Schedule 5-Year Load Test

Load Test Due Date ApproachingAutomated Test Scheduling and Compliance Tracking

Automatically schedule and track mandatory 5-year elevator load tests to maintain compliance with safety regulations and prevent costly violations.

Quick Answer

An automated 5-year elevator load test scheduling system monitors test due dates, sends advance notifications to facility managers and service providers, coordinates vendor scheduling, generates compliance documentation, and maintains complete audit trails to ensure continuous regulatory compliance and prevent safety violations.

How This Automation Works

Load Test Due Date ApproachingAutomated Test Scheduling and Compliance Tracking

1

Monitor Load Test Anniversary Dates

The system continuously tracks the 5-year anniversary of each elevator's last load test, maintaining a database of test dates, elevator identifiers, building locations, and regulatory requirements specific to each jurisdiction.

2

Send Advanced Notification Series

At 90, 60, and 30 days before the test deadline, automated notifications are sent to facility managers, building owners, and maintenance coordinators with test requirements, recommended testing providers, and scheduling instructions.

3

Coordinate Vendor Scheduling

The system sends service requests to certified load testing providers, includes necessary building and equipment details, coordinates availability with building schedules, and tracks vendor responses and confirmed appointment dates.

4

Generate Pre-Test Documentation

Automatically compile required documentation including previous test certificates, equipment specifications, maintenance logs, and building permits, then distribute to the testing provider and relevant stakeholders before the scheduled test date.

5

Create Building Access Coordination

Generate and distribute building access instructions, elevator shutdown schedules, tenant notifications, alternative transportation arrangements, and security clearances for testing personnel on the scheduled test date.

6

Track Test Completion and Results

Monitor test completion status, receive and file test results and certifications, update compliance databases with pass/fail status, flag any required repairs or follow-up actions, and notify relevant stakeholders of outcomes.

7

Schedule Next 5-Year Cycle

Upon successful test completion, automatically calculate and schedule the next 5-year load test date, update all tracking systems, archive current test documentation, and reset notification timelines for the upcoming cycle.

8

Maintain Compliance Audit Trail

Continuously log all scheduling activities, notifications sent, vendor communications, test results, and documentation in a centralized compliance database, generating audit-ready reports for regulatory reviews and insurance requirements.

Automation Complete

How It Works

Elevator load testing is a critical safety requirement mandated every five years by building codes and regulatory authorities. This system automatically tracks test due dates, sends advance notifications to facility managers and service providers, generates compliance documentation, and maintains a complete audit trail. By automating the scheduling process, building owners eliminate the risk of missed deadlines, ensure continuous compliance with safety standards, and protect against penalties while maintaining optimal elevator safety performance. The system integrates with maintenance calendars, vendor management tools, and compliance databases to streamline the entire load testing lifecycle from initial scheduling through completion verification and record retention.

The Trigger

The system monitors the 5-year anniversary date of the previous load test and triggers notifications at configurable intervals (typically 90, 60, and 30 days before the deadline). Additional triggers activate when tests are completed, rescheduled, or when compliance deadlines are missed.

The Action

Upon trigger activation, the system automatically sends reminder notifications to facility managers, creates service requests with certified testing vendors, generates required documentation templates, updates compliance dashboards, and logs all activities in the maintenance management system. When tests are completed, results are automatically filed and the next 5-year cycle is scheduled.

Common Use Cases in Elevator

  • Commercial office building managers tracking load tests across 20+ elevators in a downtown high-rise, receiving automated reminders 90 days before each deadline and coordinating with certified testing providers
  • Multi-family residential property portfolios managing 5-year test schedules for 50+ buildings across different municipalities, each with varying regulatory requirements and vendor relationships
  • Hospital facilities coordinating load tests for critical patient transport elevators, ensuring compliance while minimizing disruption to medical services through advanced scheduling and alternative access planning
  • Shopping mall operators scheduling load tests for multiple elevator banks during low-traffic periods, automatically notifying tenants and coordinating vendor access through centralized facility management
  • Airport terminal authorities managing load test compliance for dozens of passenger elevators and service lifts while maintaining continuous operations and meeting strict safety regulations
  • Hotel chains tracking 5-year load test cycles across properties nationwide, standardizing vendor selection, documentation processes, and compliance reporting through centralized systems
  • University campus facilities managing elevator load testing for academic buildings, residence halls, and research facilities while coordinating with academic calendars and minimizing student disruption
  • Manufacturing facilities scheduling load tests for freight elevators and industrial lifts, ensuring compliance with both building codes and OSHA requirements while maintaining production schedules

Results You Can Expect

Eliminate Compliance Violations

100% on-time testing

Automated tracking ensures no 5-year load test deadline is ever missed, protecting against regulatory fines, building code violations, and potential elevator shutdown orders that disrupt building operations and tenant services.

Reduce Administrative Workload

15 hours saved annually

Eliminate manual calendar monitoring, reminder setting, vendor coordination, and documentation management. The system handles all scheduling logistics automatically, freeing facility managers to focus on higher-value activities rather than administrative tracking.

Streamline Multi-Property Management

Centralized portfolio visibility

Manage load test schedules across entire building portfolios from a single dashboard, with consolidated reporting, bulk vendor coordination, and standardized processes that ensure consistent compliance across all properties regardless of location or jurisdiction.

Improve Vendor Coordination

60% faster scheduling

Automated service requests with complete equipment details and documentation accelerate vendor response times, reduce back-and-forth communications, and ensure testing providers arrive fully prepared, minimizing building disruption and coordination overhead.

Maintain Complete Audit Trails

Instant compliance reporting

Every notification, vendor communication, test result, and documentation update is automatically logged in a searchable database, enabling instant generation of compliance reports for regulatory audits, insurance reviews, and management reporting.

Reduce Liability Exposure

Full documentation coverage

Comprehensive records of timely testing, proper vendor selection, and regulatory compliance reduce liability in the event of elevator incidents, support insurance claims, and demonstrate due diligence to building occupants and regulatory authorities.

Frequently Asked Questions About This Automation

Elevators typically require full load testing every 5 years as mandated by ASME A17.1 safety code and most local building regulations. Some jurisdictions may have more frequent requirements, and newly installed elevators require initial testing before operation. The 5-year cycle ensures continued safe operation and compliance with safety standards.

Powered by Fieldproxy

Set Up Compliance Deadline Tracking in Minutes

Stop doing manual work that software can handle. Fieldproxy makes it easy to set up this automation and dozens more - no coding required. Our AI builder helps you customize everything to match your exact business process.

Time Saved
15 hours per property
ROI Impact
Zero compliance violations