Epoxy flooring software that tracks moisture, profile, dew point and recoat

An epoxy floor is decided before the first drop of resin: how much water the slab pushes up, how rough the grind left it, and whether the slab was warmer than the dew point on the day. When a coating blisters or peels, the argument is about those records. This guide covers the tests, the surface profile scale, the cure windows, the silica rule and the food-plant floor rule, and how to set a coating business up so every coat is on file.

See your own jobs set up this way

A 30-minute call. We show you epoxy flooring contractors workflows running in Fieldproxy, built around how you work.

Book your demo

60 minute video call · Step 1 of 2: your details, then pick a time

Number of employees

Short answer

Epoxy flooring contractors mostly use estimating and CRM tools built for coating businesses: QuoteIQ sells square-foot estimates with flake, metallic and solid color options plus slab inspection forms; DripJobs does proposals, job costing and crew management for epoxy and coating contractors; BuildVision AI makes takeoffs from PDF plans for primer, base coat and top coat. Moisture readings, profile checks, dew point logs and coat times usually live on paper or in photos. Whatever you pick, check that it can store slab RH or MVER per test spot against the coating's limit, the grind profile, slab temperature and dew point per coat, batch numbers, and the silica exposure plan. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each job carries its tests, its coat-by-coat log and its warranty file.

3 + 1

ASTM F2170 RH probes: three for the first 1,000 sq ft, one more for each additional 1,000 sq ft

source: Wagner Meters, ASTM guideline for RH sensors: how many concrete moisture tests per job

CSP 3 to 9

ICRI surface profiles: CSP 3 for a 4 to 5 mil coating, CSP 5 or 6 for 40 mils to 1/8 inch, CSP 6 or 7 for 1/4 to 1/2 inch toppings

source: Clemtex, Concrete surface profile visual scale (ICRI CSP 1 to 9 and coating thickness)

5°F

Slab must stay at least 5°F above the dew point, and rising, for the whole application and cure (one vendor's rule: 60 to 95°F slab and air)

source: Armor Garage, When to apply epoxy floor coating: temperature, cure times, lead time

Table 1

OSHA silica Table 1 row for walk-behind floor grinders: water feed, or a dust collector with a 99% filter, plus a HEPA vacuum indoors

source: OSHA, 29 CFR 1926.1153 respirable crystalline silica in construction, including Table 1

How a job runs

One epoxy flooring job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Walk the floor and test the slab

    Before quoting, check what the slab is and what it has been through: age, vapor barrier under it or not, oil spots, old coatings, joints and cracks, floor drains, and how many sides dry. Run in-situ RH probes under ASTM F2170 (three for the first 1,000 sq ft, one more per additional 1,000 sq ft, drilled to about 40% of slab depth when it dries from the top only) or calcium chloride dishes under ASTM F1869. A bond test patch on a prepped corner is cheap insurance.

  2. 2

    Match the system to the use

    Dry warehouse and showroom floors take a thin epoxy or flake system. Wet washdown, freezers and hot-water cleaning take urethane cement, which Duraamen says resists delamination from thermal cycling because its expansion is close to concrete's. The system sets the grind profile, the thickness and the moisture limit, so the quote is built from the data sheet, not from a price per square foot.

  3. 3

    Quote surface prep, repairs and every coat as lines

    Prep (shot blast or diamond grind to a named CSP), crack and joint repair, patching, primer, base coat, broadcast (flake or quartz), topcoat, cove base, and any moisture mitigation primer. Gallons come from thickness: a US gallon of 100% solids material covers 1,604 sq ft at 1 mil, so 20 mils over 2,000 sq ft is about 25 gallons before waste. Write down the downtime in days, because the customer is shutting a bay to give you the floor.

  4. 4

    Silica plan, access and shutdown

    Write the OSHA silica exposure control plan before grinding: tasks, controls, housekeeping, who is the competent person. Agree the shutdown window, forklift routes, drain protection, ventilation and where product is stored. In a food plant, add the sanitation hold and the quality manager's sign-off on any chemical on site.

  5. 5

    Prep, vacuum and verify profile

    Grind or blast to the CSP in the spec, cut and chase cracks, fill and patch, then vacuum. Compare against a CSP profile chip and photograph it. This is the step the Construction Specifier names as the most common cause of coating failure when it is wrong, so it carries its own record.

  6. 6

    Read the room, then mix and apply

    Log slab and air temperature, relative humidity and dew point before each coat. Armor Garage's guide says 60 to 95°F for material, slab and air, with the slab at least 5°F above the dew point and rising. Mix by the ratio on the sheet, log batch numbers, and apply inside the pot life. Broadcast flake or quartz to rejection while the base coat is wet.

  7. 7

    Recoat inside the window, sand outside it

    Each product has a recoat window that depends on temperature and humidity; one vendor says its own is no longer than 20 hours and that missing it means sanding the whole floor. Log the time each coat finished and when the next went on. If amine blush shows (a cloudy or oily film), wash it off before recoating.

  8. 8

    Cure, return to service and hand over

    Record when the floor is open to foot traffic, to wheeled and forklift traffic, and to chemicals, using the system's data sheet (one vendor example: foot traffic at 6 to 8 hours after the topcoat, vehicles another 24 to 48 hours, full cure 48 to 72 hours). Send the customer a cleaning and care sheet, the warranty and the coat-by-coat file.

  9. 9

    Inspect the first month, then yearly

    Walk the floor 2 to 4 weeks after handover for pinholes, fisheyes, gloss changes and lifting at joints, and book an annual inspection on cove, drains and wear. In food plants, repair any crack or pit quickly: 9 CFR 416.2 expects floors to stay durable and impervious to moisture.

What to record

The fields every epoxy flooring job should capture

Slab and moisture

  • Slab age, thickness, sides drying, vapor barrier under slab yes or no, old coating or sealer, oil and grease spots
  • In-situ RH per probe (ASTM F2170): location, hole depth (40% of thickness, 20% if drying from both sides), liner time, equilibrium time, RH reading, air temperature
  • Calcium chloride MVER per dish (ASTM F1869): dish weights, exposure hours, lbs per 1,000 sq ft per 24 hours
  • Limit from the coating's data sheet for that product, pass or fail, and any mitigation primer chosen
  • Pull-off or bond test patch result, joint and crack map

Surface preparation

  • Method (shot blast, diamond grind, scarify), machine, and target CSP from the spec
  • Profile check: CSP chip number achieved, photo with the chip next to the surface
  • Silica controls used: water feed or dust collector, filter spec, HEPA vacuum, competent person on site
  • Repairs: cracks chased and filled, patches, joint treatment, product and batch
  • Moisture of repair materials and dry time before priming

Coat log, one row per coat

  • Product, batch or lot, mix ratio, pot life, mixed volume, sq ft covered, gallons used vs plan
  • Slab temperature, air temperature, relative humidity and dew point before the coat and at finish
  • Start and finish time, time since previous coat vs the recoat window, broadcast quantity (lbs of flake or quartz)
  • Defects seen: pinholes, fisheyes, blush, bubbles, roller marks, photographed before the next coat
  • Cove height and radius, drain and edge detail, slope checked where specified

Handover and warranty

  • Final thickness readings (wet film and dry film) at marked points, gloss and color approval
  • Return to service times: foot, wheeled, chemical, full cure, from the data sheet
  • Warranty terms, the moisture limit it assumes, and the maintenance duties the customer accepted
  • Customer sign-off with photos, safety data sheets and batch numbers filed
  • Callbacks: defect type, location on the floor plan, root cause, cost to fix

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
RH probes: how many and how deepASTM F2170 as described by two meter makers: three probes for the first 1,000 sq ft and one for each additional 1,000 sq ft, so a 10,000 sq ft floor gets 12. Holes go to about 40% of slab thickness when the slab dries from the top only, 20% when it dries from both sides, drilled dry and perpendicular, and the liner is left in for 24 hours before the probe is sealed in. source: Tramex, In situ concrete RH test, ASTM F2170 (probe count, hole depth, liner and equilibrium times)
Count of tests on a jobWagner Meters' guide to the standard: three sensors for the first 1,000 square feet, and one additional sensor for each additional 1,000 square feet. A single probe in the middle of a warehouse is not a moisture test. source: Wagner Meters, ASTM guideline for RH sensors: how many concrete moisture tests per job
Calcium chloride (MVER) testASTM F1869 measures moisture vapor emission at the surface as lbs per 1,000 sq ft per 24 hours: bare concrete, a pre-weighed dish under a sealed dome, 60 to 72 hours exposure. One manufacturer's reference sheet says coatings need 3 lbs or less, its bond primers up to 9 lbs and its moisture mitigation primer up to 20 lbs. The same sheet warns weather and HVAC swing the result and says to combine it with RH testing. source: Floorguard Products, Calcium chloride testing (ASTM F1869): procedure and interpretation
Neither test sees saltsConstruction Specifier: RH testing does not reveal hygroscopic salt concentrations, and moisture alone rarely breaks a well-bonded coating. Salt crystals forming at the bond line are what fracture it. Mitigation (barrier, breathable or reservoir systems) has to be done before the coating goes on. source: Construction Specifier, How to avoid floor coating failures (page 4: moisture tests and mitigation)
Surface profile by thickness (ICRI)As summarized by Clemtex from ICRI's guideline on selecting concrete surface preparation: CSP 3 for coatings of 4 to 5 mils, CSP 4 or 5 for 15 to 50 mils, CSP 5 or 6 for 40 mils to 1/8 inch, CSP 6 or 7 for toppings of 1/4 to 1/2 inch, CSP 8 or 9 for overlays over 1/2 inch. A thin coat on a rough profile telegraphs the peaks; a thick coat on a smooth one can lift. source: Clemtex, Concrete surface profile visual scale (ICRI CSP 1 to 9 and coating thickness)
Dew point and temperature windowOne installer guide sets 60 to 95°F for material, slab and air for the whole application and cure, with the slab at least 5°F above the dew point and rising, not falling. Below 60°F the reaction can stall; above 95°F pot life drops sharply. Concrete lags air temperature by days, so measure the slab with an infrared thermometer. source: Armor Garage, When to apply epoxy floor coating: temperature, cure times, lead time
What dew point moisture doesMoisture condensing on a fresh floor can make epoxy cloudy or milky, and amine blush leaves an oily residue that must be removed before the next coat bonds. It can make urethanes, polyaspartics and polyureas trap CO2 and foam. source: Construction Specifier, How to avoid floor coating failures (page 5: dew point, blush, delamination)
Delamination causesConstruction Specifier lists a missed recoat window or contamination between coats, shoe residue and airborne dust, cracks and control joints, and thermal shock from hot water on a cold floor. A missed window shows as glossy surfaces on both sides of the break. source: Construction Specifier, How to avoid floor coating failures (page 5: dew point, blush, delamination)
OSHA silica Table 1 for floor grindersRow (xiii) walk-behind milling machines and floor grinders: either a machine with integrated water delivery that continuously feeds the cutting surface, or the manufacturer's dust collection system with airflow at or above the recommended rate, a filter of 99% or greater efficiency and a filter-cleaning mechanism, plus a HEPA vacuum for loose dust between passes indoors. Respiratory protection: none required for either option in both time columns. The standard also requires a written exposure control plan reviewed at least annually and a designated competent person. source: OSHA, 29 CFR 1926.1153 respirable crystalline silica in construction, including Table 1
Silica limits behind the tableThe permissible exposure limit is 50 micrograms per cubic meter as an 8-hour average and the action level is 25. If a task is not on Table 1 or the controls are not followed, the employer has to measure exposure instead. source: OSHA, 29 CFR 1926.1153 respirable crystalline silica in construction, including Table 1
USDA meat and poultry plants9 CFR 416.2(b)(2): walls, floors and ceilings in establishments must be built of durable materials impervious to moisture and be cleaned and sanitized as necessary to prevent adulteration or insanitary conditions. Paragraph (b)(3) also requires floors, walls and openings to keep out vermin. source: Cornell LII, 9 CFR 416.2 establishment grounds and facilities (USDA FSIS)
No government stamp on a floorStonhard and Sherwin-Williams both say FDA and USDA do not certify or approve flooring products or keep approved lists; they publish guidelines. Stonhard names a private certifier, HACCP International. Treat "USDA approved" on a data sheet as a manufacturer claim and ask which requirement it was tested against. source: Stonhard, The truth about FDA and USDA flooring certifications in food processing
Slips, wet floors and hazardsOSHA 1910.22 requires walking-working surfaces to be kept free of hazards, workroom floors clean and, as far as feasible, dry, and hazardous conditions to be corrected before the surface is used again. A glossy coating that gets wet is your customer's hazard and your slip complaint, so texture is a spec line. source: OSHA, 29 CFR 1910.22 walking-working surfaces: general requirements

Rules vary by state, council and contract. Checked 16 November 2026; confirm against the source for your area before relying on it.

Numbers

Tests, profile, thickness and cure windows at a glance

Test rules are from meter makers describing ASTM F2170 and F1869; cure and recoat times are from named vendor guides and differ by product, so always use the data sheet for the system on your job. The coverage row is arithmetic, not a vendor figure.

ItemFigureBasis
RH probes (F2170)3 for first 1,000 sq ft, +1 per extra 1,000Wagner Meters; Tramex
RH hole depth40% of slab (top drying), 20% (both sides)Tramex
RH hole liner time24 hours before sealing the probeTramex
Calcium chloride exposure (F1869)60 to 72 hoursFloorguard sheet
MVER limit, one maker's coatings3 lbs per 1,000 sq ft per 24 hours or lessFloorguard sheet
Profile for a 15 to 50 mil coatingCSP 4 or 5Clemtex summary of ICRI
Profile for 40 mils to 1/8 inchCSP 5 or 6Clemtex summary of ICRI
Profile for 1/4 to 1/2 inch toppingCSP 6 or 7Clemtex summary of ICRI
Slab and air temperature to coat60 to 95°F, slab 5°F above dew point and risingArmor Garage
Primer dry time5 to 8 hours (fast primer 2 to 4)Armor Garage
Recoat window, one vendor's systemNo longer than 20 hoursArmor Garage
Foot traffic after topcoat6 to 8 hours; vehicles another 24 to 48; full cure 48 to 72Armor Garage
Coverage at 1 mil, 100% solids1,604 sq ft per US gallon (231 in3 x 12 / 0.001)Arithmetic, before waste
Worked example: 2,000 sq ft at 20 milsAbout 25 gallons plus wasteArithmetic
Silica PEL / action level50 / 25 micrograms per cubic meter, 8 hour averageOSHA 1926.1153

source: Wagner Meters, ASTM guideline for RH sensors: how many concrete moisture tests per jobsource: Tramex, In situ concrete RH test, ASTM F2170 (probe count, hole depth, liner and equilibrium times)source: Floorguard Products, Calcium chloride testing (ASTM F1869): procedure and interpretationsource: Clemtex, Concrete surface profile visual scale (ICRI CSP 1 to 9 and coating thickness)source: Armor Garage, When to apply epoxy floor coating: temperature, cure times, lead timesource: OSHA, 29 CFR 1926.1153 respirable crystalline silica in construction, including Table 1

Where it breaks

Where spreadsheets and generic software fall over

A warehouse coating blisters in month three. The crew says the slab looked dry; the only test was one probe by the door and nobody kept the reading.

A job can't move from Survey to Quoted until RH or MVER is logged per test spot, counted by area (3 for the first 1,000 sq ft, 1 per extra 1,000), each against the coating's limit. A failing spot forces a mitigation line on the quote or a signed risk waiver.

The crew grinds to CSP 2 because it is faster, then rolls a 30 mil system. The coating lifts at the edges of the grind passes and the customer says you skipped prep.

The spec's target CSP comes from the system and thickness and sits on the prep step. The tech photographs the surface beside a profile chip before priming can be started, and the photo is stored with the coat log.

The slab was 58°F and the dew point 55°F at 7 a.m. Nobody checked, the base coat went on, and the floor came out cloudy with an oily film that a later topcoat won't bond to.

Every coat starts with a reading: slab temp, air temp, humidity, dew point. If the slab is not 5°F above dew point and rising, the Start coat button is blocked and the supervisor gets a text.

A crew finishes the base coat Friday and returns Monday. The window was 20 hours. The topcoat peels in sheets six weeks later with glossy surfaces both sides.

Each coat has a recoat window from the product record. A timer starts when the coat finishes and the Watcher agent warns before it closes. A missed window creates a sand-and-scuff step instead of letting the next coat start.

A food plant's quality manager asks for the chemical safety data, batch numbers and a wash-down clearance before the floor is opened. They are in a truck, a drawer and a text thread.

Every batch is scanned onto the coat log, safety data sheets are attached to the job, and a return-to-service sign-off by foot, wheeled, chemical and full cure is a handover document the plant's quality manager signs.

The silica plan was written once for a different site. On a new job the crew uses a dry grinder with a shop vacuum and the customer's safety officer shuts the job.

A silica exposure control plan is generated per job from the prep method chosen, lists the Table 1 controls, the competent person and the housekeeping, and the crew confirms the machine, filter and HEPA vacuum on the first checklist.

Checklist

The epoxy flooring operations checklist

Print it, or hand it to whoever runs the office side.

  • Slab history and moisture tested: RH probes counted by area, MVER where the data sheet asks for it, spots mapped
  • Moisture result compared to the coating's own limit, with mitigation or a signed waiver on any fail
  • Target CSP set from the system and thickness, checked with a profile chip and photographed
  • Silica exposure control plan written for this job, competent person named, Table 1 controls on the machine
  • Cracks, joints, drains and edges detailed before priming, with product and batch
  • Slab temperature, air temperature, humidity and dew point logged before every coat
  • Mix ratio, pot life and batch number recorded for each mix; gallons used vs plan per coat
  • Recoat window tracked per coat, and amine blush or contamination checked before the next coat
  • Broadcast flake or quartz weighed and rejected excess vacuumed
  • Cove, slope to drain and slip texture checked against the spec for wet areas
  • Return to service times written on site: foot, wheeled, chemical, full cure
  • Food plants: chemicals cleared by the quality manager and a sanitation hold agreed
  • Warranty issued with the moisture limit it assumes, plus a care sheet for the customer
  • Callbacks tagged by cause (moisture, profile, dew point, recoat, mix, joint) and by crew

Software options

What software epoxy flooring contractors actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

QuoteIQ

Epoxy and concrete coating installers, small to mid crews

Epoxy page: estimates that show flake, metallic and solid color options side by side, slab inspection forms and photo capture on the Beginner plan and up, deposits and partial payments, scheduling, QuickBooks Online, job costing from the Pro plan. Plans run from $29.99 to $699.99 a month by user count with a 14 day trial. Inspection forms are generic, so moisture limits and coat windows are not enforced.

source: QuoteIQ

DripJobs

Residential and light commercial coating contractors that live on lead follow-up

Estimating from square footage and coating type, job costing, drip campaigns, proposals, card and ACH payments, crew management and a sales pipeline. Pricing on its FAQ starts at $97 a month. It is a sales and job tool; slab test results and cure timing would be notes or attachments.

source: DripJobs

BuildVision AI

Estimators bidding commercial floor plans

Takeoff from a PDF or ZIP of plans for primer, base coat, top coat, flakes, quartz, sealer, crack filler, self-leveler, grinding and shot blast, in sq ft, gallons, pounds and mils, with your own material and labor prices and a shareable quote link. A takeoff tool: scheduling, field records and invoicing live elsewhere. Has a 14 day trial.

source: BuildVision AI

General field service tools (Jobber, Housecall Pro and similar)

Coating crews that also do small service work

Good at quotes, scheduling and invoices at a price per square foot. They usually have no concept of a moisture test per spot, a CSP target, a dew point gate or a coat-by-coat recoat window, so those become checklists and photos.

Meter maker apps and spreadsheets

Crews that already own RH probes or moisture meters

Many meter makers have an app or logger that stores RH readings per probe. Good for the test itself; not connected to the quote, the crew schedule or the warranty. Spreadsheets cover the same ground until two jobs run at once.

Published prices, compared:source: QuoteIQ, Epoxy flooring softwaresource: DripJobs, Epoxy and coating business CRMsource: BuildVision AI, AI takeoffs for epoxy flooring

Questions to ask any vendor

  • Can I record RH or MVER per test spot, count spots against floor area, and compare each to the limit on the coating I chose?
  • Can the app store a target CSP and the achieved profile photo, and block priming until both are there?
  • Can each coat carry slab temp, air temp, humidity and dew point, and stop the coat from starting when the slab is within 5°F of dew point?
  • Can a coat have a recoat window with a timer and an alert before it closes?
  • Can I log batch numbers, mix ratios and gallons used against the plan, and send the batch list with the warranty?
  • Can it hold a silica exposure control plan per job and the return to service times a plant's quality manager signs?

Bring one real epoxy flooring job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Epoxy flooring on Fieldproxy: built around how you already work

A Fieldproxy setup for an epoxy contractor is built around the floor: each job carries its test spots, its target profile, one row per coat with the room readings and batch, and the return to service dates the customer signs. Gates stop a coat starting on a wet slab or after a missed window, and every floor leaves with a file that answers the warranty call two years later.

Module 1

Leads, site walk and floor survey

The slab, not the square footage, decides the system and the price.

  • Record: Floor survey with zones (production, loading dock, cold room, wash bay, showroom), sq ft each, photos and a floor plan sketch
  • Fields: slab age, thickness, vapor barrier yes or no, sides drying, old coating, oil spots, floor drains, joints and cracks, ceiling height, access width, power, water, forklift routes
  • Use field: dry, damp wash, hot water, freezer, chemicals, forklift weight, slip needs
  • Rule: a survey can't be marked complete until every zone has a use and a moisture plan
How this works

Module 2

Moisture and bond test register

Blistering and peeling are argued from test results nobody kept.

  • Record: Test spot with location on the floor plan, test type (F2170 RH or F1869 MVER), reading, date, slab and air temperature
  • Rule: spots required = 3 for the first 1,000 sq ft + 1 per additional 1,000 sq ft, per zone, shown as spots done vs needed
  • Limit field copied from the chosen system's data sheet; auto pass, fail or warning
  • A fail adds a mitigation primer line to the quote or requires a signed customer waiver
  • Bond test patch (pull-off) result attached per zone
How this works

Module 3

System library, quote and approvals

The data sheet drives the profile, thickness, moisture limit and cure times, so the quote starts there.

  • Product records: system name, manufacturer, layers, mils per layer, target CSP, moisture limit, application temperature range, pot life, recoat window, return to service times, coverage per gallon
  • Quote lines: prep by method, cracks and joints, patching, primer, base, broadcast (lbs/sq ft), topcoat, cove (linear feet and height), mitigation, mobilization, off-hours premium
  • Gallons calculated from mils x sq ft with a waste % you set
  • Approvals: quote above a value or with a moisture fail needs an owner sign-off before it is sent
  • Status: Lead, Surveyed, Quoted, Deposit paid, Product ordered, Scheduled, Prepping, Coating, Curing, Handed over, Warranty, Closed
How this works

Module 4

Materials, batches and equipment

Resin kits have batch numbers and shelf lives, and a short kit stops a pour.

  • Item records: kit, part A and B, flake or quartz by color and bag weight, primer, crack filler, cove mix, solvent, with batch number and expiry date
  • Allocation from the quote's gallons and lbs, with the kit count reserved for the job
  • Equipment as resources: grinder with dust collector, shot blaster, HEPA vacuum, mixers, squeegees, spiked shoes, heaters, dehumidifier, IR thermometer, hygrometer
  • Rule: a job can't be scheduled until kits are reserved or on order and a dust collector with a HEPA vacuum is free
How this works

Module 5

Shutdown schedule and crews

The customer gives you a floor for a few days; a weather or cure slip shuts their line longer.

  • Phases: Survey, Prep, Repairs, Prime, Base, Broadcast, Topcoat, Cure, each with a crew, start time and the recoat window as a visible deadline
  • Customer shutdown window as a constraint, with night and weekend shifts
  • Crew skills: grinding, mixing, finish rolling, cove, with certifications such as silica training
  • Heaters and dehumidifiers booked as resources on cold or humid days, and a hold when the room fails its reading
  • Customer texts: day before, forklift and drain protection, ventilation, when the floor opens
How this works

Module 6

Silica plan and safety file

The OSHA silica rule requires a written plan and a competent person; customers ask for it at the gate.

  • Plan generated per job: tasks (grind, blast, chase, sweep), controls from Table 1 (water feed, or dust collector with a 99% filter and a HEPA vacuum), housekeeping, access restriction
  • Competent person named, with a daily inspection checklist
  • Machine record: collector airflow and filter service date, vacuum filter date
  • Safety data sheets for each product on the job, attached to the batch records
How this works

Module 7

Field app: the coat log

Every coat is a controlled step. The coat log is the warranty file.

  • Prep step: method, CSP achieved, profile photo with chip, repairs done, vacuum confirmed
  • Coat step: slab temp, air temp, RH, dew point, pass or block; product, batch, mix ratio, pot life timer; start and finish times; sq ft and gallons used; broadcast lbs
  • Defect step: pinhole, fisheye, bubble, blush, roller mark, with photo and a fix before the next coat
  • Offline capture: basements and plants with no signal, synced later with GPS and time stamps
  • Rule: the next coat can't start if the slab is within 5°F of dew point, the recoat window has closed, or the previous coat's defects are open
How this works

Module 8

Food plant and compliance documents

A plant's quality team wants records, not a promise.

  • Zone record: dry, wet, freezer, with the system chosen, cove height and radius, slope to drain, texture
  • Documents: coat log PDF, batch and safety data sheet list, return to service sign-off (foot, wheeled, chemical, full cure), care and cleaning sheet, warranty
  • Sanitation hold and chemical clearance by the plant's quality manager before work starts
  • Customer portal link showing floor plan with each zone's status and documents
How this works

Module 9

Invoicing, warranty and callbacks

Money is held until the floor is signed off, and a callback needs a cause.

  • Progress billing: deposit on order, milestone on prep, balance on handover sign-off, retention if the contract has one
  • Change orders for extra cracks, extra patching, moisture mitigation found on site, with photos and customer approval
  • Warranty record: term, the moisture limit it assumes, maintenance duties, annual inspection date
  • Callback register by cause (moisture, profile, dew point, recoat, mix, joint) and crew, with cost to fix
  • QuickBooks or Xero sync for invoices and payments
How this works

The AI agents, set up for epoxy flooring contractors

AgentWhenWhat it doesWhat you get
Watcher agentA coat finishes and its recoat window is about to close, or a slab reading shows a spot within 5°F of the dew pointReads the coat log timestamp, the product's recoat window and the latest room readings, and warns the supervisor before the window shuts or the room failsA text to the site supervisor with the coat, time left and the reading, and a sand-and-scuff step added to the job if the window is missed
Vision agentThe tech uploads the profile photo, a batch label or a floor defect photoReads the batch number and expiry from the kit label, checks the photo is attached to the right zone, and tags visible defects such as pinholes or blushA filled batch field on the coat log and a defect row on the floor plan, ready for the supervisor to confirm
Document intelligence agentA customer's bid package, floor plan PDF or purchase order arrivesPulls zone names, square footage, system spec, finish and shutdown window from the document and matches them to the product libraryA draft job with zones and quote lines for an estimator to review, with the source page next to each number
AutopilotA quote has been open 5 days, a deposit is overdue, or a floor handed over 2 weeks ago has no sign-offDrafts the chase using the quote, the shutdown window and the handover file, for a person to approveAn email or text draft: the quote reminder with the next free shutdown dates, the deposit nudge, or the sign-off request with the care sheet
Scheduler agentEvery Monday 7 a.m., and the morning of every pourReads the week's jobs, kits reserved vs needed, forecast and equipment bookings, and flags gapsA weekly email to the owner listing each job, missing kits, heaters needed, and open warranty inspections, plus a morning briefing per crew
Knowledge agentA tech asks in the field app: "what is the recoat window for this primer at 70 degrees?"Searches your uploaded data sheets and install guides for that product and answers with the sheet and pageA short answer with the source, so nobody guesses on a cold slab

Straight answers

Epoxy flooring: FAQ

What software do epoxy flooring contractors use?

Most use a coating-focused estimating and CRM tool such as QuoteIQ or DripJobs, a takeoff tool such as BuildVision AI for plan bids, and keep moisture readings, profile checks and dew point logs on paper or in photos. Fieldproxy is one option when you want those records on the job itself: each job carries its test spots, coat log and warranty file, set up to match your process.

How many moisture tests does an epoxy floor need?

Under ASTM F2170 as described by meter makers, three in-situ RH probes for the first 1,000 sq ft and one more for each additional 1,000 sq ft, so a 10,000 sq ft floor gets 12. Probe holes go to about 40% of the slab depth when it dries from one side. The coating's own data sheet sets the pass limit.

What is the moisture limit for epoxy?

There is no single number. It is on the data sheet for the coating. One manufacturer's reference sheet says coatings need an MVER of 3 lbs per 1,000 sq ft per 24 hours or less on a calcium chloride test, and lists higher limits for its bond primers and 20 lbs for a moisture mitigation primer. RH limits vary by product too.

What does CSP mean on an epoxy floor?

CSP is the concrete surface profile scale in ICRI's guideline, from CSP 1 (acid etched) to CSP 9 (extreme shotblast). A summary from Clemtex pairs CSP 3 with coatings 4 to 5 mils thick, CSP 4 or 5 with 15 to 50 mils, CSP 5 or 6 with 40 mils to 1/8 inch, and CSP 6 or 7 with 1/4 to 1/2 inch toppings.

How warm does the slab need to be to apply epoxy?

One installer guide says 60 to 95°F for the material, slab and air through application and cure, with the slab at least 5°F above the dew point and rising. Always check the slab, not just the air, because concrete lags the air temperature by days. Your product sheet may set a different range.

What happens if you miss the recoat window?

The next coat may not bond. Construction Specifier says a missed window shows as glossy surfaces on both sides of the delamination. One vendor says its own window is no longer than 20 hours and that missing it means sanding the whole floor. Log the finish time of every coat.

Does OSHA's silica rule apply to epoxy floor prep?

Yes when you grind or blast concrete. Table 1 in 29 CFR 1926.1153 lists walk-behind floor grinders with either a continuous water feed or a dust collector with a filter of 99% or better efficiency, plus a HEPA vacuum indoors. You also need a written exposure control plan and a competent person. The permissible exposure limit is 50 micrograms per cubic meter as an 8-hour average.

Is there a USDA approved epoxy floor?

Not in the sense of a government stamp. Stonhard and Sherwin-Williams both say FDA and USDA do not certify or list flooring products. For meat and poultry plants, 9 CFR 416.2 requires floors to be durable, impervious to moisture and cleaned and sanitized as needed. Ask the maker which test the claim rests on.

Epoxy or urethane cement for a wet food plant?

Urethane cement is usually chosen for hot washdown and freezers. Duraamen says it resists delamination from thermal cycling because its expansion is close to concrete's, and that live steam cleaning can cause thermal shock and spalling in other floors. Its working time is very short, so crew size and batching matter. Epoxy suits dry areas.

Why do epoxy floors blister or peel?

Construction Specifier names improper surface preparation as the most common cause. Others are moisture and salts in the slab, dew point condensation, amine blush left on, a missed recoat window, contamination between coats, cracks and joints that move, and hot water on a cold floor. Test, log and gate each of these.

How much epoxy do I need per square foot?

Arithmetic: a US gallon covers 1,604 sq ft at 1 mil for a 100% solids material, so mils x sq ft / 1,604 gives gallons before waste. For 20 mils over 2,000 sq ft that is about 25 gallons. Use the product's data sheet for the real coverage and add waste.

Run epoxy flooring work the way it actually runs.