Software for trade show installation and dismantle (I&D) contractors: city rules, crews and show deadlines

An I&D contractor sells labor hours inside someone else's building, under a different union agreement in every city, against a show opening time that does not move. The same 20 by 20 booth can be built by the exhibitor's own staff in Philadelphia, needs carpenters once it passes 250 sq ft at the Javits Center, and falls under Teamsters jurisdiction in Las Vegas. This guide covers the venue rules, the EAC paperwork, the labor and freight numbers and the software, with a source on every figure.

See your own jobs set up this way

A 30-minute call. We show you trade show booth installation companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Trade show installation and dismantle (I&D) contractors mostly run on a mix: an exhibit-industry ERP such as ConventionSuite (built on NetSuite) at larger exhibit houses and general service contractors, a live-event crew tool such as LASSO for booking and paying crews, the show's own ordering site (Freeman Online or GES Expresso) for show labor, electrical and rigging, and spreadsheets for the city rule sheets, EAC forms and labor desk check-ins. What generic field service software misses is that the rules belong to the venue and the show, not the job: who may touch the booth, when straight time ends, when the certificate of insurance was due. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each show carries its venue rule sheet, EAC deadlines and target move-in, crew calls are matched to union local and city, the lead checks crews in and out on a phone, and the exhibitor signs the labor ticket from a link.

250 sq ft

At the Javits Center, the booth size above which an exhibitor's own staff may no longer install even a tool-free pop-up or lay carpet (NAB Show New York 2025 rules)

source: NAB Show New York 2025, Work Rules and Labor Union Regulations, Javits Center (PDF)

30 days

Before move-in: when GES wants the notice of intent to hire an EAC, the EAC agreement and the certificate of insurance

source: GES, Exhibit Insurance and EACs Explained

6 a.m. to 10 p.m.

McCormick Place straight-time window, Monday to Friday, for any consecutive 8 hours (Teamsters, riggers, decorators, electricians); carpenters run 8:00 to 4:30

source: MPEA legislation hours chart, straight time window effective 11/30/11, revised 7-8-13 (PDF, via RSNA)

200 lb

Minimum billed weight per shipment for material handling, charged per CWT and rounded up to the next 100 lb

source: Shepard Exposition Services, Material Handling 101 (NFMT exhibitor manual, PDF)

How a job runs

One trade show booth installation job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Take the order and the set-up drawings

    An exhibit house or an exhibitor books labor for a show: show name, venue, booth number and size, booth type (linear, peninsula, island), the build (custom, modular system, rental), and whether they want supervision. Ask for the CAD set-up drawings, graphic layouts, inbound and outbound shipping details and confirmations for every service ordered from the general service contractor (electrical, rigging, AV). EXHIBITOR magazine's advice to exhibitors is to hand the labor contractor exactly this pack, plus labor estimates for both set-up and teardown.

  2. 2

    Look up the venue and the show rules

    The same booth has different rules in every building. Pull the union jurisdictions, the exhibitor rights, the straight-time and overtime windows, the labor minimums, the target move-in date and the display rules from the exhibitor service manual. Las Vegas, Chicago, New York and San Francisco each split the work between different unions, and within Las Vegas the rules differ between the Convention Center, Mandalay Bay and Caesars Forum.

  3. 3

    File the EAC paperwork before the deadline

    If you are not the official contractor you are an exhibitor appointed contractor (EAC). The exhibitor files a notice of intent, you sign the show's EAC agreement, and you upload a certificate of insurance naming the organizer, the general contractor and the venue as additional insured. GES wants all three 30 days before move-in. Some shows also charge a fee per booth serviced: EDspaces 2025 charged $300. Miss the date and the crew is refused at the door.

  4. 4

    Estimate the hours and build the crew call

    Estimate installer hours from the drawings by component (flooring, structure, graphics, AV mounts, product displays), then fit them inside the straight-time window. A crew call names the city, the union local, the lead, the number of installers, the start time and the booth. A larger crew is not always faster: EXHIBITOR's advice is that fewer installers over a longer window often beats a large time-crunched crew.

  5. 5

    Sequence around freight, rigging and electrical

    Installers standing in an empty booth are billed hours. Check the freight target time, when the hanging sign will be flown by the riggers, and whether electrical is under the carpet before flooring goes down. Material handling, rigging and electrical are usually exclusive to the general contractor or the building, so you plan around them and cannot do them yourself.

  6. 6

    Check the crew in at the labor desk

    On show site, each worker shows ID and collects that day's wristband at EAC check-in before going on the floor. NY NOW at the Javits Center requires proof of company affiliation and a photo ID. The lead records who showed up, their local, and the time each person started, took lunch and was released.

  7. 7

    Install to the drawings and the display rules

    Lay flooring, build structure, hang graphics, mount monitors where your crew is allowed to, and set product. Check heights against the show's display rules (for a linear booth under the IAEE guidelines, 8 ft at the back and 4 ft in the front half), keep no-freight aisles clear, and label empty crates for storage. Photograph the finished booth from each aisle.

  8. 8

    Get the labor ticket signed

    At the end of each shift the exhibitor or their supervisor signs the labor ticket: number of installers, start and stop times, straight time, overtime and double time hours, and any waiting time with its cause. This signature is what the invoice stands on when the bill is questioned three weeks later.

  9. 9

    Dismantle and ship out

    Dismantle cannot start before the show closes. Empties come back after the aisle carpet is pulled, so the first hour is often waiting. Pack to the outbound plan, label every piece, and turn in the material handling agreement and bill of lading at the service desk. If the carrier does not show, the general contractor reroutes the freight with its own carrier or sends it to the local warehouse.

  10. 10

    Invoice labor, supervision and extras

    Invoice the signed hours at the rate for each time band, plus supervision, travel, per diem and any materials, to the exhibit house or the exhibitor. Attach the signed labor tickets and photos. Pay the crews (and union benefit contributions where they apply) from the same check-in records.

What to record

The fields every trade show booth installation job should capture

Show and venue

  • Show name, organizer, general service contractor, venue and hall
  • Move-in, show and move-out dates and hours; booth target move-in date and time
  • Union jurisdictions for this venue: who installs, who handles freight, who rigs, who does electrical
  • Exhibitor rights at this venue (booth size limit, tools, ladders, full-time employee rule)
  • Straight time, overtime and double time windows per union; labor minimum and billing increment
  • Advance warehouse open date and deadline; direct-to-show receiving dates

EAC compliance

  • Notice of intent filed by the exhibitor: date, portal, confirmation
  • EAC agreement signed; EAC fee paid per booth (amount, receipt)
  • COI: limits required, additional insured wording, certificate holder, coverage dates including move-in and move-out, upload date, accepted date
  • Booth plan or rigging drawing submissions and their approval dates
  • Wristband or badge pick-up location and hours; workers' IDs

Booth and build

  • Exhibitor, exhibit house, booth number, size and type (linear, perimeter, peninsula, island)
  • Set-up drawings version, graphic layouts, crate list with piece count and weights
  • Services ordered from the general contractor: electrical, rigging and hanging sign, AV, cleaning, with order numbers
  • Covered area in sq ft, any second level, and whether a stamped engineering drawing was required
  • Completion photos from each aisle; damage found on unpacking, with photos

Labor and sign-off

  • Crew call: lead, installers, union local, start time
  • Per worker: check-in time, lunch, release time, hours by time band
  • Waiting time and its cause (freight late, carpet not laid, rigging not flown, electrical missing)
  • Labor ticket signed by the exhibitor or supervisor, per shift, install and dismantle
  • Outbound: piece count, bill of lading number, carrier, material handling agreement turned in

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
McCormick Place: exhibitors may build any size boothAt McCormick Place an exhibitor and its employees (full-time for at least 6 months before the show opens) may set up and dismantle a booth of any size with their own ladders and hand tools, and plug in and operate their own electrical and AV equipment. They may not use forklifts, pallet jacks, scissor lifts, condors, scooters or motorized dollies. The right belongs to the exhibitor's employees, not to a contractor's crew. source: Freeman, FABTECH 2025 exhibitor kit: Labor Jurisdictions, McCormick Place (PDF)
McCormick Place: straight time depends on the unionThe hours chart effective 30 November 2011 gives Teamsters, riggers, decorators and electricians straight time for any consecutive 8 hours between 6:00 a.m. and 10:00 p.m., Monday to Friday, overtime to midnight and double time from midnight to 6:00 a.m. Carpenters stay on 8:00 a.m. to 4:30 p.m. straight time, overtime to 8:30 p.m. and double time after. Sundays and six named holidays are double time. source: MPEA legislation hours chart, straight time window effective 11/30/11, revised 7-8-13 (PDF, via RSNA)
Chicago: who does whatThe Freeman kit for FABTECH 2025 lists display labor (a unified force of carpenters and decorators) for uncrating and installing exhibits, laying carpet and hanging non-electric signs, riggers for uncrating and positioning machinery, Teamsters for handling all material except machinery, and electricians for overhead and under-floor distribution, services of 208 V and higher and truss suspended from the building. source: Freeman, FABTECH 2025 exhibitor kit: Labor Jurisdictions, McCormick Place (PDF)
Las Vegas: Teamsters install prefabricated displaysIn Las Vegas the installation, dismantling and first cleaning of prefabricated exhibits is Teamsters work. Full-time employees of the exhibitor with proof of employment may set up their own display, and company staff may work alongside a union installer one to one. An exhibitor that hires an EAC must have it use local union members. One person may hand carry material without any dolly or hand truck. source: Shepard Exposition Services, Labor Jurisdictions, Las Vegas NV (NFMT exhibitor manual, PDF)
Las Vegas: the 2022 Local 631 agreementTeamsters Local 631 said on 2 June 2022 that its 1,500 convention and trade show members had ratified a new four-year collective bargaining agreement. A four-year term from 2022 means rates and rules in Las Vegas should be rechecked for 2026 shows, not copied from the last one. source: PR Newswire, Teamsters Local 631 members ratify trade show agreement (2 Jun 2022)
Javits Center: the 250 sq ft lineFor NAB Show New York 2025, an exhibitor's full-time staff could install a pop-up (tool-free, ladder-free, hand carried by one employee) and lay carpet only in booths under 250 sq ft; over that it requires labor. Mounting a monitor to a wall or stand requires labor at any size. Exhibitors may not use ladders; EACs may use their own ladders but may not do electrical work. Carpenters build and dismantle, Teamsters handle freight, electricians rig hanging signs and assemble LED tiles. source: NAB Show New York 2025, Work Rules and Labor Union Regulations, Javits Center (PDF)
San Francisco: tools, 30 minutes or 10 ftOne exhibit company's published guide for the Bay Area says an exhibit that needs hand tools, takes one exhibitor more than 30 minutes, or is wider than 10 ft requires labor from IUPAT Local 510, hired through the general contractor or an EAC. Teamsters Local 85 has freight, IATSE Local 16 has audio-visual and IBEW Local 6 has electrical. A crew called back with less than 8 hours between shifts is paid at overtime. Confirm against the show's own manual. source: TrueBlue Exhibits, San Francisco show rules (IUPAT Local 510, Teamsters Local 85)
Philadelphia: any booth size, overtime after 8 hoursThe Pennsylvania Convention Center's Customer Satisfaction Agreement, extended in August 2019 and in place until May 2029, lets exhibitors erect and tear down their own booths at any size (the 2014 version allowed power tools and ladders up to 6 ft only in booths of 600 sq ft or less). Overtime for trade labor is charged only after 8 hours of work on weekdays, regardless of start time. source: Exhibit City News, Pennsylvania Convention Center expands exhibitor labor rights (Aug 2019)
Boston and Orlando: full-time employees may set upFreeman's Boston jurisdiction sheet lets bona fide full-time employees of the exhibitor set up and dismantle their own booth, and unload their own vehicle with hand-operated equipment unless the truck is over 24 ft. At the Orange County Convention Center, one show's sheet says full-time employees may set their own exhibits without the local IATSE union and may use small power tools. source: Freeman, Union Jurisdictions, Boston MA (IMS 2019 exhibitor kit, PDF)
EAC insurance: what a 2027 show asks forAAOS 2027 at the Venetian requires EACs to upload a COI by 11 February 2027 for a move-in starting 25 February: general liability of $1,000,000 per occurrence and $2,000,000 aggregate, auto liability of $1,000,000 if operating on the show floor, employer's liability of $1,000,000, the organizer, Freeman and the venue entities named as additional insured, and coverage dates spanning move-in to move-out. No COI, no floor access. source: AAOS 2027, Exhibitor Appointed Contractor (EAC) Rules and Regulations (PDF)
EAC fees and wristbandsEDspaces 2025 charged a $300 EAC administrative fee per booth or meeting room serviced, and required EAC staff to show valid identification (an ESCA badge, company badge, business card or branded apparel) to receive a daily wristband at check-in. source: EDspaces 2025, Exhibitor Appointed Contractor (EAC) Process (PDF)
EACs may not solicit or run a service deskNY NOW's EAC rules at the Javits Center bar the EAC from soliciting business at the event, require every worker to collect the daily wristband with photo ID, and require the COI 30 days before installation starts, submitted only through the online form. AAOS adds that EACs must keep operations inside their client's booth, with no service desks, storage or work areas elsewhere. source: NY NOW, EAC Information, Summer 2024, Javits Center (PDF)
IAEE display rules: linear boothsUnder the IAEE 2023 North American guidelines a linear booth may reach 8 ft only in the rear half of the space, with a 4 ft limit on everything in the front half toward the aisle. A perimeter booth backing onto a wall typically allows a 12 ft back wall. Each show adopts or changes these, so the show's own rules control. source: IAEE Guidelines for Display Rules and Regulations, 2023 North American Update: Linear Booth (PDF)
IAEE display rules: islands and hanging signsAn island booth is typically 20 ft by 20 ft or larger and may use the full cubic content up to the show's maximum height, usually 16 ft to 20 ft including signage. Hanging signs should be approved by the organizer at least 60 days before installation, set back 10 ft from adjacent booths, and hung from engineered points; rigging prints are typically due about three weeks before move-in, and any hang point over 200 lb needs the official contractor's authorization. source: IAEE Guidelines for Display Rules and Regulations, 2023 North American Update, full text (PDF)
Las Vegas Convention Center: covered and multilevel exhibitsThe LVCC Facility Guide (February 2026) puts the duty on the EAC: booth plans go to the Safety and Fire Prevention Office in CAD no later than 30 days before the first day of move-in for any single-level exhibit over 1,000 sq ft or with more than 300 sq ft of contiguous covered area, and for every multilevel exhibit. An occupied upper deck needs a plan stamped by a Nevada-registered engineer; more than 300 sq ft or more than nine people upstairs needs two remote exits; spiral stairs are not allowed. source: Las Vegas Convention Center Facility Guide, Feb 2026, pages 30 to 31: multilevel and covered exhibits (PDF)
Flame retardancy and aislesA Las Vegas show's fire regulations require all construction and decoration materials to be flame retardant, with fabrics certified or a sample available for testing, and name NFPA 701 as the accepted standard. No-freight aisles must stay clear of crates during move-in and move-out, and fire hose racks and extinguishers need 3 ft of clearance, including inside exhibits. source: NFMT Las Vegas exhibitor manual, Fire Regulations (PDF)
Lifts: exhibitors and EACs usually cannot run themVenues bar exhibitors, and often EACs, from operating forklifts, pallet jacks and scissor lifts, so work at height is ordered from the official contractor. Where your own crew does work from a boom-type aerial lift, OSHA 1926.453(b)(2)(v) requires a body belt worn and a lanyard attached to the boom or basket. source: OSHA 29 CFR 1926.453, Aerial lifts

Rules vary by state, council and contract. Checked 18 November 2026; confirm against the source for your area before relying on it.

Numbers

Published show labor and freight rates, and a straight-time worked example

The first rows are rates and limits from named 2026 show documents and industry articles. They are single shows, not market averages, and each show's kit sets its own. The last rows are a worked example of fitting an install into the straight-time window; use your own hours from past builds.

ItemFigureBasis
Show labor, straight time$180.50 per hour, 8:00 a.m. to 4:30 p.m. Monday to FridayATD26 estimated booth costs (Freeman, advance rate)
Show labor, overtime$271.75 per hour, 4:30 p.m. to midnight and 7:00 to 8:00 a.m. Monday to FridayATD26 estimated booth costs
Labor minimum and increments1 hour minimum, then billed in half-hour incrementsATD26 estimated booth costs
Sign hanging, scissor lift and crew$869 per hour straight time, $1,160.50 overtime (island booths only)ATD26 estimated booth costs
Typical minimums by labor typeI&D often 4 hours, rigging 2 hours, electrical 1 hour, plumbers by the half hourEXHIBITOR magazine
Penalty for breaking labor rulesOften 1 to 4 hours of labor charged for the workers who should have done itEXHIBITOR magazine
Material handling billingPer CWT (100 lb), rounded up to the next 100 lb, 200 lb minimumShepard Material Handling 101
Material handling exampleAt $116.70 per CWT, a 1,100 lb crate costs $1,283.70Exhibit City News, 2018
Advance warehouse limitsNo single piece over 4,500 lb or beyond 108 in H x 93 in W x 144 in L; no uncrated freightFreeman Quick Facts, Geo Week 2026
Worked example: hours20 x 20 island, your history says 36 installer hours to installWorked example
Worked example: crew of 4, freight targeted 8:00 a.m.Start 9:00 a.m. after freight lands; 4 x 7 hrs to 4:30 p.m. less lunch = 28 hrs straight time, 8 hrs left for day twoWorked example
Worked example: cost of pushing to finish in one day8 hrs at $271.75 instead of $180.50 = $730 more at the ATD26 rates, before any markupWorked example

source: ATD26, Estimated Booth Costs, 2026 advance discount rates (Freeman, PDF)source: EXHIBITOR magazine, labor rules and common violations on the show floorsource: Shepard Exposition Services, Material Handling 101 (NFMT exhibitor manual, PDF)source: Exhibit City News, Traditional material handling rates out of control? (Aug 2018)source: Freeman Quick Facts, Geo Week 2026, Colorado Convention Center (PDF)

Where it breaks

Where spreadsheets and generic software fall over

The city rule sheet lives in a veteran lead's head. A new coordinator books four installers for a Javits booth of 300 sq ft assuming the exhibitor's staff will lay the carpet, and the crew call is short by half a day.

Hold the venue's jurisdictions, exhibitor rights and booth-size thresholds on a Venue record, and have every job inherit them, so the estimate screen shows what the exhibitor may and may not do in that building.

The EAC notice, agreement and COI are tracked in an inbox. One show wants them 30 days before move-in, another sets a fixed calendar date, a third charges $300 per booth, and the one that gets missed is found out at the door.

An EAC compliance checklist per show with its own due dates, and a rule that a crew call cannot be confirmed until the COI is marked accepted.

Generic field service tools price a job at one hourly rate. Show labor has straight time, overtime and double time bands that change by union and by day, plus minimums, so the quote and the invoice never match.

Store the time bands per venue and union, and let check-in and check-out times fall into the right band automatically on the labor ticket.

Four installers wait two hours because freight missed its target or the general contractor had not laid the carpet. The hours are billed, the exhibitor disputes them, and there is no record of why.

A waiting-time entry on the labor ticket with a cause and a photo of the empty booth, signed the same day.

Labor tickets are paper. One goes missing between the show floor and the office, and the invoice for a three-day install goes out with no signature behind it.

A labor ticket on the lead's phone that the exhibitor signs per shift from a link, stored on the job with the check-in times.

The same exhibitor shows in six cities a year. Each time, someone rebuilds the booth knowledge from old emails: which crate holds the hardware, how long the header took, what got damaged last time.

A booth record that travels with the exhibitor: set-up drawings, crate list, hours per component from every past show, and photos of the last build.

Checklist

The trade show booth installation operations checklist

Print it, or hand it to whoever runs the office side.

  • Show, venue, booth number, size and type confirmed against the exhibitor's space contract
  • Exhibitor service manual read: jurisdictions, exhibitor rights, time bands, labor minimums
  • Notice of intent to use an EAC filed by the exhibitor, by the show's deadline
  • EAC agreement signed and any per-booth fee paid
  • COI uploaded with the show's exact additional insureds and coverage dates, and accepted
  • Booth plan submitted where required (covered area, multilevel, hanging sign) and approval on file
  • Set-up drawings, graphic layouts and crate list received and reviewed with the lead
  • Freight target time, rigging time and electrical order confirmed before the crew start time is set
  • Crew call built inside the straight-time window, with the right local for the venue
  • Each worker checked in with ID and the day's wristband
  • Heights and setbacks checked against the show's display rules; no-freight aisles clear
  • Completion photos from each aisle; damage on unpacking photographed
  • Labor ticket signed per shift, with waiting time and its cause
  • Outbound labels, bill of lading and material handling agreement turned in before the crew is released

Software options

What software trade show booth installation companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

ConventionSuite

Exhibit houses and general service contractors that want an ERP built for the trade show sector

An ERP built on Oracle NetSuite for exhibit houses, general service contractors and venues. Its site lists lead and project tracking, rental availability, procurement, an exhibitor services portal and accounting in one system. A fit when you want finance and rental inventory in the same place; check how it handles per-venue union rules, crew check-in on the floor and signed labor tickets.

source: ConventionSuite

LASSO

Live event and AV companies that book and pay large freelance crews

A crew management platform for the live events industry: crew scheduling against availability, mobile time capture and payroll. Strong on the crew side. It is built for event production generally, so EAC paperwork, venue jurisdiction sheets and exhibitor-signed labor tickets are things to ask about.

source: LASSO

ExhibitForce

Corporate exhibit managers running a multi-show program, and the exhibit houses that serve them

A trade show management platform with an event suite (staffing, lead capture, ROI) and an enterprise product with asset tracking. It is where the exhibitor's side of the program often lives. It is not a labor contractor's dispatch tool.

source: ExhibitForce

ExhibitDay

Small exhibitor teams planning their own shows

A free planning and task tool for exhibitors: shows, travel, shipments, budgets and team tasks. Useful to know because your customer may send you its show list from here. It does not schedule union crews or track hours.

source: ExhibitDay

The show's ordering site (Freeman Online, GES Expresso)

Every exhibitor and EAC, for the services that are exclusive to the general contractor

Not a system you choose: it is where show labor, material handling, rigging, electrical and cleaning are ordered and where the EAC forms are filed for that show. Your own system has to hold the order numbers and deadlines from it.

Spreadsheets and the lead's phone

Most small and mid-size I&D contractors today

A show calendar, a city rules folder, paper labor tickets and a group chat. It works while one person remembers every venue. It breaks when two shows overlap in different cities or that person is on a show floor with no signal.

Published prices, compared:source: Sho-Link Inc., national I&D labor cooperativesource: Exhibitor Appointed Contractor Association (EACA)

Questions to ask any vendor

  • Can each venue hold its own union jurisdictions, exhibitor rights and booth-size thresholds, and can a job inherit them?
  • Can time bands (straight time, overtime, double time) differ by venue, union and day, and do clocked hours fall into them automatically?
  • Is there an EAC checklist per show with its own deadlines, and can a crew call be blocked until the COI is accepted?
  • Can the lead check each worker in and out on a phone, offline, and record waiting time with a cause?
  • Can the exhibitor sign the labor ticket per shift from a link, without a login?
  • Does a booth's history (drawings, crate list, hours per component) carry from one show to the next?

Bring one real trade show booth installation job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Trade show booth installation on Fieldproxy: built around how you already work

Fieldproxy is set up as an I&D contractor's show calendar: every show carries its venue, its rule sheet and its deadlines, every booth job inherits them, and every crew call is checked against the straight-time window and the EAC paperwork before it is confirmed. The lead runs check-in, the build checklist and the labor ticket from a phone on the show floor, and the exhibitor signs from a link. Fieldproxy builds the screens, statuses and templates around your process, and most contractors are live in weeks.

Module 1

Venue and city rule sheets

The rules belong to the building and the city, and they are what decide the crew, the hours and the price.

  • Records: Venue (city, halls, general service contractor seen there) and Jurisdiction rows (task, union and local, who may do it: exhibitor staff, EAC, official contractor only)
  • Fields: exhibitor rights (booth size limit, tools, ladders, full-time employee rule), time bands per union, labor minimum and billing increment, holiday list
  • Fields: plan submission triggers (covered area in sq ft, multilevel, hanging sign weight) and who receives them
  • Rule: each sheet has a Last checked date and source document; a sheet older than e.g. 12 months is flagged when a new show is booked there

Module 2

Show calendar and deadlines

One show is twenty booths with the same dates and the same paperwork, and the deadlines start months before move-in.

  • Records: Show (organizer, general contractor, venue, move-in, show and move-out hours) with Booth jobs underneath
  • Deadline fields: EAC notice due, COI due, advance order discount date, advance warehouse open and deadline, booth plan due, rigging drawing due
  • Statuses: Booked โ†’ EAC filed โ†’ Crew planned โ†’ Move-in โ†’ Show days โ†’ Dismantle โ†’ Signed off โ†’ Invoiced
  • The exhibitor service manual PDF is attached to the show and read into these fields
How this works

Module 3

EAC compliance per show

A crew that is refused at the door still has to be paid, and the exhibitor still opens tomorrow.

  • Checklist per show and exhibitor: notice of intent filed, EAC agreement signed, fee paid, COI uploaded, COI accepted
  • COI record: required limits, additional insureds as worded by the show, certificate holder, coverage dates, upload and acceptance dates
  • Rule: a crew call cannot move from Planned to Confirmed until the COI is accepted and the notice of intent is on file
  • Worker list for wristbands: name, ID type, union local, badge numbers where the venue uses them
How this works

Module 4

Booth records and labor estimating

The same booth is built again in the next city, and the last build is the best estimate.

  • Booth record per exhibitor: size, type, build (custom, modular, rental), set-up drawings by version, crate list with piece count and weights
  • Estimate lines by component (flooring, structure, graphics, AV mounts, product set) with installer hours, priced across the venue's time bands
  • Adders: supervision, travel, per diem, materials, the show's EAC fee
  • Quote from your own template as a PDF and a link the exhibit house accepts; actual hours per component feed the next estimate
How this works

Module 5

Crew calls by city and local

An installer cleared for Las Vegas is not cleared for Chicago, and the best people are booked first.

  • Worker record: home city, union and local, skills (custom carpentry, modular systems, graphics, flooring, lead), travel status
  • Crew call: booth job, date, start time, lead, headcount, local required by the venue
  • Conflicts flagged: a worker on two calls, a call outside the venue's move-in hours, a start time before the freight target
  • Partner labor companies in cities you do not staff are offered the call and accept it in their own portal
How this works

Module 6

Freight, rigging and electrical dependencies

Most wasted hours on a show floor come from the crew arriving before the things it depends on.

  • Dependency rows per booth: freight target date and time, advance warehouse or direct to show, hanging sign rigging slot, electrical order, carpet by the general contractor
  • Each row holds the order number from the show's ordering site and a status (ordered, confirmed, done)
  • Rule: a crew call starts e.g. 1 hour after the freight target unless the coordinator overrides it with a reason
  • Outbound plan: carrier, pickup window, piece count, where the bill of lading is turned in
How this works

Module 7

Lead's show floor app

The lead is in a hall with poor signal, running a crew against a clock, and is the only source of proof.

  • Works offline: worker check-in with ID and wristband confirmed, lunch, release, per booth
  • Build checklist from the booth record: flooring, structure, graphics, AV, product, heights against the show's display rules, aisles clear, empties labeled
  • Photos: crates on arrival, damage on unpacking, finished booth from each aisle, booth empty at release
  • Waiting-time entry: start, end, cause (freight, carpet, rigging, electrical, client decision), photo
How this works

Module 8

Labor tickets and exhibitor sign-off

The signed ticket is the invoice's only defense, and paper tickets get lost between the hall and the office.

  • Labor ticket per booth per shift, built from check-in times: workers, hours by time band, waiting time
  • Hours fall into straight time, overtime or double time from the venue's bands, with the minimum applied
  • Sign-off link: the exhibitor or supervisor reviews and signs on a phone, no login; a refusal records the reason
  • Signed ticket generated as a PDF from your template and attached to the invoice
How this works

Module 9

Exhibit house portal

Exhibit houses send you a season of shows and want status without calling the lead on the floor.

  • Their shows and booths, EAC checklist status, crew calls, live check-in, photos and signed tickets
  • They upload drawings and shipping details against the booth, and approve estimates and change requests
  • Change request record: what changed on site, extra hours, approved by, time
How this works

Module 10

Invoicing, crew pay and reporting

Margin is the gap between billed and paid hours, and it leaks through unsigned tickets and overtime nobody planned.

  • Invoice per booth or per show from signed tickets, with supervision, travel and materials; sync to QuickBooks or Xero
  • Crew pay export from the same check-in records, by worker, local and time band
  • Reports: estimated vs actual hours by booth and component, overtime share by show, waiting hours by cause, unsigned tickets, EAC items overdue
  • Open API and MCP server so Claude or ChatGPT can answer questions such as which shows next month still have no accepted COI
How this works

The AI agents, set up for trade show booth installation companies

AgentWhenWhat it doesWhat you get
Document intelligence agentA show's exhibitor service manual, EAC rules PDF or an exhibit house's labor order is uploaded or emailed inReads the move-in and move-out hours, the EAC notice and COI deadlines, required insurance limits and additional insureds, labor time bands and the advance warehouse dates, and compares them with the venue's stored rule sheet.A draft Show record with its deadlines filled in, booth jobs created from the order, and a list of differences from the venue sheet for a coordinator to confirm.
Watcher agentA show is e.g. 35 days from move-in with no accepted COI or notice of intent, or a crew call starts before the booth's freight targetChecks the EAC checklist dates, the dependency rows and the crew call times against the show's deadlines and the venue's time bands.An alert to the coordinator naming the show, the booth, the missing item and its due date, with the crew call held at Planned.
Dispatch agentA booth job is accepted and its crew calls need peopleMatches workers by city, union local required at that venue, skills for the build type, availability across overlapping shows and travel cost.A suggested lead and crew for each call, inside the straight-time window where the hours allow, for the coordinator to confirm.
Vision agentThe lead photographs crate labels, a damaged panel on unpacking, or the finished boothReads the crate numbers against the crate list, describes the damage and which component it is, and checks the photo set is complete for each aisle.Crates marked received or missing on the booth record, and a damage note with photos sent to the exhibit house before the crew builds over it.
AutopilotA labor ticket is unsigned e.g. 2 hours after the crew was released, or an invoice passes its due dateDrafts the message to the exhibitor's on-site contact with the sign-off link and the shift's hours, or the payment reminder with the signed tickets attached.A drafted text or email a person approves before it sends.
Scheduler agentEvery Monday at 7 a.m., and every evening during a move-inPulls shows in the next six weeks with their open EAC items, crew calls not yet filled, and during a show the day's hours by time band and waiting time by cause.A weekly show readiness briefing to the operations manager, and a nightly floor report per show to each account lead.

Straight answers

Trade show booth installation: FAQ

What software do trade show booth installation companies use?

Larger exhibit houses and general service contractors often run an industry ERP such as ConventionSuite, which is built on NetSuite. Labor contractors with big freelance pools use crew tools such as LASSO for scheduling and pay. Everyone uses the show's own ordering site (Freeman Online or GES Expresso) for exclusive services and EAC forms, and many I&D contractors still keep venue rules, crew calls and labor tickets in spreadsheets and on paper. Some run it in one configurable platform such as Fieldproxy. The test is whether the venue's rules, the EAC deadlines, the crew's clocked hours and the exhibitor's signed ticket sit on one show record.

What does I&D mean at a trade show?

Installation and dismantle: the labor that builds the exhibit before the show and takes it down after. It can be ordered from the show's general service contractor or from an exhibitor appointed contractor chosen by the exhibitor or its exhibit house.

What is an exhibitor appointed contractor (EAC)?

Any company other than the official contractor that an exhibitor hires to work in its booth, most often for installation and dismantle. The exhibitor has to notify the show, and the EAC has to sign the show's agreement and provide a certificate of insurance. GES asks for all of it 30 days before move-in, and some shows charge a fee per booth serviced.

Can an exhibitor set up its own booth?

It depends on the building. At McCormick Place, full-time employees of the exhibitor may build a booth of any size with their own ladders and hand tools. The Pennsylvania Convention Center allows any booth size. At the Javits Center, for one 2025 show, exhibitor staff could install a tool-free pop-up only in booths under 250 sq ft and could not use ladders. In Las Vegas, full-time employees with proof of employment may set up their own display. Read the labor rules in each show's manual.

Which union installs booths in Las Vegas, Chicago and New York?

In Las Vegas the installation and dismantling of prefabricated displays is Teamsters work. At McCormick Place in Chicago it is display labor, a unified force of carpenters and decorators, with riggers handling machinery and Teamsters handling freight. At the Javits Center in New York, carpenters build and dismantle booths, Teamsters handle material, and electricians do electrical work and rig hanging signs.

When does straight time end on a show floor?

It varies by city and union. One 2026 show's kit lists straight time as 8:00 a.m. to 4:30 p.m. Monday to Friday. At McCormick Place most unions have straight time for any consecutive 8 hours between 6:00 a.m. and 10:00 p.m. on weekdays, while carpenters stay on 8:00 to 4:30. In Philadelphia, overtime starts only after 8 hours worked on a weekday, whatever the start time.

How much does show labor cost per hour?

Each show sets its own rates. As one published example, ATD26 listed Freeman show labor at $180.50 per hour on straight time and $271.75 on overtime, with a one-hour minimum and half-hour increments after that. An EAC's rates are agreed with the exhibitor or exhibit house and are not in the show kit.

What is drayage, and can an I&D contractor do it?

Drayage, or material handling, is unloading freight at the dock, delivering it to the booth, storing empty crates and reloading at the end. It is almost always exclusive to the general service contractor. It is billed per 100 lb (CWT), rounded up, with a 200 lb minimum per shipment. An I&D crew plans around the freight target time; it does not move the freight.

What insurance does an EAC need?

The show decides. AAOS 2027 asks for general liability of $1,000,000 per occurrence and $2,000,000 aggregate, auto liability of $1,000,000 if operating on the show floor, and employer's liability of $1,000,000, with the organizer, the general contractor and the venue named as additional insured and coverage dates that span move-in to move-out.

When does a booth need plans approved by the fire marshal?

At the Las Vegas Convention Center, any single-level exhibit over 1,000 sq ft or with more than 300 sq ft of contiguous covered area, and every multilevel exhibit, must submit a booth plan at least 30 days before the first day of move-in, and the guide puts that duty on the EAC. An occupied upper deck needs a Nevada-registered engineer's stamp. Other venues set their own thresholds.

How tall can a trade show booth be?

Under the IAEE 2023 guidelines, a linear booth is limited to 8 ft in the rear half and 4 ft in the front half; a perimeter booth typically 12 ft; island and peninsula booths usually 16 ft to 20 ft including signage. Each show adopts its own version, so check the show's display rules.

How long does it take to set up Fieldproxy for an I&D contractor?

Fieldproxy does the setup: venue rule sheets, the show calendar and deadlines, the EAC checklist, crew calls, the lead's check-in and labor ticket screens, and your quote and invoice templates. Most contractors are live in weeks, with unlimited users, so every lead, installer and partner labor company is included.

Related guides

All sources on this page (28)

Run trade show booth installation work the way it actually runs.