How do you bill a commercial project with a deposit, phases, retainage and change orders?
Set a billing schedule on the project: a deposit, then a percentage of the contract per phase, with retainage withheld on every line except the deposit. Lines become ready when their phase is done, invoices start as drafts, and change orders only change the contract once approved.
This walkthrough follows an $86,500 rooftop-unit replacement at Summit Home Services, a demo HVAC, plumbing and electrical company: the deposit invoice, phase billing with 10% retainage, a progress invoice preview, a pending change order, budget and margin, and offering a visit to a ranked subcontractor.
Chapters
Summit Home Services is a demo company with fictional customers. Every screen is the real Fieldproxy product; some sequences are sped up.
Step by step
See every contract at once
The projects list shows contract value, billed to date, finished work that is ready to bill, and which projects are off track and why.
Bill the deposit
A deposit line (for example 20% of the contract) is invoiced up front with no retainage, on an invoice tied to the project.
Split the contract by phase
Each billing line is a share of the contract linked to a phase on the schedule, so it becomes ready to bill when that phase is done.
Hold retainage automatically
Retainage (for example 10%) is worked out on every line except deposits, and the invoice preview shows the phase amount, retainage held and the total due.
Run change orders through approval
A change order shows price, cost and schedule impact and waits for a signed approval; only then does the contract grow and a billing line get added.
Watch budget and margin
Budget versus actual, projected profit and an under-billed or over-billed figure stay current as costs and invoices come in.
Offer work to subcontractors
Subs are ranked for a visit by trade, area, capacity, acceptance rate and rating; the offer goes to their portal and their cost lands on the project.
Questions people ask
- What is AIA-style progress billing?
- Billing a contract in stages as work is completed, usually a deposit and then a percentage per phase, with retainage withheld until the job is finished. Fieldproxy keeps that schedule on the project and builds each invoice from it.
- How is retainage handled?
- You set a retainage percentage on the contract. It is withheld on every billed line except deposits, tracked as retainage held, and released onto its own invoice when the job is done.
- Can I bill a phase before it is finished?
- Yes, but the invoice preview warns you that the phase isn't finished, so you only bill early when the contract allows it. Invoices are created as drafts and nothing is sent automatically.
- What happens when a change order is approved?
- The contract value goes up by the change order amount, a billing line is added, the cost budget grows, the target date moves by the days impact, and you can book a job for the work.
- Can subcontractors accept work in a portal?
- Yes. Offers go to the subcontractor's portal, where they accept or decline; the video shows the offer and ranking from the office side only.
- Is Summit Home Services a real company?
- No. Summit is a demo company with fictional customers. The screens are the real Fieldproxy product, recorded live and sped up.
Transcript
Show
- 0:00How do you bill a big commercial job without a spreadsheet on the side?
- 0:04Take a deposit up front, bill each phase as it's finished, hold back retainage automatically, and let change orders move the contract only once they're signed.
- 0:14Here's that end to end on an eighty-six-thousand-dollar rooftop replacement at a demo heating and cooling company.
- 0:23Start with the money across every project. Four active jobs, a hundred and sixty-four thousand dollars in contracts, forty-two thousand billed so far, and over seven thousand dollars of finished work that nobody has invoiced yet. That last number is the one most contractors never see until the end of the month.
- 0:42Each row tells you where a project stands: the contract, what's billed, the margin, and why it's off track. The rooftop job has a sixty-four-hundred-dollar change order still waiting. The repipe is ninety percent billed, with the last fifteen hundred ready to go.
- 1:00Open the rooftop units job for Bayview Property Management.
- 1:03Eighty-six thousand five hundred dollars, with a twenty percent deposit and ten percent retainage written into the contract. The banner is honest about it: phases are running late, permits are overdue, and a change order has been sitting for over a week.
- 1:20The billing tab is the whole contract on one screen: the revised contract, what's been billed, what's ready, and how much retainage you're holding.
- 1:30The deposit went out on day one: twenty percent, seventeen thousand three hundred dollars, on invoice P-1002-1. No retainage on a deposit, and it's tied to the project, not floating in a list of invoices.
- 1:44Those phases come from the project schedule. Submittals, the permit and crane, demo and set, ductwork, start-up, and close-out, each with its own dates and its own visits. When a phase finishes, the billing line tied to it becomes ready to bill.
- 1:59When a phase slips, the bill slips with it, and you can see why.
- 2:04Under each phase sit the actual visits your technicians see on their phones: the roof survey that's already done, the crane day to swap the units, ductwork, gas and controls, the electrical and building-controls wiring, then start-up, test and balance. One of five is complete, which is exactly why only the deposit has been billed so far.
- 2:26On the billing schedule, the rest of the contract is split the same way.
- 2:30Thirty percent when the old units come off and the new ones are set.
- 2:34Twenty-five after ductwork, gas and controls. Fifteen after start-up, test and balance, and the last ten at close-out. Every line shows whether its phase is actually done, so nobody bills on a guess.
- 2:47And retainage is worked out on every line before you bill it.
- 2:51Ten percent of the demo and set phase is twenty-five ninety-five held back.
- 2:55Nobody has to remember to subtract it on the invoice.
- 3:00Click invoice on a phase and you see exactly what will go out before anything is created: twenty-five thousand nine fifty for the phase, less twenty-five ninety-five retainage, twenty-three thousand three fifty-five to pay. It even warns you this phase isn't finished yet, so you only bill early when the contract allows it.
- 3:20Invoices start as drafts. We cancel here, so nothing is billed.
- 3:24Here's the deposit invoice the customer actually got. A project invoice, the deposit line written out as twenty percent of the contract, the balance still due, and payment reminders already lined up, so the office isn't chasing it by memory.
- 3:40And the last bill on a commercial job usually waits on paperwork, not work. The checklist holds every permit, inspection and handover item, tied to its phase with a due date: the mechanical permit, the crane permit, the gas pressure test, the final mechanical inspection, the punch list walk with the owner, and the O and M manuals. Pass or fail is recorded right here, so when the owner asks why close-out hasn't been invoiced, you can show them what's still open.
- 4:09Here's a project further along, a whole-home repipe. The deposit is paid.
- 4:13Rough-in and fixtures were both finished, so they went out together on one invoice.
- 4:18Now the final inspection line says ready, fourteen hundred and eighty dollars, and the project tells you so before the money sits there for weeks.
- 4:28And a multi-site job with five percent retainage: water heaters replaced across every building of a senior living community. The deposit is paid.
- 4:37Each building is its own phase with its own retainage, five thirty-two fifty held on each. The close-out line is ready, with two hundred and thirteen dollars held back.
- 4:48When the job is truly finished, release retainage puts everything you held onto one final invoice.
- 4:55Back on the rooftop job, the owner asked for factory economizers on two units.
- 4:59That's a change order: plus sixty-four hundred dollars, thirty-nine hundred of it cost, and two extra days. Until someone signs it, it sits in waiting for approval, and the contract doesn't move.
- 5:12Approving it asks who signed, and shows what happens next: the contract becomes ninety-two thousand nine hundred dollars, a new billing line is added, and you can book a job for the extra work. We cancel, so the change order stays pending.
- 5:27Here's what approval looks like once it happens, on a heat pump job.
- 5:32The crew found an undersized return duct during the survey, fourteen fifty to fix. The customer signed it, so it's approved, and the contract moved from nineteen thousand four ninety-five to twenty thousand nine forty-five.
- 5:46And on the billing tab, that change order is now its own line, fourteen fifty, marked ready to bill, sitting under the deposit and the phases.
- 5:55Extra work stops being something the office has to remember to add to an invoice at the end of the job.
- 6:02The budget follows the same contract. Labor, materials, subcontractors and other costs against what's actually been spent, a projected profit of twenty-one thousand six hundred, twenty-five percent. And because the work is twenty-five percent done but only twenty percent billed, it flags you as under-billed by forty-three hundred dollars.
- 6:24And every money event lands on the project's activity log: the deposit invoice, the change order sent for approval, each cost as it's logged, back to the day the contract was signed. When the customer asks what they've been billed and why, the answer is one tab away.
- 6:41Some of this job goes to subcontractors. Pick the ductwork visit and the software ranks your subs for it: who does that trade, who covers Levittown, who has room in the next seven days, who actually accepts offers, and their rating. Coastal Air Mechanical comes out on top.
- 6:59Set a price or use each sub's own rate card, a not-to-exceed, how long they have to answer, and let it offer the job to the next best sub if nobody takes it. Subs see the offer in their own portal. We don't send it here.
- 7:13Every sub job then moves across one board: offered, accepted, scheduled, submitted for review, approved and billed. When you approve their work, a payable is drafted at the agreed price, and that cost lands on the project budget you just saw.
- 7:29Up top, the numbers that keep subs honest and you paid on time: what's approved but not yet billed, and how often your subs actually accept the work you offer them. A sub who won't cover an area or a customer is simply blocked from the ranking.
- 7:45There's a list of visits in the next two weeks with nobody assigned, technician or sub. Right now, every visit is covered.
- 7:53And a capacity view shows who can take work over the next seven days and how each sub has really performed over the last year: compliance, acceptance, on-time rate, rating and callbacks. One with lapsed insurance shows as blocked, so nobody offers them a job by mistake.
- 8:10Deposit, phases, retainage, change orders and subs, all on one contract.
- 8:15Get your own custom field service management within a day, tailored to your workflows.
- 8:20Start at fieldproxy dot ai.