Guide for audio-visual installation companies ยท checked 18 November 2026

Audio-visual installation, from rack build to the signed verification list

A commercial AV job is sold as rooms, built as racks and paid on documents. The owner's spec asks for rack elevations before the build, a label on both ends of every cable, a performance verification against AVIXA's list, and a closeout pack with serial numbers, IP and MAC addresses, firmware versions and the uncompiled control code. This guide covers each stage, the standards and state licenses behind it, how many assistive listening receivers a room needs, and what a service plan promises after the one-year warranty starts.

See your own jobs set up this way

A 30-minute call. We show you audio-visual installation companies workflows running in Fieldproxy, built around how you work.

Book your demo

60 minute video call ยท Step 1 of 2: your details, then pick a time

Number of employees

Short answer

Audio-visual installation companies use design and proposal tools such as D-Tools System Integrator, Jetbuilt or XTEN-AV for equipment lists, rack elevations and signal flow drawings, and an operations system such as Solutions360 Q360 or ProjX360 for projects, purchasing and service tickets. Remote monitoring comes from Crestron XiO Cloud or Q-SYS Reflect. Generic field service tools schedule visits but do not hold a per-room device schedule, a verification list or a closeout pack. Fieldproxy is set up around your own rooms, racks, verification items and service plan response times.

160 items

Potential verification items defined in AVIXA's Audiovisual Systems Performance Verification standard (10:2013); each project picks the ones that apply

source: AVIXA, Audiovisual System Performance Verification course: 160 potential verification items

25%

Share of assistive listening receivers that must be hearing-aid compatible under ADA 219.3, and never fewer than two

source: US Access Board, ADA Standards Chapter 2: 216.10 signs and 219 assistive listening systems (Table 219.3)

5x

Safety factor Cornell's AV spec requires on every support, and on the safety cable for suspended equipment

source: Cornell University, Section 27 41 16 Integrated Audio-Video Systems and Equipment (10/8/24)

100 m

HDBaseT limit for 1080p over Cat5e or better; first-generation 4K drops to 70 m unless the cable is select Cat6a

source: HDBaseT Alliance, About the technology: distances by specification

How a job runs

One audio-visual installation job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Write the program: what each room is for

    Start with use, not equipment: how many people, what they look at (slides, spreadsheets, drawings, video), who is remote, and who runs the room. AVIXA's documentation standard D401.01:2023 exists to decide which documents the project needs, who creates each and how delivery is tracked. Group rooms into types (e.g. huddle, 12-seat conference, divisible training room, 300-seat auditorium) so one design covers many rooms.

  2. 2

    Survey the room and the building

    Measure the farthest and closest viewer, ceiling height and type, wall construction behind each display, the path from rack to display and to the table, and where power and network drops are. Record whether the ceiling space is an air-handling plenum, because that changes the cable. Photograph the wall, the ceiling above the tile, and the closet or credenza where the rack will sit.

  3. 3

    Size the display and design the signal flow

    AVIXA's display image size standard splits rooms into basic decision making (slides, with a 15:1 minimum contrast ratio) and analytical decision making (drawings and fine detail, 50:1). Its calculator takes the farthest viewer and returns the minimum image height, and uses a suggested eye level of 48 inches seated and 62 inches standing for the closest viewer. The design output is a signal flow diagram, a rack elevation, a cable schedule and an equipment list per room.

  4. 4

    Quote, then submit before you build

    The proposal prices equipment, shop labor, site labor, programming, commissioning and the service plan separately. On institutional work the owner then wants submittals before anything is ordered: Cornell asks for rack, lectern and credenza elevations, signal flow diagrams and the cable labeling scheme in the design submittal, plus a network provisioning submittal listing make, model, location, MAC address, serial number and PoE needs for every networked device.

  5. 5

    Order, receive and stage

    Long-lead items (large displays, DSPs, control processors, LED wall panels) drive the schedule. Receive against the purchase order, record serial and MAC on arrival, and shelve by project and room. A Microsoft Teams Room also needs its license decided now: the free Basic license is capped at 25 rooms per organization, and remote management and dual screens need Pro.

  6. 6

    Build and label the rack in the shop

    AVIXA F502.01:2018 covers rack assembly, equipment mounting, cable management for power and signal, thermal management and finishing; design is a separate standard (F502.02) and must be documented before the build. Label to F501.01:2015 so every power and signal path can be identified. Cornell's version of the rule: labels are never handwritten, sit at equipment terminals and each junction, are on both ends, and match the as-built drawings. Load firmware and test the rack on the bench before it ships.

  7. 7

    Rough-in, pull cable and hang the hardware

    Use plenum-rated cable above a suspended ceiling used for environmental air (NEC 300.22(C)), and firestop every penetration of a rated wall or floor (300.21). Keep HDBaseT runs inside their distance limit. Display mounts listed to UL 2442 are tested at four times their rating for screens of 100 pounds or less, but the wall still has to carry the load. Cornell requires a safety factor of five on all supports, SAE Grade 8 hardware, and a safety cable from any rigidly suspended device to the structure.

  8. 8

    Program, address and bring the room onto the network

    Assign IP addresses from the owner's scheme, load the control and DSP code, set up the conferencing platform account, and confirm each device appears in the monitoring platform. Keep the uncompiled code under version control from day one, because the DoD guide spec and Cornell both require the editable source to be handed over and owned by the client.

  9. 9

    Verify performance against the agreed list

    AVIXA's verification standard defines 160 potential items and sets out processes to choose the items that apply (and add your own), define the metric for each, verify, and report. The DoD spec says testing and commissioning are performed in accordance with it, and that audio coverage is demonstrated to A102.01. Record a result, a measured value where the item needs one, who tested and when, for every item on every room.

  10. 10

    Punch list, training and closeout pack

    Walk the room with the owner, list every open item with a photo and an owner, and close them. Train the users and the support staff and get a signature. The closeout pack is as-built drawings, the per-room device schedule (make, model, serial, IP, MAC, firmware, warranty end date), licenses, logins and the source code. An InfoComm project management column notes that punch-list items can amount to 10 percent of a project's billing, which is why sign-off should say the job is complete to bill.

  11. 11

    Start the warranty, then the service plan

    The DoD guide spec defaults to one year from final acceptance with service response within 24 hours and two maintenance visits at months six and twelve. Cornell wants acknowledgment in 4 hours, on site in 48 and repair or replacement in 72. After warranty the same room moves to a service plan with its own response times and preventive visits.

What to record

The fields every audio-visual installation job should capture

Each room and its devices

  • Building, floor, room number, room type, seat count, farthest and closest viewer distance, ceiling type and whether it is a plenum
  • Per device: make, model, serial number, MAC address, IP address, firmware version, rack and rack unit or mount location, manufacturer warranty end date
  • Display: size, image height, mount model and rated load, wall construction, backing or structure used, safety cable yes/no
  • Projector: light source type and rated hours (e.g. 20,000 hours on a laser model), hours at each visit, filter cleaned
  • Conferencing platform and license type per room (e.g. Teams Rooms Basic or Pro), resource account name
  • Assistive listening: system type, seat count used, receivers required and supplied, hearing-aid compatible receivers, sign posted

Rack and cable

  • Rack ID, location, rack elevation revision built to, power circuit and breaker, UPS runtime if fitted
  • Cable schedule: cable ID, type, from device and port, to device and port, length, plenum rated yes/no
  • Label check: both ends labeled, machine printed, IDs match the as-built drawing
  • Penetrations firestopped: location, system used, photo
  • Bench test in the shop: date, by whom, firmware loaded, faults found

Verification, closeout and service

  • Verification item, category, metric and target, result (pass, fail, not applicable), measured value, tester, date, retest date
  • Punch item: description, photo, owner (integrator, electrician, IT, furniture), due date, closed date
  • Training: session date, attendees, hours, signed by, recording link if the owner requires one
  • Closeout pack contents and date delivered: as-builts, device schedule, licenses, logins, compiled and uncompiled code, warranty statement
  • Warranty start and end; service plan tier, phone and onsite response targets, preventive visits per year and dates

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
AVIXA performance verification (10:2013)A framework for deciding which elements of an AV system to verify, when in the project, against what metric, and how to report. AVIXA's course states the standard defines 160 potential verification items, with processes for choosing, measuring, verifying and reporting them. AVIXA's current standards list now shows it as D402.02:2013 (R2024), formerly INFOCOMM 10:2013, so specs cite it under either number. source: AVIXA, Audiovisual Systems Performance Verification (10:2013, republished 2024)
AVIXA F502.01:2018 rack buildingCovers rack planning and assembly, equipment population and loading, and integration. The performance criteria it names are rack mounting, cable management for power and signal, thermal management and finishing. Rack design is the separate F502.02:2020 standard. The DoD guide spec requires racks built to F502.01, F502.02 and EIA/ECA 310-E. source: AVIXA, Rack Building for Audiovisual Systems (F502.01:2018)
AVIXA F501.01:2015 cable labelingSets requirements so every power and signal path in a finished AV system can be identified for operation, support, maintenance and troubleshooting. Owner specs add the practical rules: Cornell requires machine-made labels at equipment terminals and junction points, on both ends, matching the as-built record drawings. source: AVIXA, Cable Labeling for Audiovisual Systems (F501.01:2015)
AVIXA D401.01:2023 documentationFormerly INFOCOMM 2M-2010, published May 2023. A framework for deciding what documentation a project needs, who creates each document, and tracking delivery. The DoD guide spec still cites 2M-2010 for independent designs led by a CTS-D. source: AVIXA, Documentation Requirements for Audiovisual Systems (D401.01:2023, formerly 2M-2010)
Display image size and contrastAVIXA's image size standard defines basic decision making (15:1 minimum contrast, content as a percentage of image height, classrooms and boardrooms) and analytical decision making (50:1, detail down to a line pair, medical imaging and engineering drawings). The viewing ratio is farthest viewer divided by image height. The list of current standards shows a 2026 edition; Cornell and MIT still cite V202.01:2016. source: AVIXA, DISCAS: choosing basic or analytical decision making (15:1 and 50:1 contrast)
Audio coverage uniformity (A102.01)A procedure to measure and classify how evenly early-arriving sound covers the listener area. The DoD guide spec requires coverage to be demonstrated in accordance with it. Cornell's spec cites the 2017 edition; AVIXA's current edition is 2022. source: AVIXA, Audio Coverage Uniformity in Listener Areas (A102.01:2022)
DoD guide spec UFGS 27 41 00: what closeout must containAs-builts include serial numbers, the network addressing scheme, and both compiled and uncompiled code for future modification; all control system software becomes the property of the Government. The wire run list is delivered as a spreadsheet. Editable defaults: one-year warranty from final acceptance, service response within 24 hours, two maintenance visits at months six and twelve, and eight hours of extra programming before warranty expiry. source: US Department of Defense, UFGS 27 41 00 Audio-Visual Systems (February 2026)
Cornell 27 41 16: device schedule, warranty and staffingCloseout needs a per-room list with make, model, location, serial, IP address, MAC address, firmware version, manufacturer warranty end date, usernames and passwords, plus editable compiled and uncompiled code, modules and graphics as work for hire. One-year system warranty starting at owner acceptance after the punch list: acknowledge in 4 hours, on site in 48, repair or replace in 72. At least one CTS-D and one CTS-I oversee the job. Conduit fill is capped at 40%. source: Cornell University, Section 27 41 16 Integrated Audio-Video Systems and Equipment (10/8/24)
MIT design standard T02Section 1.2 requires AV design and installation to comply with a list of AVIXA standards including audio coverage uniformity, cable labeling, display image size, design coordination and performance verification. Campus standards like this are how AVIXA documents become contract terms. source: MIT Design Standards, T02 Audiovisual Systems (2022)
ADA 219: where assistive listening is requiredEvery assembly area where audible communication is integral to the use of the space needs an assistive listening system. It is not required where there is no audio amplification, except in courtrooms, which always need one. At least 25% of receivers, and never fewer than two, must be hearing-aid compatible; that minimum drops away where an induction loop serves every seat. Section 216.10 requires a sign with the International Symbol of Access for Hearing Loss. source: US Access Board, ADA Standards Chapter 2: 216.10 signs and 219 assistive listening systems (Table 219.3)
ADA 706: receiver performanceReceivers need a 1/8 inch standard mono jack. Hearing-aid compatible receivers work through neckloops. Sound pressure level is 110 dB minimum and 118 dB maximum with a 50 dB dynamic range on the volume control, signal-to-noise ratio is 18 dB minimum, and peak clipping may not exceed 18 dB relative to speech peaks. source: US Access Board, ADA Standards Chapter 7: 706 assistive listening systems
California C-7 low voltage licenseThe C-7 classification covers communication and low voltage systems that are energy limited and do not exceed 91 volts, and names sound systems, closed-circuit video and cable television. Low voltage fire alarm systems are specifically not included. Business and Professions Code 7048 exempts only jobs under $1,000 in total that need no building permit, and not if the person employs anyone else on the work. source: California Contractors State License Board, C-7 Low Voltage Systems Contractor
Florida limited energy specialtyRule 61G6-7.001 defines the limited energy specialty as wiring, fixtures, raceways, conduit and fiber optics not exceeding 98 volts RMS, and excludes anything that is part of an alarm system. source: Florida Administrative Code r. 61G6-7.001, Electrical specialty contractors (limited energy, 98 volts)
Georgia low-voltage classesRule 121-3-.06: LV-A is restricted to alarm and general system work, LV-T to telecommunication and general system work, LV-G to general system work only, and LV-U is unrestricted. The exam pass mark is 70 and applicants need at least one year of low-voltage wiring experience in the category. source: Georgia Rule 121-3-.06, Low-voltage license classes (LV-A, LV-T, LV-G, LV-U)
Texas: Class 2 wiring is outside the electrical licensing chapterOccupations Code 1305.003 exempts the design, installation, repair or alteration of Class 1, Class 2 or Class 3 remote control, signaling or power-limited circuits, optical fiber cables and communications circuits as defined by the National Electrical Code. Line-voltage work for the same room is not covered by that exemption. source: Texas Occupations Code s. 1305.003, Exemptions from electrical licensing
Washington and Oregon limited energy licensesWashington's (06) limited energy system specialty is restricted to low-voltage circuits and lists commercial and residential amplified sound and public address systems. Oregon licenses Class A limited energy technicians for all limited energy systems and Class B for systems without protective signaling; limited energy means Class 2 and Class 3 installations not exceeding 100 volt-amperes. source: Washington WAC 296-46B-920, Electrical specialties: (06) limited energy system
NEC Article 640, plenum cable and firestoppingArticle 640 covers equipment and wiring, permanent and temporary, for public address, sound distribution, amplification and reproduction, and permits flexible cords and cables for permanently installed equipment racks. Section 300.22(C) limits wiring above a suspended ceiling used for environmental air to plenum-rated methods, with cable ties listed for plenum use. Section 300.21 requires openings through fire-rated assemblies to be firestopped by approved methods. source: EC&M, Code Q&A: installing wiring in plenum spaces for environmental air (NEC 300.22(C))
California small-job exemption (B&P Code 7048)The contractor license requirement does not apply to work where the total price for labor and materials is less than $1,000 and no building permit is needed. The exemption is lost if the person employs anyone else to do or help with the work, so it rarely fits a commercial AV job. source: California Business and Professions Code s. 7048, Small operations exemption
Oregon limited energy technician (ORS 479.905)A Class A limited energy technician may install, alter and repair all limited energy systems. Class B covers systems that do not include protective signaling, such as intercom, paging and data telecommunication. Limited energy activity means Class 2 and Class 3 installations that do not exceed 100 volt-amperes. source: Oregon Revised Statutes 479.905, Limited energy technician Class A and Class B
NEC Article 640: audio equipment and racksArticle 640 covers equipment and wiring, permanent and temporary, for public address, speech input, sound distribution, amplification and reproduction. Section 640.21(B) permits flexible cords and cables for permanently installed equipment racks. source: EC&M, The apprentice's guide to NEC Article 640 (audio systems)
Firestopping low-voltage penetrationsNEC 300.21 requires openings through fire-rated walls, partitions, floors and ceilings to be firestopped by approved methods. Sections 770.26 for optical fiber and 800.26 for communications cable repeat the requirement almost word for word, so it applies to AV cable as much as to power. source: IAEI Magazine, Firestopping: the National Electrical Code and the International Building Code (300.21, 770.26, 800.26)
Microsoft Teams Rooms licensesAn organization can assign up to 25 Teams Rooms Basic licenses, which are free. Beyond 25 rooms, and for features such as dual screens, Teams Panels and remote management, each room needs a Pro license. The license type belongs on the room record because it decides what the service team can see remotely. source: Microsoft Learn, Microsoft Teams Rooms licenses (Basic limited to 25 rooms)
Laser projector life and warranty (one manufacturer's example)Epson rates the Pro L20000UNL laser light source at 20,000 hours in Normal mode and 30,000 in Extended, measured as the approximate time until brightness falls by half. Its warranty is three years or 20,000 hours, whichever comes first, so hours read at each visit decide whether a failure is covered. source: Epson, Pro L20000UNL laser projector specifications (20,000 hour light source)
Service plan tiers (one integrator's published example)Red Thread's AmplifyService plans: Basic is 4-hour phone response and onsite in 4 days with no preventive visits; Silver and Gold are 2-hour phone and onsite in 2 days with two preventive visits a year; Platinum is 1-hour phone and 4-hour onsite, around the clock. Gold and Platinum include parts, repair and loaners. source: Red Thread, AmplifyService AV service plans brochure (Basic, Silver, Gold, Platinum)
Public contract labor rates and warranty (Washington State, Diversified)Not-to-exceed hourly rates: $80.29 for an AV installation technician, $119.91 for AV design or consulting, $166.83 for a service technician in business hours (7 am to 5 pm weekdays) and $250.25 after hours and weekends. Warranty is 90 days on the project and one year on workmanship. source: Washington State Contract 03418, OneDiversified pricing and ordering (labor rates, warranty)
Closeout and billing practiceAn InfoComm project management column by Bradley A. Malone notes that punch-list items can amount to 10 percent of a project's billing, that training should be a formal milestone with client sign-off, and that the sign-off at substantial completion should state the project is complete to bill. source: InfoComm / rAVe, Project closure: when is done really done? (Bradley A. Malone, PMP)
UL 2442 display mountsThe standard for wall and ceiling mounts. A mount for a television of 100 pounds or less is tested with at least four times its weight rating; heavier mounts are tested at two times the rating plus 200 pounds. The listing covers the mount, not the wall it is fixed to. source: UL Standards & Engagement, How standards for wall and ceiling mounts help prevent serious injuries (UL 2442)
CTS, CTS-D and CTS-I renewalAVIXA certifications last three years and need 30 renewal units per cycle. A CTS-D or CTS-I holder needs at least 15 of the 30 at the specialty level. Renewal fees are $175 for CTS and $200 each for CTS-D and CTS-I. Specs name the certifications for the project manager, designer and lead installer. source: AVIXA, CTS Renewal Handbook 2026 (30 renewal units every three years, fees)
California prevailing wage: Communication and System InstallerOn public works in 18 Northern California counties the AV installer falls under Electrician: Communication & System Installer or Technician, which covers installation, testing, service and programming of sound, video and multi-media systems. Raceway on new construction is excluded when an electrical contractor is on site, except chases and sleeves up to 10 feet. source: California DIR, Scope of work: Electrician, Communication & System Installer (61-X-7 NO)

Rules vary by state, council and contract. Checked 18 November 2026; confirm against the source for your area before relying on it.

Numbers

How many assistive listening receivers a room needs (ADA Table 219.3)

The count is set by seating capacity, and fractions round up. Worked example: a 300-seat auditorium needs 2 plus 1 per 25 seats over 50, so 2 + 10 = 12 receivers, of which 1 in 4, so 3, must be hearing-aid compatible. An 800-seat hall needs 20 plus 1 per 33 seats over 500, so 20 + 10 = 30 receivers and 8 hearing-aid compatible. Several rooms in one building under one management may be counted together if every receiver works with every system.

Seating capacityMinimum receiversMinimum hearing-aid compatible
50 or less22
51 to 2002, plus 1 per 25 seats over 502
201 to 5002, plus 1 per 25 seats over 501 per 4 receivers
501 to 1,00020, plus 1 per 33 seats over 5001 per 4 receivers
1,001 to 2,00035, plus 1 per 50 seats over 1,0001 per 4 receivers
2,001 and over55, plus 1 per 100 seats over 2,0001 per 4 receivers

source: US Access Board, ADA Standards Chapter 2: 216.10 signs and 219 assistive listening systems (Table 219.3)source: US Access Board, ADA Standards Chapter 7: 706 assistive listening systems

Where it breaks

Where spreadsheets and generic software fall over

The device schedule is typed from memory in the last week. Serial numbers and MAC addresses are read off the back of a display that is already on the wall, and firmware versions are whatever the tech remembers.

Serial and MAC are captured at receiving, IP and firmware at the bench test, and location at install, all on the same device record. The closeout schedule is an export, not a typing job.

Verification is a walk-through with a clipboard. Nobody agreed which of the 160 items applied, so the owner's consultant fails the room on items the integrator never tested.

Each room type carries its agreed verification list with a metric per item. The room cannot be marked ready for owner walk until every item has a result, a tester and a date.

Punch items live in an email thread. Three are the electrician's and one is IT's, and the final 10 percent invoice waits on all of them.

Every punch item is a record with a photo, an owner and a due date. Items owned by other trades are reported separately so substantial completion and billing are not held by someone else's work.

The programmer keeps the uncompiled control code on a laptop. Two years later the client wants a button changed, the programmer has left, and the spec said the code belonged to the client all along.

Code files, with version and date, are attachments on the room record, and the closeout pack cannot be issued without compiled and uncompiled files for control, DSP and video.

A 300-seat room is handed over with four assistive listening receivers because that is what came in the kit.

Seat count on the room record calculates the Table 219.3 minimum, and the equipment list is flagged when receivers or hearing-aid compatible receivers fall short.

The warranty clock and the service plan are in different places. A room fails in month eleven, nobody knows if it is covered, and the 48-hour onsite promise passes unnoticed.

Final acceptance sets warranty start and end on every room and device. Service tickets inherit the response targets of the warranty or plan and alert before they are missed.

Checklist

The audio-visual installation operations checklist

Print it, or hand it to whoever runs the office side.

  • Room type, seat count, farthest viewer and ceiling type recorded at survey
  • Display size checked against basic or analytical decision making for the content
  • Rack elevation, signal flow and cable labeling scheme approved before the build
  • Network provisioning list (make, model, MAC, serial, PoE) sent to the owner's IT team
  • Installer license matches the state (C-7, limited energy, LV class) and certifications are current
  • Serial and MAC captured at receiving; firmware loaded and recorded at bench test
  • Rack built to the approved elevation with power and signal cable managed separately
  • Every cable labeled on both ends with a printed ID that matches the drawings
  • Plenum cable in air-handling ceilings; every rated penetration firestopped and photographed
  • Mounts fixed to structure; safety cable on suspended projectors and loudspeakers where the spec requires it
  • Assistive listening receivers counted against Table 219.3 and the sign posted
  • Verification list completed per room with measured values where the item needs one
  • Punch items closed, or assigned to the trade that owns them
  • Training signed off; closeout pack with as-builts, device schedule, logins and source code delivered
  • Warranty start date set; first preventive visit booked

Software options

What software audio-visual installation companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

D-Tools System Integrator

Mid-size and large integrators that need engineering documentation

System design, drawings and project management for integrators, hosted or on-premises. D-Tools positions it for projects of $75,000 and up and publishes pricing from $1,800 per user per year with a five-user minimum. D-Tools Cloud is the lighter product, from $99 a month. D-Tools and Portal.io announced a merger in August 2026 and keep their product names.

source: D-Tools System Integrator

Solutions360 Q360

Integrators that want sales, projects, service and accounting in one system

Business management software aimed at security, fire and life safety, and AV integrators: sales, project management, service dispatch, inventory and finance. No public pricing.

source: Solutions360 Q360

Jetbuilt

Sales and estimating teams at AV integrators

Project budgeting and proposals on an AV and IT product database, with purchase orders and change orders. Publishes per-user pricing from $69 a month, with drawings and service as add-ons.

source: Jetbuilt

XTEN-AV

Designers who want drawings produced from the equipment list

X-DRAW generates rack layouts, signal flow diagrams and cable schedules; x.doc produces proposals. Publishes pricing from $139 per user per month. A design and proposal tool, not a service or dispatch system.

source: XTEN-AV

ProjX360

Small and mid-size integrators replacing several tools

Sales, proposals, projects, scheduling, purchasing, inventory, invoicing and service in one product, with a page for AV integrators. Publishes plans from $229 a month plus a setup fee.

source: ProjX360

Crestron XiO Cloud and Q-SYS Reflect

Service teams monitoring installed rooms

Manufacturer platforms that show device status and send alerts: XiO Cloud for Crestron devices, Reflect for Q-SYS Cores and peripherals, with email and webhook alerts. They watch the equipment; they do not hold the contract, the visit or the invoice.

source: Crestron XiO Cloud and Q-SYS Reflect

ServiceTitan

Residential and light commercial AV firms run like a service trade

Has an audio visual page covering pricebook, dispatch and progress billing. It does not describe rack elevations, signal flow, verification lists or source code handover, so those would live elsewhere.

source: ServiceTitan

Published prices, compared:source: D-Tools, System Integrator pricingsource: D-Tools, Cloud pricingsource: Solutions360, Q360 for security, fire and life safety, and AV integratorssource: Jetbuilt, Pricingsource: XTEN-AV, Pricing (X-DRAW, x.doc, XAVIA)source: ProjX360, Pricingsource: Crestron, XiO Cloudsource: Q-SYS, Reflect overview (monitoring Cores and peripherals)source: ServiceTitan, Audio visual business software

Questions to ask any vendor

  • Is each device a record with serial, MAC, IP and firmware that I can export as the closeout schedule, or a line on a quote?
  • Can I keep a verification list per room type and block handover until every item has a result?
  • Can punch items be assigned to another trade and reported separately from my own?
  • Does final acceptance start the warranty on every room, and do service tickets carry that room's response targets?
  • Can alerts from Crestron XiO Cloud or Q-SYS Reflect open a service ticket on the right room?
  • Where do compiled and uncompiled code files live, and can a closeout pack be built from the job?

Bring one real audio-visual installation job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Audio-visual installation on Fieldproxy: built around how you already work

A Fieldproxy setup for an AV integrator is built on the room and the device. Each room carries its type, seat count, rack, cable schedule and verification list; each device carries its serial, MAC, IP and firmware from receiving to closeout. Handover is blocked until the verification list and closeout pack are complete, and final acceptance starts the warranty and service clock on every room.

Module 1

Rooms, room types and survey

A 40-room project is five designs repeated, and every later record hangs off the room.

  • Records: Client > Building > Room; room fields: number, room type, seat count, farthest and closest viewer, ceiling type, plenum yes/no, wall construction, conferencing platform and license
  • Room type template: standard equipment list, verification list, labor hours for shop, site, programming and commissioning (e.g. 6 site hours for a huddle room)
  • Survey screen on the phone with required photos: display wall, above the ceiling tile, rack location, power and network drops
  • Display check: image height against farthest viewer for basic or analytical decision making, with the result stored on the room
  • Assistive listening: seat count calculates the Table 219.3 minimum receivers and hearing-aid compatible receivers
How this works

Module 2

Proposal, submittals and approvals

Institutional owners approve drawings before anything is ordered, and that approval gates the build.

  • Proposal lines per room: equipment, shop labor, site labor, programming, commissioning, training, service plan per year
  • Submittal register: rack elevations, signal flow, cable labeling scheme, network provisioning list; status Draft, Submitted, Revise and resubmit, Approved
  • Block: a rack build job cannot be scheduled until the rack elevation submittal is Approved
  • Change order record for added rooms or programming changes, with client approval before work
How this works

Module 3

Purchasing, receiving and device records

The closeout device schedule is only painless if the data is captured when the box is opened.

  • Purchase orders by project with expected dates; long-lead items flagged against the install date
  • Receiving screen: scan or photograph the label to capture serial and MAC; device assigned to project, room and rack
  • Device fields: make, model, serial, MAC, IP, firmware, rack unit or mount location, manufacturer warranty end, light source hours for projectors
  • Stock shelved by project and room; shortages listed per room before the truck is loaded
How this works

Module 4

Rack build and bench test

Faults found in the shop cost an hour; the same fault on site costs a return visit.

  • Rack record: ID, elevation revision, room, power circuit, UPS
  • Shop checklist built on your F502.01 practice: equipment mounted to the elevation, power and signal cable managed separately, ventilation, blanks fitted, finishing
  • Cable schedule: cable ID, type, from and to device and port; label check for printed labels on both ends
  • Bench test: firmware loaded and recorded, signal paths tested, faults logged; status Built, Tested, Shipped
How this works

Module 5

Install scheduling, crews and subs

Rooms are only free on certain days, lifts are rented, and the installer's license has to match the state.

  • Install job per room with phases: rough-in, cable pull, mounting, rack set, termination, programming, verification, training
  • Room access windows from the client (e.g. classrooms only during break weeks) on the room record
  • Crew skills and credentials: CTS, CTS-I, CTS-D with expiry, manufacturer programmer certifications, state low-voltage license class
  • Subcontractors for electrical, structural backing or rigging tracked on the same job with their own tasks
  • Prevailing wage flag on public works with the classification recorded on time entries
How this works

Module 6

Field app: site install records

The photos an inspector or consultant asks for later can only be taken before the ceiling tile goes back.

  • Required photos: mount fixed to structure, safety cable on suspended devices, each firestopped penetration, cable labels at both ends, finished rack
  • Mount record: model, rated load, display weight, wall or ceiling structure used
  • Plenum check: cable type recorded where the room is flagged as a plenum ceiling
  • Works offline in basements and new buildings without signal
How this works

Module 7

Performance verification and punch list

This is the document the owner's consultant signs, and the gate to the final invoice.

  • Verification list per room copied from the room type: item, category, metric, target, result, measured value, tester, date
  • Status per room: Installed, Programmed, Verified, Owner walk, Punch open, Accepted
  • Punch item record: photo, description, owner (integrator, electrician, IT, furniture, client), due date, closed date
  • Block: a room cannot move to Owner walk with any verification item blank
  • Verification report PDF per room from your own template
How this works

Module 8

Closeout pack and training

Specs make final payment depend on documents, not on the last screw.

  • Closeout checklist per project: as-built drawings, device schedule export, licenses, logins, compiled and uncompiled code for control, DSP and video, warranty statement
  • Code files with version and date attached to the room; block on issuing the pack if any are missing
  • Training record: date, attendees, hours, signature
  • Client portal: device schedule, drawings, verification reports and warranty dates per room
How this works

Module 9

Warranty, service plans and preventive visits

The install margin is made once; the service plan is what the client renews.

  • Acceptance date sets warranty start and end on every room and device
  • Plan record: tier, phone response and onsite response targets (e.g. 2 hours and 2 days), preventive visits per year, parts included yes/no, renewal date
  • Service ticket types: no display, no audio, conferencing fault, control fault, network, user error; each ticket shows covered or billable
  • Preventive visit checklist per room: firmware against current, projector hours, filter, microphone batteries, test call, receivers counted
How this works

Module 10

Management reporting

Owners need to see which rooms are stuck and what is waiting to be billed.

  • Rooms by status across all projects; rooms with punch items older than e.g. 14 days
  • Labor hours against the room type budget by phase
  • Revenue held behind acceptance or closeout documents
  • Service plan response met or missed, repeat tickets per room, renewals due in 90 days
  • QuickBooks or Xero sync for progress and service invoices
How this works

The AI agents, set up for audio-visual installation companies

AgentWhenWhat it doesWhat you get
Vision agentA warehouse or site tech photographs the label on a display, DSP or control processorReads make, model, serial number and MAC address from the labelThe device record filled and assigned to the project and room, ready for the closeout schedule
Document intelligence agentAn owner's specification section or a consultant's punch list arrives as a PDFPulls the required submittals, closeout items, warranty response times and each punch item with its roomA submittal and closeout checklist on the project, and punch item records on the right rooms for a person to confirm
Watcher agentA room is scheduled for owner walk with blank verification items, a warranty ticket is within e.g. 8 hours of its onsite target, or a CTS certification expires in 90 daysChecks the verification list, the room's warranty or plan response targets, and crew credentialsAn alert to the project manager or service manager naming the room, the item and the deadline
Dispatch agentA service ticket is raised on a room, or an install phase is ready to scheduleMatches technicians by the certifications and license the job needs, the spares on the van and drive time, inside the room's access windowAn assigned technician, a visit time and a parts list
Knowledge agentA technician on site asks how a room is wired or what changed last visitSearches that room's signal flow, cable schedule, device schedule, code notes and service historyThe answer with the drawing or record it came from
AutopilotA punch item owned by the client or another trade is open past its due date, or a service plan renews in 60 daysDrafts a chase naming the room, the item and the photo, or a renewal note with the year's visits and ticketsA draft email a person approves before it sends

Straight answers

Audio-visual installation: FAQ

What software do audio-visual installation companies use?

Design and proposals are usually done in D-Tools System Integrator, Jetbuilt or XTEN-AV, which produce equipment lists, rack elevations and signal flow drawings. Operations run in systems such as Solutions360 Q360 or ProjX360. Installed rooms are monitored in Crestron XiO Cloud or Q-SYS Reflect. Fieldproxy is set up around your rooms, devices, verification lists and service plans.

What is the AVIXA performance verification standard?

Audiovisual Systems Performance Verification (10:2013, also listed as D402.02) is a framework for deciding what to verify on an AV system, when, against what metric, and how to report it. AVIXA says it defines 160 potential verification items. The project team picks the items that apply to each room and can add their own.

What goes in an AV closeout package?

Owner specs typically ask for as-built drawings, a per-room device schedule with make, model, serial, IP address, MAC address and firmware version, software licenses, logins, a warranty statement, and the compiled and uncompiled control, DSP and video code. The US DoD guide spec and Cornell University both require the editable code and state that the client owns it.

Who owns the control system source code?

Whoever the contract says. The DoD guide spec states that all control system software becomes the property of the Government and requires both compiled and uncompiled code. Cornell treats code, modules and graphics as work for hire. If the contract is silent, agree it in writing before programming starts.

How many assistive listening receivers does a room need?

ADA Table 219.3 sets it by seats: 2 receivers for 50 seats or fewer; 2 plus 1 per 25 seats over 50 up to 500 seats; 20 plus 1 per 33 over 500 up to 1,000; 35 plus 1 per 50 over 1,000 up to 2,000; and 55 plus 1 per 100 over 2,000. At least 25% and never fewer than two must be hearing-aid compatible.

Do AV installers need a contractor license?

It depends on the state. California licenses the work under C-7 Low Voltage Systems (up to 91 volts) for jobs of $1,000 or more. Florida has a limited energy specialty (up to 98 volts), Georgia has four low-voltage classes, and Washington and Oregon license limited energy work. Texas exempts Class 2 and communications circuits from its electrical licensing chapter.

How long is the warranty on a commercial AV system?

One year from acceptance is the common term. The DoD guide spec defaults to one year with 24-hour service response and maintenance visits at months six and twelve. Cornell requires one year with acknowledgment in 4 hours, a technician on site in 48 and repair in 72. A Washington State contract with Diversified lists a 90-day project warranty and a one-year workmanship warranty.

What does an AV service plan include?

Response times and preventive visits, by tier. One published example, Red Thread's AmplifyService, runs from Basic (4-hour phone response, onsite in 4 days, no preventive visits) to Platinum (1-hour phone, 4-hour onsite, around the clock), with two preventive visits a year on Silver and above and parts, repair and loaners included on Gold and Platinum.

What do AV technicians cost per hour?

Rates vary by region and contract. One public example: Washington State's contract with Diversified lists not-to-exceed rates of $80.29 an hour for an installation technician, $119.91 for AV design, $166.83 for a service technician in business hours and $250.25 after hours and weekends.

How far can HDBaseT run?

The HDBaseT Alliance lists 1080p to 100 m over Cat5e or better under specification 1.0, with 4K limited to 70 m unless select Cat6a is used. Specification 2.0 carries 4K at 30 Hz 4:4:4 or 4K at 60 Hz 4:2:0 to 100 m over Cat6 (90 m over Cat5e), and 3.0 carries uncompressed 4K at 60 Hz 4:4:4 to 100 m, with Cat6a recommended.

Who are the largest AV integrators?

SCN's Top 50 Systems Integrators list for 2025, ranked by projected revenue from commercial AV installations, puts AVI-SPL first, Diversified second and FORTร‰ (formerly AVI Systems) third.

Related guides

All sources on this page (44)

Run audio-visual installation work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.