How do I run permit-to-work and safety sign-off before field work starts?
Make the permit its own record linked to the job, with the hazards, the isolation points, the people covered, an issuer, a receiver and an expiry time, and do not let the job move to In progress until that permit is in an Issued status. Approve the plan before the crew travels, then have the issuer sign on the day once isolation has been applied and verified, so the worker waits on site for minutes and not for a phone call that nobody answers. Close the loop the same way: the job cannot be completed until the permit is handed back and cancelled.
- The permit is a record with a status, not a checkbox on the job. One permit can cover several jobs, and one job can need several permits.
- Split approval in two: the plan (hazards, isolations, people) the day before, and the on-site confirmation (isolated, tested, briefed) on the day.
- The block has to be a hard one. If the technician can tap Start without an issued permit, the permit is paperwork.
- Every permit expires. Work that runs past the expiry or into a new shift needs a revalidation or a new permit.
- Hand-back is a step with a signature: tools and people clear, locks removed by the person who applied them, equipment returned to operations.
A permit in software records and enforces a decision. It does not make the decision safe. Plants with hundreds of interlinked isolations usually need a dedicated control-of-work system. The rules below summarize official pages and are not legal or safety advice.
Facts checked as of November 2026. Sources at the end of the page.
Step by step
How permit-to-work before a field job works, step by step
The same eight steps apply to a solar inverter swap, a compressor station outage, a confined space entry or hot work on a customer's roof. What changes is which permit types you use and who may issue them.
1. Decide which jobs need a permit
Put it on the job type, not on the technician's judgment. Fields on the job type: Permit required (yes or no) and Permit types, e.g. electrical isolation, hot work, confined space entry, work at height, excavation. A job created from that type is born with a permit request attached.
2. Create the permit as its own record
Fields: site and asset, scope of work, permit type, hazards, precautions, isolation points, people covered, issuer, receiver, valid from, valid until, and linked jobs. For confined space entry, US rules list what the permit must identify, including the space, the purpose, the date and authorized duration, the entrants, the attendants, the entry supervisor, the hazards, the isolation measures, the acceptable entry conditions and the test results with the tester's initials and the time.
3. Approve the plan before anyone travels
A person with authority reviews the hazards, the isolation list and the named crew, and moves the permit from Requested to Approved. This is the slow, thinking step, so do it the day before. Nothing is live yet and no work may start.
4. Isolate, lock and verify on site
The US lockout rule sets the order: preparation for shutdown, shutdown, isolation, applying the lockout or tagout device, dealing with stored energy, then verification. Before starting work on locked out equipment, the authorized employee must verify that isolation and deenergization have been accomplished. Record each isolation point as a line with who applied it, the lock or tag number, a photo and the test result.
5. Brief the crew and collect acceptance
Everyone covered by the permit reads it and signs. For electric power work in the United States the briefing must cover at least the hazards of the job, the work procedures, special precautions, energy-source controls and personal protective equipment, with at least one briefing before the first job of each day or shift and more if significant changes occur.
6. Issue the permit, which unlocks the job
The issuer signs last, after isolation and briefing, and the permit moves to Issued with a valid-until time. For confined spaces the entry supervisor named on the permit signs before entry begins, and the permit is posted at the entry point or made available by an equally effective means. Only now can the job move to In progress.
7. Watch the clock and the conditions
A permit should not last longer than the task it covers. If work runs past the valid-until time, the crew changes or conditions change (gas reading, weather, a second contractor arriving), the permit is suspended and revalidated or reissued. The US lockout rule requires specific procedures at shift or personnel changes so that protection carries over in an orderly way.
8. Hand back and cancel
The receiver declares the work complete or stopped, people and tools clear, guards refitted. Each lock is removed by the employee who applied it. The issuer accepts the equipment back and cancels the permit. Only then can the job be marked complete. Keep the cancelled permit: US rules require cancelled confined space entry permits to be retained for at least 1 year.
Failure modes
Why it goes wrong
The permit lives outside the work order
A renewable energy operator with solar and wind sites at 16 to 17 locations told us permit-to-work ticketing was a must-have alongside spares and job management. When the permit is a paper book in the control room, nothing stops a job from being started, and nobody at head office can see which sites have live permits.
The worker waits on site for an approver
An electrical inspection contractor working for a grid operator asked whether the office can approve a completed checklist while the field worker is still on the same job. If approval means a phone call, a crew of two stands at the gate. If approval arrives after the visit, it is a rubber stamp.
No signal at the site
A support team working at compressor stations and gas plants described sites with no connectivity and a lot of noise, with everything done on laptops afterward. A permit that needs a live connection to open will be bypassed on the first day.
The form cannot keep up with the rules
The same team said that changing their field form meant a request to a central IT group that could take months. Permit templates change after every incident review. If the people who own safety cannot edit the form, crews go back to paper.
Signatures are scattered across screens
One buyer wanted a single checklist that captures photos and three signatures instead of separate menus. Issuer, receiver and site owner each sign at a different moment. If each signature is a different screen with no order, one gets skipped.
Nobody closes the permit
The job is finished and invoiced while the permit still shows Issued and the locks are still on. The UK Health and Safety Executive lists failure to hand over plant in a safe condition when work is completed or the permit is cancelled as one of the major hazards of permit systems.
Options
Ways to do it
Six real approaches. The question to ask of each one is whether an unissued permit actually stops the job, or only leaves a gap in the file.
| Approach | What it does well | Where it falls short |
|---|---|---|
| Paper permit book and a phone call | Everyone understands it. The permit is physically posted at the work location, which regulators expect for confined space entry. | Nothing links it to the job, the office cannot see live permits across sites, and expiry is enforced by memory. |
| An inspection app with approvals (SafetyCulture) | Permit templates on a phone, with approval workflows in templates so an inspection is reviewed and approved before it can be completed. | The approval gates the form, not the job. Your work order system does not know the permit exists unless you integrate the two. |
| Required forms in a trades FSM (ServiceTitan) | A form trigger can be marked Required, which means the form must be filled out to advance a job, and set to Must complete the form at the time of trigger. Set under Settings > Operations > Forms. | The technician fills it in alone. ServiceTitan's own help article says technicians can pick Fill out later on required forms unless the time of trigger option is set. A form is not an approval by a second person. |
| Inspections on service tasks (Microsoft Dynamics 365 Field Service) | An inspection is tied to a service task on the work order. If an inspection question is required, the technician must answer it or the task cannot be marked complete. | It gates completing a task, not starting the work, and it has no issuer, expiry or hand-back out of the box. Those need an administrator to build. |
| Enterprise asset management with work clearance (SAP Work Clearance Management) | A true hard block. Maintenance tasks on a WCM-relevant order cannot be performed until Released for execution (status EXEC) is issued, and that release is controlled by the approval status of the work clearance application, SAP's safety certificate for lockout and tagout. | Built for plants that already run SAP Plant Maintenance. Heavy to set up for a service contractor with 10 to 50 technicians visiting other people's sites. |
| A configurable field service platform (Fieldproxy) | The permit is a record beside the job with your own statuses, an approval step for the office, signatures in order, and a rule that holds the job at Ready until the permit is Issued. Works offline for the on-site steps. | The permit flow is set up for your business, not switched on from a menu. It is not a plant-wide isolation management system. |
Vendor facts are from each vendor's own help pages, read in November 2026. Features change, so check the linked page.
Worked example
A worked example: 14 permit jobs a week
Say a maintenance contractor runs 14 jobs a week that need an electrical isolation permit, each with a crew of two. Today the receiver phones the customer's operations lead from the gate, reads out the plan, and waits for the lead to find the drawing and agree. Assume that wait averages 25 minutes.
That is 14 jobs x 2 people x 25 minutes = 700 minutes, or 11 hours 40 minutes of paid time a week spent standing at a gate.
| Step | Before | With a two-stage permit |
|---|---|---|
| Plan reviewed (hazards, isolation list, crew) | On site, by phone | Day before, from the office |
| Isolation applied and tested | On site | On site, each point logged with lock number and photo |
| Issuer confirms and signs | 25 min wait, verbal | About 5 min, issuer sees the photos and signs |
| Crew time waiting per week | 11 h 40 min | 2 h 20 min |
A worked example, not a benchmark. 14 x 2 x 5 minutes = 140 minutes.
The saving is 9 hours 20 minutes a week, and none of it comes from skipping a check. The plan gets more attention because it is read at a desk, and the on-site step gets faster because the issuer is confirming evidence, not hearing the plan for the first time.
The second number to track is permits still open after their job closed. In a paper system you cannot count them. With the permit as a record it is one filter, and the target is zero.
Before you buy
What to check before you choose a tool
Good signs
- The permit is a separate record with its own status, linked to one or more jobs.
- The job cannot move to In progress while a required permit is not Issued, and the app says why.
- Approval is by a named second person with the authority to issue, not by the technician ticking a box.
- Signatures are collected in a fixed order, and each one is stamped with name, time and location.
- Isolation points are lines on the permit with lock or tag number, photo, applied by and removed by.
- Permits have a valid-until time, and an expired permit pauses the job.
- The on-site steps work with no signal and sync later, with the time each step was actually done.
- The job cannot be completed until the permit is handed back and cancelled.
- Your safety lead can change the permit template without a developer.
Red flags
- The only control is a required form the technician completes alone.
- A required form can be deferred with a fill out later option.
- The form blocks closing the job, not starting it.
- Anyone with office access can approve, with no check on who is authorized for that permit type.
- Permits never expire, or expiry is a date with no time.
- A completed permit can be edited afterward with no history of who changed what.
- Customers and subcontractors who must sign need a paid login to do it.
In Fieldproxy
Setting it up in Fieldproxy
Fieldproxy is configured around your process, so the permit flow below is records, statuses and rules set up for your account. Values marked e.g. are examples to replace with your own.
A Permit record linked to jobs
Fields for site, asset, permit type, scope, hazards, precautions, people covered, issuer, receiver, valid from and valid until. Statuses e.g. Requested, Approved, Issued, Suspended, Handed back, Cancelled. Isolation points sit under it as lines with lock or tag number, photo, applied by and removed by.
Job types that demand a permit
A Permit required flag and the permit types on each job type. A job created from that type gets its permit request automatically, and the job is held at e.g. Ready, with Start disabled on the phone, until every required permit is Issued and inside its valid-until time.
Two approval steps for the office
Approval workflows route the plan to the people authorized for that permit type the day before, and route the on-site confirmation to the issuer on the day. The issuer sees the isolation photos and test results and signs from the web or a phone.
On-site steps in the technician app
The Android and iOS app walks the receiver through isolation, verification, the crew briefing and signatures in order, with photos and GPS check-in, and keeps working offline. It runs in 27 languages, so each crew member reads the permit in their own.
Watcher agent on expiry and open permits
The Watcher agent flags a permit that expires in e.g. 30 minutes while its job is still In progress, a job closed with a permit not handed back, and a permit Issued for a site where no one has checked in.
Vision agent on the evidence
The Vision agent reads a photo of a lock tag, a gas detector reading or a nameplate and fills the matching field, so the issuer reviews values and not blurry pictures.
A permit PDF and a live register
Each permit prints to a PDF from your own template for posting at the work location and for the customer's file. In Command Center, ask in plain English for all permits live right now by site, or all permits issued last month by type.
By country
Rules that shape the permit
United States: lockout, confined spaces and hot work
The lockout rule requires an inspection of each energy control procedure at least annually. Confined space entry needs a written permit signed by the entry supervisor, and cancelled permits are kept for at least 1 year. For welding and cutting, a fire watch is maintained for at least a half hour after the work, and authorization is given preferably in the form of a written permit. On construction sites the controlling contractor and entry employers must coordinate entry when more than one entity is in a space at the same time.
United Kingdom: HSE guidance
The Health and Safety Executive publishes HSG250, Guidance on permit-to-work systems, written for the petroleum, chemical and allied industries. Its technical measures page asks whether work is properly authorized by a responsible person, whether precautions such as isolation, draining and risk assessments are taken before a permit is initiated, whether all permits are kept on file, and whether there is a formal procedure to hand equipment back to operation.
Canada: longer fire watch, permit posted at the space
The Canadian Centre for Occupational Health and Safety advises posting a trained fire watcher for at least 60 minutes after hot work has stopped, and longer where needed. For confined spaces it says the entry permit should state how long it is valid, name the entrants, the attendant and the supervisor, record atmospheric test details, and be posted at the space until the work is completed. Provincial rules set the legal detail.
India: permit-to-work on electrical lines and apparatus
Under the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023, before shutdown work or testing the engineer or supervisor in charge must identify the hazards, brief the whole working group, obtain a proper permit-to-work from the operation in-charge, and make sure the line or apparatus is isolated, de-energised and earthed. Local earths stay connected until people and materials are clear and the permit is returned.
How switching works
How switching to Fieldproxy works
We move your data over and set the system up to the way you already work. Fieldproxy replaces the old tool; it does not run alongside it.
Bring your permit forms and one real job
The paper or PDF permits you use today, who may issue each type, and one recent job walked through from request to hand-back, including where the crew waited.We build the permit record and the block
Permit types, fields, isolation lines, statuses, the two approval steps and the rule that holds a job until its permit is issued, set up before you commit.Sites, assets and authorized people come across
Sites, equipment, open jobs and the list of who is authorized to issue or receive each permit type are loaded from your spreadsheets and exports.Run one site on it, then the rest
One site or one customer runs permits in the app for two weeks beside the paper book. You compare wait times and open permits, adjust the template, then switch the others over.
FAQ
Questions people ask
- Does field service software support permit-to-work (PTW) ticketing for renewable plants?
- Some does, in different ways. Enterprise asset systems such as SAP have a work clearance module that blocks the order. Most trades-focused tools offer required forms, which is weaker. A configurable platform can hold the permit as a record that gates job start, which is the pattern described above for solar and wind sites.
- Can the office approve a completed checklist while the field worker is still on the same job?
- Yes, if the approval is a status change that reaches the phone straight away. The worker submits the on-site confirmation, the approver gets it with the photos, and the Start button unlocks when the permit moves to Issued. Plan for no signal: agree what the crew does if the approval cannot reach them.
- Can one form capture photos and three signatures instead of separate menus?
- Yes. Put issuer, receiver and site owner on one permit in a fixed order, each stamped with name and time. Ask the vendor to show the order being enforced, so the issuer cannot sign before the isolation lines are complete.
- What happens when there is no signal at the site?
- The on-site steps (isolation lines, photos, briefing signatures) should work offline and sync later with their real times. An approval by someone who is not on site needs a connection at some point, so either the issuer is on site and signs on the same device, or the crew moves to signal before starting.
- Is a required checklist the same as a permit to work?
- No. A checklist is filled in by the person doing the work. A permit is an authorization by a second, named person, for a stated scope and time, with a hand-back at the end. Many jobs need both.
- How long should a permit stay valid?
- No longer than the task. US confined space rules say the duration may not exceed the time required to complete the job identified on the permit. Many companies cap a permit at one shift and require revalidation after that.
- How long do we need to keep closed permits?
- It depends on the permit type and the country. US rules require cancelled confined space entry permits to be kept for at least 1 year. Customers and insurers often ask for longer in the contract, so set retention per permit type and check with your safety adviser.
- Can we change the permit form ourselves?
- You should be able to. Ask who can edit a template, how long a change takes to reach phones, and whether permits already issued keep the old version. In Fieldproxy, forms, checklists and statuses are configured for your account and changed without a development queue.
Sources
Competitor details on this page come from the vendors' own pages and documentation, checked as of November 2026. Plans and prices change, so check the vendor's current page before you decide.
- 29 CFR 1910.146: Permit-required confined spaces: https://www.law.cornell.edu/cfr/text/29/1910.146
- 29 CFR 1910.147: The control of hazardous energy (lockout/tagout): https://www.law.cornell.edu/cfr/text/29/1910.147
- 29 CFR 1910.252: Welding, cutting and brazing, general requirements: https://www.law.cornell.edu/cfr/text/29/1910.252
- 29 CFR 1910.269: Electric power generation, transmission and distribution: https://www.law.cornell.edu/cfr/text/29/1910.269
- 29 CFR 1926.1203: Confined spaces in construction, general requirements: https://www.law.cornell.edu/cfr/text/29/1926.1203
- UK Health and Safety Executive: Permit to work systems (technical measure): https://www.hse.gov.uk/comah/sragtech/techmeaspermit.htm
- UK Health and Safety Executive: HSG250, Guidance on permit-to-work systems: https://www.hse.gov.uk/pubns/books/hsg250.htm
- Canadian Centre for Occupational Health and Safety: Hot work: https://www.ccohs.ca/oshanswers/safety_haz/welding/hotwork.html
- Canadian Centre for Occupational Health and Safety: Confined space program: https://www.ccohs.ca/oshanswers/hsprograms/confinedspace/confinedspace_program.html
- Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023 (Gazette of India): https://kseb.in/uploads/Downloadtemsuppy/Central%20Electricity%20Authority%20(Measures%20relating%20to%20Safety%20and%20Electric%20Supply)%20Regulations,%202023-1699594973944568556.pdf
- SAP Library: Order in Work Clearance Management (PM-WCM): https://help.sap.com/saphelp_470/helpdata/en/a5/9878342b7711d68d770000e8284931/content.htm
- SAP Documentation: Work Clearance Application: https://help.sap.com/doc/b182b6535fe6b74ce10000000a174cb4/3.6/en-US/e281b6535fe6b74ce10000000a174cb4.html
- ServiceTitan Help: Use form triggers: https://help.servicetitan.com/docs/use-form-triggers
- ServiceTitan Help: How do I make forms mandatory in ServiceTitan?: https://help.servicetitan.com/docs/how-do-i-make-forms-mandatory-in-servicetitan
- Microsoft Learn: Add inspections to work orders in Dynamics 365 Field Service: https://learn.microsoft.com/en-us/dynamics365/field-service/inspections
- SafetyCulture Help Center: Approvals: https://help.safetyculture.com/en-US/using-safetyculture/approvals
- SafetyCulture: Permit to work: https://safetyculture.com/topics/permit-to-work/
Related
Keep reading
- Make sure only qualified technicians get scheduled
- Does the field service app work offline with no signal?
- Require before and after photos to complete a job
- Turn a paper checklist into a mobile form
- What is the best field service software for a 5-10 person HVAC team?
- Cheaper ServiceTitan alternatives for small plumbing and HVAC companies, without payment processor lock-in