Guide for kitchen fire suppression service companies ยท checked 30 November 2026

Kitchen fire suppression service, every hood, every six months, link by link

Every restaurant hood with a wet chemical system gets a certified technician twice a year: trip the detection line, prove the gas valve and the shunt trip, replace the fusible links, check the cylinder and its hydro date, retag it, and send the report to the fire department. A suppression company carries hundreds of these on a rolling six month calendar. This guide covers NFPA 17A and NFPA 96, the IFC, UL 300, state technician licenses, tags and AHJ portals, and how to set up software around systems, links and deficiencies.

See your own jobs set up this way

A 30-minute call. We show you kitchen fire suppression service companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Kitchen fire suppression companies usually run on paper or PDF service reports (state forms such as New Jersey's Kitchen System Report or Seattle's hood ITM form), a calendar of six month due dates, and a fire inspection platform such as Inspect Point, Uptick or BuildingReports, with reports uploaded to the AHJ's portal (often The Compliance Engine). Fieldproxy is one option for the contractor's own system: a register of every system with its make, cylinders, hydro date, appliances and link temperatures, a mobile semiannual test that cannot close without the gas shutoff and link replacement recorded, deficiencies that become quotes, and tags and AHJ reports from the same record.

6 months

Service by a trained, qualified person at least every six months and after every discharge (IFC 904.12.6.2, NFPA 96 11.2.1)

source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)

12 years

Hydrostatic test interval for wet chemical agent cylinders (NFPA 17A 7.5.1, 2009); dry chemical cylinders are also examined every 6 years

source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)

21 Nov 1994

UL 300 took effect; FEMA's quiz lists systems made before this date as a sign a system is not UL 300

source: Fire Equipment Manufacturers' Association, Restaurant Fire Protection Changes: UL Standard 300

30 feet

Maximum travel distance from cooking equipment to the Class K portable extinguisher (IFC 904.12.5)

source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)

How a job runs

One kitchen fire suppression job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Survey the line and the system

    List every appliance under the hood from left to right, the hood and plenum, and the duct risers, and match each to a nozzle. Record the system make, model and size (for example Ansul R-102, Amerex KP), cylinder locations, control head, and the fusible link temperatures from left to right. Seattle's ITM form asks for exactly this inventory and a photo of the appliance layout.

  2. 2

    Check the system is still designed for the line

    Compare today's appliances with the system design and the signage on the hood. A fryer where a range used to be, a new charbroiler or a switch to vegetable oil changes the hazard. IFC 904.12.6.1 says a change of cooking media, appliance position or appliance means the system must comply again with the current requirements.

  3. 3

    Confirm UL 300 or quote the replacement

    Dry chemical systems have no UL 300 listing, and FEMA's decision tree says to replace them and not to do a 6 month maintenance on them. Older wet chemical systems are upgraded or replaced where the manufacturer and AHJ require it. Seattle's form makes a non UL 300 system a deficiency when vegetable oil is used, parts are no longer available, or coverage is inadequate.

  4. 4

    Prepare before testing

    Tell building staff and the monitoring company, put the fire alarm in test mode, and disarm the system per the manufacturer's manual so it can be tripped without discharging agent. New Jersey's report starts with these items: last serviced by, personnel notified, monitoring company notified, system found charged, untampered and at pressure.

  5. 5

    Run the functional test

    Trip the detection line at the terminal link or test link, then operate the remote manual pull station. Confirm the gas valve closes, electric appliances shut off, makeup air shuts down, the control head releases, and the fire alarm receives the signal. Test all actuation and control components, including mechanical and electrical devices and detectors (NFPA 96 11.2.2).

  6. 6

    Replace the fusible links

    Replace metal alloy fusible links at least semiannually (NFPA 96) or annually where the AHJ enforces the IFC, using the rating the design calls for at each position. Record each link's temperature and position. Make sure grease is not impairing the link line, and keep cleaning chemicals off links and detectors.

  7. 7

    Check cylinders, agent and nozzles

    Verify agent type and volume match the manufacturer, the gauge reads in range, the nitrogen or CO2 cartridge weighs correctly, and the hydrostatic test date is current. Check nozzles are the right type, aimed at the right appliance, braced, clear, and that blow off caps are on. Count flow points against the manufacturer's maximums.

  8. 8

    Rearm, seal and tag

    Rearm the system, replace tamper seals, put the alarm back in service, and hang a tag on the cylinder or pull station. Seattle uses white (normal), yellow (deficient) and red (impaired). In New York City the tag shows the date, the Master Fire Suppression Piping contractor's name and license number, and that the system was found in good working order.

  9. 9

    Report to the owner and the AHJ

    Give the owner the report and file it where the AHJ requires: Arlington County and Seattle want the contractor to upload it to The Compliance Engine, and New Jersey's form says it will be filed with the local AHJ. Deficiencies go to the owner with a quote; FEMA's decision tree says to have the owner sign the deficiency report and proposal.

  10. 10

    Invoice and set the next date

    Invoice the service, links and parts, and set the next semiannual date from today. Flag the 12 year hydro on the calendar, and any line change the manager mentioned, so the next visit starts with a redesign question instead of a surprise.

What to record

The fields every kitchen fire suppression job should capture

System register

  • Site, kitchen area (main line, deli, bakery), system ID (one per system), AHJ and its portal
  • Make, model, agent (wet or dry chemical), capacity in gallons, number of cylinders and their locations
  • UL 300 yes or no, appliance specific or overlapping coverage, install year, permit number and code edition
  • Appliances under the hood left to right, nozzle per appliance, plenum and duct nozzles, flow points used
  • Detection: link positions and temperatures left to right, terminal link, control head model
  • Cylinder serials, last hydrostatic test month and year, cartridge type and weight
  • Gas valve type and location, electrical shunt, makeup air interlock, fire alarm connection and monitoring company

Each semiannual service

  • Date, technician, state license or certificate number and expiry, manufacturer training certificate
  • Arrival condition: charged, untampered, at pressure, nozzle caps on, line unchanged since last service
  • Functional test: detection line trip, manual pull, gas shutoff, electric appliances off, makeup air off, alarm signal received
  • Links replaced: count, temperature at each position; tamper seals replaced
  • Gauge reading, cartridge weight, agent volume, hydro due date
  • Class K extinguisher within 30 feet, tagged or bought within 12 months
  • Tag color left (white, yellow, red), photos of appliances, nozzles, tag and any deficiency

Deficiencies, changes and discharges

  • Deficiency: what, where, code reference, severity (impaired or deficient), photo
  • Line change found: appliance added, moved or replaced, or cooking media changed
  • Quote sent, owner signature on the deficiency report, AHJ or insurer notified where required
  • Discharge: date, cause, cylinders recharged, links and nozzle caps replaced, system retested
  • AHJ report: portal, submitted date, filing fee paid if any

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
IFC 904.12.6.2: service every six months and after activationAutomatic fire extinguishing systems protecting commercial cooking are serviced at least every six months and after activation, by qualified individuals, and a certificate of inspection is forwarded to the fire code official on completion. source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)
NFPA 96 11.2: test every actuation and control componentThe semiannual service by properly trained and qualified persons includes a test of all actuation and control components, including remote manual pull stations, mechanical and electrical devices, detectors and actuators. Fire alarm interconnect switches are visually inspected, and tested annually under NFPA 72. source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)
Fusible links: semiannual under NFPA 96, annual under the IFCNFPA 96 (2011, 11.2.4) requires metal alloy fusible links to be replaced at least semiannually, and non metal alloy links and bulbs to be examined and cleaned or replaced at least annually. The IFC requires fusible links to be replaced at least annually, with frangible bulbs exempt. Inspect Point states semiannual replacement under the 2021 editions; Seattle's IFC-based form asks if links were replaced annually. source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)
NFPA 17A: monthly owner inspectionBetween services the owner checks monthly that the system is armed, manual actuators are unobstructed, tamper seals are intact, the maintenance tag is in place, there is no physical damage, gauges are in range and nozzle caps are on (NFPA 17A-2009 7.2.2). Minnesota's health department publishes a log for kitchen staff to do it. source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)
12 year hydrostatic test, 6 year dry chemical examWet chemical cylinders are hydrostatically tested every 12 years (NFPA 17A-2009 7.5.1). Dry chemical cylinders are examined every 6 years for caking and hydrostatically tested every 12 years (NFPA 17). Orr's guide lists hood suppression containers and hose assemblies on the 12 year cycle; Amerex's KP manual also gives 12 years. source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)
UL 300 listingNFPA 96 10.2.3 and the fire code require dry or wet chemical kitchen systems to be listed to UL 300. UL 300 took effect on 21 November 1994 and tests with vegetable shortening because it burns hotter. FEMA lists an existing wet chemical system as acceptable only while it is in its original location, protecting the original equipment without changes, and UL 300 compliant. source: Fire Equipment Manufacturers' Association, Restaurant Fire Protection Changes: UL Standard 300
Dry chemical systems are replaced, not maintainedFEMA's decision tree says all non UL 300 systems are to be removed from service under NFPA 96, a 6 month maintenance is not done on dry chemical systems, existing control heads, nozzles and piping are not reused, and unrepaired or non UL 300 systems get a red tag with deficiencies reported to the owner and the AHJ. source: Fire Equipment Manufacturers' Association, Decision Tree for Servicing Pre-Engineered Systems for Commercial Cooking Operations (updated 2021)
IFC 904.12.6.1: a changed line means a compliant systemWhere the cooking media, the position of cooking equipment or the equipment itself changes in an existing kitchen, the extinguishing system must comply with the current commercial cooking requirements. Seattle's form asks the technician to confirm the appliances have not been rearranged, against the left to right signage on the hood. source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)
Class K extinguisher within 30 feetPortable extinguishers within 30 feet of travel from commercial cooking equipment; Class K where vegetable or animal oils and fats are used. One 1.5 gallon Class K for up to four fryers of up to 80 pounds of cooking medium each, and another for each further group of four (IFC 904.12.5.2). source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)
State technician licenses (examples)Texas: an FEL-K license lets a technician install, certify or service pre-engineered kitchen systems, needs 6 months on an FEL-B or apprentice permit first, and the ICC/NAFED Pre-Engineered Kitchen exam can replace the technical tests. Illinois licenses the company (Class B distributor) and the technician (2-K), and both numbers go on the tag. Oklahoma charges $250 for a kitchen company license and $75 for a technician. source: Texas Department of Insurance, Fire extinguisher registration, license and test information (FEL-K)
California: an A license or C-16Under Title 19 Section 905, nobody may service automatic fire extinguishing systems as a business without an A license from the State Fire Marshal or a C-16 Fire Protection contractor license. Owners who only maintain their own systems are exempt. source: California Code of Regulations, Title 19, Section 905 (license to service automatic extinguishing systems)
Manufacturer training and authorized distributorsAmerex's KP manual says a factory trained and authorized distributor must install and service the system, and people who design, install and maintain it must be trained by Amerex and hold current credentials. Seattle's attestation has the technician swear they have the current manufacturer's manual and service bulletins. source: Amerex, KP Restaurant Fire Suppression System design, installation and maintenance manual (P/N 16921)
New York City: Master Fire Suppression Piping contractorFDNY says at least once every 6 months a Master Fire Suppression Piping contractor licensed by the Department of Buildings inspects, tests, services and maintains the system, gives a written report of defects, and hangs a tag with the date, the contractor's name and license number, and the system's status. source: FDNY, Fire Safety in Commercial Cooking Locations
AHJ portals: the contractor filesArlington County VA makes the contractor that inspects, tests or maintains the system responsible for uploading the report to The Compliance Engine, on a six month cycle, and charges $175 for an annual hood permit. Seattle's reports must be filed in TCE and only for accepted new systems or ITM tests of existing ones. source: Arlington County VA Fire Marshal, Commercial Kitchen Hood Systems

Rules vary by state, council and contract. Checked 30 November 2026; confirm against the source for your area before relying on it.

Numbers

Intervals and limits a kitchen suppression technician works to

From NFPA 17A, NFPA 17, NFPA 96 and the IFC as quoted by state and city fire officials. Always work to the edition and amendments the AHJ enforces, and to the system manufacturer's manual.

ItemFigureSource note
Owner inspectionMonthlyNFPA 17A; checklist of seals, gauge, caps, tag
Certified service and testEvery 6 months and after dischargeIFC 904.12.6.2, NFPA 96 11.2
Metal alloy fusible linksReplace every 6 monthsNFPA 96 11.2.4 (2011)
Fusible links under the IFCReplace at least annuallyIFC 904.12.6.3; bulbs exempt
Non metal alloy links and bulbsExamine, clean or replace yearlyNFPA 96 11.2.4
Fire alarm interconnect switchTest annuallyNFPA 72 Table 14.4.5
Wet chemical cylinder hydro testEvery 12 yearsNFPA 17A 7.5.1
Dry chemical cylinderExamine 6 years, hydro 12 yearsNFPA 17; system itself not UL 300
Class K extinguisher distance30 feet travel maxIFC 904.12.5
Class K per fryer group1.5 gal per 4 fryers up to 80 lb eachIFC 904.12.5.2
UL 300 effective date21 Nov 1994FEMA UL 300 guide
Records kept on premises3 yearsMinnesota fire code via MDH
Hood signage (Seattle)8.5 x 11 in min, 12 pt, not handwritten2021 WA FC 904.13

source: Minnesota Department of Health, Protection of Kitchen Cooking Equipment (Jul 2016, rev Jun 2024)source: City of Lawrence KS, 2015 International Fire Code Section 904.12 (commercial cooking systems)source: Inspect Point, Kitchen hood suppression inspection requirements (NFPA 96 and 17A, 2021 editions)source: Orr Protection, Code Requirement Reference Guide (functional testing and visual inspections by interval)source: Fire Equipment Manufacturers' Association, Restaurant Fire Protection Changes: UL Standard 300source: Seattle Fire Department, Report of System Testing: Hood Suppression System (2021 Fire Code ITM form, v07152025)

Where it breaks

Where spreadsheets and generic software fall over

The report says 'links replaced' with no temperatures, and after a remodel a link rated for the old appliance sits over a new charbroiler that runs hotter, so the system trips on a busy Friday.

Store each link position and its rated temperature on the system, make the technician confirm or change each one at every service, and flag any position where the rating differs from the design.

The manager added a second fryer six months ago. The technician services the system as before, and the new fryer has no nozzle.

Keep the appliance list left to right on the system record and make the first screen of every visit a line check against it. Any change opens a redesign deficiency and blocks a white tag.

A cylinder's 12 year hydro date passes unnoticed because it sits in a paper file, and an inspector finds it on a city walk through.

Hold every cylinder's last hydro date on the record and show the due year on the schedule two services ahead, so the hydro and recharge are quoted before they are overdue.

The gas valve is never actually tested because the cable is stiff and the line is cooking, so the report ticks it anyway.

Make gas shutoff, electric shutoff, makeup air and alarm signal required fields with a photo or reading, and refuse a pass when any is skipped.

The report goes to the owner but never to the AHJ portal, and the city sends the restaurant a violation that the restaurant passes back to the contractor.

Track AHJ filing as a status on each service with the portal and submission date, and keep the service open until it is filed.

A technician's state license or manufacturer certificate lapses, and the company keeps sending them to jobs in that state or on that brand.

Store license and training expiry per technician, state and brand, and stop the dispatcher assigning a system the technician is not current for.

Checklist

The kitchen fire suppression operations checklist

Print it, or hand it to whoever runs the office side.

  • Every system registered with make, model, cylinders, hydro dates and AHJ
  • Appliances listed left to right and matched to nozzles; hood signage matches
  • UL 300 status recorded; dry chemical and unsupported systems quoted for replacement
  • Alarm in test mode and monitoring company told before tripping
  • Detection line tripped and manual pull operated every service
  • Gas valve, electric shutoff, makeup air and alarm signal each proven
  • Fusible links replaced at the interval the AHJ enforces, temperatures recorded per position
  • Gauge, cartridge weight, agent volume and nozzle caps checked
  • 12 year hydro dates tracked per cylinder
  • Class K extinguisher within 30 feet and in date
  • Tamper seals replaced and the right tag color hung
  • Report to the owner, AHJ filing done where required, deficiencies quoted and signed
  • Technician licenses and manufacturer certificates current for the state and brand

Software options

What software kitchen fire suppression service companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

Inspect Point

Fire protection contractors that inspect hood systems alongside extinguishers, alarms and sprinklers.

Keeps each asset with its deficiencies and carries a finding through proposal, work order, invoice and the AHJ's portal; publishes kitchen hood suppression guidance on NFPA 17A and 96.

source: Inspect Point

Uptick

Fire and security contractors with several branches that want one system for inspections, quoting and billing.

Inspection forms, asset lists, defect quoting, scheduling, customer portal and invoicing built for fire protection.

source: Uptick

BuildingReports

Contractors and owners that want barcode-based device records and reports that AHJs can look up.

ScanSeries mobile inspections with scan history per device, and a free compliance reporting hub for AHJs.

source: BuildingReports

State and city paper forms

Small extinguisher and kitchen shops and owners checking their contractor.

New Jersey's Kitchen System Report and Seattle's hood ITM form list every item to check. Cheap and accepted, but links, hydro dates and line changes are hard to follow from one visit to the next.

source: State and city paper forms

Fieldproxy

Kitchen suppression and extinguisher companies that service many restaurant chains and want the system set up around their own report and tag rules.

Set up for you around your system register, semiannual test screens, link and hydro tracking, deficiency quotes and AHJ filing; existing customer lists come in by import or the open API.

source: Fieldproxy

Published prices, compared:source: Inspect Point, fire protection operations software for contractorssource: Uptick, fire inspection softwaresource: BuildingReports, ScanSeries mobile inspection and compliance reportingsource: New Jersey Division of Fire Safety, Kitchen System Report (filed with the local AHJ, N.J.A.C. 5:70-3)source: Seattle Fire Department, Report of System Testing: Hood Suppression System (2021 Fire Code ITM form, v07152025)

Questions to ask any vendor

  • Can it hold each system with its appliances left to right, nozzles, link positions and temperatures, and cylinder hydro dates?
  • Will the semiannual test refuse to close if the gas shutoff, manual pull or link replacement is not recorded?
  • Can it hold different link intervals per AHJ (semiannual under NFPA 96, annual under the IFC)?
  • Does it track technician licenses and manufacturer certificates by state and brand, and stop bad assignments?
  • Can a line change or non UL 300 finding become a signed deficiency and a replacement quote without retyping?
  • Does it track which reports were filed to which AHJ portal, and when?

Bring one real kitchen fire suppression job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Kitchen fire suppression on Fieldproxy: built around how you already work

A Fieldproxy setup for a kitchen suppression company is built around systems, not visits: each hood system holds its appliances left to right, nozzles, links and cylinders, each semiannual service is a test that cannot close until the trip, gas shutoff, links and tag are recorded, and every line change, hydro date and red tag flows into a quote and an AHJ report from the same record.

Module 1

Restaurant, kitchen and system register

Every question the fire marshal asks is about one system over one line.

  • Record: Site (brand, store number, address, AHJ, portal, permit, monitoring company, kitchen manager)
  • Child record: System (make, model, agent, gallons, UL 300 yes or no, appliance specific or overlapping, install year)
  • Child records: Appliance (position left to right, type, fuel, nozzle), Cylinder (serial, location, last hydro month and year), Link position (location, rated temperature)
  • Gas valve type, shunt trip, makeup air interlock and alarm connection as fields
  • Import from old service reports or chain store lists
How this works

Module 2

Contracts and chain pricing

Chains, franchisees and food service operators buy semiannual service per system, with links and parts on top.

  • Contract per customer: sites, systems, price per system per visit, link price by count, travel zones
  • Franchise and national account billing rules (e.g. invoice per store, PO number required)
  • Hydro, recharge and replacement priced from a parts list by brand
  • Systems added or removed from the register change the next invoice
How this works

Module 3

Semiannual service screen

The test sequence is fixed and the steps people skip are the ones that matter.

  • Step 1 line check: appliances shown left to right; confirm unchanged or record the change
  • Pre-test: staff told, monitoring company told, alarm in test mode, system disarmed per manual
  • Required results: detection trip, manual pull, gas off, electric off, makeup air off, alarm received, control head released
  • Links: each position with its temperature, replaced yes or no; gauge, cartridge weight, agent, nozzle caps
  • Rule: no white tag while a required result is missing or a line change is open; works offline in basements and walk ins
How this works

Module 4

Tags, reports and AHJ filing

The tag and the report are what the city and the insurer see.

  • Report from your template or the state form (e.g. New Jersey Kitchen System Report, Seattle hood ITM fields)
  • Tag status white, yellow or red with technician name and license numbers (company and technician where the state wants both)
  • AHJ filing status per service: portal, submitted date, filing fee
  • Service stays open until the AHJ filing is recorded where the AHJ requires one
How this works

Module 5

Deficiencies, line changes and replacements

Most of the extra revenue is in replacing non UL 300 systems and redesigning changed lines.

  • Deficiency record: type (non UL 300, appliance not covered, nozzle misaimed, hydro due, gas valve fails, Class K missing), code reference, photo, severity
  • Quote linked to the deficiency; owner signs the deficiency report and the proposal on the phone
  • Line change opens a redesign job with the new appliance list and flow points
  • Red tag notifies the AHJ or insurer where the customer's AHJ requires it
How this works

Module 6

Discharges and emergency calls

After a fire or an accidental trip the kitchen is closed until the system is recharged.

  • Discharge job: cause, cylinders to recharge, links, nozzle caps and cartridges to replace
  • Van stock of agent, links by temperature, cartridges and caps by brand
  • Retest and new tag required before the job closes
How this works

Module 7

Technician licenses and brand certificates

A tag from an unlicensed or untrained technician is worthless in most states.

  • Per technician: state licenses (e.g. Texas FEL-K, Illinois 2-K, California A license employee), number, expiry
  • Per brand: manufacturer training certificate (Ansul, Amerex, Kidde, Pyro-Chem, Buckeye) and expiry
  • Dispatch blocks a system whose state or brand the technician is not current for
How this works

Module 8

Six month calendar and hydro forecast

Hundreds of systems roll due every month, and hydro years must be quoted ahead.

  • Next service set 6 months from the last completed one, grouped by area and chain
  • Hydro due year shown per cylinder; quotes raised one service ahead
  • Visits scheduled around service hours (e.g. before lunch prep or after close)
How this works

Module 9

Customer portal for chains

Facility managers for 40 stores want to see which ones are red or yellow without calling.

  • Per store: last service, tag color, open deficiencies, next due, AHJ filing status
  • Download reports and quotes; approve quotes online
How this works

The AI agents, set up for kitchen fire suppression service companies

AgentWhenWhat it doesWhat you get
Vision agentThe technician photographs the cylinder label, the old service tag or the hood signage.Reads make, model, capacity, cylinder serial and hydro date from the label, last service date and company from the tag, and appliances left to right from the sign.System, cylinder and appliance fields filled, with a hydro due year flagged when it falls within the next two services.
Document intelligence agentA new customer sends past suppression reports or a chain sends a store list as PDFs.Reads each report for site, system make, link temperatures, deficiencies and last service date.Draft sites and systems with next due dates, and open deficiencies carried over for review.
Watcher agentA service is completed, or a system reaches month 5 since its last service.Checks for a missing gas shutoff result, links not replaced, a line change with no redesign quote, an AHJ report not filed, or a red tag with no follow up.A list on the system and an alert to the service manager before the 6 month limit or the AHJ notices.
Dispatch agentDue systems are released to the schedule or a discharge call comes in.Matches each system to a technician licensed for that state and trained on that brand, with the right links and agent on the van, nearest first.Assigned visits, with any system no available technician is current for flagged.
AutopilotA replacement or redesign quote for a red or yellow tagged system has had no answer for 7 days (e.g.).Drafts a short note to the facility manager naming the store, the tag color, what failed and the quote total.A chase email a person approves before it sends, logged on the quote.

Straight answers

Kitchen fire suppression: FAQ

What software do kitchen fire suppression service companies use?

Many use paper or PDF reports built on state forms and a calendar of six month due dates. Fire protection contractors often use Inspect Point, Uptick or BuildingReports and upload reports to the AHJ's portal, often The Compliance Engine. Fieldproxy is one option: a register of systems with appliances, links and cylinders, a semiannual test that cannot close with steps missing, and deficiencies that become quotes.

How often does a restaurant hood suppression system need service?

Every six months by a trained and qualified technician, and after every discharge, under NFPA 96, NFPA 17A and the IFC. The owner also does a monthly visual check of the seals, gauge, nozzle caps and tag.

How often are fusible links replaced?

NFPA 96 requires metal alloy fusible links to be replaced at least every six months. The IFC requires at least annual replacement, and some AHJs (Seattle, for one) check for annual replacement. The stricter rule the AHJ enforces applies, and many contractors replace them at every semiannual service.

When does a kitchen suppression cylinder need a hydrostatic test?

Wet chemical cylinders every 12 years under NFPA 17A. Dry chemical cylinders are examined every 6 years and hydro tested every 12, but dry chemical kitchen systems are not UL 300 listed and FEMA advises replacing them.

What is UL 300 and does my system need it?

UL 300 is the fire test standard for commercial cooking systems, in effect since 21 November 1994. It tests with vegetable shortening, which burns hotter. NFPA 96 and the fire code require UL 300 listed systems, and existing wet chemical systems stay acceptable only while the line and cooking method are unchanged.

What happens when a restaurant adds or moves an appliance?

Under IFC 904.12.6.1 a change in appliances, their position or the cooking media means the system has to comply again with current requirements. The technician checks the line against the hood signage and quotes a redesign if a nozzle no longer covers the appliance.

Does a technician need a license to service hood suppression systems?

In most states, yes. Texas issues an FEL-K license, Illinois licenses the company as a Class B distributor and the technician as 2-K, California requires an A license or a C-16 and Oklahoma licenses kitchen companies and technicians separately. Manufacturers such as Amerex also require factory training.

What do the red, yellow and white tags mean?

On Seattle's form, white means normal operation, yellow means a deficiency, and red means the system is impaired. FEMA's decision tree says a non UL 300 system or an unrepaired deficiency gets a red tag, reported to the owner and the AHJ.

Who sends the suppression report to the fire department?

Usually the contractor. Arlington County VA and Seattle make the contractor upload it to The Compliance Engine, and the IFC says a certificate of inspection is forwarded to the fire code official after each service.

Can Fieldproxy print our service report and tag details?

Yes. The report is generated from your own template or the state form, filled from the system register and the semiannual test, with license numbers, link temperatures and the tag color, and the AHJ filing date is tracked on the service.

Related guides

All sources on this page (29)

Run kitchen fire suppression service work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.