Guide for foundation repair companies · checked 1 November 2026

Foundation repair, proved pier by pier

A foundation repair is sold on an elevation survey and defended for decades on a pier log. This guide covers how the survey is taken, when a city wants an engineer's sealed plan, what push pier pressures and helical torque actually prove, the special inspection items on an ICC-ES report, the plumbing test before and after the lift, and what a transferable warranty asks of the next owner.

See your own jobs set up this way

A 30-minute call. We show you foundation repair companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Foundation repair companies use software that keeps the before and after elevation surveys on the same grid, routes the job through an engineer's letter and the city permit, and records every pier's number, depth, final drive pressure or installation torque, lock-off load and lift, because that pier log is what the engineer's completion letter, the special inspector and a future buyer rely on. Supportworks dealers often sell with SolutionView; others use Leap, MarketSharp or Improveit 360 for in-home sales and a generic tool like Jobber for scheduling. Fieldproxy is set up around your own survey, pier log, permit and warranty process.

±1/8 in

Minimum accuracy the Foundation Performance Association asks of an elevation device; spirit levels are not acceptable for slab slope

source: Foundation Performance Association, FPA-SC-13-0 Evaluation of residential foundations (2007)

Kt = 10 ft⁻¹

Torque factor for a 1.5 in square-shaft helical pile in ICC-ES ESR-2794: ultimate capacity = Kt × installation torque, allowable = half that

source: ICC-ES ESR-2794, CHANCE helical foundation systems (Hubbell), torque correlation and factors of safety

48 hours

Texas: minimum notice to the one-call center before digging, excluding weekends and holidays; augering 16 in or deeper counts

source: Texas Utilities Code 251.151, notice of excavation

30 days

Window two Texas contractors give a buyer to transfer the warranty after closing ($200 fee at one, 5% of the contract at the other)

source: Quality Foundation Repair (Austin), warranty terms

How a job runs

One foundation repair job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Inspect and shoot elevations

    The inspector walks the house, measures cracks, checks doors and windows, and shoots a relative elevation survey with a digital manometer or water level, not a spirit level. FPA-SC-13 asks for ±1/8 in accuracy, a reading every 30 to 100 sq ft, a fixed reference point re-checked during the survey, and averaged readings where flooring changes height.

  2. 2

    Decide the level of evaluation

    ASCE Texas Section guidance sets levels: Level A is observation, Level B adds the relative elevation survey and a drawing, Level C adds plumbing tests, soil tests and post-tension cable checks. A homeowner calling about a crack usually gets Level B. A slab over Houston Black clay or a known post-tension slab may need Level C.

  3. 3

    Test the plumbing before quoting

    A leaking sewer under a slab can drive heave or settlement, and lifting a slab can crack lines. A sewer hydrostatic test plugs the main, fills the system to slab level and watches it for up to 15 minutes. Record the result before the repair and again after the lift.

  4. 4

    Get the engineer's plan

    Many cities want a sealed design. Plano wants pier and footing locations, pier details and an engineer's letter dated, sealed and signed by a Texas registered engineer, in two sets. The engineer reviews your survey, sets pier type, count and spacing, and names the minimum installation torque or load-test criteria.

  5. 5

    Sell, sign and permit

    Present the scope, the per-pier price and the warranty terms; take the deposit. Pull the permit with the sealed plan. Call 811: in Texas no earlier than 14 days and no later than 48 hours before digging, not counting weekends and holidays.

  6. 6

    Excavate and install each pier

    Push piers are driven one at a time against the structure's weight until the target pressure is reached and the pier stops moving; Supportworks treats each install as a proof load test. Helical piles are turned in until they reach the engineer's minimum torque at a steady rate of advance. Number every pier on the site plan and log its depth, final pressure or torque and photo before backfill.

  7. 7

    Lift, lock off and special inspection

    Piers are tied together through a manifold and the structure is lifted to the target, then locked off near the working load. Where the city requires special inspection, the inspector records installer certification, product IDs, equipment, procedures, tip elevations, pressures, depth, inclination, bolt tightness and compliance with plans (ESR-4317 lists these items).

  8. 8

    Post-repair survey and plumbing retest

    Re-shoot elevations on the same grid points from the same reference so the change is point by point. ASCE Texas guidance calls for plumbing tests after lifting, a post-repair survey, and a completion letter from the engineer.

  9. 9

    Final, warranty and invoice

    Pass the city's final with the engineer's letter, collect the final payment, and issue a warranty tied to the address, the pier log and the post-repair survey. Tell the owner what keeps it valid: drainage upkeep, a passed plumbing test where required, and the transfer window if they sell.

What to record

The fields every foundation repair job should capture

Evaluation

  • Foundation type: slab (conventional or post-tension), pier and beam, basement; PT stamp or tendon ends seen
  • Elevation device, reference point location and value, and each grid reading in tenths of an inch
  • Floor covering at each reading (tile, carpet, wood) so transitions are not read as movement
  • Cracks: location, length, width, pattern (stair-step, diagonal at corners, horizontal in basement wall), photo with a scale
  • Doors and windows binding, frieze board gaps, brick separation; drainage, gutters, trees within root reach
  • Plumbing test type, duration and result (sewer hydrostatic, supply pressure)

Design, permit and sale

  • Engineer name, Texas or state license number, letter date, sealed plan, design criteria (minimum torque or load-test value)
  • Pier type (steel push, helical, pressed concrete, drilled), count, spacing, bracket type, location on the plan
  • Permit number, plan review date, 811 ticket number and its valid-from date
  • Contract, deposit, per-pier price, extra-pier unit rate, warranty type (steel lifetime, concrete 10 years)

Install and close-out (per pier)

  • Pier number, location, bracket, shaft size and section count, final depth below footing
  • Push pier: final drive pressure in psi, cylinder effective area, calculated drive load, lock-off pressure and load
  • Helical: torque at final depth, Kt used, calculated ultimate and allowable capacity, helix configuration
  • Lift achieved, photo before backfill, special inspector sign-off where required
  • Post-repair elevations at the same grid points, plumbing retest, engineer's completion letter, final inspection
  • Warranty number, address, start date, transfer window and fee, claims history

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
IBC 1810: helical piles by torque correlationIBC 1810.3.3.1.9 lets ultimate capacity be found from well-documented correlations with installation torque. 1810.4.11 says install to the depth and torque criteria set by a registered design professional and never over the manufacturer's rated maximum torque. 1810.4.12 calls for special inspection per 1705.9. source: UpCodes, Texas IBC 2021 Chapter 18: 1810.3.1.5, 1810.3.3.1.9, 1810.4.11 helical piles
ESR-2794: Kt factors and factor of safetyQult = Kt × T and Qall = 0.5 Qult. Kt is 10 ft⁻¹ for the 1.5 in and 1.75 in square shafts, 9 for RS2875, 7 for RS3500, 5.5 for RS4500. On IRC jobs with no geotechnical report, the factor of safety is 2.5, so Qall = 0.4 Qult. source: ICC-ES ESR-2794, CHANCE helical foundation systems (Hubbell), torque correlation and factors of safety
Where Kt came fromA.B. Chance developed the torque correlation in the late 1950s and 1960s; Hoyt and Clemence published it in 1989 from about 100 load tests at 24 sites. Perko's regression on about 260 tests was added to ICC-ES AC358. source: Hubbell, Origin and development of the torque correlation Kt factor
Push piers: every install is a proof loadSupportworks' manual says installing each push pier is essentially a proof load test at that location. Drive and lock-off loads are the cylinder's effective area times gauge pressure, and lock-off is typically at or near the service load. source: Foundation Supportworks Technical Manual, section 3.13 push pier load testing
Special inspection items (ESR-4317)The special inspector verifies the manufacturer and installer certification, product IDs for lead and extension sections, brackets, bolts and nuts, installation equipment, written procedures, tip elevations, installation pressure and final depth, inclination and position, bolt tightness, and compliance with plans. Inspection is continuous. source: ICC-ES ESR-4317, Magnum push pier system (special inspection items, proof test to refusal)
Portland BOD 25-01 (effective 4 Feb 2025)Push piers and helical piles need continuous special inspection. For helical piles the drawings state the minimum installation torque and the final report certifies each pile met it; for push piers the drawings state load-test criteria and the final report gives the values. source: City of Portland, BOD 25-01 Helical piles and push piers (special inspection)
City permits: Plano and Heath, TexasPlano requires two sets of drawings with pier and footing locations, pier details and a sealed engineer's letter referencing the building code. Heath asks for a licensed engineer's evaluation with a site plan and pier details at application, and an engineer inspection report at final. source: City of Plano, TX, Foundation repair permit requirements (FM624RY013)
What is and isn't a permitted repair (Lawrence, KS)Structural foundation repair (piers, steel posts, helical piers, I-beams, tiebacks) needs a permit under City Code 5-139 and IRC Chapter 4. Waterproofing, crack injection and mudjacking may be exempt under 5-144. source: City of Lawrence, KS, Foundation repairs and basement drainage guidelines (2022)
ASCE Texas Section residential guidelinesVersion 3 took effect 1 April 2022. Version 2 defined Levels A, B and C of evaluation, noted a floor slope over 1% is usually noticeable, and called for plumbing tests after lifting (7.6), a post-repair elevation survey (7.7) and an engineer's completion letter (7.8). source: ASCE Texas Section, Guidelines for the Evaluation and Repair of Residential Foundations, Version 2
FPA-SC-13: survey and performance criteriaDevice accuracy ±1/8 in or better; readings every 30 to 100 sq ft; deflection limit L/360 adjusted down to about L/255 on diagonals, minimum effective length 20 ft; tilt 1% or less. The 2007 edition was replaced by FPA-SC-13-1 in 2015 with a 2022 errata on deflection. source: Foundation Performance Association, FPA-SC-13-0 Evaluation of residential foundations (2007)
Texas engineers and repair-company pier plansIn 2017 an engineer asked the Texas Board of Professional Engineers to rule on engineers sealing pier plans recommended by repair companies without checking whether the slab could span between piers. The Board declined to issue an opinion and said it investigates substantiated complaints. source: Texas Board of Professional Engineers, response to request for policy advisory opinion (Jan 2018)
Post-tension slabsThe 2024 IRC added R506.2: post-tensioned slabs on ground over expansive or stable soils are designed to PTI DC10.5. Identify PT before coring or cutting a slab for interior piers. source: Post-Tensioning Institute, Slab-on-ground (2024 IRC R506.2 and PTI DC10.5)
Texas 811Notify no earlier than the 14th day and no later than 48 hours before excavating, excluding Saturdays, Sundays and legal holidays. Excavate means mechanized soil disturbance 16 in or deeper, including augering and boring. source: Texas Utilities Code 251.002, definition of excavate (16 inches, includes augering)
Seller's disclosure (Texas)TREC 55-1 asks sellers about defects in the foundation or slab, previous structural repair, settling and soil movement, and repairs made without permits. That is why buyers' agents call for the pier log and permit years later. source: TREC No. 55-1 Seller's Disclosure Notice (copy)
Expansive soil, definedTDLR applies IRC 403.1.8 and IBC 1808.6: soil is expansive with plasticity index 15 or more, over 10% passing the No. 200 sieve, over 10% finer than 5 µm, and expansion index over 20; the expansion index test alone also qualifies. source: Texas Department of Licensing and Regulation, IHB TB 10-01 Expansive soils

Rules vary by state, council and contract. Checked 1 November 2026; confirm against the source for your area before relying on it.

Numbers

Pier, survey and warranty numbers foundation crews work to

Capacities and factors are from the named ICC-ES report or manufacturer; prices are consumer cost guides and vary by market; warranty terms are from two named Texas contractors, not an industry rule.

ItemValueSource
Elevation device accuracy±1/8 in or better; no spirit levelsFPA-SC-13-0
Survey densityOne reading per 30 to 100 sq ftFPA-SC-13-0
Tilt / deflection criteria≤1% tilt; L/360 deflectionFPA-SC-13-0
Helical Kt, 1.5 in square shaft10 ft⁻¹; Qall = 0.5 × Kt × torqueESR-2794
Helical FS, IRC, no geotech report2.5 (Qall = 0.4 Qult)ESR-2794
Push pier drive vs lock-off (Madison WI job)Wall: ≥2,200 psi drive, 1,500 psi lock-off (14 kips)Supportworks case study
Push pier shaft sizes2.375 / 2.875 / 3.50 / 4.00 in O.D.Supportworks manual 3.3
Helical termination (Ram Jack)SPT N ≥ 50; typical 20 to 30 ft embedmentRam Jack engineer Q&A
Cost per pier$1,000 to $3,000This Old House 2026
Structural engineer report$500 to $1,000This Old House 2026
Sewer hydrostatic testFilled to slab level, watched up to 15 minAccurate Leak
Warranty transfer30 days; $200 fee or 5% of contractQFR and Hercules warranties

source: Foundation Performance Association, FPA-SC-13-0 Evaluation of residential foundations (2007)source: ICC-ES ESR-2794, CHANCE helical foundation systems (Hubbell), torque correlation and factors of safetysource: Supportworks case study, Renovation of The Crossing, Madison WI (push pier drive and lock-off pressures)source: Foundation Supportworks Technical Manual, section 3.3 push pier shafts and bracketssource: Ram Jack, Q&A with a Ram Jack engineer (helical termination and depth)source: This Old House, Foundation repair cost (2026)source: Upgraded Home, Pier and beam foundation repair cost (cost per pier by type)source: Accurate Leak, Sewer hydrostatic testsource: Quality Foundation Repair (Austin), warranty termssource: Hercules Foundation Repair (Garden Ridge, TX), warranty terms

Where it breaks

Where spreadsheets and generic software fall over

The pre-repair survey is a hand sketch with numbers, and the post-repair crew shoots from a different reference point. The 'after' drawing can't be compared and the engineer won't sign a completion letter off it.

Store the grid, the reference point and each reading as data on the job; the post-repair form opens the same points from the same reference and shows the difference per point.

Pier 7 hit refusal at 9 ft while the rest went 18 ft. Nobody wrote it down, and three years later a warranty claim on that corner has no record.

A pier log row per pier with required depth, final pressure or torque, lock-off, lift and photo; the job cannot close with a blank row, and outliers against the job average are flagged before backfill.

The helical pile reached depth but never hit the engineer's minimum torque. The crew logged 'installed' and the special inspector catches it on the report.

The minimum torque (or load-test value) from the sealed plan is stored on the job and each pier is checked against it on the phone; under-target piers go to 'Engineer review' instead of 'Done'.

Crews show up and the permit isn't issued, or the 811 ticket hasn't reached its legal start time.

Install can't be scheduled until the permit number is entered and the 811 ticket's valid-from date has passed.

The slab was lifted and a drain line cracked. With no pre-lift plumbing test, you can't show it was leaking before.

Required plumbing test before quoting and again after lifting, with method, duration and result on the job, and the warranty only activates when the post-lift test passes.

A buyer's inspector calls about a warranty for a house you repaired eight years ago under a previous owner. The office can't find it, or doesn't know if it was transferred in time.

Warranties live on the address, not the customer, with transfer requests, fees, deadlines and claims attached.

Checklist

The foundation repair operations checklist

Print it, or hand it to whoever runs the office side.

  • Survey with a manometer or water level to ±1/8 in, never a spirit level
  • Reference point marked, photographed and re-checked during the survey
  • Floor covering noted at each reading
  • Plumbing tested before quoting and again after the lift
  • Post-tension slab identified before any coring or interior pier
  • Engineer's sealed plan with pier layout and minimum torque or load-test criteria on file
  • Permit issued and 811 ticket valid before excavation
  • Each pier numbered on the plan with depth, final pressure or torque, lock-off and photo
  • Special inspector's items captured where the city requires it
  • Post-repair survey on the same grid and reference
  • Engineer's completion letter and city final on the job
  • Warranty issued to the address with upkeep conditions in writing
  • Transfer window and fee tracked when the house sells
  • Drainage and watering advice given to the owner in drought

Software options

What software foundation repair companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

Supportworks SolutionView / ServiceView

Supportworks dealers selling push piers, helicals, PolyLevel and wall repair

Cloud in-home presentation software that syncs with CRMs; Supportworks says 130+ dealers use it and that it is offered outside the dealer network too. Strong on the sales visit; the pier log and warranty process sit elsewhere.

source: Supportworks SolutionView / ServiceView

Leap

Home-improvement companies with in-home sales reps

Point-of-sale app for estimating, financing, contracting and payments. A basement company in its case studies reports about 70% less paperwork per sale. Not built around surveys or pier logs.

source: Leap

MarketSharp

Remodeling and basement/foundation contractors running lead-to-sale

Remodeling CRM; Basement Repair Specialists' franchise arm partnered with it for foundation repair and water control. Lead tracking, appointments and marketing more than field records.

source: MarketSharp

Improveit 360

Larger specialty contractors on Salesforce

Remodeling and home-improvement CRM built on Salesforce, for lead, sales and project management. Survey and pier records are custom work.

source: Improveit 360

Jobber or ServiceTitan

Smaller crews, or companies where foundation work is one service line

Good scheduling, quotes and invoicing. Neither publishes a foundation-specific elevation survey, pier log or engineer and permit workflow, so those are custom forms you build.

Questions to ask any vendor

  • Can the post-repair survey open the exact grid points and reference from the pre-repair survey and show the difference per point?
  • Does the pier log require depth, final pressure or torque, lock-off and photo for every pier, and calculate load from cylinder area or Kt?
  • Can a pier below the engineer's minimum torque or load criteria be blocked from completion?
  • Will it stop an install being scheduled before the permit is issued and the 811 ticket is valid?
  • Are warranties stored by property address, with transfer deadlines, fees and claims, so a future owner's call finds them?
  • Can the engineer and the special inspector see and sign the job record from a link, without a login?

Bring one real foundation repair job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Foundation repair on Fieldproxy: built around how you already work

A Fieldproxy setup for a foundation repair company is built around the survey and the pier log: the inspection captures elevations on a numbered grid from a fixed reference, the engineer's sealed design sets the targets each pier must meet, and the crew can't close a job until every pier has its depth, pressure or torque, lock-off and photo. Warranties live on the address, so the call from a buyer's inspector a decade later finds the whole record.

Module 1

Lead intake and inspection booking

Most calls are a worried homeowner with a crack or a buyer with an inspection report and a deadline.

  • Record: Lead; fields: source, property address, reason (crack, doors sticking, buyer's report, insurance), closing date if a sale is pending, uploaded inspection report
  • Inspection visit statuses: Requested, Booked, Inspected, Engineer needed, Quoted, Lost
  • Buyer's-deadline leads flagged and booked first
How this works

Module 2

Evaluation and elevation survey

The survey is the evidence for the sale, the engineer and the warranty, so it has to be data, not a sketch.

  • Record: Survey (Pre-repair or Post-repair) on the Job; fields: device type, accuracy, reference point location, photo and value, evaluation level (A, B, C per ASCE Texas)
  • Child rows: Grid point number, x/y on the floor plan, reading in tenths of an inch, floor covering
  • Crack rows: location, length, width, pattern, photo with scale
  • Post-repair survey copies the grid and reference from the pre-repair survey and calculates change per point and overall tilt (e.g. warn over 1%)
  • Foundation type with post-tension yes/no; PT blocks interior coring tasks until engineer approves
How this works

Module 3

Plumbing tests

Under-slab leaks cause movement and a lift can crack lines; warranties often depend on a passed test.

  • Record: Plumbing test; fields: stage (pre-quote, post-lift), type (sewer hydrostatic, supply pressure), duration, result, plumber, report upload
  • Failed pre-quote test creates a referral task and holds the quote
  • Warranty can't be issued until the post-lift test is Passed

Module 4

Engineer review and permit

Cities like Plano and Heath want a sealed plan up front and an engineer's report at final; jobs stall here.

  • Record: Engineering; fields: engineer, license number, request date, sealed plan, design criteria (pier type, spacing, minimum torque or load-test value, lock-off load), completion letter
  • Record: Permit; fields: city, permit number, plan review date, special inspection required yes/no, final inspection date and result
  • 811 ticket number and valid-from date, calculated from the state's notice rule (e.g. Texas 48 hours excluding weekends and holidays)
  • Job status: Awaiting engineer, Plan received, Permit applied, Permit issued, Ready to schedule
How this works

Module 5

Estimate, contract and payments

Pier count often changes on site; the contract needs a unit rate for extras and a clear warranty.

  • Estimate lines by pier type (steel push, helical, pressed concrete), count, per-pier price, excavation, interior breakout, engineering, permit, plumbing test
  • Contract with extra-pier unit rate and warranty terms (e.g. steel lifetime, concrete 10 years), e-signature
  • Payments: deposit, on install, on final; change order for extra piers signed on the phone
How this works

Module 6

Crew scheduling and materials

A pier crew, a hydraulic unit and the right shaft stock all have to be on the same site on a permit-valid day.

  • Install can't be scheduled until Permit issued and 811 ticket valid
  • Material pick list from the estimate: brackets, shaft sections by size, helix leads, bolts
  • Equipment: hydraulic pump and cylinder set with cylinder effective area, torque motor with calibration date
  • Weather and soil notes (e.g. after heavy rain) as a reschedule reason
How this works

Module 7

Pier log on the crew app

The pier log is what the engineer, inspector and next owner rely on.

  • Record: Pier per job; fields: number, location on plan, bracket, shaft size, sections, final depth, final drive pressure (psi) or final torque (ft-lb)
  • Calculated: drive load = pressure × cylinder area; helical Qult = Kt × torque and Qall at the design factor (e.g. 0.5, or 0.4 on IRC jobs with no geotech report)
  • Lock-off pressure and load, lift achieved, photo before backfill; required before the pier is Done
  • Below design criteria → status Engineer review; inspector sign-off field where special inspection applies
  • Works offline in crawlspaces and basements; GPS check-in on arrival
How this works

Module 8

Close-out documents

The city, the engineer and the homeowner each need their own proof.

  • PDFs from your templates: Inspection report with elevation plot, Pier log, Before/after survey comparison, Completion package for the engineer
  • Homeowner sign-off and walkthrough photos
  • Customer link to follow the job and see documents
How this works

Module 9

Warranty register by address

Warranties transfer with the house and are claimed years later by people you've never met.

  • Record: Warranty on the Property; fields: number, start date, coverage per pier type, conditions (drainage upkeep, passed plumbing test), transfer window (e.g. 30 days), transfer fee
  • Transfer requests: new owner, closing date, fee paid, approved or lapsed
  • Claims: date, readings, piers adjusted, cost charged (e.g. per-claim fee)
How this works

Module 10

Management reporting

Owners watch close rate on inspections, jobs stuck at engineer or permit, and piers per job against the estimate.

  • Inspections to sales by inspector, average piers sold vs installed, extra-pier change orders
  • Jobs by status with days in Awaiting engineer and Permit applied
  • Warranty claims by pier type and by crew
How this works

The AI agents, set up for foundation repair companies

AgentWhenWhat it doesWhat you get
Document intelligence agentA buyer's agent emails a home inspection report PDF, or the engineer returns a sealed planReads the foundation findings and address from the inspection report, or the pier count, spacing, minimum torque and lock-off load from the engineer's planA lead with the closing date flagged, or the Engineering record filled with design criteria the pier log checks against
Watcher agentA pier is saved below the engineer's minimum torque or drive pressure, its depth is far off the other piers on the job, or a job sits in Awaiting engineer or Permit applied past e.g. 10 daysCompares each pier with the design criteria and the job average, and checks status agesA hold on the pier with the reason sent to the crew lead and engineer, or a stuck-job alert to the office
Voice agentThe crew lead, hands dirty in the hole, says 'pier six, nineteen feet, twenty-two hundred psi, locked at fifteen hundred'Turns the voice note into the pier row: number, depth, drive pressure, lock-offA filled pier log row waiting for its photo
Calling agentA homeowner calls at night about a new crack or a door that won't closeAsks about cracks, doors, foundation type, a pending sale, and whether they have had repairs before, and checks the address against the warranty registerA booked inspection, or a warranty claim on the existing record
AutopilotA house with an active warranty is listed or sold, or a transfer request has not arrived 20 days into a 30-day windowDrafts a note to the seller or buyer with the warranty number, the transfer deadline and fee, and the pier logA draft email a person approves before it sends
Scheduler agentEvery Monday at 7 amPulls inspections booked, quotes outstanding, jobs waiting on engineer or permit, installs this week with 811 status, piers flagged for review and warranty claimsA weekly briefing to the owner and operations manager

Straight answers

Foundation repair: FAQ

What software do foundation repair companies use?

Supportworks dealers often present with SolutionView; others use Leap, MarketSharp or Improveit 360 for in-home sales and CRM, and Jobber or ServiceTitan for scheduling and invoicing. The elevation survey, pier log, engineer letter and warranty are often still paper or spreadsheets. Fieldproxy is set up around your own survey, pier log, permit and warranty process, with crew forms on a phone app that works offline.

How accurate does a foundation elevation survey need to be?

The Foundation Performance Association's FPA-SC-13 asks for a device accurate to ±1/8 in or better, with readings every 30 to 100 sq ft from a fixed reference point that is re-checked during the survey. Spirit levels are not acceptable for slab slope. Note the floor covering at each reading, because tile and carpet transitions can differ by several tenths of an inch.

Do I need a permit and an engineer for foundation repair?

Often, and it depends on the city. Plano, TX requires two sets of drawings with a sealed Texas engineer's letter and pier details. Heath, TX wants an engineer's evaluation at application and an inspection report at final. Lawrence, KS requires a permit for piers, helical piers and tiebacks but may exempt mudjacking and crack injection.

How is helical pile capacity verified in the field?

By installation torque. Under ICC-ES ESR-2794, ultimate capacity equals Kt times final torque, with Kt = 10 ft⁻¹ for 1.5 in square shafts, and allowable capacity is half that. On IRC jobs without a geotechnical report the factor of safety is 2.5. The engineer sets the minimum torque and each pile is checked against it.

What does a push pier's installation pressure prove?

Supportworks' technical manual treats each push pier install as a proof load test: the pier is driven against the structure until it reaches the target pressure and stops moving. Load is the cylinder's effective area times gauge pressure. On one Supportworks job, wall piers were driven to at least 2,200 psi and locked off at 1,500 psi for a 14-kip working load.

Should plumbing be tested before foundation repair?

ASCE Texas Section guidance includes plumbing tests in a Level C evaluation and calls for them after lifting. A sewer hydrostatic test fills the system to slab level and watches it for up to 15 minutes. One Austin contractor's lifetime warranty requires a passed hydrostatic test within 60 days of the repair.

Is a foundation repair warranty transferable?

Usually, with conditions. Quality Foundation Repair in Austin requires a written transfer within 30 days of closing and a $200 fee. Hercules Foundation Repair allows transfer to two later owners within 30 days for 5% of the original contract price plus an inspection. Ram Jack's lifetime warranty is backed by a dealers' warranty trust.

Do sellers have to disclose foundation repair in Texas?

The TREC 55-1 seller's disclosure asks about foundation or slab defects, previous structural repair, settling or soil movement, and repairs made without permits. That is why buyers ask for the pier log, permit and warranty.

What makes a soil expansive?

Texas's TDLR bulletin, applying IBC 1808.6, lists plasticity index 15 or more, over 10% passing the No. 200 sieve, over 10% finer than 5 µm, and expansion index over 20. The Houston Black clay series cracks 1/2 to 4 in wide at 12 in depth in dry periods.

Can I put piers through a post-tension slab?

Only with care and the engineer's say. Post-tension slabs on ground are designed to PTI DC10.5 (referenced by 2024 IRC R506.2), and cutting a tendon is dangerous and costly. Identify PT before coring for interior piers.

Related guides

All sources on this page (29)