How do I get an approved landscaping estimate to the crew without retyping it?

Build the estimate in sections with the descriptions, materials and budgeted hours the crew needs, and put add-ons like lighting, an extra bed or drainage on it as optional lines that stay out of the total until the client ticks them. When the client approves from a link, the accepted version (base sections plus only the options they chose) becomes the job or work order, so the crew sees the same scope, materials and hours on their phone with nobody retyping it. Anything that changes after approval goes through as a change order, and the invoice is built from the accepted lines.

  • Write the estimate once, in sections, with crew descriptions, materials and budgeted hours on every line.
  • Optional add-ons sit below the total and only count when the client ticks them.
  • Only the accepted version becomes the work order. Declined options never reach the crew.
  • Changes after approval are change orders, approved by the client, not edits to the original.
  • The invoice comes from the accepted lines and approved change orders, not from a separate sheet.

Book your demo

A video call with our team

Number of employees

This page is about one estimate becoming one crew's work order. If a single approved estimate needs to go to several crews or subcontractors, see the page on splitting an approved quote across crews.

Facts checked as of November 2026. Sources at the end of the page.

Step by step

How an estimate becomes a crew work order, step by step

The retyping happens because the estimate was written for the client and the work order has to be written again for the crew. The fix is to write one document that serves both, then let the approval decide what moves on.

1. Build the estimate in sections

Group the work the way the crew does it, e.g. Excavation and base, Paver install, Edging and cleanup. Each line carries a client description, a crew description (what to do and how), materials with quantities, budgeted crew hours, cost and price. The client sees the price and the plain description. The crew later sees the work and the hours.

2. Add the options as optional lines

Lighting, an extra bed, drainage or a sealer go on the same estimate as optional lines with their own materials and hours. They show under the main total with their own price, and they are not counted in the total until the client selects them. Mark one as recommended if you want it pre-selected.

3. Send a link and let the client choose

The client opens the estimate from a link, ticks the options they want, sees the total change, and approves with a signature (and a deposit if you take one). The approval records exactly which options were accepted and the accepted total.

4. The accepted version becomes the job

On approval, the base sections plus the accepted options become the job or work order: crew descriptions, materials list, budgeted hours per section, site photos and notes from the estimate visit. Declined options drop off. Nobody opens a spreadsheet.

5. Assign the crew and schedule it

The office puts the job on the schedule board, assigns a crew and sets dates. The budgeted hours tell the scheduler how many crew days to block. The crew sees the job, the sections and the materials on their phone.

6. Track hours against the budget

Crews clock time against each section, so you see actual against budgeted hours while the job is still running, not after the invoice has gone out.

7. Changes go through as change orders

If the client adds 30 square feet on site or asks for the lighting after all, raise a change order against the job with its own price, materials and hours. The client approves it from a link, and it is added to the job and the billing. The original accepted estimate stays as it was.

8. Invoice from the accepted lines

Deposit, progress and final invoices are built from the accepted lines and approved change orders. The total on the last invoice matches what the client agreed to, plus or minus the change orders they signed.

Failure modes

Why it goes wrong

The work order is written twice

The owner of a hardscape and landscape company told us on a sales call: "once they accept that contract, one of the hardest things is then getting it on our schedule board and getting our guys work orders that have all the descriptions and everything on there." His office typed each accepted estimate into Excel sheets so crews had something to work from.

Options change the total before anyone agrees

The same owner wanted to show the main job and its total, then list add-ons underneath, in his words "here's landscape lighting and it's three grand, but it's not changing the total unless they say, yeah, I want to add that." When the tool adds every line to the total, the client sees a bigger number than the job they asked for, and the office edits the estimate by hand to take options out.

A declined option still reaches the crew

When the work order is copied from the full estimate instead of the accepted version, the crew sees lighting materials on a job where the client said no. Someone orders the fixtures anyway.

Hours never make it across

The estimator priced 100 crew hours, but the work order only says what to build. Without budgeted hours on the job, nobody knows the crew is running over until the job is closed.

Changes on site live in a text message

The client asks for a wider step and the crew lead agrees on the spot. If it is not a change order with a price and an approval, it is either never billed or billed and disputed.

The invoice is rebuilt from memory

When the invoice is typed from the spreadsheet instead of the accepted estimate, options get billed that were declined, or a change order gets left off.

Options

Ways to do it

Several tools handle parts of this well. Ask the same three questions of each: do optional items stay out of the total until the client picks them, does only the accepted version move to the job, and do crew descriptions, materials and hours come across with it.

ApproachEstimate to job, and optional add-onsWhat to check
Estimate tool plus a spreadsheet work orderThe estimate goes to the client from one tool, and after acceptance the office types descriptions, materials and hours into Excel or a printed work order for the crew.Works for a few jobs a month. Every job is typed twice, and options, changes and hours drift between the two copies.
Optional line items (Jobber)Jobber's help center says a quote line can be marked optional, the client selects or deselects options in client hub and the total adjusts, and on conversion to a job the selected options become regular line items while unselected ones are left off. Line items, discount, tax and transferable custom fields move to the job when you choose Convert to Job.Optional line items are on select plans. Conversion is started from the quote. The conversion article does not say whether line item notes or attachments carry over, so check that crew descriptions reach the job.
Optional Services group and work tickets (Aspire)Aspire's guide says a new estimate has a Default Group for required work and an Optional Services group, and optional services are not included in the total estimated price. After the opportunity is won, Aspire creates a work ticket for each service, listing the required materials, equipment and hours.Built for larger landscape companies. That guide page does not say how an option the client picks later becomes a ticket, so ask to see it in a demo.
Estimate import into a job (LMN)LMN's help center says importing an estimate turns its work areas or services into job tasks and carries over the estimated man hours, and crew notes can be copied as task notes the crew sees when they clock in on the LMN Crew app. Change orders stay on the original job.LMN's change order article says customer approval of a change order currently happens outside LMN, and approving one does not update scheduled or future invoices. The jobs article does not mention optional items.
Included, Recommended and Optional items (SingleOps)SingleOps' help article sets each proposal item as Included (the client cannot opt out), Recommended (pre-selected, the client can opt out) or Optional (the client can add it). The client ticks items, refreshes the proposal, and checked items show as Accepted, unchecked as Declined.The article says choices cannot be altered once the proposal is accepted, and it does not describe how accepted items reach the job, work order or invoice. Ask to see that step.
Multi-option estimates (Housecall Pro)Housecall Pro's help center describes multi-option estimates for packages or tiers. By default the customer can approve only one option, or you can allow several. A setting can create a job automatically when the customer approves through the Customer Portal.Options are whole alternatives, not add-ons under a total. The help article says each approved option must be copied to a job and approved options are not combined into one job automatically.
A configurable field service platform (Fieldproxy)Estimates are set up in your own sections with budgeted hours, cost, margin and markup, and optional lines the client ticks from a link. The accepted version becomes the job on the crew's phone, with change orders and progress invoices from the same lines.The estimate layout and job fields are built for your business during setup, not picked from a fixed template. Bring two or three real estimates so the setup matches how you price.

Vendor facts are from each vendor's own help pages, read in November 2026. We could not open a current Service Autopilot help article on optional items or estimate conversion, so it is not in this table. Features change, so check the linked pages.

Worked example

A worked example: a $24,000 paver patio with a $3,000 lighting option

Say a hardscape company prices a 600 square foot paver patio at $24,000, in three sections. Under the total it offers three options: landscape lighting at $3,000, an extra planting bed at $1,800 and a drainage line at $2,200. The client sees $24,000 as the job total and the options listed below it.

LineCrew scope and materialsBudgeted hoursPriceOn the work order?
Excavation and baseDig out 8 inches, compact, 4 inches of crushed stone base32$6,400Yes
Paver install600 sq ft pavers, 1 inch bedding sand, pattern per plan48$14,200Yes
Edging and cleanupEdge restraint, polymeric sand, haul away spoils12$3,400Yes
Base total92$24,000
Option: landscape lighting8 fixtures, transformer, low voltage cable10$3,000Yes, client ticked it
Option: extra planting bedBed edging, soil, plants per plan9$1,800No, declined
Option: drainage lineTrench, perforated pipe, gravel, outlet11$2,200No, declined
Accepted totalBase plus lighting102$27,000

A worked example with made-up figures. $6,400 + $14,200 + $3,400 = $24,000; plus $3,000 lighting = $27,000.

The client opens the link, ticks lighting, watches the total move from $24,000 to $27,000, signs and pays a 30% deposit of $8,100. The job is created with four sections (the three base sections and lighting), 102 budgeted crew hours, the materials list for each, and the photos from the site visit. The bed and drainage lines never appear on the crew's phone, so nobody orders plants or pipe for them.

With a crew of three working 8 hour days, 102 hours is a little over 4 crew days, so the scheduler blocks 5 days. On day two the client asks to widen the step by the back door. The crew lead raises a change order for $900 with 4 extra hours and the material, the client approves it from a link, and the job budget becomes 106 hours.

The final invoice is $27,000 + $900 change order less the $8,100 deposit = $19,800. If the crew logged 110 hours against a budget of 106, the office sees which section ran over while the job is still open, not at year end.

Before you buy

What to check before you choose a tool

Good signs

  • Optional lines show their own price and stay out of the total until the client selects them.
  • The client picks options and approves from a link, on a phone, with a signature and an optional deposit.
  • Only accepted lines move to the job. Declined options do not reach the crew or the invoice.
  • Each line carries a crew description, materials and budgeted hours, and all three appear on the job.
  • Site photos and notes from the estimate visit come across to the job.
  • Change orders have their own price and approval, and flow into the invoice without retyping.
  • Deposit, progress and final invoices are built from the accepted lines.
  • Crews can clock time against sections so you see actual against budgeted hours.

Red flags

  • Every line on the estimate adds to the total, so options must be removed by hand.
  • Options are only whole alternatives (good, better, best), with no add-ons under a base price.
  • Converting to a job copies prices but not crew descriptions, materials or hours.
  • Each accepted option has to be copied to the job one at a time.
  • Change orders are approved outside the system and the invoice is updated by hand.
  • The demo uses a sample estimate, never one of your own.

In Fieldproxy

Setting it up in Fieldproxy

Fieldproxy is set up around your own process, so the estimate layout, sections and job fields are configured for your account. Values marked e.g. are examples to replace with your own.

Estimates in your own sections

Estimates are built in sections that match how your crews work, e.g. Excavation and base, Install, Lighting. Each line has a client description, a crew description, materials, budgeted hours, cost, margin and markup, so the price and the plan are written once.

Optional lines the client ticks

Add-ons go on as optional lines with their own price, shown below the main total. The client opens the estimate from a link, ticks the options they want, and approves. The total only changes for the options they chose.

The accepted estimate becomes the job

On approval, the accepted sections and options become the job on the crew's phone, with descriptions, materials, budgeted hours and photos. The office assigns the crew and schedules it. Declined options stay on the estimate record only.

Change orders and progress invoices

Changes after approval are raised as change orders the client approves, and invoices (deposit, progress and final) are built from the accepted lines and approved change orders. Invoices sync with QuickBooks or Xero.

Follow-ups on estimates nobody answered

The Autopilot agent drafts a follow-up when an estimate has gone unanswered for e.g. 5 days, and a person approves it before it is sent. The Watcher agent can flag jobs running past their budgeted hours.

Live within a day, with your data moved for you

Setup is guided: we build the estimate layout from your real estimates, and your first crews can run real jobs the day after the call. Moving customers, price lists and open estimates from your current tool is free and assisted. Fieldproxy is one price per company with unlimited users.

How switching works

How switching to Fieldproxy works

We move your data over and set the system up to the way you already work. Fieldproxy replaces the old tool; it does not run alongside it.

  1. Bring three real estimates

    One with options the client took, one with options they declined, and one with a change order. We set up the sections, lines and options to match.
  2. We build the estimate and the work order together

    The client view and the crew view come from the same lines, so we check both against your real estimates before anything goes live.
  3. Customers, price list and open estimates come across

    Migration is free and assisted. Open estimates are moved so clients can still approve them from a link.
  4. Crews get the job on their phone

    The next accepted estimate becomes a job your crew opens on the app, usually within a day of the setup call.

FAQ

Questions people ask

Can optional add-ons be shown on an estimate without changing the total?
Yes, in tools that support optional lines. The option shows its own price under the total and only counts once the client selects it. Check that declined options also stay off the job and the invoice.
Do declined options ever reach the crew?
They should not. Only the accepted version of the estimate, the base work plus the options the client chose, should become the work order.
Can the crew see the descriptions and materials but not the prices?
That is the usual setup. The crew view shows scope, materials and budgeted hours, while prices stay on the client view and the office side.
What if the client wants an option after they already approved?
Add it as a change order against the job, with its own price, materials and hours, and have the client approve it from a link. The original approval stays as a record of what was agreed first.
How are budgeted hours used once the job starts?
They set how many crew days to schedule, and crews clock time against each section, so you can see actual against budgeted hours while the job is still running.
Can I take a deposit when the client approves?
Many tools take a deposit at approval. The deposit, progress and final invoices should all come from the accepted lines and approved change orders so the totals reconcile.
What if one estimate needs two crews, for example hardscape and lighting?
Then the approved estimate becomes more than one job. The page on splitting an approved quote across crews covers that case.

Sources

Competitor details on this page come from the vendors' own pages and documentation, checked as of November 2026. Plans and prices change, so check the vendor's current page before you decide.

See it built on your workflow

Tell us how your jobs run today. We build a demo on your stages, forms and pricing before the call.