Guide for concrete contractors · checked 2 November 2026
Concrete contractors, pour by pour
A concrete job is won on the takeoff and lost or defended on the pour log. This guide covers what has to line up before a pour, what the truck ticket and the cylinders prove, what a low break really means under ACI 318, the weather limits, F-number measurement on floors, the OSHA rules that hit concrete crews, and the retainage caps that changed in 2026.
See your own jobs set up this way
A 30-minute call. We show you concrete contractors workflows running in Fieldproxy, built around how you work.
Short answer
Concrete contractors use software that ties each pour to its placement area, mix, truck tickets, weather, field tests and photos, because that pour log is what settles a low cylinder break, a cracked slab, a floor that misses its FF/FL, or a backcharge. Takeoff often runs in STACK or PlanSwift, daily reports in Raken or HCSS HeavyJob, time in busybusy, accounting in Foundation Software, and in-place strength in maturity sensors like Giatec SmartRock or Converge. Fieldproxy is set up around your own pour checklist, test log, retainage and pay-app process, with a crew app that works offline.
f′c − 500 psi
ACI 318-19 26.12.3.1: no single strength test below this (0.9 f′c above 5,000 psi), and the average of any three in a row at or above f′c
60 to 80°F
ASTM C31 initial curing for field cylinders, up to 48 hours; 68 to 78°F when f′c is 6,000 psi or more
source: SI Certs, ASTM C31 making and curing concrete test specimens in the field (study guide)
72 hours
Window to measure FF/FL after finishing, before curling changes the slab
source: ACI, Concrete International (Jan 2011) on specifying and measuring F-numbers
5%
California's retainage cap now covers private works on contracts signed from 1 Jan 2026 (Civ. Code 8811)
source: Holland & Knight, California expands 5 percent retainage cap to private projects (Apr 2026)
How a job runs
One concrete contractors job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Takeoff and bid
Measure each placement from the drawings: slab areas and thicknesses, footing and wall volumes, rebar, vapor retarder, joints, finish and any FF/FL spec. Convert to cubic yards with a waste factor, price labor by crew-days, pump and finishing equipment, and read the spec section 03 30 00 for testing, curing and tolerance requirements before pricing.
- 2
Contract, schedule of values and submittals
Sign the subcontract and check retainage against state law (5% caps in California, New York and Colorado for many private jobs). Break the price into a schedule of values that matches the G703 continuation sheet. Submit mix designs, curing compounds, joint layouts and the finisher's certifications.
- 3
Pre-pour checks
Subgrade compacted, not frozen, free of snow and ice. Forms and shoring inspected before erection and again before placement (OSHA 1926.703(b)). Rebar placed, chaired and capped against impalement. Embeds, sleeves and the vapor retarder checked. The GC or inspector signs the pre-pour card.
- 4
Order and confirm the pour
Order yards, mix, slump and pour rate from the plant, book the pump and the testing agency, and check the forecast. Below 40°F expected during the protection period is cold weather under ACI 306R; on hot, windy days check the evaporation rate against 0.2 lb/ft²/h.
- 5
Pour day
Log each truck ticket on arrival: ticket number, mix, yards, batch time and arrival time, and any water added and by whom. The testing technician samples, runs slump, air and temperature and makes cylinders. Nobody stands under the bucket while it is raised or lowered (1926.701(e)).
- 6
Finish, joints and cure
Finish to spec, saw-cut joints at 24 to 36 times the slab thickness (about 10 ft on a 4 in slab) and at least a quarter of the depth deep, and start curing. Keep the cylinders in a 60 to 80°F box with a max-min thermometer until the lab picks them up.
- 7
Floor measurement and strip
Measure FF/FL within 72 hours of finishing on spec'd floors. Strip forms and shores only when the concrete has enough strength (1926.703(e)), shown by field-cured cylinders or a maturity sensor reading.
- 8
Breaks, punch and pay app
Track 7-day and 28-day breaks against the acceptance rule. Bill the work in place monthly on G702/G703 with lien waivers, minus retainage. Punch out cracks, curling and joint filler.
- 9
Close-out and retainage release
Hand over the pour log, test results, curing and floor reports. Chase retainage at substantial completion, and book any sealing visit on residential flatwork once the cure period is over.
What to record
The fields every concrete contractors job should capture
Per placement (before the pour)
- Placement ID tied to the drawing: level, gridlines, element (footing, wall, SOG, elevated deck), area and thickness
- Mix design number, f′c and test age, max w/cm, slump and air targets, admixtures
- Subgrade or deck checks, form and shoring inspection with time and inspector, rebar and embed photos
- Forecast low and high for the protection period, wind, cold or hot weather plan (blankets, heaters, retarder, evaporation retarder)
- Plant order: yards, pour rate, pump size, start time, testing agency booked
Pour log (on the day)
- Each truck ticket: number, mix, yards, batch time, arrival, start and end of discharge, drum revolutions where shown
- Water added on site: gallons, who authorized it, before or after sampling
- Field tests from the testing technician: slump, air content, concrete and air temperature, unit weight, set number of cylinders
- Crew on site with hours, finisher names and certifications, equipment (pump, screed, trowels, saw)
- Photos: placement start, finish, joints cut, cure applied
After the pour
- Cylinder set: count and size (6x12 or 4x8), initial curing box temperatures (max-min), lab pickup date
- Breaks: 7-day and 28-day results per cylinder, test average, running average of three, hold cylinders left
- Curing method and duration; maturity sensor ID and strength readings where used
- FF/FL readings and date measured, joint saw time, crack log with widths and photos
- Strip date and basis (field-cured cylinders or maturity), billed quantity on the pay app
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| ACI 318-19 26.12.3.1: strength acceptance | Strength test results are acceptable if the average of any three consecutive tests equals or exceeds f′c and no single test is below f′c − 500 psi, or 0.9 f′c when f′c exceeds 5,000 psi. A single test outside the second limit triggers a low-strength investigation under 26.12.6. source: Klinger, Lobo, Connolly, Suprenant, Expect compressive strength test results less than specified strength on every project (Concrete International, Feb 2022, via ASCC) |
| Testing frequency: one test per 150 yd³ | ACI 318-19 26.12.2.1 and ACI 301-20 1.7.3.3(d) set the same minimum of one strength test per 150 yd³; some project specs ask for one per 100 yd³. ACI 301 is usually referenced through the AIA MasterSpec section 03 30 00. source: Klinger, Lobo, Connolly, Suprenant, Expect compressive strength test results less than specified strength on every project (Concrete International, Feb 2022, via ASCC) |
| Low tests are expected, and labs don't reject | Mixes are proportioned so about 10% of individual tests can fall below f′c. On a 10,000 yd³ job, expect 7 to 10 tests below f′c. The ACI authors say a testing agency marking a report 'failed' or 'rejected' is wrong: it has no authority to accept or reject. source: Klinger, Lobo, Connolly, Suprenant, Expect compressive strength test results less than specified strength on every project (Concrete International, Feb 2022, via ASCC) |
| NRMCA CIP 9: most low breaks are testing errors | Improper cylinder handling, curing and testing contribute to most low results; the other big cause is extra water added on the job. Field technicians must hold ACI Concrete Field Testing Technician Grade I or equivalent, and labs should meet ASTM C1077 and be inspected by CCRL. source: NRMCA CIP 9, Low concrete cylinder strength |
| ASTM C31 initial curing | Field cylinders are stored at 60 to 80°F, protected from moisture loss, for up to 48 hours; 68 to 78°F when f′c is 6,000 psi or more. A max-min thermometer records the initial curing temperatures, and transport to the lab may not exceed 4 hours. source: SI Certs, ASTM C31 making and curing concrete test specimens in the field (study guide) |
| Bad initial curing cuts measured strength | A September 2026 STRUCTURE article says multiple studies show cylinders initially cured outside ASTM C31 conditions can test up to 28% lower than properly cured ones. That is the cheapest dispute to prevent. source: STRUCTURE magazine, Initial curing of concrete cylinders: a sustainable lever hiding in plain sight (Sep 2026) |
| Cold weather (ACI 306R) | Cold weather exists when air temperature has fallen to, or is expected to fall below, 40°F during the protection period. Keep most slabs and sections under 36 in at 50°F or more, and don't let concrete freeze in the first 24 hours; PCA cites 500 psi as the strength to resist freezing damage. source: NIH Office of Research Facilities, Concrete construction precautions during cold weather (Technical Bulletin, Feb 2016) |
| Hot and windy weather (ACI 305) | Above an evaporation rate of 0.2 lb/ft²/h, plastic shrinkage cracking is a strong possibility; take precautions above 0.1. The ACI 305 chart uses relative humidity, air temperature, concrete temperature and wind speed. source: Euclid Chemical, Preventing rapid evaporation when the heat is on (ACI 305 evaporation chart) |
| ASTM C94 discharge time | ASTM C94 has long limited discharge to 1½ hours. ASCC's Position Statement 32 argues the limit is too conservative when no water is added. Check which edition and limit the project spec cites before turning a truck away. source: ASCC Position Statement #32, Concrete discharge time (ASTM C94) |
| Floor flatness: ACI 117 and ASTM E1155 | FF comes from curvature over 24 in and FL from slope over 10 ft. ACI 117 classes run from conventional 20/15 to super flat 60/40; local minimums are typically 60% of the overall values. FL can't be measured on unshored elevated decks. source: ACI, Concrete International (Jan 2011) on specifying and measuring F-numbers |
| Joints (NRMCA CIP 6) | Maximum joint spacing is 24 to 36 times the slab thickness, panels no more than 1.5 times longer than wide, and the groove at least a quarter of the slab depth. source: NRMCA CIP 6, Joints in concrete slabs on grade |
| OSHA 1926.701 and 1926.703 | No one under a concrete bucket being raised or lowered; protruding rebar guarded against impalement; no construction loads until a qualified person says the structure can carry them. Shoring is inspected before erection and immediately before, during and after placement. Forms and shores stay until the concrete has 'gained sufficient strength'. source: OSHA 29 CFR 1926.703, Requirements for cast-in-place concrete |
| Silica, 29 CFR 1926.1153 Table 1 | Action level 25 µg/m³, PEL 50 µg/m³ (8-hour TWA). A walk-behind saw with integrated water needs no respirator outdoors and APF 10 indoors. A written exposure control plan lists the tasks, controls, housekeeping and how access is restricted. source: OSHA 29 CFR 1926.1153, Respirable crystalline silica (Table 1) |
| Retainage caps: California, New York, Colorado | California Civ. Code 8811 caps private-works retainage at 5% for contracts from 1 Jan 2026 and 8820 bars waiving it. New York GBL 756-c caps private contracts over $150,000 at 5%, and a Dec 2025 amendment voids higher terms. Colorado HB21-1167 caps private projects over $150,000 at 5%. source: Holland & Knight, California expands 5 percent retainage cap to private projects (Apr 2026) |
| AIA G702 / G703 pay applications | The contractor applies on G702 and the architect certifies it; G703 is the continuation sheet that breaks the contract into the schedule of values. Lien waivers usually travel with each monthly application. source: AIA Contract Documents, GC pay apps: G702 and G703 |
Rules vary by state, council and contract. Checked 2 November 2026; confirm against the source for your area before relying on it.
Numbers
Numbers concrete crews pour, test and bill to
Standards values are from the named source; prices are consumer cost guides and vary by market. The yardage and test count is a worked example, not a rule.
| Item | Value | Source |
|---|---|---|
| Strength tests, minimum | 1 per 150 yd³ (some specs 1 per 100 yd³) | ACI 318-19 26.12.2.1 |
| Acceptance | Avg of 3 ≥ f′c; each ≥ f′c − 500 psi (0.9 f′c above 5,000) | ACI 318-19 26.12.3.1 |
| Expected low tests | 7 to 10 below f′c on a 10,000 yd³ job | Concrete International 2022 |
| Cylinder initial curing | 60 to 80°F, up to 48 h; 68 to 78°F at f′c ≥ 6,000 psi | ASTM C31 study guide |
| Cylinder pair range | Rarely over 8.0% (2 cyl) or 9.5% (3 cyl) of the average | NRMCA CIP 9 |
| Cold weather trigger | Air ≤ 40°F expected during protection | ACI 306R via NIH |
| Plastic shrinkage risk | > 0.2 lb/ft²/h evaporation (caution > 0.1) | ACI 305 via Euclid |
| FF/FL classes | 20/15 conventional · 35/25 flat · 60/40 super flat | ACI 117 via ArchToolbox |
| Joint spacing | 24 to 36 × thickness; ~10 ft on 4 in slab | NRMCA CIP 6 |
| Ready-mix price | $120 to 150/yd³; short-load fee about $43/yd under a full load | LawnStarter 2026 |
| Driveway, 24×24 ft | About $5,184 average ($6 to 20/sq ft range) | Fixr |
| Worked example: 100 × 120 ft SOG, 6 in | 12,000 sq ft × 0.5 ft ÷ 27 = 222 yd³ → at least 2 tests at 1/150 yd³ | Worked example |
source: Klinger, Lobo, Connolly, Suprenant, Expect compressive strength test results less than specified strength on every project (Concrete International, Feb 2022, via ASCC)source: SI Certs, ASTM C31 making and curing concrete test specimens in the field (study guide)source: NRMCA CIP 9, Low concrete cylinder strengthsource: NIH Office of Research Facilities, Concrete construction precautions during cold weather (Technical Bulletin, Feb 2016)source: Euclid Chemical, Preventing rapid evaporation when the heat is on (ACI 305 evaporation chart)source: ArchToolbox, FF and FL numbers (ACI 117 classes and ACI 302.1 values by use)source: NRMCA CIP 6, Joints in concrete slabs on gradesource: LawnStarter, Cost of ready-mix concrete (updated Sep 2026)source: Fixr, Concrete driveway cost
Where it breaks
Where spreadsheets and generic software fall over
A 28-day break comes back 600 psi low. The GC asks for cores. Nobody can say whether water was added, what the curing box read, or which slab section that truck went into.
Each cylinder set links to its truck ticket, placement area, water added and the curing box max-min readings, so the first answer to a low break is a record, not a guess.
The lab report says 'FAILED' on a single test that still meets ACI 318, and the engineer stops the next pour.
Breaks are entered per cylinder and the job shows the test average and the running average of three against f′c and f′c − 500, so you can show it complies the same day.
The forecast drops to 34°F overnight after a slab pour, and the blankets were never ordered.
A pour can't be confirmed without a forecast check; a low at or below 40°F during the protection period adds a cold weather plan with blanket count, heaters and temperature checks to the pour checklist.
The warehouse floor misses FF 35 and the owner withholds payment. The readings were taken a week later, after curling.
Floors with an FF/FL spec get a measurement task due within 72 hours of finishing, with readings and the date stored on the placement.
Truck tickets live in a crew lead's truck. At billing, yards poured don't match yards billed, and short-load fees were never passed through.
Tickets are captured by photo at arrival and totaled per placement against the takeoff; short loads and overtime waits flag for the pay app or change order.
Retainage sits unbilled for months after substantial completion, and the contract held 10% on a California private job signed in 2026.
Retainage is tracked per contract against the state cap, and release is chased the day the job reaches substantial completion.
Checklist
The concrete contractors operations checklist
Print it, or hand it to whoever runs the office side.
- Mix design approved and on the placement before ordering
- Subgrade unfrozen, compacted and free of snow, ice and frost
- Forms and shoring inspected before erection and before, during and after placement
- Rebar capped against impalement; embeds and sleeves photographed
- Forecast checked: cold weather plan below 40°F, evaporation check on hot windy days
- Testing agency booked and on-site curing box ready at 60 to 80°F with a max-min thermometer
- Every truck ticket logged, including water added and who approved it
- Nobody under the bucket; silica controls per Table 1 for saw cutting and grinding
- Joints cut at 24 to 36 × thickness and at least a quarter of the depth
- FF/FL measured within 72 hours where specified
- Forms and shores stripped only on proven strength
- Breaks tracked against f′c and f′c − 500 psi with running average of three
- Pay app on G702/G703 with lien waivers; retainage checked against state cap
- Close-out package: pour log, test results, curing and floor reports
Software options
What software concrete contractors actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
STACK
Estimators doing takeoff from plans
Cloud takeoff (linear, area, count, volume) and estimating with a concrete and masonry package. Takeoff and bids, not field records.
Raken
Concrete subs that owe the GC daily reports
Mobile daily reports with photos and video, time cards, safety checklists and toolbox talks, exported to PDF. Test logs and retainage live elsewhere.
HCSS HeavyJob
Larger heavy-civil and structural concrete contractors
Daily log of crews, hours, equipment, materials, weather, delays and safety, tied to job cost. Strong on cost codes; heavier to set up.
busybusy
Crews that need accurate time by job and cost code
GPS clock-in with an on-site requirement, cost-code switching and equipment hours, works offline. Time tracking rather than pour records.
Foundation Software
Contractors needing construction accounting and certified payroll
Job cost, payroll split across jobs, certified payroll and prevailing wage. The back office, not the field.
Giatec SmartRock or Converge
Structural and tilt-up crews deciding when to strip or stress
Wireless sensors tied to rebar estimate in-place strength by the ASTM C1074 maturity method; SmartRock reads every 15 minutes. They answer 'is it strong enough yet', not the rest of the job.
Questions to ask any vendor
- Can each cylinder set link to its truck ticket, placement area, water added and curing box temperatures?
- Does it calculate the test average and running average of three against f′c and f′c − 500 psi as breaks come in?
- Will it block confirming a pour without a forecast check, and add a cold or hot weather plan automatically?
- Can FF/FL readings be stored per placement with a measurement due date 72 hours after finishing?
- Can it produce G702/G703 pay apps from work in place, track retainage per contract against state caps, and collect lien waivers?
- Does the crew app work offline on a deck or in a basement and capture ticket photos?
Bring one real concrete contractors job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Concrete contractors on Fieldproxy: built around how you already work
A Fieldproxy setup for a concrete contractor is built around the placement and the pour log: every pour carries its mix, truck tickets, weather plan, field tests, cylinders and photos, and the breaks that come back weeks later land on the same record. The office sees work in place for the pay app and retainage per contract, and the crew app works offline on the deck.
Module 1
Bids and takeoff intake
Concrete work arrives as invitations to bid with plans and a 03 30 00 spec, or as a homeowner asking for a driveway.
- Record: Bid; fields: GC, project, bid date, plan set and spec upload, f′c by element, FF/FL spec, testing and curing requirements, retainage %
- Takeoff lines by placement: element, area, thickness, yards with waste factor, rebar tons, finish, joints, pump
- Statuses: Invited, Takeoff, Submitted, Won, Lost; residential flatwork uses Lead, Site visit, Quoted, Accepted
Module 2
Contract, schedule of values and submittals
How the price is broken down on day one decides how every pay app reads.
- Record: Contract; fields: value, retainage % checked against state cap (e.g. warn above 5% in CA, NY, CO), pay app day, lien waiver type
- Schedule of values lines matching G703 columns
- Submittals: mix designs, curing compounds, joint layout, finisher certifications; statuses Draft, Sent, Approved, Revise
Module 3
Placements and pre-pour
A pour can't happen until the subgrade, forms, rebar and inspector are all signed off.
- Record: Placement; fields: level, gridlines, element, area, thickness, planned yards, mix design, f′c and test age
- Pre-pour checklist with required photos: subgrade, forms, shoring inspection time, rebar and caps, embeds, vapor retarder, inspector sign-off
- Status: Planned, Pre-pour checked, Ordered, Poured, Finished, Cured, Accepted
- Can't move to Ordered until the pre-pour checklist and inspector sign-off are complete
Module 4
Pour scheduling, plant and pump
The plant, the pump, the testing agency, the crew and the weather all have to agree on one morning.
- Pour booking: plant, yards, pour rate, start time, pump size and operator, testing agency confirmation
- Forecast check required to confirm; low ≤ 40°F during protection adds the cold weather plan, high wind and heat add an evaporation check
- Rain-out moves the pour and every crew booking that depends on it, with the reason logged
Module 5
Pour log on the crew app
The pour log is what answers a low break, a crack claim or a billing dispute.
- Truck ticket rows: ticket photo, number, mix, yards, batch and arrival time, discharge start and end
- Water added: gallons, authorized by, before or after sampling; required when entered
- Field tests: slump, air, concrete and air temperature, cylinder set ID
- Crew and hours, finisher certifications, equipment, photos at start, finish, joints and cure; works offline
Module 6
Cylinder and break tracker
Breaks arrive weeks after the pour, from a lab, and have to be read against ACI 318 straight away.
- Record: Cylinder set; fields: placement, truck ticket, size (6x12 or 4x8), count, curing box max-min, lab pickup
- Break rows per cylinder at 7 and 28 days; calculated test average, running average of three, pass or investigate against f′c − 500 (or 0.9 f′c above 5,000 psi)
- Hold cylinders remaining, maturity sensor readings where used, strip approval
Module 7
Floors, joints and cracks
Warehouse and retail floors are accepted on numbers measured inside a short window.
- FF/FL task due 72 hours after finishing (e.g. reminder at 48 hours); readings, overall and local values, date
- Joint saw time and depth, joint spacing check against slab thickness
- Crack log: location, width, length, photo with scale, repair method
Module 8
Pay apps, retainage and change orders
A concrete sub's cash is work in place, minus retainage, plus every extra that was actually signed.
- Monthly G702/G703 from accepted placements against the schedule of values, with lien waivers attached
- Retainage ledger per contract: held, released, due date at substantial completion
- Change orders for extra yards, short loads, overtime waits, winter protection; signed on the phone by the GC's super
- QuickBooks or Xero sync
Module 9
Close-out and customer outputs
The GC, the owner and the homeowner each want a different package at the end.
- PDFs from your templates: pour log per placement, test summary, curing and cold weather record, floor report
- Residential: cure and traffic instructions, sealing visit booked after the cure period, photos and sign-off
- Portal link for the GC's PM to see pours, tests and pay app status
Module 10
Management reporting
Owners watch yards placed per crew-day, low breaks, and money tied up in retainage.
- Yards placed vs takeoff by placement and crew, labor hours per yard
- Low tests by plant, mix and testing agency; water-added frequency
- Retainage outstanding by GC and age; pours lost to weather
The AI agents, set up for concrete contractors
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | A testing agency emails a break report PDF, or a GC sends an invitation to bid with the spec | Reads the cylinder IDs, ages and strengths and matches them to cylinder sets, or pulls f′c, FF/FL, testing and retainage terms out of the spec | Break rows filled with the running average updated, or a Bid record with the spec requirements filled |
| Watcher agent | A test falls below f′c − 500 psi, the running average of three drops below f′c, a curing box reading leaves 60 to 80°F, or an FF/FL measurement is not entered 60 hours after finishing | Checks the break, curing and floor records against the rules stored on the placement | An alert to the project manager with the truck ticket, water added and curing record attached, or an overdue task to the floor crew |
| Vision agent | The crew lead photographs a truck ticket as the truck backs in | Reads ticket number, mix, yards, batch time and water added | A truck ticket row on the pour log, totaled against the yards ordered |
| Scheduler agent | Every weekday at 5 pm | Pulls tomorrow's pours with forecast lows, wind and the weather plan, pump and testing bookings, and any pre-pour checklist not complete | A pour briefing emailed to supers and crew leads |
| Autopilot | A job reaches substantial completion with retainage still held, or a pay app is unpaid past its due date | Drafts the release request with the retainage amount, the close-out documents and the lien waiver | A draft email to the GC that a person approves before it sends |
| Voice agent | The finisher, gloves on, says 'grid C to D, joints cut at ten feet, inch and a quarter deep, cure on at two' | Turns the voice note into joint saw time, spacing, depth and cure start on the placement | Filled finish and cure fields waiting for photos |
Straight answers
Concrete contractors: FAQ
What software do concrete contractors use?
Most use several tools: STACK or PlanSwift for takeoff, Raken or HCSS HeavyJob for daily reports, busybusy for time, Foundation Software for accounting, and maturity sensors like Giatec SmartRock or Converge for in-place strength. Pour logs, cylinder breaks and retainage often still sit in spreadsheets. Fieldproxy is set up around your own placements, pour log, test tracker and pay apps, with an offline crew app.
How often do concrete cylinders have to be tested?
ACI 318-19 26.12.2.1 and ACI 301-20 set a minimum of one strength test per 150 yd³, and some project specs ask for one per 100 yd³. A test is the average of cylinders from one sample, usually two 6x12 or three 4x8, broken at 28 days unless the spec names another age.
What happens if a concrete cylinder breaks low?
Under ACI 318-19 26.12.3.1, a test below f′c can still be acceptable if the average of three consecutive tests meets f′c and no single test is more than 500 psi below (or below 0.9 f′c above 5,000 psi). NRMCA CIP 9 says most low results come from cylinder handling, curing and testing. Check the curing record and hold cylinders before anyone cores.
What temperature do test cylinders need to be kept at on site?
ASTM C31 calls for 60 to 80°F, protected from moisture loss, for up to 48 hours, or 68 to 78°F when f′c is 6,000 psi or more, recorded with a max-min thermometer. A 2026 STRUCTURE article says non-compliant initial curing can cut measured strength by up to 28%.
When is it too cold to pour concrete?
ACI 306R treats it as cold weather when air temperature has fallen to, or is expected to fall below, 40°F during the protection period. You can still pour, with a plan: unfrozen subgrade, heated materials or accelerators, blankets, concrete kept at 50°F or more for most sections, and no freezing in the first 24 hours.
When should floor flatness (FF/FL) be measured?
Within 72 hours of finishing, before curling changes the slab, using ASTM E1155. ACI 117 classes run from conventional 20/15 to super flat 60/40, and local minimums are typically 60% of the overall numbers.
How far apart should control joints be?
NRMCA CIP 6 gives 24 to 36 times the slab thickness, so about 10 ft on a 4 in slab, with panels no more than 1.5 times longer than wide and joints at least a quarter of the slab depth.
How much retainage can a GC hold on a concrete sub?
It depends on the state and the job. California caps private-works retainage at 5% for contracts signed from 1 Jan 2026. New York caps private contracts over $150,000 at 5%, and Colorado does the same for private projects over $150,000. Check your state's statute and the contract.
What OSHA rules apply to concrete crews?
29 CFR 1926 Subpart Q: nobody under a bucket being raised or lowered, rebar guarded against impalement, shoring inspected before and during placement, forms stripped only once the concrete has enough strength. Saw cutting and grinding fall under the silica standard 1926.1153, with Table 1 controls and a written exposure control plan.
How much does ready-mix concrete cost?
A 2026 consumer guide puts it at about $120 to 150 per cubic yard delivered within 20 miles, with short-load fees around $43 per yard under a full truck. Prices vary a lot by market and season.
Related guides
All sources on this page (28)
- source: Klinger, Lobo, Connolly, Suprenant, Expect compressive strength test results less than specified strength on every project (Concrete International, Feb 2022, via ASCC)
- source: SI Certs, ASTM C31 making and curing concrete test specimens in the field (study guide)
- source: ACI, Concrete International (Jan 2011) on specifying and measuring F-numbers
- source: Holland & Knight, California expands 5 percent retainage cap to private projects (Apr 2026)
- source: NRMCA CIP 9, Low concrete cylinder strength
- source: STRUCTURE magazine, Initial curing of concrete cylinders: a sustainable lever hiding in plain sight (Sep 2026)
- source: NIH Office of Research Facilities, Concrete construction precautions during cold weather (Technical Bulletin, Feb 2016)
- source: Euclid Chemical, Preventing rapid evaporation when the heat is on (ACI 305 evaporation chart)
- source: ASCC Position Statement #32, Concrete discharge time (ASTM C94)
- source: NRMCA CIP 6, Joints in concrete slabs on grade
- source: OSHA 29 CFR 1926.703, Requirements for cast-in-place concrete
- source: OSHA 29 CFR 1926.1153, Respirable crystalline silica (Table 1)
- source: AIA Contract Documents, GC pay apps: G702 and G703
- source: ArchToolbox, FF and FL numbers (ACI 117 classes and ACI 302.1 values by use)
- source: LawnStarter, Cost of ready-mix concrete (updated Sep 2026)
- source: Fixr, Concrete driveway cost
Run concrete work the way it actually runs.