How do you manage HVAC projects with phases, a Gantt chart and visits?
Split the job into phases on a Gantt chart, attach each technician visit, permit and inspection to a phase, and bill by phase with a deposit and retainage. In Fieldproxy one project page shows the stage, what is late and why, cost to date and projected margin.
This walkthrough opens the projects list and an $86,500 rooftop-unit replacement at Summit Home Services, a demo HVAC, plumbing and electrical company: the at-risk banner, the Gantt of phases and visits, permits and inspections, and progress billing.
Chapters
Summit Home Services is a demo company with fictional customers. Every screen is the real Fieldproxy product; some sequences are sped up.
Step by step
See every project at once
The projects list shows contract value, billed, ready to bill, projected margin and which projects are at risk, with the reason.
Open the project
A stage tracker from lead to closed, an at-risk banner and live contract, progress, cost and margin figures.
Plan phases on a Gantt
Each phase has dates, an owner and links to the next; late phases show in red.
Hang visits on phases
Every technician visit is a normal job grouped under its phase, so the field team sees it on the phone.
Track permits and inspections
Permits, submittals and inspections are checklist items tied to a phase, with due dates and pass or fail.
Bill by phase
A billing schedule with a deposit, a share of the contract per phase and retainage; invoices are created as drafts.
Questions people ask
- What is HVAC project management software?
- Software that runs multi-visit HVAC work such as replacements and commercial installs as one project: phases, visits, permits, change orders, budget and billing in one place.
- Can I see a Gantt chart of the project?
- Yes. The project's schedule tab is a Gantt of phases with their visits underneath, linked phases, today's line and the target date.
- How does progress billing work?
- You set a billing schedule: a deposit, then a percentage of the contract per phase, with optional retainage. Lines become ready to bill when their phase is done and invoices start as drafts.
- How do I know a project is slipping?
- Projects are flagged at risk with the reason, such as a late phase, overdue permits or a change order waiting for approval, on the list and on the project page.
- How long does it take to set up?
- Fieldproxy builds your own field service management system around your workflows, and it can be live within a day.
- Is Summit Home Services a real company?
- No. Summit is a demo company with fictional customers. The screens are the real Fieldproxy product, recorded live and sped up.
Transcript
Show
- 0:00How do you run a big HVAC job without losing track? Break it into phases on a timeline, hang every visit, permit and invoice off those phases, and let the software flag what's slipping. Here's an eighty-six-thousand-dollar rooftop replacement at a demo heating and cooling company.
- 0:23Spreadsheets and whiteboards can't tell you which install is slipping.
- 0:28Here, every active project sits on one list: a hundred and sixty-four thousand in contracts, what's billed, what's ready to bill, and the projected margin.
- 0:38Three are flagged at risk, each with the exact reason.
- 0:42Open the rooftop units job. A stage tracker from lead to closed, and a banner that says why it's at risk: the permit and crane phase is two days late.
- 0:52Contract, progress, billed, cost to date and a twenty-five percent projected margin, all live.
- 1:00The schedule is a Gantt chart. Six phases, from submittals to close-out, each one linked to the next, and the late one in red. Under every phase sit its visits: the crane day to swap the units, ductwork, gas and controls, the electrical and building-controls wiring, then start-up, test and balance.
- 1:21Each visit is a normal job your technicians see on their phones, grouped by phase. One of five is done, and the crane day is booked for the nineteenth.
- 1:32Permits and inspections live on the project too, each tied to a phase with a due date: the mechanical permit, the crane permit, the gas pressure test and the final inspection, with pass or fail.
- 1:46And the money follows the phases. A twenty percent deposit, already invoiced. Then thirty percent when the units are set, twenty-five after ductwork and controls, and so on, with ten percent retainage held on each line. Invoices start as drafts, so nothing goes to the customer until you say so.
- 2:07Every phase, visit, permit and invoice of a big job, on one page.
- 2:12Get your own custom field service management within a day, tailored to your workflows.
- 2:18Start at fieldproxy dot ai.