Guide for holiday lighting installation companies · checked 10 November 2026

Holiday lighting installation, from the September survey to the bins on the warehouse shelf

A downtown contract is 200 lamp posts, a dozen street trees wrapped branch by branch, a 24-hour outage clock and a removal window the client wrote into the RFP. A shopping center is a 30 foot tree in a mall court that the fire code may not allow, plus a roof edge your crew works within 6 feet of. All of it goes up in about ten weeks, comes down in four, and has to fit back in the right bins for next year. This guide covers the code, safety and permit rules, what commercial clients write into contracts, and how to run the season without losing a single bin.

See your own jobs set up this way

A 30-minute call. We show you holiday lighting installation companies workflows running in Fieldproxy, built around how you work.

Fieldproxy

Short answer

Holiday lighting installation companies use software that treats each customer as a design with a measured inventory: rooflines in linear feet, trees by height and light count, poles by number, power points by circuit, and the bins that hold it all between seasons. Residential and small commercial installers often use QuoteIQ, RealGreen, Service Autopilot, Markate or Jobber for measuring, quoting, routing and payments. Commercial and municipal contracts add what those tools rarely hold: outage response SLAs (Stamford Downtown's RFP sets 24, 48 and 72 hours by priority), removal windows, client-owned inventory counts, pole permits and certificates of insurance. Fieldproxy is set up around your own designs, bins, crews, SLAs and contracts.

90 days

NEC 590.3(B): temporary power and lighting for holiday decorative lighting is allowed for no more than 90 days

source: IAEI Magazine, Holiday lighting requirements and the NEC (590.3(B) 90 days; listed lighting; UL 588 temporary use)

24 hours

Stamford Downtown RFP: Priority 1 outages (gateways, feature trees, civic parks) answered within 24 hours, with SLA credits

source: Stamford Downtown, Holiday lighting and seasonal decor program RFP (SLA 24/48/72 hours, 98% uptime)

6 ft

OSHA 1910.28(b)(13): within 6 feet of a low-slope roof edge you need guardrail, net, travel restraint or fall arrest

source: 29 CFR 1910.28(b)(13), Fall protection on low-slope roofs (under 6 ft, 6 to 15 ft, 15 ft or more)

960 W

Max watts per run on a typical 100 ft C9 SPT2 18-gauge commercial stringer with 12 inch spacing

source: Christmas Lights Etc, 100 ft C9 commercial stringer, SPT2 18-gauge, 12 inch spacing, 960 W max per run

How a job runs

One holiday lighting installation job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Renew last year's customers first

    The season is sold in summer. Commercial work starts early: Blingle! told NALP it begins commercial installs in the last week of September and residential in early October, aiming to finish by 12 December. Renewals go out with last year's design, photos and price so the install slot can be locked before the calendar fills.

  2. 2

    Survey and measure the site

    Measure rooflines and ridges in linear feet, trees by height and wrap method, lamp posts and signal poles by count, and wreaths, garland and feature pieces by location. Find every power point: which outlets, which circuit, whether it is GFCI protected and switched. Stamford's RFP gives a feel for scale: street trees from 12 to 60+ feet carry 500 to 1,700 lights each, and large feature trees can exceed 15,000 to 60,000+.

  3. 3

    Design, quote and decide who owns the lights

    Quote by zone with the product (C9 on rooflines, 5 mm mini lights on trees, garland, wreaths), the install, any in-season maintenance, takedown and storage. Decide ownership: installer-owned lights leased each season, or client-owned decor the installer handles. Albany's BID owns its decor and has the contractor collect it from the BID's storage container behind the Quackenbush Garage; Stamford asks the vendor for inventory documentation of all client-owned materials.

  4. 4

    Clear permits, insurance and the fire marshal

    Decorations on poles in the public right of way usually need a city permit, and the pole owner's consent if a utility owns it. Albany asked for a $1,000,000 liability binder naming the BID and the City as additional insured on award; Bethlehem PA wants a $1,000,000 certificate naming the city and its officers and employees. A real cut tree inside a mall or office lobby is a fire code question: Fairfax County's Section 806 bans natural cut trees in Group A, E, I, M, R-1, R-2 and R-4 occupancies unless sprinklered exceptions apply.

  5. 5

    Prep the bins in the warehouse

    Pull each customer's bins, test every strand and run, replace dead bulbs and sockets, add anything new from the design, and load by route. A bin that leaves short is a second trip in the busiest week of the year.

  6. 6

    Install at height, by the rules

    Ladders reach 3 feet past the gutter or roof edge, or are tied off with a grab device (1926.1053(b)(1)). On a flat commercial roof, anyone within 6 feet of the edge needs a guardrail, net, travel restraint or fall arrest; 6 to 15 feet may use a designated area only for infrequent, temporary work (1910.28(b)(13)). In a boom lift the lanyard is attached to the boom or basket (1926.453(b)(2)(v)). Lights in live trees need strain relief or tension take-up so branch movement cannot damage the conductors (NEC 590.4(J)).

  7. 7

    Light it, test it, set the timers

    Keep each run under its rating (960 W on a typical 100 ft C9 SPT2 stringer), check the outlet is GFCI protected, program timers or controllers, and photograph every zone lit at dusk. That photo is the proof of completion and next year's design.

  8. 8

    Run the season's service

    Commercial contracts often promise uptime. Stamford's RFP targets 98% or better, asks for proactive inspections before the public reports an outage, weekly inspection and maintenance, and answers outages within 24, 48 or 72 hours depending on priority. Wind is the usual culprit: one NALP contractor books follow-up checks before Christmas because of it.

  9. 9

    Take down in the window, count it back in

    Albany's schedule sets removal no earlier than 12 January and no later than 19 January for the 2025 season, with the lighted displays and the 80 foot State Street span left until the last weekend of February. Blingle! starts the day after New Year's and aims to have everything down by 1 February. Count every item back into its labelled bin, log damage, and invoice storage.

  10. 10

    Close the year and draft the renewal

    Invoice takedown and storage, attach the lit photos, and draft next year's renewal from the same design while the details are fresh.

What to record

The fields every holiday lighting installation job should capture

Survey and design

  • Zones: roofline, ridge, eaves, trees, lamp posts, signal poles, entrances, wreaths, garland, feature pieces
  • Measurements: linear feet per roofline zone, tree height and wrap method (branch or canopy), pole count and wrap height
  • Product per zone: C9 or C7 bulb color, 5 mm mini lights, garland, wreath size, socket spacing (12 inch is common for C9)
  • Power points: outlet location, circuit and breaker, GFCI yes or no, switched or timer, distance to first zone
  • Access: ladder, roof (low-slope or steep), scissor lift, boom lift height, traffic control needed
  • Photos: day photo for the design, last year's lit photo

Contract, permits and inventory

  • Ownership: installer-owned (leased) or client-owned, per item
  • Bins: bin number, customer, zone, item list and counts, test result before loading
  • Install window and turn-on date; removal window (for example 12 to 19 January)
  • Right-of-way permit number and dates, utility pole consent, certificate of insurance with additional insureds and expiry
  • Fire marshal check for natural cut trees in assembly, mercantile or institutional buildings; NFPA 701 certificate for artificial trees
  • SLA terms: priority per zone, response hours, uptime target, credits

Install, service and takedown

  • Per run: product, length, connected watts against the run rating, outlet used, GFCI tested
  • Strain relief or tension take-up used on live trees
  • Fall protection used: ladder 3 ft above landing, guardrail, travel restraint, harness and lanyard in lift
  • Timer or controller program and turn-on time
  • Lit photo per zone at completion
  • Outage tickets: reported time, priority, response time, cause (wind, water, failed strand), fix, photo
  • Takedown: items returned per bin against items installed, damaged or lost, storage location

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
NEC 590.3(B): 90 days for holiday lightingTemporary electric power and lighting is permitted for no more than 90 days for holiday decorative lighting and similar purposes, and holiday lighting must be listed. A display energized from late November to the end of February runs past that, so long-running commercial displays need a conversation with the AHJ or permanent wiring. source: IAEI Magazine, Holiday lighting requirements and the NEC (590.3(B) 90 days; listed lighting; UL 588 temporary use)
NEC 590.4(J): lights in live treesVegetation may support overhead spans of branch circuit conductors and cables only where strain relief or tension take-up devices, or another approved means, are used. Wrapping tight to a growing branch without slack is how conductors get damaged. source: IAEI Magazine, 'Tis the season for temporary power (590.4(J) trees with strain relief; 590.6(B)(2) tests every 3 months)
UL 588: temporary use means 90 daysUL 588 originally covered only string lights installed and used for no more than 90 days. String lights for all-year use are a separate category, DGZW, with heavier minimum wire gauge, thicker insulation, extra flexing and strain relief tests and different markings. source: UL Solutions, String lights for all-year use (UL 588 category DGZW; heavier wire and insulation)
OSHA 1910.28(b)(13): flat commercial roofsWithin 6 feet of the edge: guardrail, safety net, travel restraint or personal fall arrest. From 6 to under 15 feet: the same, or a designated area for work that is both infrequent and temporary. At 15 feet or more: no fall protection for infrequent, temporary work if a work rule keeps people out of the 15 foot zone. source: 29 CFR 1910.28(b)(13), Fall protection on low-slope roofs (under 6 ft, 6 to 15 ft, 15 ft or more)
OSHA 1926.1053(b)(1): ladders past the roof edgePortable ladder side rails must extend at least 3 feet above the upper landing, or the ladder is secured at the top with a grab device provided. source: 29 CFR 1926.1053(b)(1), Ladder side rails at least 3 feet above the upper landing
OSHA 1926.453(b)(2)(v): boom liftsA lanyard attached to the boom or basket when working from an aerial lift. Body belts are not acceptable as part of a personal fall arrest system. source: 29 CFR 1926.453(b)(2)(v), Aerial lifts: lanyard attached to the boom or basket
Section 806: real trees indoorsFairfax County's fire marshal applies Section 806: natural cut trees are banned in Group A, E, I, M, R-1, R-2 and R-4 occupancies, with sprinklered exceptions. They must stay a distance from heat at least equal to their height, unlisted lighting is prohibited on cut trees and artificial vegetation, and artificial trees must meet NFPA 701 flame propagation criteria. source: Fairfax County Fire Marshal, Guidelines for decorative vegetation (Section 806: cut trees, listed lights, NFPA 701)
Pole permits in the right of wayMinneapolis requires a permit to attach banners or seasonal decorations to poles in the right of way. Saint Paul charges a permit fee and asks for a certificate of insurance. Utility-owned poles need the owner's consent too. source: City of Minneapolis, Banner and seasonal decorations permit (poles in the right of way)
Certificates of insuranceBethlehem PA requires a certificate for at least $1,000,000 naming the city and its officers and employees as additional insured, 30 days' written notice before the policy changes, a signed indemnity, and utility pole permission attached where the pole is PPL's. source: City of Bethlehem PA, Street and pole banner application ($1,000,000 COI, utility pole permission)
Utility pole lighting heights (Canada example)Manitoba Hydro requires permission before anything is attached to its poles or streetlights, sets minimum heights for decorative lighting (3,810 mm, about 12 ft 6 in, on 4,600 mm post-top standards) and requires the receptacle to face the road. source: Manitoba Hydro, Attachments to poles and streetlights (decorative lighting heights, receptacle faces road)
Commercial SLAs and removal windowsStamford Downtown's RFP sets 24, 48 and 72 hour responses by priority, a 98% uptime target, weekly inspections and SLA credits. Albany's BID contract fixes Thanksgiving weekend installs and a one-week January removal window per season. source: Stamford Downtown, Holiday lighting and seasonal decor program RFP (SLA 24/48/72 hours, 98% uptime)

Rules vary by state, council and contract. Checked 10 November 2026; confirm against the source for your area before relying on it.

Numbers

The figures that run a commercial season

From the code, OSHA, product specs and two real downtown contracts. Check the edition your jurisdiction adopted and the spec of the product you install.

ItemFigureSource
Temporary power for holiday lightingNo more than 90 daysNEC 590.3(B)
UL 588 temporary useInstalled and used no more than 90 days; all-year lights are DGZWUL Solutions
100 ft C9 SPT2 stringer, 12 inch spacing100 sockets, 18-gauge, 960 W max per runChristmas Lights Etc spec
Downtown street trees500 to 1,700 lights per tree; feature trees 15,000 to 60,000+Stamford Downtown RFP
Downtown lamp postsAbout 180 to 200 posts, plus about 6 signal poles wrapped base to armStamford Downtown RFP
Outage response24 h (Priority 1), 48 h (Priority 2), 72 h (Priority 3); 98% uptimeStamford Downtown RFP
Install and removalThanksgiving weekend; removal 12 to 19 Jan (2025), displays end of FebDowntown Albany BID RFP
Liability insurance$1,000,000, BID and City as additional insuredDowntown Albany BID RFP
Roof edge fall protectionUnder 6 ft always; 6 to 15 ft designated area if infrequent and temporaryOSHA 1910.28(b)(13)
Ladder past the landingAt least 3 ftOSHA 1926.1053(b)(1)
Peak season crews (one firm)10 to 11 install crews in NovemberNALP, Blingle!
Decorating injuries in EDs18,400 (Nov 2016 to Jan 2017); falls 38%CPSC

source: IAEI Magazine, Holiday lighting requirements and the NEC (590.3(B) 90 days; listed lighting; UL 588 temporary use)source: UL Solutions, String lights for all-year use (UL 588 category DGZW; heavier wire and insulation)source: Christmas Lights Etc, 100 ft C9 commercial stringer, SPT2 18-gauge, 12 inch spacing, 960 W max per runsource: Stamford Downtown, Holiday lighting and seasonal decor program RFP (SLA 24/48/72 hours, 98% uptime)source: Downtown Albany BID, 3-year holiday lighting installation and removal RFP 2023 to 2026source: 29 CFR 1910.28(b)(13), Fall protection on low-slope roofs (under 6 ft, 6 to 15 ft, 15 ft or more)source: 29 CFR 1926.1053(b)(1), Ladder side rails at least 3 feet above the upper landingsource: NALP, Providing holiday decor and lighting: mastering the logistics (install and takedown calendars, crews)source: CPSC and NIST, holiday decorating hazards (18,400 ED injuries Nov 2016 to Jan 2017; falls 38%; 2 ladder deaths)source: CPSC, 15,000 holiday decorating injuries in Nov and Dec 2012; falls 34%

Where it breaks

Where spreadsheets and generic software fall over

A downtown client calls about a dark tree on the main corridor. The office logs it in an inbox, nobody knows it is a Priority 1 location, and the 24 hour response passes. The SLA credit comes off the invoice.

Every zone carries its contract priority. An outage ticket opens against the zone, starts the 24, 48 or 72 hour clock, and the uptime report is built from the tickets.

Takedown crews throw everything into whatever bins are on the truck. Next September the warehouse finds a shopping center's wreaths in an HOA's bin and three roofline runs short.

Bins belong to a customer and zone. Takedown counts items back in against the install record, flags anything missing or damaged, and the bin label prints from the system.

A crew connects four 100 ft C9 runs end to end off one outlet on a building with other loads on the circuit. The breaker trips every night at turn-on.

Each run records its connected watts against the stringer's rating and the outlet's circuit, so the design flags a run or circuit over its limit before the crew leaves the warehouse.

A property manager's certificate of insurance on file expires in December. The city asks for a current certificate before the January removal on its poles.

The certificate and permit are records with expiry dates linked to every job that uses them, and the removal job can't be scheduled until a current certificate is attached.

The design for a mall court calls for a real 30 foot tree. Nobody checked the building's occupancy or sprinklers until the fire marshal walked in.

Indoor natural trees trigger a fire code check on the design: occupancy group, sprinklers, distance from heat, listed lights only, before the quote is sent.

Renewals go out in October from memory and an old spreadsheet. Half the best commercial customers have already signed with someone else for their September slot.

Every closed season drafts a renewal from the same design, lit photos and price, ready to send in summer with an install window to pick.

Checklist

The holiday lighting installation operations checklist

Print it, or hand it to whoever runs the office side.

  • Renewals sent in summer with last year's design, lit photo and price
  • Every zone measured (linear feet, tree height, pole count) and photographed
  • Every power point mapped to a circuit, with GFCI and switching noted
  • Ownership recorded per item: installer-owned or client-owned
  • Right-of-way permits, pole owner consent and a current certificate of insurance on file
  • Fire code checked for any real tree indoors; NFPA 701 certificate for artificial trees
  • Bins pulled, every strand tested, short items replaced before loading
  • Ladders 3 ft past the landing, roof edge fall protection, lanyards in lifts
  • Each run kept under its watt rating; strain relief on live trees
  • Lit photo of every zone at completion; timers programmed
  • Outage tickets answered within the contract's priority hours
  • Weekly inspections logged where the contract asks for them
  • Takedown in the contract window, counted back into labelled bins
  • Damage logged, storage invoiced, renewal drafted

Software options

What software holiday lighting installation companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

QuoteIQ

Residential and small commercial installers who sell by the linear foot

Satellite roof tracing (MapMeasure) priced straight into the estimate, e-signatures, deposits, before and after photos, routing. Ask how it handles client-owned inventory and SLA tickets on large contracts.

source: QuoteIQ

RealGreen

Lawn and landscape companies with a holiday lighting line

Saves decor plans and placement notes to the customer account, has an online roofline measuring tool, route optimization and pre-pay letters. Strong where lighting runs alongside lawn programs.

source: RealGreen

Service Autopilot

Lawn care firms adding Christmas lights

Estimates, automated email and text workflows, before and after photos, GPS time tracking, route optimization and asset tracking.

source: Service Autopilot

Markate

Seasonal installers who want to pay only in season

Branded proposals with lighting designs, seasonal packages, rebooking campaigns, and the option to pause after the season.

source: Markate

Jobber

Small crews running lighting as one of several services

A general home service platform for quotes, scheduling, invoicing and payments. Not built for bins, removal windows or SLA credits.

source: Jobber

Spreadsheets, bin labels and a shared photo drive

Most installers in their first seasons

Works for a few dozen homes. Breaks on a downtown contract with 200 poles, a 24 hour outage clock and client-owned decor to count back in.

Published prices, compared:source: QuoteIQ, Holiday lighting software (MapMeasure satellite roof tracing)source: RealGreen, Holiday light installation software (decor inventory per customer, roofline measuring)source: Service Autopilot, Christmas light softwaresource: Markate, Holiday lighting CRM (seasonal packages, pause after season)

Questions to ask any vendor

  • Can each customer hold a design by zone, with measurements, products, power points and last year's lit photo?
  • Can bins be tied to a customer and zone, with item counts checked out at install and back in at takedown?
  • Can I mark items as client-owned or ours, and give a municipal client an inventory report of their decor?
  • Can outage tickets run on the contract's priority hours and produce an uptime report?
  • Can permits and certificates of insurance carry expiry dates and block jobs that need them?
  • Can a closed season draft next year's renewal from the same design and price?

Bring one real holiday lighting installation job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Holiday lighting installation on Fieldproxy: built around how you already work

A Fieldproxy setup for a holiday lighting company is built around the design, the bin and the season calendar. Each customer keeps a zone-by-zone design with measurements, products, power points and lit photos; each bin knows which customer and zone it belongs to and what should be in it; and commercial contracts carry their outage priorities, removal windows, permits and certificates. Crews work offline on roofs and in lifts, and the office sees installs left against crew days through the ten-week crunch.

Module 1

Renewals and pre-season sales

The calendar fills from renewals, and commercial installs start in late September.

  • Renewal record per customer: last year's design, lit photos, price, install window picked, deposit status
  • Statuses: Renewal drafted, Sent, Accepted, Deposit paid, Window locked, Declined
  • New lead intake: property type (residential, HOA, shopping center, office campus, downtown BID, municipal), site contact, desired turn-on date
  • Rule: an install slot is only held once the deposit is paid
How this works

Module 2

Survey and design by zone

Every price, bin and crew plan comes from the measured design.

  • Zone record: type (roofline, ridge, tree, lamp post, signal pole, entrance, wreath, garland, feature), linear feet or count, tree height and wrap method
  • Product per zone: C9 or C7 color, 5 mm mini lights, socket spacing, garland length, wreath size
  • Power point record: location, circuit, breaker size, GFCI yes or no, switched or timer
  • Run plan: runs per power point with connected watts against the stringer rating (e.g. 960 W) and a flag when a circuit is over
  • Access per zone: ladder, low-slope roof, steep roof, scissor or boom lift height, traffic control
  • Day photo and design mockup attached to the zone
How this works

Module 3

Quote and contract

Commercial work is priced by zone and season, with ownership and service terms spelled out.

  • Line items per zone: product, install, in-season maintenance, takedown, storage
  • Ownership per item: installer-owned (leased per season) or client-owned
  • Contract terms: install window, turn-on date, removal window, SLA priority per zone, response hours, uptime target, credits
  • Multi-year contracts (like Albany's three seasons) with a price per season
  • Quote PDF with zone photos and mockups, signed online with deposit
How this works

Module 4

Permits, insurance and fire code

Pole work, public right of way and indoor trees each have a gate before work starts.

  • Permit record: city, right-of-way permit number, poles covered, dates, pole owner consent (city or utility)
  • Certificate of insurance: amount, additional insureds (e.g. the BID and the City), expiry, 30-day notice clause
  • Indoor tree check: natural or artificial, occupancy group, sprinklered yes or no, NFPA 701 certificate for artificial
  • Block: a job on poles or in a right of way can't be scheduled until the permit and a current certificate are linked
How this works

Module 5

Warehouse, bins and inventory

The decor comes back to the shelf every January and has to leave complete every autumn.

  • Bin record: number, customer, zone, owner, item list with counts, shelf location
  • Statuses: In storage, Pulled, Tested, Short (items missing), Loaded, Installed, Returned, Damaged
  • Pre-season test log per strand or run: pass, bulbs replaced, sockets repaired
  • Stock of spares: C9 bulbs by color, stringer by spacing, clips by type, timers
  • Client-owned inventory report per municipal or BID client, as Stamford's RFP asks
  • Bin labels printed with QR codes that open the bin on the phone
How this works

Module 6

Season scheduling and crews

Ten weeks, dozens of crews' worth of work, and every customer wants lights on before Thanksgiving.

  • Install windows by customer type: commercial from late September, residential from October (e.g.)
  • Crew record: members, lift certifications, roof and fall-protection training, truck and trailer
  • Lift bookings tied to the job, with height needed
  • Route by area to cut drive time; site access windows (before mall opening hours, after office close)
  • Crunch board: zones left to install against crew days left before the latest turn-on date
How this works

Module 7

Install app for crews

The install record is the proof, the SLA baseline and next year's design.

  • Per zone: bins scanned out, runs hung, watts per run, outlet used, GFCI tested, strain relief on trees
  • Fall protection step: ladder height past landing, roof edge distance and system, lift lanyard
  • Timer program and turn-on time
  • Lit photo per zone at dusk, required before the job closes
  • Customer sign-off on the phone; works offline on roofs and in lifts
How this works

Module 8

In-season service and SLAs

Commercial contracts are judged on outages fixed, not lights hung.

  • Outage ticket: zone, priority, reported time, response due (24, 48 or 72 hours by contract), cause, fix, photo
  • Weekly inspection jobs on contracts that ask for them, with zones checked and dark sections found
  • Storm check runs booked after high wind
  • Uptime report per contract from tickets and inspections
How this works

Module 9

Takedown, storage and the client portal

Removal windows are in the contract, and the decor has to come home complete.

  • Takedown job inside the contract window (e.g. 12 to 19 January), with displays that stay longer as separate jobs
  • Count-back per bin against the install record; missing and damaged items logged with photos
  • Storage fee line per customer; client-owned decor returned to the client's container when the contract says so
  • Customer portal: design, lit photos, outage tickets, invoices and certificate of insurance
How this works

Module 10

Invoicing and season reporting

Deposits, installs, maintenance, takedown and storage bill at different times of year.

  • Deposit, install, maintenance and takedown invoices, with SLA credits applied, synced to QuickBooks or Xero
  • Reports: renewals accepted, revenue per crew day, items lost or damaged per customer, outages by cause, uptime by contract
How this works

The AI agents, set up for holiday lighting installation companies

AgentWhenWhat it doesWhat you get
Document intelligence agentA city, BID or property manager sends an RFP, purchase order or scope PDFReads the zones, quantities (lamp posts, trees, wreaths), install and removal dates, insurance amount and SLA response hoursA draft contract with zones, dates, SLA priorities and the certificate of insurance requirement filled in for a person to check
Watcher agentAn outage ticket reaches 75% of its response time, a certificate of insurance expires before the removal window, or a run's watts exceed its ratingChecks tickets against contract priorities, certificates and permits against job dates, and run plans against stringer ratingsAn alert to the office naming the zone, the contract and the deadline, and the removal job held until a current certificate is attached
Dispatch agentAn outage ticket opens or an install needs a liftMatches the nearest crew with the right lift certification and spare stock on the truckA crew assigned with the response deadline on the job, or the ticket flagged if no qualified crew can make it in time
Vision agentA crew photographs a bin's contents at takedown or a dark section during an inspectionCounts the items in the photo against the bin's list, or reads which part of the zone is outA count-back with missing items flagged, or an outage ticket with the zone and photo filled in
AutopilotA season closes, or a renewal has sat unanswered for e.g. 14 days in summerDrafts the renewal with last year's lit photos, design and price, and offers the open install windowsA draft renewal email a person approves before it sends
Scheduler agentEvery morning from 15 September to 15 December, and every Monday in the seasonTotals zones left to install against crew days left, open outage tickets by priority, and bins still shortA daily crunch briefing to the owner and a weekly uptime report for each commercial client

Straight answers

Holiday lighting installation: FAQ

What software do holiday lighting installation companies use?

Residential and small commercial installers often use QuoteIQ, RealGreen, Service Autopilot, Markate or Jobber for measuring, quoting, routing and payments. Commercial and municipal contracts also need per-customer bin inventory, outage SLAs, removal windows, pole permits and insurance certificates. Fieldproxy is set up around your own designs, bins, crews, SLAs and contracts.

How long can holiday lights stay up under the electrical code?

NEC 590.3(B) allows temporary power and lighting for holiday decorative lighting for no more than 90 days. Displays that run longer should be discussed with the authority having jurisdiction or fed from permanent wiring. UL 588 also treats seasonal string lights as temporary use of no more than 90 days, with a separate DGZW category for all-year lights.

Can you put lights on a real tree in a shopping mall?

Often not. Fairfax County's fire marshal applies Section 806, which bans natural cut trees in assembly, mercantile, institutional and several residential occupancies unless sprinklered exceptions apply. Where allowed, the tree must stay away from heat by at least its height, and only listed lighting may be used. Artificial trees must meet NFPA 701.

What fall protection do installers need on a flat commercial roof?

OSHA 1910.28(b)(13): within 6 feet of the edge, a guardrail, safety net, travel restraint or personal fall arrest. From 6 to 15 feet, the same or a designated area for infrequent, temporary work. At 15 feet or more, a work rule keeping people out of the 15 foot zone is allowed for infrequent, temporary work.

How many C9 strands can you connect on one run?

It depends on the wire and plug. A typical 100 ft C9 SPT2 18-gauge commercial stringer with 12 inch spacing lists 960 W as its maximum per run. Add up the bulbs' watts on the run and keep under the rating, and check the outlet's circuit has room for the total.

What response times do commercial holiday lighting contracts ask for?

Stamford Downtown's RFP sets Priority 1 (gateways, major corridors, feature trees, civic parks) at 24 hours, Priority 2 (standard street trees, lamp posts, garages) at 48 hours and Priority 3 at 72 hours, with a 98% uptime target, weekly inspections and SLA credits.

Do I need a permit to hang lights on city light poles?

Usually yes. Minneapolis requires a permit to attach seasonal decorations to poles in the right of way, Saint Paul charges a permit fee and asks for a certificate of insurance, and utility-owned poles need the owner's consent. Bethlehem PA asks for a $1,000,000 certificate naming the city as additional insured.

When do commercial holiday lights go up and come down?

Earlier than most people think. One large installer told NALP it starts commercial work in the last week of September and aims to finish by 12 December, then starts takedown the day after New Year's with everything down by 1 February. Albany's downtown contract installs on Thanksgiving weekend and removes in a one-week January window.

Who owns the lights, the installer or the customer?

Both models exist. Many installers lease their own lights each season and store them. Municipal and BID clients often own their decor: Albany's BID has the contractor collect it from the BID's own storage container, and Stamford asks for inventory documentation of all client-owned materials.

How common are holiday decorating injuries?

CPSC estimated 18,400 emergency department injuries tied to holiday decorating from November 2016 to January 2017, with falls the most common at 38%, and two deaths from ladder falls.

Related guides

All sources on this page (29)

Run holiday lighting installation work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.