subpart IIII, the same structure applies: no limit in emergencies, 100 hours a year for maintenance and testing, up to 50 non-emergency hours that cannot be used for peak shaving. Anything else makes it a non-emergency engine. source: 40 CFR ยง 60.4211 (NSPS IIII), compliance requirements for stationary CI engines |
| Residential install clearances (Generac) | 5 ft from operable windows, doors, vents and window wells; 18 in from the back to a wall only for units carrying the SwRI logo; 3 ft at the front and both ends including shrubs; 5 ft above; units without the SwRI logo 5 ft from combustibles; never under a wooden deck. Local codes take precedence. source: Generac support, Clearance requirements when installing a home standby generator |
| Florida nursing homes: 96 hours at 81 ยฐF | Florida nursing homes need an alternate power source that keeps resident areas at or below 81 ยฐF for at least 96 hours after losing primary power, must store at least 72 hours of fuel on site, and must secure 96 hours of fuel when in a declared state of emergency area (59A-4.1265, amended 25 Jan 2026). source: Florida Administrative Code 59A-4.1265, Emergency environmental control for nursing homes (amended 1-25-26) |
| Florida fuel stations on evacuation routes | New or substantially renovated retail fuel outlets must be prewired with a transfer switch. Outlets within half a mile of an interstate or designated evacuation route carry stricter duties by size: 16 or more fueling positions in counties of 300,000 or more, 12 or more in counties of 100,000 to 300,000, 8 or more below that. Terminals must run loading racks on generated power for 72 hours. source: Florida Statutes ยง 526.143, Alternate generated power capacity for motor fuel dispensing facilities |
| Technician certification: EGSA | EGSA certifies generator technicians at Apprentice (valid 3 years) and Journeyman (minimum 3 years' experience, four 1-hour exam modules). 15 recertification credit hours extend a certification by one year. EGSA also runs a 2.5-day load bank certification covering NFPA 110 and NFPA 70E. source: EGSA, Technician certification FAQs |
Rules vary by state, council and contract. Checked 13 November 2026; confirm against the source for your area before relying on it.
Numbers
Test intervals and limits a generator service company schedules to
NFPA 110 rows apply to Level 1 and Level 2 emergency power supply systems; the AHJ and the edition it adopted decide the details. EPA rows apply to emergency stationary engines. Use these to build each unit's recurring schedule and the readings your techs must enter.
| Task or limit | Interval or value | Basis |
|---|---|---|
| Visual inspection (Level 1) | Weekly | NFPA 110 ch. 8 (Risk Logic, Bell) |
| Exercise under load | Monthly, 30 min at 30% nameplate or min exhaust temp | NFPA 110 8.4.2 |
| Health care generator exercise | Not more than 30 days apart | NFPA 99 |
| Transfer switch operation | Monthly; 12 a year, max 40 days apart (TJC) | NFPA 110-2010 8.4.6; EC.02.05.07 EP 6 |
| Supplemental load bank | Annually if monthly run can't reach 30%: 50% ร 30 min, then 75% ร 60 min | NFPA 110 (Bell, HFM) |
| Level 1 continuous test | Every 36 months, 4 hours at โฅ30% | NFPA 110; EC.02.05.07 EP 7-8 |
| Fuel quality test | At least annually (ASTM D975) | NFPA 110 8.3.7 |
| Main fuel tank size | 133% of full-load running for the Class duration | NFPA 110 5.5.3 (CSE) |
| Hospital on-site fuel where required | Minimum 24 hours | FGI 2.1-8.3.3.1 (CSE) |
| Level 1 start and transfer | 10 seconds (Type 10); NEC 701 standby 60 seconds | NFPA 110; NEC 700/701 |
| EPA maintenance and testing hours | 100 per calendar year | 40 CFR 63.6640(f); 60.4211(f) |
| EPA non-emergency hours | Up to 50 of the 100; no peak shaving | 40 CFR 63.6640(f); 60.4211(f) |
| UL 1008 transfer switch endurance | โฅ3,000 transfers, โฅ1,000 at 100% load | UL 1008 (EC&M) |
source: Risk Logic, Testing and inspection of emergency generators (NFPA 110 2016 ed.)source: Bell Performance, NFPA 110 generator fuel testing (Jan 2026)source: Health Facilities Management, Complying with inspection, testing and maintenance for electrical systems (Jun 2022)source: Avtron Power Solutions, Using load banks to meet emergency power generating system codes and standardssource: ASHE, Tip #20: NFPA 110-2010, Transfer the blame (monthly transfer switch tests)source: Consulting-Specifying Engineer, The role of NFPA 110 and its interaction with other codessource: 40 CFR ยง 63.6640 (RICE NESHAP), emergency engine operating limitssource: 40 CFR ยง 60.4211 (NSPS IIII), compliance requirements for stationary CI enginessource: EC&M, Test that transfer switch (NFPA 110 monthly transfer, UL 1008 endurance)
Where it breaks
Where spreadsheets and generic software fall over
Units sit on a twice-a-year PM repeat, so the monthly run, the monthly ATS test, the annual load bank, the fuel sample and the 36-month 4-hour test live in the service manager's head. The hospital finds the gap when the surveyor does.
Store the NFPA 110 Level on each unit and generate every task from it: monthly, annual, 36-month and fuel, each with its own due date and its own required readings.
The monthly run is recorded as 'ran 30 min, OK'. The surveyor wants the load percentage or exhaust temperature and the transfer time, and without them the test does not count.
Make kW, % of nameplate or exhaust temperature, and transfer and retransfer seconds required fields; a run below 30% flags the unit for the annual load bank automatically.
Engine hours are written on each service ticket but never added up, so nobody can show the air district how many of this year's hours were testing versus emergency, or warn when a unit nears 100.
Every visit and every outage call adds a line to the unit's calendar-year hours log with purpose; the unit shows hours used against the 100-hour and 50-hour limits.
A storm knocks out a county and 300 customers call in two hours. A generic queue books them first come, first served, and the nursing home with a failed ATS waits behind a homeowner whose unit just needs a reset.
Outage calls are ranked by the unit's Level, the site type (hospital, nursing home, 911 center, residence), agreement status and remote-monitor fault, and the board fills top down.
Install details (pad clearances, gas meter size, permit numbers, monitor registration) stay in the sales folder, so the first PM tech arrives blind and the dealer is never registered on the customer's remote monitor.
Startup converts the install job into the unit asset with every survey photo, clearance and permit attached, and the startup checklist won't close until the monitor is registered to your company.
Failed tests and deficiencies go into a PDF and stop there. A battery flagged in March is still in the unit in August when it doesn't crank.
Each deficiency is an open record with photo, reading and quote; Level 1 failures also need an interim measure and a retest date, and stay on every report until closed.
Checklist
The generator service operations checklist
Print it, or hand it to whoever runs the office side.
- Every unit classed Level 1, Level 2 or optional standby, with Type and Class on the record
- Every ATS listed separately with the loads it serves and its NEC article
- Monthly run logged with minutes, kW and % of nameplate or exhaust temperature
- Monthly ATS test logged with transfer and retransfer seconds; hospitals no more than 40 days apart
- Units whose monthly run can't reach 30% scheduled for an annual load bank (50% then 75%)
- Level 1 units have a 36-month 4-hour test date and the last result on file
- Annual fuel sample taken (3-6 in off the tank bottom) and the ASTM D975 result recorded
- Hour meter read every visit; calendar-year EPA hours split by testing, maintenance and emergency
- Battery load test and date code, block heater, charger and controller fault log checked every PM
- Black smoke under load noted as a wet stacking sign and quoted for load bank work
- Install clearances measured and photographed (5 ft from openings, 3 ft front and ends, 5 ft above)
- Remote monitor registered to your company at startup
- Technician EGSA certification and load bank certification dates on file
- Outage priority list ready: hospitals, nursing homes, critical sites and agreement customers first
- Every lead on a worksheet with the load evaluation attached, not on paper
- Proposal options built from the product list (unit, ATS, extended warranty, maintenance plan), not retyped
- Signed contract and deposit recorded before the site survey or install is booked
- Extended warranty term and registration date on the unit; first maintenance visit booked at startup
Software options
What software generator service companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Smart Service
Generac, Kohler and Cummins dealers and independent generator service companies running QuickBooks
A QuickBooks add-on (Online and Desktop) with a generator page built around maintenance agreements that generate their own visits, renewal reminders before expiry, equipment with warranty status, and custom inspection forms. Priced from $129 per user per month with a 5-user minimum.
Commusoft
Generac dealers with 6 or more staff
Markets itself directly to Generac dealers: automated maintenance scheduling, full equipment and service history with serial numbers and warranty status, guided field workflows, margin reporting and accounting integration.
Tinnacity
Power generation dealers and distributors with switchgear and multi-brand fleets
OEM-agnostic equipment dealer software covering generators, ATS, paralleling switchgear, load banks and remote monitoring panels, with stated integrations to DIS, Cummins PowerCommand and Caterpillar Power Systems and an offline mobile app.
Genspector
Generator service contractors serving hospitals and nursing homes who need test records, not full job management
Logs NFPA 110 weekly inspections, monthly load tests and annual load banks from the field, tracks cadences and exports a CSV binder for AHJs and surveyors. One plan at $99 a month for up to 25 client facilities.
OEM monitoring portals (Generac Mobile Link, Generac Link)
Every dealer, alongside whatever job software they run
Mobile Link lets a customer pick a dealer and offers a dealer-managed plan to view unit status remotely. Generac Link's NFPA report logs transfer and retransfer times and exports a PDF. These hold readings, not jobs, so they still need a home for work orders, quotes and invoices.
source: OEM monitoring portals (Generac Mobile Link, Generac Link)
Leaving FieldServio? Our step-by-step guide covers why compressed air and equipment service companiesswitch, what to export, what doesn't export and how to run both during cutover: how to switch from FieldServio.
Questions to ask any vendor
- Can each generator carry its NFPA 110 Level, Type and Class, and generate monthly, annual, 36-month and fuel tasks from it?
- Can a tech log a monthly run with kW, % of nameplate or exhaust temperature, and per-ATS transfer seconds, and will a run under 30% schedule a load bank?
- Does every visit and outage call add to a calendar-year EPA hours log split by purpose, with a warning near 100 hours?
- During a regional outage, can the board rank calls by site type, Level and agreement status instead of arrival order?
- Does the install job become the service asset with survey photos, clearances and permits, without re-keying?
- Can a hospital's facilities team see every unit's test history and open deficiencies in the format their surveyor asks for?
- Can a lead worksheet turn into a proposal with options, then a signed contract with a deposit link, without retyping the unit and ATS?
- Can it read the manufacturer's load evaluation PDF into the lead, and keep it with the unit for life?
Bring one real generator service job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Generator service on Fieldproxy: built around how you already work
A Fieldproxy setup for a generator dealer is built around the unit and its transfer switches, not the ticket: every generator carries its NFPA 110 Level, Type and Class, its EPA hour budget and its fuel record, and every test the code calls for is generated from that. Install crews, PM techs and load bank techs work from an offline app with required readings at each step, and when the grid goes down the outage board ranks calls by who loses lives or money first. For dealers the same record starts earlier: the lead worksheet and load evaluation become the proposal, the chosen option becomes the contract and the install job, and the startup turns it into the unit on its maintenance plan.
Module 1
Dealer sales: worksheet, load evaluation, proposal and contract
The sale is written three times today: on paper, in the manufacturer's sizing tool and in a word-processor contract. Each copy is a chance for the wrong kW or ATS to reach the install crew.
- Lead worksheet on the phone or desktop: contact, address, loads to back up (whole house, AC, well pump, medical equipment, sump), service size, fuel available, timing, how they heard of you
- Load evaluation attached to the lead; the Document intelligence agent reads the manufacturer's evaluation PDF into kW, ATS amperage and key loads (forward or BCC the email to your intake inbox)
- Product list: generator models by kW and fuel, transfer switches by amperage and type, pads, extended warranty packages (e.g. 5, 7 or 10 years), maintenance plans, each with your price and the manufacturer spec sheet link
- Proposal with good/better/best options from the product list; the customer picks one online and the choice becomes the contract with your terms, signature and deposit line
- Deposit by payment link (Stripe, card or ACH) on the signed contract; customer financing stays with your lender and is recorded as the payment method
- Status: Lead, Evaluated, Proposal sent, Option chosen, Contract signed, Deposit paid, Survey booked, Lost (with reason); an unanswered proposal is chased by Autopilot with your approval
Module 2
Sales survey and install quote
A residential install fails inspection on a 4-foot window clearance, and a commercial one fails on a transfer switch nobody priced.
- Record: Survey linked to Customer and Site; fields: loads to back up, service size and panel photo, fuel type, gas meter size and pipe run or tank size, proposed pad location
- Measured clearances with photos: distance to nearest operable window, door, vent; front and end clearance; overhead clearance; SwRI-logo unit yes/no (decides 18 in vs 5 ft to the wall)
- Quote lines generated from the survey: unit by kW, ATS by amperage, pad, gas or fuel line by length, electrical, permit fee, startup, first-year agreement as an optional line
- Status: Requested, Surveyed, Quoted, Deposit paid, Won, Lost; a quote can't go out with any clearance field blank
- Site evaluation on the phone: photos of the proposed pad, the panel, the gas meter or tank and the route of the gas line and conduit, each with a note and a measurement, so the install crew sees exactly where the customer wants it
Module 3
Permits, install and startup
The install is a chain of trades and inspections, and the startup sheet is the unit's birth certificate.
- Install job with ordered tasks: permit applied, unit and ATS ordered, pad, gas, electrical, inspections, startup; each with its own crew or subcontractor
- Block: startup can't be scheduled until electrical and gas inspections are recorded Passed with the permit number
- Startup checklist: no-load and loaded voltage and frequency, transfer and retransfer time, exercise day and time set, controller firmware, remote monitor registered to your company as dealer, owner walkthrough signature
- Closing the startup converts the job into a Generator asset and ATS assets, carrying every survey photo, clearance, permit and serial
Module 4
Unit and transfer switch register
NFPA 110, the EPA and the surveyor all ask questions about one unit, and the answers come from its record, not the customer's.
- Generator: make, model, serial, nameplate kW, fuel, engine serial, install date, warranty end, NFPA 110 Level (1 / 2 / optional standby), Type (e.g. 10), Class (e.g. 48 or X), site type (hospital, nursing home, 911, data center, retail, residence)
- ATS child records: make, amperage, open or closed transition, NEC article (700 / 701 / 702), loads served
- Fuel tank: capacity, type (base, day, remote), last fuel test date and result, polishing system yes/no
- EPA block: regulated under 63 ZZZZ or 60 IIII, hour meter reading history, calendar-year hours by purpose against 100 and 50
- QR label on the enclosure opens the unit's history on the tech's phone
Module 5
NFPA 110 test cadence and service agreements
One hospital has three Level 1 units with five transfer switches; one homeowner has a 22 kW unit on an annual visit. Both need the right tasks generated, not a generic repeat.
- Agreement per customer: units covered, visit frequency, which tests are included (monthly run, ATS, annual load bank, fuel sample, 36-month test), rate card and renewal date
- Tasks generated from each unit's Level: monthly run and ATS test (Level 1 hospital: max 40 days apart), PM visits, annual load bank if any monthly run in the past year was under 30%, annual fuel test, 36-month 4-hour test
- Next due date counts from the last completed test, so a missed month shows as overdue instead of silently rolling
- Task status: Due, Booked, In progress, Passed, Failed (retest required), Done by owner staff (with their log attached)
- Residential and light commercial plans sold with the install start on the startup date: first PM booked, reminders before each visit, extended warranty term and registration date on the unit
- Warranty vs billable on each visit: parts and labor covered by the manufacturer or extended warranty recorded for the claim, the rest invoiced
Module 6
Tech app: PM, monthly run and ATS test
The surveyor only accepts what was measured, and 'ran OK' is not a measurement.
- Opens on the unit by QR scan; works offline in generator rooms and basements and syncs on the way out
- Required at arrival: hour meter photo and reading, controller fault log photo
- PM checklist: oil and filters, coolant level and condition, belts and hoses, battery voltage and load test with date code, block heater, charger, leaks, air filter
- Run under load: minutes, kW, % of nameplate (computed from nameplate kW), or exhaust temperature against the manufacturer's minimum; black smoke yes/no
- Per ATS: normal-to-emergency transfer seconds, retransfer seconds, seconds to available power; anything over 10 seconds on a Level 1 switch opens a failed test
Module 7
Load bank and 36-month test sheet
Load bank days are billed high and audited hard; the sheet has to show every step.
- Load bank job: load bank unit and serial, cable sets, crew with EGSA load bank certification date
- Step table pre-filled from the test type, e.g. annual 50% ร 30 min then 75% ร 60 min; 36-month 4 h at โฅ30% with last hour โฅ75% when combined
- Readings every step (e.g. every 15 min): kW, volts, amps per phase, frequency, oil pressure, coolant temperature, exhaust temperature
- Pass or fail per step; a failure opens a deficiency with an interim-measure field and a retest date
- Report PDF from your own template citing the NFPA 110 edition the AHJ uses
Module 8
Fuel and EPA hours log
Bad fuel fails a unit in the outage it was bought for, and an engine over its hours becomes an air permit problem for the owner.
- Fuel sample record: date, sampling point (e.g. 3-6 in off the bottom), lab, ASTM D975 result, water and sediment, microbial result; fail opens a polishing quote
- EPA hours log: every visit and outage call adds a line with date, start, end and purpose (testing, maintenance, emergency, non-emergency)
- Unit shows calendar-year hours against 100 for maintenance and testing and 50 for non-emergency; e.g. warns at 80 hours
- Annual hours summary per unit for the owner's air permit file
Module 9
Outage board
A storm turns a 40-call week into a 400-call day, and order matters more than speed.
- Outage mode on the dispatch board: calls ranked by site type (hospital, nursing home, 911, water, then commercial, then residential), NFPA Level, agreement status and remote-monitor fault
- Each call tied to a unit with its last PM, last load bank, fault code and parts likely needed
- Routine PMs and load banks bumped automatically with a reschedule note to the customer
- Fuel delivery requests logged separately for units running on tank, with hours run since outage start
Module 10
Deficiencies, quotes and invoicing
Most repair revenue comes from what the test found, and it leaks when findings stop at the report.
- Deficiency record linked to unit or ATS: type (battery, block heater, ATS slow transfer, fuel failed, light load / wet stacking, leak, controller fault), photo, reading, severity (Level 1 failed test / repair / advisory)
- Quote from the deficiency; status Open, Quoted, Approved, Scheduled, Fixed, Declined in writing
- Invoice on visit completion against the agreement or PO, with the test report attached; agreement renewals invoiced ahead of the renewal date
- QuickBooks or Xero sync; payment status back on the agreement
Module 11
Customer portal and surveyor pack
Hospital facilities managers want a binder their Joint Commission surveyor accepts, on demand.
- Portal per customer: every unit with Level, last monthly run, last ATS tests, last load bank, last fuel test, 36-month date, open deficiencies and quotes to approve
- One-click surveyor pack per unit for the last 12 or 36 months: monthly run records with load %, ATS transfer times, load bank sheets, fuel results, failed tests with interim measures and retests
- Dashboards: units overdue by task type, units under 30% on monthly runs, EPA hours by unit, deficiency quote win rate, outage response time by site type
The AI agents, set up for generator service companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | A manufacturer load evaluation PDF or a customer's emailed spec arrives in the sales inbox | Reads the recommended kW, fuel, transfer switch amperage and type, and the loads listed, and matches the email to the open lead | The lead worksheet filled in and a draft proposal with the matching unit and ATS lines, for the salesperson to check and send |
| Watcher agent | A monthly run is saved under 30% of nameplate with no exhaust temperature, an ATS transfer on a Level 1 switch is logged over 10 seconds, a hospital ATS test is 35 days old, or a unit's EPA hours pass e.g. 80 | Reads the unit's Level, test history and agreement, and decides whether it needs a load bank booked, a failed-test retest, an ATS test before day 40, or an hours warning to the owner | An alert on the unit and the service manager's list, and a draft load bank or retest job ready to book |
| Calling agent | Inbound calls during a declared outage, when lines are overloaded | Identifies the caller and site, finds the unit, asks whether it failed to start, failed to transfer or is running and needs fuel, and checks the site type and agreement | An outage call created on the right unit with symptom and priority, placed on the outage board; the caller hears where they are in the queue |
| Vision agent | A tech photographs the nameplate, the hour meter or the controller screen | Reads make, model, serial and kW from the nameplate, the hour reading, and fault codes from the controller display | Unit fields and hour meter reading filled in; fault codes added to the visit and the EPA hours log line drafted |
| Scheduler agent | First business day of each month | Pulls every Level 1 and Level 2 unit per customer: monthly runs done and their load %, ATS tests done, load banks and fuel tests due in the next 90 days, 36-month tests due this year, open deficiencies | A compliance summary emailed to each hospital or nursing home facilities contact and a due-list to your service manager |
| Autopilot | An agreement is 60 days from renewal, a deficiency quote (battery, ATS, fuel polishing) sits in Sent for 7 days, or an invoice passes terms | Drafts the renewal with last year's tests and findings, or the deficiency chase with the reading and why it matters (for example 'monthly runs at 18% of nameplate, load bank required'), or the payment chase with the report attached | A draft email or text that a person approves before it is sent |
| Knowledge agent | A tech on site asks about a fault code, an ATS setting or a service interval for the unit in front of them | Searches the OEM manuals, service bulletins and this unit's own history you have loaded | An answer on the phone with the manual page and what was done on this unit last time |
Straight answers
Generator service: FAQ
What software do generator service companies use?
Most use field service software that tracks each generator and transfer switch as an asset and schedules it on its NFPA 110 cadence. Smart Service (a QuickBooks add-on) and Commusoft market to Generac, Kohler and Cummins dealers; Tinnacity serves power generation distributors; Genspector keeps NFPA 110 test records for contractors serving hospitals. Dealers also use OEM portals such as Generac Mobile Link for remote status. Fieldproxy is configured around a dealer's own install, test and outage process.
What software do generator dealers use to go from lead to proposal and contract?
Many small dealers still use paper worksheets, the manufacturer's sizing tool and a word-processor template, which means the same job is typed three times. Look for software where a lead worksheet holds the load evaluation, a proposal is built from your own product list with options, the chosen option becomes the contract with a deposit link, and the signed job becomes the install and then the serviced unit. Fieldproxy is set up that way around your products, prices and terms.
Can I quote a standby generator before driving to the site?
Yes, and many dealers do: price a range from the phone worksheet and load evaluation, then book the site evaluation once the customer accepts. On site, take photos of the pad location, panel, meter or tank and the gas and conduit route on the phone, so the final contract and the install crew work from the same evidence.
Does Fieldproxy take deposits and offer customer financing?
Fieldproxy sends invoices and payment links and takes card payments through Stripe, including Tap to Pay on the phone, so a deposit can be collected on the signed contract. It does not offer customer financing; that stays with your lender, and the job records which payment method was used.
How do extended warranties and maintenance plans fit after the install?
Sell them as options on the proposal. When the startup closes, the unit record carries the warranty term and registration date, and the maintenance plan generates its visits from the startup date. On each visit, covered parts and labor are recorded against the warranty and the rest is invoiced.
How often must an emergency generator be tested under NFPA 110?
Level 1 systems get a weekly inspection and a monthly run of at least 30 minutes at 30% of nameplate kW or the manufacturer's minimum exhaust temperature, with every transfer switch operated monthly. If monthly runs can't reach 30%, an annual load bank test is required. Level 1 systems also need a 4-hour continuous test every 36 months, and the fuel is tested at least once a year.
What are the annual load bank test steps?
Recent summaries of NFPA 110 give 50% of nameplate for 30 minutes followed by 75% for 60 minutes. An older version cited by Avtron steps 25%, 50% and 75% for 30, 30 and 60 minutes. It is required when the monthly exercise can't reach 30% of nameplate or the minimum exhaust temperature. Check the edition your AHJ enforces.
What is the difference between NFPA 110 Level 1 and Level 2?
Level 1 systems are those whose failure could cause loss of life or serious injury, such as egress lighting, fire alarms and fire pumps (NEC Article 700). Level 2 systems are those whose failure could cause hazards or hamper rescue, such as smoke removal or sewage pumps (NEC 701). Level 1 gets more frequent inspection and the 36-month 4-hour test.
How many hours a year can an emergency generator run for testing under EPA rules?
Under 40 CFR 63.6640(f) and 60.4211(f), an emergency stationary engine may run up to 100 hours per calendar year for maintenance and readiness testing, and up to 50 of those for non-emergency use. The non-emergency hours can't be used for peak shaving or to earn income outside narrow grid-dispatch conditions. There is no limit in a real emergency. Owners keep a non-resettable hour meter log showing why each run happened.
What does the Joint Commission require for hospital generators?
EC.02.05.07 requires monthly transfer switch tests (12 a year, not more than 40 days apart), a 4-hour continuous generator test every 36 months at at least 30% of nameplate or the manufacturer's exhaust temperature, and documented actions and retests when a test fails. CMS requires hospitals to follow NFPA 99, NFPA 101 and NFPA 110 under 42 CFR 482.15(e).
What is wet stacking and why does it matter for testing?
Wet stacking is unburned fuel and carbon building up in a diesel exhaust from running at light load, shown by continuous black smoke. Cummins puts the threshold at no load or under 30% of standby rating. It is the reason NFPA 110 asks for 30% load or minimum exhaust temperature on monthly runs, and why light-loaded units need a load bank.
How far must a home standby generator be from windows?
Generac's guidance is 5 ft from operable windows, doors, vents and window wells, 3 ft at the front and ends, and 5 ft above. Units with the SwRI logo can sit 18 in from a wall at the back; units without it need 5 ft from combustible materials. They must not go under a wooden deck. Local codes take precedence.
How much fuel must a Florida nursing home keep for its generator?
Under Florida rule 59A-4.1265, a nursing home must keep resident areas at or below 81 ยฐF for at least 96 hours after losing power, store at least 72 hours of fuel on site, and secure 96 hours of fuel when it is in a declared state of emergency area.
Is there a certification for generator technicians?
Yes. EGSA (the Electrical Generating Systems Association) certifies technicians at Apprentice and Journeyman levels; Journeyman needs at least 3 years' experience and four exam modules. EGSA also runs a 2.5-day load bank certification covering NFPA 110 and NFPA 70E.
How often should a transfer switch be tested, and does it wear out the switch?
NFPA 110 requires every emergency transfer switch to be operated monthly, from normal to emergency and back. A UL 1008 listed switch is rated for at least 3,000 transfers, 1,000 of them at full load, so 12 tests a year is far inside its rated life.
Related guides
All sources on this page (31)
- source: Health Facilities Management, Complying with inspection, testing and maintenance for electrical systems (Jun 2022)
- source: 40 CFR ยง 63.6640 (RICE NESHAP), emergency engine operating limits
- source: Consulting-Specifying Engineer, The role of NFPA 110 and its interaction with other codes
- source: Bell Performance, NFPA 110 generator fuel testing (Jan 2026)
- source: ASHE, Tip #20: NFPA 110-2010, Transfer the blame (monthly transfer switch tests)
- source: EC&M, Test that transfer switch (NFPA 110 monthly transfer, UL 1008 endurance)
- source: EC&M, Running without load (NFPA 110 A.8.4.2 wet stacking)
- source: 42 CFR ยง 482.15, Condition of participation: Emergency preparedness (hospitals)
- source: Avtron Power Solutions, Using load banks to meet emergency power generating system codes and standards
- source: 40 CFR ยง 63.6655 (RICE NESHAP), records for emergency engines
- source: 40 CFR ยง 60.4211 (NSPS IIII), compliance requirements for stationary CI engines
- source: Generac support, Clearance requirements when installing a home standby generator
- source: Florida Administrative Code 59A-4.1265, Emergency environmental control for nursing homes (amended 1-25-26)
- source: Florida Statutes ยง 526.143, Alternate generated power capacity for motor fuel dispensing facilities
- source: EGSA, Technician certification FAQs
- source: Risk Logic, Testing and inspection of emergency generators (NFPA 110 2016 ed.)