At a glance
The challenge
Competent Pneumatic does several different kinds of field work: getting a site ready for a new compressor, commissioning it, servicing and maintaining it under contract, and designing and installing aluminium piping. Each has its own checklist and its own report, and a single generic job form would not hold any of them properly.
What we built
Fieldproxy built the system around those job types instead of one template. The office works from a web console of customers, machines, quotes, service requests and piping projects, and each kind of engineer gets their own mobile flow with the checklists and reports for that work. The first service flow was set up in June 2025, and the rest were added and refined in stages through 2026.
The results
- Site check-in with location for each engineer visit
- Pre-commissioning, commissioning and service report layouts per visit
- Machine warranty and AMC tracked against each machine
- Spare parts requested and consumed recorded per job
Want yours built around how you work, the same way?
Get DemoA compressed air business with four kinds of field work
Competent Pneumatic Pvt. Ltd. works from an industrial area base. It is an authorised partner for industrial air compressors, refrigeration dryers and filters, aluminium compressed air piping, flow meters and sensors, and pneumatic fittings, and has expanded into water and chemical piping, industrial lubricants and measurement equipment.
On the service side the company rents out air compressors, sells used compressors, monitors and audits compressed air systems, and designs and installs aluminium piping. That means engineers on customer sites for very different reasons: preparing a site before a machine arrives, starting a new machine up, maintaining it under an annual contract, repairing it when it fails, or laying a piping network.
Each of those visits produces its own paperwork, and the engineers were already working from a paper service report. Whatever system the team used had to match those stages and those documents, not replace them with something generic.
What we built: a system around their machines and job types
The core of the system is the customer's machine. Make, model, machine type, serial details and warranty sit on the machine record, and every pre-commissioning, commissioning and service visit is tied back to it. From there, each kind of work got its own flow.
Pre-commissioning and commissioning
Engineers check in at site, record machine details and run the initial start up checklist, with a separate commissioning report for dryers.
Service and annual maintenance
Service requests carry machine details, warranty, checklists, consumed spare parts and an annual maintenance section, ending in a service report PDF.
Repairs and spare parts
A ticket flow lets engineers request spare parts, record repair execution and submit a repair order.
Piping projects
Piping engineers check in, record the bill of materials and parts required, and file a daily work report, with projects assigned to a lead and a secondary technician.
Quotes and AMC scheduling
The office raises quotes against spare parts and schedules annual maintenance from the web console.
Job acceptance
Engineers see their assigned jobs on a dashboard and accept a job before starting it.
The office console
The office works from one web console. It holds customers and their contacts, machines and models, quotes, service requests, pre-commissioning and commissioning jobs, piping customers and projects, and the employee list. Reports for pre-commissioning, commissioning, service and piping projects can be opened from the same place, and service reports can be sent from it.
Bulk import is available for loading existing records, and a separate job counter lets the team check visits by date.
Built in stages, alongside the team
The system was not delivered as one fixed package. The first service flow was set up in June 2025. By July 2026 the web console and the separate pre-commissioning, commissioning and piping flows were in place and being checked before rollout to the engineers.
From there the team went through the flows screen by screen, including comparing the digital checklists with the paper service report their engineers already used. A single home screen for engineers was added in August 2026, and the flows continued to be adjusted through October 2026 as the team reviewed them.
How it went
Start
The first mobile service flow set up.
Next
Commissioning and piping flows added.
Today
One home screen for engineers, still being tuned with them.