Guide for lead-safe RRP renovation firms ยท checked 29 November 2026

Lead-safe RRP renovation software for pamphlets, containment and cleaning cards

On any paid job that disturbs more than 6 square feet of paint per room inside, or 20 square feet outside, in a home or child care facility built before 1978, the EPA Renovation, Repair and Painting rule applies. The owner gets the Renovate Right pamphlet no more than 60 days before work, a certified renovator sets up containment and does the cleaning verification with an EPA card, and the firm keeps the proof for 3 years. This guide covers how the work runs, the EPA, HUD, state and city rules, and what to look for in software.

See your own jobs set up this way

A 30-minute call. We show you lead-safe RRP renovation firms workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Most RRP certified firms run the job in a general tool (Jobber, Buildertrend, PaintScout for painters) and keep the lead paperwork on paper: the signed pamphlet acknowledgment, test kit results, photos of containment and the EPA sample recordkeeping checklist, with photos in an app such as CompanyCam. The deciding features are a year-built check that flags pre-1978 jobs at intake, the 60-day pamphlet window, square footage per room against the 6 and 20 square foot triggers, renovator and firm certificate expiry, a cleaning verification record with cloth counts, and 3-year retrieval by address. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: it is built around your pamphlets, renovators and job types.

Pre-1978

Target housing and child-occupied facilities built before 1978 are covered on any renovation performed for compensation

source: 40 CFR 745.82, Applicability (test kit, paint chip and inspector exceptions; emergency renovations, Cornell LII)

6 / 20 sq ft

Painted surface disturbed per room inside, or outside in total, above which a job stops being minor repair; window replacement is never minor

source: 40 CFR 745.83, Definitions (minor repair and maintenance, child-occupied facility, renovation, Cornell LII)

60 days

Latest the Renovate Right pamphlet can be handed over before work starts; a certificate of mailing must be at least 7 days before

source: 40 CFR 745.84, Information distribution requirements (Renovate Right pamphlet, Cornell LII)

3 years

How long the firm keeps every record proving compliance after the renovation is completed

source: 40 CFR 745.86, Recordkeeping and reporting requirements (Cornell LII)

How a job runs

One lead-safe RRP renovation job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Catch the year built at intake

    The rule turns on the building, not the job type. Target housing built before 1978, or a child-occupied facility (a pre-1978 building where the same child under 6 visits at least two days a week, 3 hours a day, 6 hours a week and 60 hours a year) puts the job under 40 CFR 745 Subpart E. Day cares, preschools and kindergarten rooms count, and so does a commercial building's restroom those children use.

  2. 2

    Decide if lead rules apply to this scope

    Minor repair and maintenance disturbs 6 square feet or less of painted surface per room inside or 20 square feet or less outside, uses no prohibited practice, and is not window replacement or demolition. Removing a painted component counts its whole surface. Jobs in the same room within 30 days add together. Above that, the firm either assumes lead is present or proves it is not.

  3. 3

    Test or presume

    A certified renovator can test each component with an EPA recognized kit (LeadCheck, D-Lead, or the Massachusetts kit for drywall and plaster only), send paint chips to an NLLAP recognized lab, or rely on a certified inspector's written report. A negative result below 1.0 mg/cm2 or 0.5% by weight takes the component out of the rule. Most firms simply presume lead and run the job lead safe.

  4. 4

    Deliver the pamphlet and get it signed

    No more than 60 days before work, give the owner the Renovate Right pamphlet and get a signed acknowledgment, or a certificate of mailing at least 7 days before work. A rented unit also needs an adult occupant's signature, or a written certification of delivery with the date, method, names and reason no signature was obtained. Common areas get a written notice to each affected unit or posted signs; child care facilities get the parents informed too.

  5. 5

    Assign a certified renovator and train the crew

    The firm must hold EPA or state firm certification, and one certified renovator is assigned to every job. That renovator trains each non-certified worker on the task they will do, is on site while signs go up, containment is built and cleaning is done, is reachable on site or by phone the rest of the time, and carries the initial and latest refresher certificates.

  6. 6

    Post signs and build containment

    Signs go up before work, in the occupants' primary language where practicable. Inside: remove or cover furniture, seal ducts, close and cover doors, and tape plastic on the floor at least 6 feet past the work. Outside: close doors and windows within 20 feet, lay plastic at least 10 feet past the work, and add vertical containment when work is within 10 feet of the property line.

  7. 7

    Work without the banned methods

    Open flame burning or torching is banned. Sanding, grinding, planing, needle guns and blasting are allowed only with a shroud and a HEPA vacuum attachment. A heat gun must run below 1,100ยฐF. On HUD assisted work, dry sanding and dry scraping are also banned outside small areas. Waste is contained every day and covered in transit.

  8. 8

    Clean and verify with the card

    Mist and fold the plastic dirty side in, HEPA vacuum and wet wipe everything in and within 2 feet of the work area, and mop with a two-bucket or wet mopping system. The certified renovator then wipes each windowsill and each floor or countertop section of under 40 square feet with a wet cloth and compares it to the EPA cleaning verification card. A cloth darker than the card means re-clean, re-wipe, then wait an hour and finish with a dry cloth.

  9. 9

    Hand over the records and file the job

    When the final invoice goes out, or within 30 days of completion if sooner, the owner and an adult occupant get the compliance record, usually the EPA Sample Renovation Recordkeeping Checklist. If dust clearance sampling was used instead of the card, the dust report goes over too. The firm keeps everything for 3 years: longer if a state or city says so, such as 10 years under NYC Local Law 1.

What to record

The fields every lead-safe RRP renovation job should capture

Before anyone opens a can

  • Address, year built, target housing or child-occupied facility, owner occupied or rented, child under 6 in residence (asked, not assumed)
  • Scope per room: components, square feet of painted surface disturbed, window replacement or demolition flag, prior jobs in the same room within 30 days
  • Lead determination: presumed, test kit (manufacturer, model, component, location, result), paint chip lab (NLLAP lab name and address, result) or inspector report
  • Pamphlet: version, recipient, date delivered, signed acknowledgment or certificate of mailing date, occupant signature or certification of attempted delivery

On the job

  • Firm certification number and expiry; assigned certified renovator, initial course date, last refresher, hands-on or online (5 or 3 years)
  • Workers trained on site by the renovator, with the topics for each worker
  • Signs posted (time, language), containment type: interior 6 ft floor plastic, ducts sealed, doors covered; exterior 10 ft ground plastic, windows within 20 ft closed, vertical containment
  • Methods used: HEPA shrouded tools, heat gun under 1,100ยฐF, wet scraping; photos of containment before work and after cleanup
  • Waste bagged, stored under containment at day end, covered in transit

Close-out

  • Visual inspection pass, then cleaning verification: each windowsill and each floor or countertop section under 40 sq ft, number of wet and dry cloths used, re-cleans
  • Or dust clearance: sampler certification, lab, results in ยตg/ft2 against 5 floors, 40 sills, 100 troughs
  • HUD jobs: clearance report with the examiner's certification number and lab ID; independent from the crew
  • Records checklist delivered with the final invoice or within 30 days; retention end date (3 years, or the state or city period)

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
Who is covered (40 CFR 745.82, 745.83)All renovations for compensation in target housing and child-occupied facilities built before 1978, by any firm, including landlords' in-house maintenance staff and government agencies. Exceptions: a certified inspector's written determination that the affected components are lead free, or a certified renovator's test kit or lab paint chip result below 1.0 mg/cm2 or 0.5% by weight. A staircase can be tested as one component unless parts were refinished separately. source: 40 CFR 745.82, Applicability (test kit, paint chip and inspector exceptions; emergency renovations, Cornell LII)
Minor repair and maintenance (745.83)Work that disturbs 6 square feet or less of painted surface per room inside or 20 square feet or less outside is outside the rule, unless it uses a prohibited or restricted practice, replaces windows or demolishes painted surfaces. Removing part of a painted component counts its whole surface area. Non-emergency jobs in the same room within the same 30 days are one job for the threshold. source: 40 CFR 745.83, Definitions (minor repair and maintenance, child-occupied facility, renovation, Cornell LII)
Pre-renovation education (745.84)No more than 60 days before work, the owner receives the Renovate Right pamphlet with a signed acknowledgment, or a certificate of mailing at least 7 days before. Non-owner-occupied units add an adult occupant. Common areas get a notice to every affected unit or posted signs, plus a signed statement of the steps taken; if the scope or dates change, affected units are told again before the extra work. The acknowledgment can be part of the contract and must be in the contract's language. source: 40 CFR 745.84, Information distribution requirements (Renovate Right pamphlet, Cornell LII)
Containment and occupant protection (745.85(a)(1), (2))Signs before work, kept up until cleaning verification passes. Interior: objects removed or covered, ducts sealed, doors covered, floor plastic 6 feet beyond the work or further. Exterior: doors and windows within 20 feet closed (and below on multi-story buildings), ground plastic 10 feet beyond the work, and vertical containment if work is within 10 feet of the property line. source: 40 CFR 745.85, Work practice standards (containment, prohibited practices, cleaning verification, Cornell LII)
Prohibited and restricted practices (745.85(a)(3))Open-flame burning or torching of painted surfaces is prohibited. High speed sanding, grinding, power planing, needle guns, abrasive blasting and sandblasting are prohibited unless the machine has a shroud and a HEPA vacuum attachment and no visible dust escapes. Heat guns only below 1,100 degrees Fahrenheit. source: 40 CFR 745.85, Work practice standards (containment, prohibited practices, cleaning verification, Cornell LII)
Cleaning and the verification card (745.85(a)(5), (b))Clean the work area and 2 feet beyond, high to low: walls HEPA vacuumed or wiped, everything HEPA vacuumed (beater bar on carpet), hard surfaces wet wiped, floors mopped with wash and rinse water kept apart. The renovator wipes each windowsill and each floor or countertop section under 40 square feet and compares each cloth to the EPA card. Exteriors get a visual inspection of surfaces, sills and the ground. Signs come down only after it passes. source: 40 CFR 745.85, Work practice standards (containment, prohibited practices, cleaning verification, Cornell LII)
Optional dust clearance instead of the card (745.85(c), 745.227)If the contract or another law requires dust clearance sampling by a certified inspector, risk assessor or dust sampling technician, cleaning verification can be skipped. Since 12 January 2026 the action levels are 5 ยตg/ft2 for floors, 40 ยตg/ft2 for interior window sills and 100 ยตg/ft2 for window troughs, down from 10, 100 and 400. source: 40 CFR 745.227, Work practice standards for lead-based paint activities (dust-lead action levels, Cornell LII)
Dust-lead hazard is now any reportable level (745.65)On or after 12 January 2026, a dust-lead hazard in a home or child-occupied facility is any reportable level of lead on floors or interior window sills from wipe samples analyzed by an NLLAP recognized lab. Before that date the sill hazard was 10 ยตg/ft2. This is why clearance results below the action level can still come with a hazard statement. source: 40 CFR 745.65, Lead-based paint hazards (dust-lead hazard from 12 Jan 2026, Cornell LII)
Firm certification (745.89, 745.92)Firms apply online to EPA and pay $300, or $550 combined with lead abatement activities. Certification lasts up to 5 years. Apply to renew 90 days or more before expiry to stay covered while EPA decides; amend within 90 days of any change to the application details or stop working until it is amended. A replacement certificate is $15. source: 40 CFR 745.89, Firm certification (5 years, 90-day renewal and amendment rules, Cornell LII)
Renovator certification and duties (745.90)Initial accredited course, then a refresher within 5 years. A refresher with hands-on training certifies for 5 years; an online refresher without hands-on certifies for 3 years and the next one must be hands-on. EPA added online training for every other recertification in 2016. The renovator must keep the initial and latest refresher certificates at the work site. source: 40 CFR 745.90, Renovator certification and responsibilities (Cornell LII)
Emergency renovations (745.82(b))Unplanned work after a sudden event, or interim controls for a child with an elevated blood lead level, is exempt from the pamphlet and, as far as the emergency needs, from signs, containment, waste, training and certification. It is never exempt from cleaning, cleaning verification by a certified renovator, or the records, and the firm documents the emergency and which provisions it could not follow. source: 40 CFR 745.82, Applicability (test kit, paint chip and inspector exceptions; emergency renovations, Cornell LII)
Records (745.86)Keep for 3 years: lead-free determinations and test kit or lab results, signed acknowledgments, certificates of mailing, attempted delivery certifications, common area notices, the renovator's certificate copy and the renovator's certification of each step including the number of wet and dry cloths used. Give the owner and an adult occupant the compliance record with the final invoice or within 30 days of completion, whichever is earlier. source: 40 CFR 745.86, Recordkeeping and reporting requirements (Cornell LII)
Penalties (TSCA, 40 CFR 19.4)Civil penalties under 15 U.S.C. 2615(a)(1) are up to $49,772 per violation for penalties assessed on or after 8 January 2025. Home Depot paid $20.75 million in 2021, the largest TSCA settlement to that date, after EPA found its installers' jobs had uncertified firms, missing cleaning, no pamphlets and no compliance records; it agreed to an electronic certification tracking system and a required checklist on every job. source: US EPA (archived 19 Jan 2025), Home Depot settlement information sheet ($20.75 million TSCA penalty)
HUD Lead Safe Housing Rule: safe work practices and de minimis (24 CFR 35.1350, 35.140)On federally assisted housing, safe work practices apply above 20 square feet exterior, 2 square feet in any interior room, or 10% of a small component such as sills, baseboards and trim: tighter inside than EPA's 6 square feet. HUD bans heat guns at or above 1,100ยฐF or charring the paint, and dry sanding or dry scraping beyond small areas. source: 24 CFR 35.1350, Safe work practices and de minimis levels (HUD, Cornell LII)
HUD clearance instead of the card (24 CFR 35.1340)HUD assisted work above de minimis ends with a clearance examination: a visual assessment, wipe samples from floors and, where practicable, sills and troughs, lab analysis and a report with the examiner's certification number and the lab's EPA recognition number. The examiner must be independent of the crew; an in-house employee may not do both the work and its clearance. source: 24 CFR 35.1340, Clearance (HUD Lead Safe Housing Rule, Cornell LII)
HUD rehab tiers by assistance per unit (24 CFR 35.930)Up to $5,000 per unit of federal rehab money: test or presume, safe work practices and clearance. Over $5,000 to $25,000: add a risk assessment and interim controls of the hazards found. Over $25,000: risk assessment and abatement of the hazards. Interim controls crews need lead-safe work practices training or abatement supervision above de minimis. source: 24 CFR 35.930, Rehabilitation: evaluation and hazard reduction by assistance per unit (HUD, Cornell LII)
State programs replace EPA's (EPA authorizations)EPA firm certification does not apply in Alabama, Delaware, Georgia, Iowa, Kansas, Massachusetts, Mississippi, North Carolina, Oklahoma, Oregon, Rhode Island, Utah, Vermont, Washington and Wisconsin, or in the Bois Forte Band of Chippewa: firms there certify with the state program. Massachusetts, for example, licenses Lead-safe Renovation Contractors under 454 CMR 22 and assigns a certified Lead-safe Renovator-supervisor to every project. source: US EPA, Apply for or update your renovation firm's lead-safe certification (states where EPA certification does not apply)
New York City Local Law 1 of 2004Owners of multiple dwellings built before 1960 (or 1960 to 1978 with known lead) presume lead paint, use certified workers and safe work practices for repairs, and keep inspection and remediation records for at least 10 years. The city's paint threshold is 0.5 mg/cm2, half the federal 1.0. Pre-1960 buildings had to have every painted surface tested once by August 2025. source: NYC HPD, Lead-based paint (Local Law 1 of 2004, 0.5 mg/cm2, 10-year records)
OSHA lead in construction (29 CFR 1926.62)Separate from RRP, the crew is covered by OSHA: the permissible exposure limit is 50 ยตg/m3 as an 8-hour average and the action level is 30 ยตg/m3. source: 29 CFR 1926.62, Lead in construction (OSHA PEL and action level, Cornell LII)

Rules vary by state, council and contract. Checked 29 November 2026; confirm against the source for your area before relying on it.

Numbers

The thresholds, clocks and dust levels that run a lead-safe renovation

Square feet and dates decide this trade more than price does: they decide whether the rule applies, when the pamphlet must go out, how far the plastic runs, how the job is cleared and how long the file is kept.

RuleFigureWhere
Covered buildingsHousing and child-occupied facilities built before 197840 CFR 745.82
Minor repair limit (EPA)6 sq ft per room inside, 20 sq ft outside; no window replacement40 CFR 745.83
Same-room aggregationJobs in the same room within 30 days count together40 CFR 745.83
De minimis (HUD assisted)2 sq ft per room inside, 20 sq ft outside, 10% of small components24 CFR 35.1350(d)
Lead-based paint threshold1.0 mg/cm2 or 0.5% by weight (NYC: 0.5 mg/cm2)40 CFR 745.82; NYC LL1
Pamphlet windowNo more than 60 days before work; mailing at least 7 days before40 CFR 745.84
Interior floor plastic6 ft beyond the work40 CFR 745.85(a)(2)
Exterior ground plastic / closures10 ft beyond the work / doors and windows within 20 ft40 CFR 745.85(a)(2)
Vertical containment triggerWork within 10 ft of the property line40 CFR 745.85(a)(2)
Heat gun limitBelow 1,100ยฐF40 CFR 745.85(a)(3)
Cleaning reach / verification section2 ft beyond work area / sections under 40 sq ft40 CFR 745.85
Failed card wait1 hour or until dry, then a dry cloth40 CFR 745.85(b)
Dust action levels from 12 Jan 20265 floors, 40 sills, 100 troughs (ยตg/ft2)40 CFR 745.227
Records to ownerWith final invoice or within 30 days of completion40 CFR 745.86(c)
Record retention3 years (NYC LL1: 10 years)40 CFR 745.86; NYC HPD
Firm certification$300, up to 5 years; renew 90+ days before expiry40 CFR 745.89, 745.92
Renovator refresherWithin 5 years; online-only refresher = 3 years40 CFR 745.90
Civil penaltyUp to $49,772 per violation40 CFR 19.4

source: 40 CFR 745.82, Applicability (test kit, paint chip and inspector exceptions; emergency renovations, Cornell LII)source: 40 CFR 745.83, Definitions (minor repair and maintenance, child-occupied facility, renovation, Cornell LII)source: 40 CFR 745.84, Information distribution requirements (Renovate Right pamphlet, Cornell LII)source: 40 CFR 745.85, Work practice standards (containment, prohibited practices, cleaning verification, Cornell LII)source: 40 CFR 745.86, Recordkeeping and reporting requirements (Cornell LII)source: 40 CFR 745.89, Firm certification (5 years, 90-day renewal and amendment rules, Cornell LII)source: 40 CFR 745.90, Renovator certification and responsibilities (Cornell LII)source: 40 CFR 745.92, Fees for renovation firm certification (Cornell LII)source: 40 CFR 745.227, Work practice standards for lead-based paint activities (dust-lead action levels, Cornell LII)source: 24 CFR 35.1350, Safe work practices and de minimis levels (HUD, Cornell LII)source: NYC HPD, Lead-based paint (Local Law 1 of 2004, 0.5 mg/cm2, 10-year records)source: 40 CFR 19.4, Civil monetary penalties adjusted for inflation (TSCA 15 U.S.C. 2615(a)(1), Cornell LII)

Where it breaks

Where spreadsheets and generic software fall over

A window crew replaces two sashes in a 1962 ranch. The salesperson filed it as 'under 6 square feet' and nobody brought plastic. Window replacement is never minor repair, whatever the footage.

Year built is a required intake field; any pre-1978 job with window replacement or demolition is marked RRP automatically and the job cannot be scheduled without a pamphlet record and an assigned certified renovator.

A handyman patches 4 square feet in a bathroom on the 3rd and comes back on the 20th to cut another 4 square feet for a vanity. Each visit looked minor; together they are 8 square feet in one room within 30 days.

Painted square feet are logged per room on each job, and a new job at the same address and room within 30 days adds to the running total and flips the job to RRP when it passes 6.

The pamphlet was signed at the sales call in March. The job slipped to June. That signature is now more than 60 days old and does not count.

The acknowledgment carries its date, and a job that starts more than 60 days after it is blocked until a fresh signature or mailing certificate is attached.

The company's only certified renovator took the online refresher in 2023. Nobody noticed it gave 3 years, not 5, and the next refresher must be hands-on.

Each renovator holds course type and dates, the expiry is worked out from hands-on or online, alerts go out ahead, and an expired renovator cannot be assigned to an RRP job.

An EPA inspector asks for three jobs from 2024. The photos are on a former foreman's phone and the checklists were thrown out with the truck's glovebox papers.

Pamphlet, test results, containment photos, worker training and the cleaning verification record live on the job, with a retention date of 3 years from completion (or the state or city period), and can be pulled by address.

On a HUD funded rehab, the crew's own lead tech did the clearance wipes. HUD requires the clearance examiner to be independent of the crew.

HUD jobs carry a funding source and per-unit assistance tier; clearance must be recorded by a different person with a certification number, and the job cannot close on the crew's own wipes.

Checklist

The lead-safe RRP renovation operations checklist

Print it, or hand it to whoever runs the office side.

  • Year built captured at intake; pre-1978 and child-occupied facility questions answered
  • Painted square feet per room estimated; window replacement or demolition flagged
  • Same-room jobs within 30 days checked before calling it minor repair
  • Lead determination recorded: presumed, test kit with brand and locations, lab chips, or inspector report
  • Renovate Right pamphlet signed within 60 days of start (or mailed 7+ days before); occupant covered on rentals
  • Firm certification current, in the right jurisdiction (EPA or state program)
  • Certified renovator assigned, refresher current, certificates on site
  • Workers trained on site by the renovator, topics recorded
  • Signs posted; containment built to 6 ft inside or 10 ft outside; vertical containment near the property line
  • No torching, no unshrouded power tools, heat gun under 1,100ยฐF
  • Waste contained daily and covered in transit
  • Cleaning verification done by the renovator, cloth counts recorded (or dust clearance results attached)
  • Compliance record delivered with the final invoice or within 30 days
  • File kept 3 years from completion, longer where the state or city requires

Software options

What software lead-safe RRP renovation firms actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

PaintScout

Residential and commercial painting contractors

Painting estimating and selling with an operations side for schedules and jobs. RRP fields such as year built, pamphlet date, renovator and cleaning verification would be custom fields or attachments.

source: PaintScout

CompanyCam

Any crew that needs time-stamped job photos

Job site photo documentation organized by project, useful for proving containment and cleanup. It holds the photos, not the pamphlet clock or certification records.

source: CompanyCam

Buildertrend

Remodelers and design-build firms running longer renovation projects

Project management with schedules, selections, change orders and daily logs. Lead-safe steps would be set up as checklists or to-dos on each project.

source: Buildertrend

Jobber

Small painting, handyman and window companies

Quotes, scheduling, invoices and forms. The pamphlet acknowledgment, test kit record and cleaning verification can be job forms; the 60-day and 30-day clocks and certificate expiry would be tracked outside it.

Paper and the EPA sample checklist

Small firms that keep the file on paper

The EPA Sample Renovation Recordkeeping Checklist plus a signed pamphlet page in the contract. It meets the rule if every box is filled and the paper survives 3 years.

Published prices, compared:source: PaintScout, Software for painting contractors (estimating and operations)source: CompanyCam, Job site photo documentationsource: 40 CFR 745.86, Recordkeeping and reporting requirements (Cornell LII)

Questions to ask any vendor

  • Can intake require the year built and flag every pre-1978 home or child care facility before a quote goes out?
  • Does it add painted square feet per room across jobs at the same address within 30 days, and treat window replacement as RRP regardless of size?
  • Can it hold the pamphlet acknowledgment with its date and block a job that starts more than 60 days later?
  • Does it track firm certification and each renovator's refresher type and expiry, and stop an expired renovator being assigned?
  • Can the renovator record the cleaning verification on a phone, per sill and per floor section, with cloth counts and photos, offline in a basement?
  • Can we pull every record for one address three years later, and send the owner the compliance record with the final invoice automatically?

Bring one real lead-safe RRP renovation job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Lead-safe RRP renovation on Fieldproxy: built around how you already work

A Fieldproxy setup for a lead-safe renovation firm is built around the address and its year, not the job type: whether the rule applies, whether the pamphlet is still inside its 60 days, which certified renovator owns the job, and what the cleaning cards showed. EPA, HUD, state and city rules are built into the statuses and blocks, so a pre-1978 job cannot start without its pamphlet and cannot close without its verification record.

Module 1

Properties and the RRP decision

Year built, occupancy and the square footage per room decide whether any of the rule applies.

  • Records: Customer (owner, landlord, property manager, child care operator, housing agency) > Property > Unit > Room
  • Property fields: year built, target housing or child-occupied facility, owner occupied or rented, jurisdiction (EPA, authorized state, NYC LL1), HUD assisted and assistance per unit
  • Per room: components, painted sq ft disturbed, window replacement or demolition flag, running total of the last 30 days
  • Auto status: Not covered (1978 or later), Minor repair (6/20 sq ft), RRP job, HUD safe work practices (2/20 sq ft, 10% small component), HUD rehab tier by $5,000 and $25,000 per unit
How this works

Module 2

Estimates with lead-safe lines

Containment, HEPA tools, cleaning and verification are real labor and material and belong on the quote.

  • Line items: interior containment per room, exterior ground plastic per linear ft, vertical containment, HEPA vacuum and shroud days, cleaning and verification, waste bags
  • Pamphlet acknowledgment page built into the estimate, in the contract's language, signed on a phone
  • Estimate and change order PDFs from your own template; a scope change on a common area job triggers a revised occupant notice
How this works

Module 3

Lead determination and testing

A negative test takes a component out of the rule, but only if the record names the kit, the place and the result.

  • Per component: method (presumed, LeadCheck, D-Lead, Massachusetts kit, NLLAP lab chips, inspector report), location, result, photo of the swab
  • Integrated whole flag (one staircase) and refinished-separately note
  • Inspector or risk assessor reports attached with certification number; NYC jobs compare against 0.5 mg/cm2
How this works

Module 4

Pamphlet and occupant notice clock

The rule is broken before work begins if the pamphlet is late, unsigned or older than 60 days.

  • Per job: pamphlet version, recipient role (owner, adult occupant, child care representative), delivery date and method, signature or certificate of mailing date
  • Attempted delivery certification with the reason no signature was obtained
  • Common areas and child care: notice to each unit or posted sign record, signed statement of steps; parent notices
  • Block: job cannot be scheduled to start more than 60 days after the acknowledgment, or less than 7 days after a mailing
How this works

Module 5

Firm and renovator certifications

Every job needs a current certified firm and an assigned certified renovator, and the expiry depends on the refresher type.

  • Firm: EPA or state program, certificate number, expiry, renewal submitted date (90 days rule), amendment due date
  • Per renovator: initial course date, last refresher, hands-on or online, expiry (5 or 3 years), next refresher must be hands-on flag, certificate PDFs
  • Per worker: on-the-job training topics and date from the renovator
  • Block: an RRP job cannot be dispatched without a renovator whose certificate is current on the work dates
How this works

Module 6

Lead-safe job checklist on the phone

The renovator's certification of each step is the record EPA asks for, so it is filled where the work happens.

  • Steps: signs posted (language), objects removed or covered, ducts sealed, doors covered, floor plastic 6 ft, or exterior 10 ft ground plastic, windows within 20 ft closed, vertical containment
  • Methods: shrouded HEPA tools, heat gun under 1,100ยฐF, no torching; daily waste containment
  • Photos time-stamped and GPS-tagged at each step; works offline in crawl spaces and basements
How this works

Module 7

Cleaning verification and clearance

The card result, or the lab clearance, is what proves the house was left safe.

  • Per windowsill and per floor or countertop section under 40 sq ft: wet cloth pass or fail, re-clean, 1-hour wait, dry cloth; total wet and dry cloths
  • Exterior: visual inspection of surfaces, sills and ground
  • Dust clearance alternative: sampler, certification number, lab, results against 5, 40 and 100 ยตg/ft2; HUD clearance by an independent examiner
  • Signs-removed time recorded only after a pass
How this works

Module 8

Compliance record, invoice and 3-year file

The owner gets the record with the final invoice, and the firm has to find it again years later.

  • Auto-built compliance record PDF matching the EPA sample checklist: renovator certificate, training, steps, test results, cloth counts
  • Sent with the final invoice or by day 30 after completion, whichever comes first; posted for common area jobs
  • Retention date per job (3 years, 10 years NYC LL1); search by address; QuickBooks or Xero sync
How this works

Module 9

Landlord and agency portal

Property managers, housing authorities and child care operators need proof per unit without calling the office.

  • Per property and unit: jobs, pamphlet records, cleaning verification or clearance reports, invoices
  • HUD funded jobs grouped by grant with per-unit assistance and clearance status
How this works

The AI agents, set up for lead-safe RRP renovation firms

AgentWhenWhat it doesWhat you get
Watcher agentA pre-1978 job is scheduled with no pamphlet record, a start date passes 60 days from the acknowledgment, the assigned renovator's certificate expires before the job ends, or a closed job has no cleaning verificationChecks the property year, room square footage over 30 days, pamphlet date, firm and renovator expiry, and the close-out recordThe job held at its current status with the reason, and an alert to the operations manager
Vision agentThe renovator photographs a signed pamphlet page, a test kit swab against the component, or the wet cloth beside the EPA cleaning verification cardReads the signature date and name, the swab color and location, or whether the cloth matches the cardThe pamphlet, test result or verification step filled on the job, with the photo attached
Voice agentThe renovator talks through close-out: 'kitchen, three sills passed first wipe, floor two sections, one re-clean, five wet cloths one dry, signs down 4:10'Splits the note into sills, floor sections, re-cleans, cloth counts and the sign removal timeThe cleaning verification record completed, ready for the compliance PDF
AutopilotA booked pre-1978 job has no signed pamphlet e.g. 7 days before start, or a rented unit has no occupant acknowledgmentDrafts the request to the owner or tenant with the pamphlet link and the signing pageA draft email or text a person approves before it sends
Scheduler agentEvery Monday at 6 amLists RRP jobs starting this week and their pamphlet status, renovators with refreshers due in e.g. 90 days, the firm renewal date, and closed jobs whose compliance record has not gone to the ownerA weekly lead-safe briefing emailed to the owner and office manager

Straight answers

Lead-safe RRP renovation: FAQ

What software do lead-safe RRP renovation firms use?

Most run jobs in a general tool such as Jobber, Buildertrend or PaintScout and keep the lead paperwork on paper or as attachments: the signed pamphlet, test kit results, CompanyCam photos and the EPA sample recordkeeping checklist. What matters is a year-built check at intake, the 60-day pamphlet clock, square footage per room, renovator certificate expiry and a cleaning verification record you can find for 3 years. Fieldproxy is set up around your own job types and renovators.

When does the EPA RRP rule apply?

To renovation, repair and painting done for pay in housing or child-occupied facilities built before 1978, when the work disturbs more than 6 square feet of painted surface per room inside or more than 20 square feet outside, or involves window replacement or demolition of painted surfaces. Jobs in the same room within 30 days count together.

How far ahead do you have to give the Renovate Right pamphlet?

No more than 60 days before work starts, with a signed acknowledgment from the owner, or a certificate of mailing at least 7 days before. For a rented unit an adult occupant also gets it, or the firm certifies in writing that it was delivered and why no signature was obtained.

How does the cleaning verification card work?

After cleaning and a visual inspection, the certified renovator wipes each windowsill and each section of floor or countertop under 40 square feet with a damp disposable cloth and compares it to the EPA card. If the cloth matches or is lighter, it passes. If darker, re-clean and re-wipe; if it still fails, wait 1 hour or until dry and wipe with a dry cloth, which completes verification. The number of wet and dry cloths goes in the record.

Is a lead test required before renovation?

No. Firms can presume lead is present and work lead safe. To take a component out of the rule they need a negative result from an EPA recognized test kit used by a certified renovator (LeadCheck or D-Lead, or the Massachusetts kit on drywall and plaster), an NLLAP lab paint chip result, or a certified inspector's report, below 1.0 mg/cm2 or 0.5% by weight.

How long is RRP certification good for?

Firm certification lasts up to 5 years and costs $300 from EPA; renew 90 days or more before expiry to stay covered. Renovator certification lasts 5 years after a hands-on refresher, or 3 years after an online refresher, and the next refresher after an online one must be hands-on.

What records does an RRP firm keep, and for how long?

For 3 years after the job: lead determinations and test results, pamphlet acknowledgments or mailing certificates, common area notices, the renovator's certificate, worker training, and the renovator's certification of each work practice and the cleaning verification with cloth counts. The owner and an adult occupant get the compliance record with the final invoice or within 30 days. Some places require longer, such as 10 years under NYC Local Law 1.

What are the new dust-lead levels in 2026?

From 12 January 2026, EPA treats any reportable level of lead in floor or window sill dust as a dust-lead hazard, and post-abatement dust clearance must be below 5 ยตg/ft2 on floors, 40 on interior window sills and 100 on window troughs. RRP firms meet them when they use dust clearance sampling instead of the cleaning verification card.

How is HUD's Lead Safe Housing Rule different from EPA RRP?

On federally assisted housing, HUD's safe work practices start at 2 square feet in an interior room (EPA: 6), it bans dry sanding and dry scraping beyond small areas, and the job ends with an independent clearance examination with lab wipe samples rather than the cleaning card. Rehab money above $5,000 and $25,000 per unit adds risk assessments, interim controls and abatement.

Which states run their own RRP program?

Per EPA: Alabama, Delaware, Georgia, Iowa, Kansas, Massachusetts, Mississippi, North Carolina, Oklahoma, Oregon, Rhode Island, Utah, Vermont, Washington and Wisconsin, plus the Bois Forte Band of Chippewa. Firms working there certify with the state, not EPA.

What are the penalties for RRP violations?

Up to $49,772 per violation under TSCA for penalties assessed from 8 January 2025. The largest case is Home Depot's $20.75 million settlement in 2021, driven by uncertified installers, skipped cleaning, missing pamphlets and missing compliance records.

Related guides

All sources on this page (38)

Run lead-safe RRP renovation firms work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.