Fire door inspection, run opening by opening, both sides, with a signed record
Every labeled fire door assembly has to be inspected and tested at least once a year under NFPA 80, both sides, by a qualified person, with a signed record kept for the fire marshal or surveyor. A hospital can have hundreds of openings and a convention center 1,500. This guide covers the 13 inspection items, the clearance limits, what CMS and The Joint Commission expect, rolling door drop tests, the UK's quarterly and annual checks, and how to set up software around openings, deficiencies and repairs.
See your own jobs set up this way
A 30-minute call. We show you fire door inspection companies workflows running in Fieldproxy, built around how you work.
Short answer
Fire door inspection companies mostly run on paper or PDF checklists built from the NFPA 80 list, a spreadsheet of door numbers per building, and photos sorted into folders, with some using a door app such as Fire Door Pro or Krinkle Fire Door, or a fire protection platform such as Inspect Point that holds doors beside alarm and sprinkler records. Fieldproxy is one option for the inspector's own system: a register of every opening with its rating and label, a mobile screen for the 13 items on both sides, deficiencies that become quotes and repair jobs, and a signed per-door report the owner can show the AHJ.
Annual
Fire door assemblies are inspected and tested not less than annually, and a signed written record is kept for the AHJ (NFPA 80-2010, 5.2.1)
source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts)
13 items
Visual and functional checks for swinging fire doors since the 2013 edition of NFPA 80; the 2010 edition had 11
Jan 1, 2018
Date CMS required full compliance with annual NFPA 80 (2010) fire door inspection in health care; deficiencies are cited under K211
3/4 inch
Maximum clearance under a fire door to the finished floor or threshold; 1/8 inch plus or minus 1/16 at the head and jambs of hollow metal doors
How a job runs
One fire door inspection job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Get the door schedule and the code basis
Start from the owner's door schedule or life safety drawings, which show the rated barriers and the rating each opening needs (20, 45, 60, 90 minutes or 3 hours). Confirm which edition of NFPA 80 the AHJ enforces. Health care facilities answer to the 2010 edition through the 2012 Life Safety Code; a 2022 RFQ from the San Diego Convention Center asked for NFPA 80 (2022), NFPA 101 (2021), NFPA 105 and NFPA 252 together with the California Fire Code.
- 2
Tag and number every opening
Give each opening a permanent ID tied to building, floor, room or barrier, and mark it on a floor plan. Inventory by number, location, type (swinging, sliding, rolling, access door) and rating, as Travelers' risk control guidance suggests. A record per opening is what lets the AHJ ask about one specific door.
- 3
Read the labels
Find the door label (usually on the hinge edge) and the frame label (usually on the hinge jamb). They establish the rating; NFPA 80 lets the frame, door and hardware come from different manufacturers and be listed by different labs, so each component needs its own label or listing. A painted-over or missing label is written up because the rating can no longer be verified.
- 4
Inspect both sides against the 13 items
Labels legible; no open holes or breaks; glazing, vision frames and beads intact; door, frame, hinges, hardware and noncombustible threshold secure and aligned; no missing or broken parts; clearances within limits; closer works from full open; coordinator closes the inactive leaf first; latch secures the door; no auxiliary hardware that interferes; no field modifications that void the label; gasketing and edge seals present where required; signage within 5% of the door face and attached with adhesive.
- 5
Measure clearances with a gauge
Clearances are measured on the pull side. Under NFPA 80-2025: hollow metal doors 1/8 inch plus or minus 1/16 at head, jambs and meeting stiles; 20 minute wood and HPDL doors in hollow metal frames 3/16 inch; bottom 3/4 inch to the finished floor or threshold, or 3/8 inch where the door bottom is more than 38 inches above the floor. Gaps vary along a door, so record the worst reading at each edge.
- 6
Test operation, hold-opens and special doors
Release the door from full open and watch it close and latch. Where magnetic hold-opens release on alarm, trip them through the fire alarm and confirm the door closes. Rolling steel doors get a drop test at least yearly, after installation and after any mechanical repair, and are reset per the manufacturer's written instructions; DASMA says a door that cannot be traced to a manufacturer must be replaced.
- 7
Photograph and rate every deficiency
Each failed item gets a photo, the opening ID, the NFPA 80 item and a recommended correction. Rank by urgency (the San Diego RFQ asked for issues ranked by urgency with a proposed course of action). HFM warns facility managers that free or cheap inspections tied to the repair contract have produced long, sometimes inaccurate deficiency lists, so a clear code reference per finding matters.
- 8
Sign the record and leave the inspection mark
The inspector signs the written record, which lists each opening, the date, the inspector and each item's result. Periodic records are kept at least 3 years; acceptance test records for the life of the assembly. An inspection label or tag on the door is common but not required by NFPA 80.
- 9
Quote and repair without delay
NFPA 80 says repairs are made and defects corrected without delay; some AHJs set 60 days. Repairs use listed parts (listed fasteners or steel fillers for old holes, listed edge guards or door shoes for excess clearance, labeled replacement glazing), and the opening is inspected again after the work, because NFPA 80 requires inspection after maintenance as well as annually.
What to record
The fields every fire door inspection job should capture
Opening register
- Opening ID, building, floor, room or corridor, barrier it sits in and that barrier's rating, floor plan pin
- Type: single or pair, swinging with builders hardware, swinging with fire door hardware, sliding, rolling steel, access door
- Door label: lab (UL, Intertek), rating in minutes, temperature rise if stated, legible yes or no; frame label likewise
- Door material (hollow metal, wood, HPDL faced), size, hand, glazing type and its label
- Hardware set: hinges, closer, latch or lock, exit device, coordinator, flush bolts, hold-open and how it releases, gasketing, smoke rating if any
- Special locking: delayed egress, access controlled, electrified hardware, panic or fire exit hardware
Each annual inspection
- Date, inspector, credential (DHI CFDAI, Intertek IQP, or the owner's qualified person), NFPA 80 edition used
- Result per item for each side: pass, fail, N/A, with comment for every fail
- Clearance readings: head, hinge jamb, latch jamb, meeting stiles, bottom, in sixteenths of an inch
- Close and latch from full open, hold-open release on alarm, coordinator sequence
- Photos: both faces, labels, each deficiency
- Inspector's signature and the inspection mark applied
Deficiencies and repairs
- Opening, NFPA 80 item, description, urgency, photo, recommended correction
- Listed part to be used (fastener, filler, edge guard, door shoe, glazing, closer), quote line
- Owner approval, repair date, technician, parts installed
- Reinspection after repair and its result
- Rolling and sliding doors: drop test date, fusible link date and condition, reset by, retest result
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| NFPA 80 annual inspection and signed record | Fire door assemblies are inspected and tested not less than annually, and a written record of the inspection is signed and kept for inspection by the AHJ (5.2.1, 2010 edition). Functional testing is done by people who know the operating components of that type of door (5.2.3.1), after a visual inspection. source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts) |
| Performance-based option, subject to the AHJ | As an alternative to the annual cycle, NFPA 80 (5.2.2) lets an AHJ accept a written performance-based program that sets inspection type and frequency to demonstrate the assembly works, balancing frequency against proven reliability (Annex J). source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts) |
| CMS: annual inspection for all fire doors in health care | S&C 17-38-LSC says health care occupancies must inspect and test all fire door assemblies annually to the 2010 edition of NFPA 80, through Life Safety Code 8.3.3.1. Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are not subject to the annual NFPA 80 or NFPA 105 requirement but should be routinely inspected. Full compliance was due January 1, 2018; deficiencies are cited under K211. source: CMS, S&C 17-38-LSC: Fire and Smoke Door Annual Testing Requirements in Health Care Occupancies (28 Jul 2017) |
| Life Safety Code 7.2.1.15 for other occupancies | The 2012 LSC added 7.2.1.15, annual inspection and testing of certain fire and smoke door assemblies, applied only where the occupancy chapter references it. Assembly, educational, day care and residential board and care chapters do. source: CMS, S&C 17-38-LSC: Fire and Smoke Door Annual Testing Requirements in Health Care Occupancies (28 Jul 2017) |
| The Joint Commission EC.02.03.05 EP 25 | Hospitals inspect and test door assemblies annually by a qualified person, and the EP carries the documentation marker even after the words 'written documentation' were dropped in 2018. EP 28 lists what the documentation holds: activity name, date, inventory of items, frequency and contact information. source: iDigHardware, WWYD: Joint Commission policy changes (EC.02.03.05 EP 25 and EP 28 discussion, Mar 2018) |
| NFPA 1 Fire Code repeats the annual rule | NFPA 1 (2021) 12.4.2.8.4.1 and NFPA 80 (2019) 5.2.4.1 both say periodic inspections and testing are performed not less than annually. Florida's fire marshal pointed to both; enforcement is reported rising in Massachusetts, Mississippi, Pennsylvania, Ohio and Texas. source: iDigHardware (Allegion), Enforcement of Fire Door Inspections (Sep 2025, with NFPA 1 and NFPA 80 excerpts) |
| Clearances (NFPA 80-2025, 4.8.4 and 6.3.1.8) | Hollow metal doors 1/8 inch plus or minus 1/16 at head, jambs and meeting stiles; HPDL, 20 minute flush wood and stile and rail wood doors in hollow metal frames 3/16 inch; wood doors rated above 20 minutes 1/8 inch; bottom 3/4 inch, or 3/8 inch for door bottoms more than 38 inches above the floor. Listed accessories may mitigate excess clearance. source: iDigHardware (Allegion), FDAI: Inspection Criteria 6, clearances under NFPA 80-2025 (Nov 2025) |
| Signage, protection plates and job site preparation | Signs on a fire door are limited to 5% of the door face and attached with adhesive, not screws or nails. Field modifications that void the label are a failed item, and holes left by removed hardware are filled with listed fasteners or another method the standard permits. source: iDigHardware (Allegion), Decoded: Fire Door Assembly Inspections in Multi-Unit Residential Buildings (Jun 2021) |
| IFC 703: keep doors operable | The International Fire Code (703.2) requires fire doors to be maintained in operative condition per NFPA 80, and hold-open devices and automatic closers to be maintained; while a hold-open is out of service the door stays closed but operable. source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts) |
| Rolling steel doors: drop test and reset | Drop testing yearly at a minimum, after installation and after mechanical repair, reset per the manufacturer's written instructions. A rolling fire door that no longer works cannot just be left closed: it is maintained, including drop testing, or removed and the opening filled to the wall's rating. Fusible links and labels are never painted. source: DASMA TDS 295, Rolling Steel Fire Doors: Frequently Asked Questions |
| Who may inspect | NFPA 80 asks for a qualified person and names no credential. DHI's CFDAI requires its DAI600 course; Intertek's IQP program also starts with DAI600, then an online exam, an annual fee, requalification every three years and company audits. source: Intertek, Qualified Fire & Egress Door Inspector (IQP program) |
| UK: Fire Safety (England) Regulations 2022, regulation 10 | In blocks of flats with a top storey above 11 m, the Responsible Person checks communal fire doors at least every 3 months and uses best endeavours to check all flat entrance doors at least every 12 months. In all blocks, residents are told to keep fire doors shut, not tamper with closers and report faults, reminded every 12 months. source: GOV.UK, Fire Safety (England) Regulations 2022: fire door guidance |
Rules vary by state, council and contract. Checked 28 November 2026; confirm against the source for your area before relying on it.
Numbers
Limits and intervals a fire door inspector works to
Clearances are from NFPA 80-2025 as quoted by Allegion's iDigHardware. Intervals are from NFPA 80, CMS and the England regulations. Always work to the edition and local amendments the AHJ enforces.
| Item | Figure | Source note |
|---|---|---|
| Swinging fire door inspection and test | At least annually, both sides | NFPA 80 5.2.1 (2010); also after installation and after maintenance |
| Clearance, hollow metal door at head and jambs | 1/8 inch plus or minus 1/16 | Also meeting stiles of pairs, pull side |
| Clearance, 20 minute wood or HPDL door in hollow metal frame | 3/16 inch max | Wood doors rated above 20 minutes: 1/8 inch |
| Clearance under the door | 3/4 inch max | To finished floor or threshold |
| Clearance under a door more than 38 inches above floor | 3/8 inch max | Access doors, counter shutters |
| Signage on the door face | 5% of face max | Adhesive only, no screws or nails |
| Surface hardware holes from job site preparation | 1 inch round max | Larger cuts need the manufacturer |
| Periodic inspection records | Keep 3 years min | Acceptance test records: life of the assembly |
| Rolling steel fire door drop test | Yearly min | And after installation and mechanical repair |
| Fusible link load (typical) | About 40 lb | Links may be stacked for more holding power |
| England: communal fire doors (over 11 m) | Every 3 months | Flat entrance doors: every 12 months, best endeavours |
source: iDigHardware (Allegion), FDAI: Inspection Criteria 6, clearances under NFPA 80-2025 (Nov 2025)source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts)source: iDigHardware (Allegion), Decoded: Fire Door Assembly Inspections in Multi-Unit Residential Buildings (Jun 2021)source: FCIA Barrier Management Symposium, Inspecting swinging fire doors (Laura Frye, DSSF and DHI, 2018)source: Inspect Point, Fire door inspection requirements under NFPA 80 (Aug 2026)source: DASMA TDS 295, Rolling Steel Fire Doors: Frequently Asked Questionssource: GOV.UK, Fire Safety (England) Regulations 2022: fire door guidance
Where it breaks
Where spreadsheets and generic software fall over
Door numbers in the spreadsheet do not match the tags on site after a renovation, so the report says 412 doors passed and the surveyor finds an uninspected door in a new stair.
Hold every opening as a record with a plan pin and a scan tag, and flag any opening on the plan with no result this cycle before the report can be issued.
Clearance is written as 'OK' or 'excess' with no reading, so nobody can tell whether a 7/8 inch undercut needs a listed door shoe or a new door.
Capture each edge's reading in sixteenths against the limit for that door's material and rating, so the screen decides pass or fail and the quote picks the right listed fix.
Photos sit in a phone camera roll and are matched to door numbers back at the office, and some deficiencies end up on the wrong opening.
Take photos inside the opening's inspection, attached to the failed item, with the opening ID stamped on them.
The deficiency list goes out as a 60 page PDF, the hospital approves part of it by email, and next year the same doors fail again with no record of what was fixed.
Make each deficiency a record with a quote line, owner approval, repair job and reinspection, so the open list per building is always current.
A rolling steel door is drop tested, fails to reset, and the tech leaves it closed with a note, so the warehouse props it open the next day.
Treat a failed drop test as a critical deficiency that opens a repair job with the manufacturer's reset procedure attached and alerts the owner the same day.
A hospital is surveyed to the 2010 edition while the inspector's form follows 2022, and the surveyor questions items that do not match.
Store the NFPA 80 edition per building and load that edition's item list and clearance table on the inspection screen.
Checklist
The fire door inspection operations checklist
Print it, or hand it to whoever runs the office side.
- NFPA 80 edition and local code confirmed per building (CMS health care: 2010)
- Door schedule or life safety plan obtained; rated barriers and required ratings known
- Every opening tagged with an ID and pinned on a floor plan
- Door and frame labels read and recorded; illegible labels written up
- All 13 items checked on both sides of each swinging door
- Clearances measured with a gauge at every edge and recorded as readings
- Close and latch from full open tested; coordinators and hold-open releases tested
- Rolling and sliding doors drop tested and reset per manufacturer instructions
- Every deficiency has a photo, code item, urgency and listed correction
- Inspector credential (CFDAI, IQP or documented qualification) on file
- Written record signed; periodic records kept 3 years, acceptance records for life
- Repairs made without delay with listed parts, then reinspected
- Non-rated corridor and smoke barrier doors in health care on the routine maintenance list
- UK blocks over 11 m: quarterly communal and annual flat entrance door checks logged
Software options
What software fire door inspection companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Inspect Point
Fire protection contractors that already inspect alarms, sprinklers and extinguishers and add fire doors in the same buildings.
Keeps fire door records by building beside the other ITM records; a failed item opens a deficiency with photo that flows into a proposal, work order and invoice. Dampers can be set up as custom inspections.
Krinkle Fire Door
Door and damper inspection firms that want a dedicated iPad and iPhone app.
Tracks customers, buildings, fire doors, frames and fire dampers and their inspections, with a module for repairing defects including parts and labor costing.
Fire Door Pro
General contractors commissioning a health care project and inspectors doing a modest number of doors.
Free app for the 13 point NFPA 80 swinging door inspection with photos per door or deficiency and an emailed or printed report. App Store reviews mention sync glitches; try it on a few doors first.
Paper or PDF forms plus spreadsheets
Most small door hardware distributors and locksmiths starting inspections.
State forms such as Iowa DIAL's annual swinging door form, a door list in Excel and a Word report. Cheap and familiar; readings, photos and deficiencies are retyped and hard to compare year to year.
Fieldproxy
Door inspection and repair companies that want openings, inspections, deficiencies, quotes, repairs and reports in one system set up around their own report format.
Set up for you around your opening register, item list and report template; door schedules and floor plans come in by import or the open API.
Published prices, compared:source: Inspect Point, Fire doors and damperssource: Inspect Point, Fire door inspection requirements under NFPA 80 (Aug 2026)source: Apple App Store, Krinkle Fire Door (doors, frames and dampers, repair costing)source: Apple App Store, Fire Door Pro (13 point NFPA 80 inspection app)source: Iowa Department of Inspections, Appeals and Licensing, Annual Inspection of Swinging Fire Door Assemblies form (NFPA 80-2010)
Questions to ask any vendor
- Can it hold every opening with its ID, plan location, rating, labels and hardware set, for buildings with 1,000 doors or more?
- Does the inspection screen follow the NFPA 80 edition the building is surveyed to, both sides, with N/A allowed per item?
- Are clearances captured as readings and judged against the limit for that door's material and rating?
- Can a deficiency become a quote line, an approved repair job and a reinspection without retyping?
- Can the report list every opening with its result, signed by the inspector, in my own format?
- Does it work offline in stairwells and basements and attach photos to the failed item, not just the door?
Bring one real fire door inspection job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Fire door inspection on Fieldproxy: built around how you already work
A Fieldproxy setup for a fire door inspection company is built around openings, not jobs: every door in every building is a record with its rating, labels and hardware, each year's 13 item inspection is captured against it on both sides, and each deficiency carries through quote, repair and reinspection, so the signed report and next year's walk both start from the same register.
Module 1
Building and opening register
The AHJ and surveyor ask about one specific door, so the opening is the record.
- Record: Building (owner, occupancy, AHJ, NFPA 80 edition enforced, CMS or TJC surveyed yes or no, UK height over 11 m yes or no)
- Child record: Opening (ID, floor, room, barrier and its rating, plan pin, type, single or pair, door and frame material, size, hand)
- Label fields: door lab and rating, frame lab and rating, glazing label, legible yes or no, photo of each label
- Hardware set per opening (hinges, closer, latch, exit device, coordinator, flush bolts, hold-open and release method, gasketing, special locking)
- Import from the owner's door schedule (e.g. Exhibit A and B schedules in an RFQ) or last year's report
Module 2
Contracts, bids and per-door pricing
Owners buy inspections per door, with the report and repairs priced separately.
- Bid record: door count, per-door price, report and presentation lump sum, exclusions, prompt payment discount
- Annual contract per building: anniversary month, door count, price, repair rates and markup on listed parts
- Change in door count from the register updates the next invoice
- Insurance certificates and additional insureds stored against the contract
Module 3
Mobile inspection screen
Pass or fail is decided at the door, both sides, against the edition the building answers to.
- Scan the tag or pick on the plan; the screen loads that edition's item list (11 items for 2010, 13 for 2013 and later)
- Each item pass, fail or N/A per side; a fail needs a photo and a comment
- Clearance fields in sixteenths for head, both jambs, meeting stiles and bottom, judged against the limit for that material and rating (e.g. hollow metal 1/8 plus or minus 1/16, bottom 3/4)
- Close and latch from full open, coordinator sequence, hold-open release on alarm; works offline in stairwells
Module 4
Rolling, sliding and special doors
Drop tests and resets have their own steps and the most expensive failures.
- Opening types with their own checklist: rolling steel, horizontal sliding, fire shutter, access door
- Drop test record: release method (fusible link or detector), close time, governor and spring tension, reset by, retest result
- Fusible link date and condition; painted or corroded links flagged for replacement
- Rule: a failed drop test cannot be closed out until a repair job and retest are logged
Module 5
Deficiencies, quotes and repairs
The inspection pays for itself only when deficiencies turn into approved, completed repairs.
- Deficiency record: opening, NFPA 80 item, urgency (e.g. critical, priority, routine), photo, recommended listed correction
- Quote built from deficiencies with listed parts (steel fillers, listed fasteners, edge guards, door shoes, labeled glazing, closers)
- Owner approves per line in the portal; approved lines become repair jobs grouped by building and floor
- Repair job closes only with a reinspection of the affected opening
Module 6
Inspection report and record
The signed record is what the AHJ, CMS or TJC surveyor reads.
- Generated from the inspections in the firm's own template: basis and edition, executive summary, per-door table with location, material, rating and result, deficiencies ranked by urgency with photos
- Inspector's signature and credential (CFDAI, IQP number) on the report
- Block: report cannot be issued while any opening in scope has no result
- Retention: periodic records kept 3 years minimum, acceptance records for the life of the opening
Module 7
Scheduling and inspector credentials
Big sites are walked over days, around patients, events and tenants.
- Inspection visits by building and floor, with access windows (e.g. 24 hours notice, around events)
- Inspector cards: DHI CFDAI, Intertek IQP requalification date (every three years), state licenses where needed
- Rule: health care buildings only assigned to credentialed inspectors
- Next annual date set from last completed, not last scheduled
Module 8
Owner portal
Facility managers need the record at survey time without emailing the inspector.
- Per building: current report, every opening with its last result and photos, open deficiencies with status
- Approve repair quotes and repair windows
- Survey pack export: inspection dates, inventory, frequency, inspector contact (the items TJC EP 28 lists)
- UK blocks: quarterly communal and annual flat entrance door checks with the reminders sent to residents
The AI agents, set up for fire door inspection companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | An owner sends a door schedule, life safety plan or last year's inspection report as PDF or spreadsheet. | Reads opening numbers, locations, ratings, door and frame material and prior results. | Draft opening records under the building, with openings that have no rating or appear twice flagged for review. |
| Vision agent | The inspector photographs a door or frame label, a glazing etch or a hardware item. | Reads the listing lab, rating and serial from the label, or the glazing mark, and checks it against the rating the barrier needs. | Label fields filled on the opening, with a deficiency drafted when the label is illegible or the rating is lower than the barrier's. |
| Voice agent | The inspector dictates at the door: 'Stair 3 north, bottom gap seven eighths, closer leaking, latch fine.' | Matches the opening, fills the clearance reading and item results, and writes the deficiency text. | The inspection items and deficiency filled in for review before the inspector moves to the next door. |
| Watcher agent | A report is in draft, or a building's annual date or an inspector's IQP requalification is within 60 days (e.g.). | Checks for openings with no result, fails without photos, failed drop tests without a repair job, and approved repairs not yet reinspected. | A list on the building of what blocks the report or the next visit, sent to the account manager. |
| Autopilot | A deficiency quote has had no owner approval for 14 days (e.g.). | Drafts a short note to the facility manager listing the open critical items by opening, with the quote total. | A chase email a person approves before it sends, logged on each deficiency. |
| Scheduler agent | Every Monday morning. | Gathers buildings due next month, doors inspected last week, open deficiencies by building and repairs waiting on reinspection. | A weekly briefing emailed to operations and each account manager. |
Straight answers
Fire door inspection: FAQ
What software do fire door inspection companies use?
Many use paper or PDF checklists, a spreadsheet of door numbers and photos sorted into folders. Dedicated apps include Fire Door Pro and Krinkle Fire Door, and fire protection contractors often use Inspect Point to keep doors beside alarm and sprinkler records. Fieldproxy is one option for the inspector's own system: an opening register, a 13 item mobile screen with clearance readings, deficiencies that become quotes and repairs, and a signed per-door report.
How often do fire doors have to be inspected?
NFPA 80 requires fire door assemblies to be inspected and tested at least annually, after installation and after maintenance work. An AHJ may accept a performance-based program instead. In England, blocks of flats over 11 m need communal fire doors checked every 3 months and flat entrance doors every 12 months.
What are the 13 items in an NFPA 80 fire door inspection?
Labels legible; no open holes or breaks; glazing and vision frames intact; door, frame, hinges, hardware and threshold secure and aligned; no missing or broken parts; clearances within limits; the closer closes the door from full open; the coordinator closes the inactive leaf first; the latch secures the door; no interfering auxiliary hardware; no field modifications that void the label; gasketing and edge seals where required; signage within limits. The 2010 edition had 11 items.
What is the maximum gap under a fire door?
3/4 inch from the bottom of the door to the finished floor or threshold, or 3/8 inch where the door bottom is more than 38 inches above the floor. Listed door shoes and sweeps made for fire doors may mitigate a larger gap; standard sweeps do not.
Do non-rated corridor doors in hospitals need annual inspection?
Not under NFPA 80 or NFPA 105, according to CMS memo S&C 17-38-LSC. Corridor doors to patient rooms and smoke barrier doors are not rated, but CMS says they should be routinely inspected as part of facility maintenance.
Who is qualified to inspect fire doors?
NFPA 80 asks for a qualified person with knowledge of the operating components of that door type, and names no credential. Common proof is DHI's Certified Fire and Egress Door Assembly Inspector (CFDAI, after the DAI600 course) or Intertek's IQP qualification, which requires requalification every three years.
How long must fire door inspection records be kept?
Periodic inspection and test records at least 3 years; acceptance test records for the life of the assembly. The record is signed by the inspector and kept for the AHJ.
How are rolling steel fire doors tested?
With a drop test at least yearly, after installation and after mechanical repair, after a visual inspection and operation check. The door is reset per the manufacturer's written instructions. A rolling fire door that no longer works must be repaired or removed and the opening filled; it cannot be left closed.
Can I fill old screw holes in a fire door?
Holes from removed hardware must be filled with listed fasteners or another method NFPA 80 permits; for other holes, ask the door or frame manufacturer whether the repair keeps the listing. Open holes are a failed item.
Can Fieldproxy produce our fire door report format?
Yes. The report is generated from your own template, filled from the per-door results, clearance readings, photos and your inspector's signature and credential. Door schedules and prior reports can be imported.
Related guides
All sources on this page (28)
- source: University of Colorado Boulder, Fire Door Maintenance (NFPA 80 and IFC 703 excerpts)
- source: FCIA Barrier Management Symposium, Inspecting swinging fire doors (Laura Frye, DSSF and DHI, 2018)
- source: CMS, S&C 17-38-LSC: Fire and Smoke Door Annual Testing Requirements in Health Care Occupancies (28 Jul 2017)
- source: iDigHardware (Allegion), FDAI: Inspection Criteria 6, clearances under NFPA 80-2025 (Nov 2025)
- source: iDigHardware, WWYD: Joint Commission policy changes (EC.02.03.05 EP 25 and EP 28 discussion, Mar 2018)
- source: iDigHardware (Allegion), Enforcement of Fire Door Inspections (Sep 2025, with NFPA 1 and NFPA 80 excerpts)
- source: iDigHardware (Allegion), Decoded: Fire Door Assembly Inspections in Multi-Unit Residential Buildings (Jun 2021)
- source: DASMA TDS 295, Rolling Steel Fire Doors: Frequently Asked Questions
- source: Intertek, Qualified Fire & Egress Door Inspector (IQP program)
- source: GOV.UK, Fire Safety (England) Regulations 2022: fire door guidance
- source: Inspect Point, Fire door inspection requirements under NFPA 80 (Aug 2026)
- source: Inspect Point, Fire doors and dampers
- source: Apple App Store, Krinkle Fire Door (doors, frames and dampers, repair costing)
- source: Apple App Store, Fire Door Pro (13 point NFPA 80 inspection app)
- source: Iowa Department of Inspections, Appeals and Licensing, Annual Inspection of Swinging Fire Door Assemblies form (NFPA 80-2010)
Run fire door inspection work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.