Cell site generator fueling software that knows every tank before the storm does
A fueling contractor for wireless carriers and tower owners works from a list of tanks, not customers: hundreds of sites, each with a generator, a tank size, a fuel type, a gate code, a tower owner NOC to call and a carrier PO to bill. Most weeks it is routine top-offs and fuel tests. Then a hurricane, an ice storm or a planned power shutoff turns the same list into a 72-hour race, where the only thing that matters is which sites run dry first and which truck can reach them. This guide covers how that work runs, the rules around it (CPUC 72-hour backup, SPCC, DOT bulk limits, RICE hour limits, the FCC disaster rules) and how to set it up.
See your own jobs set up this way
A 30-minute call. We show you cell site generator fueling companies workflows running in Fieldproxy, built around how you work.
Short answer
Cell site fuelers need software that holds every site's tank (size, fuel type, usable gallons, last reading, burn rate under load), the access rules for that site (tower owner NOC call-in, gate and lock codes, rooftop procedures), and a fuel ticket per tank per visit with before and after levels, gallons delivered and photos of both gauges. Tower and carrier operations platforms such as Sitetracker manage the sites and work orders on the owner side, fuel delivery tools such as FleetPanda handle bulk fuel orders and drivers, and telemetry from Westell or DPS Telecom shows tank levels; most fuelers still stitch these together with spreadsheets during a storm. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each site carries its tank, access and billing rules, storm days re-rank the fuel list by hours of runtime left, and every delivery produces the ticket and photo proof the carrier pays against.
72 hours
Backup power California requires at wireless facilities in Tier 2 and Tier 3 High Fire Threat Districts (CPUC D.20-07-011)
source: CPUC, Communications Resiliency Plans (D.20-07-011 wireless, D.21-02-029 wireline)
1,320 gal
Aggregate aboveground oil storage above which an SPCC plan is required; only containers of 55 gallons or more count
1,000 gal
Aggregate tank capacity (with any tank over 119 gal) that makes a truck a 'tank vehicle' for CDL purposes
source: eCFR, 49 CFR 383.5 definitions (tank vehicle: over 119 gal per tank and 1,000 gal aggregate)
100 h/yr
Cap on maintenance and readiness running for emergency engines under the RICE NESHAP; 50 non-emergency hours count inside it
How a job runs
One cell site generator fueling job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Build the site and tank list from the contract
The carrier or tower owner hands over a site list: site ID, address and coordinates, structure type (monopole, self-support, guyed, rooftop, small cell cabinet), generator make and kW, fuel type (diesel or propane), tank capacity and the region it rolls up to. Walk or confirm each one: usable gallons are less than the nameplate, fill points move, and half the gate notes on the list are out of date.
- 2
Set a top-off rule per tank
Agree a refill trigger (for example 'fill when below 60%'), a fill target (for example 'to 90%, never to the brim'), and a routine visit cycle where there is no telemetry. A site in a California Tier 2 or Tier 3 fire district needs enough fuel on hand to cover 72 hours, so its trigger is set from runtime, not percentage.
- 3
Request access before the truck rolls
Each tower owner has its own process. Crown Castle's contractor terms, for example, ask for the Network Operations Center to be called on entering and leaving the site, and 48 hours' notice before construction work. Carriers add their own site access tickets. Record the ticket or call reference against the visit, with the gate, lock and key details for that site.
- 4
Read the tank before fueling
Photograph the tank gauge and, where fitted, the generator controller's fuel reading and engine hour meter. Check the containment basin for water or product, look at the fill cap, vent and spill bucket, and note any alarm on the controller. Pull a bottom sample on the sites that are due a fuel test.
- 5
Deliver and record the fuel ticket
Fuel from the truck's metered hose or a transfer tank, to the agreed fill target. The ticket records site, tank, product (ULSD, dyed off-road where permitted, or propane), meter start and stop, gallons delivered, the before and after gauge photos, the driver, the truck and the time on site.
- 6
Close out the site
Lock the fill cap, put back the gate exactly as found, clear the alarm with the NOC if one was raised, and call out of the site where the owner requires it. Spills of any size get photographed and reported the same day; the spill kit used is logged so it can be restocked.
- 7
Reconcile gallons against the readings
Every week, compare gallons delivered with the change in tank level and the engine hours run since the last visit. A tank that needed 180 gallons after a generator that logged six hours is either leaking, being siphoned or reading wrong. Remote telemetry vendors sell fuel theft alerts for exactly this reason.
- 8
Storm mode: pre-fill, then fuel by runtime left
Before a named storm or a planned power shutoff, carriers ask for every site in the cone to be topped off. Once commercial power drops, the list re-ranks by hours left: tank gallons divided by burn rate at the site's load, minus travel time. Trucks run 24 hours, some sites need a fuel trailer or cube left on site, and roads, debris and curfews change the plan every few hours.
- 9
Report to the carrier and bill
Carriers want gallons delivered per site and per day, sites at risk, sites inaccessible and why. Invoices go against the carrier or tower owner PO, often one line per site visit, with fuel billed at an index plus a delivery fee and storm-mode surcharges as the contract allows. The ticket and photos travel with the invoice.
What to record
The fields every cell site generator fueling job should capture
Site, tank and access profile
- Site ID used by the carrier and the tower owner (often different), address, coordinates, structure type, region
- Generator make, model, kW, serial, controller type, and whether it runs a whole shelter or a single cabinet
- Fuel type (diesel or propane), tank capacity, usable gallons, fill point location, gauge type, telemetry yes/no and sensor ID
- Refill trigger and fill target, burn rate at typical load (gal/h), hours of runtime at the trigger level
- California HFTD tier where relevant, and whether the site is on the carrier's 72-hour list
- Tower owner and NOC phone, access ticket rules, gate and lock codes, key box, rooftop procedure, landlord contact
- Road notes: last-mile surface, weight limits, gate width, turn-around for a tank wagon, seasonal closures
Each fueling visit
- Access ticket or NOC call reference, time on and off site
- Before photo of the tank gauge and controller fuel level; engine hour meter reading
- Product, meter start and stop, gallons delivered, truck or trailer ID, driver
- After photo of the gauge at the fill target; cap locked; spill bucket and basin condition
- Fuel sample taken yes/no, sample ID, lab, result (water, sediment, microbial) when returned
- Alarms present on arrival, any fault found, and whether it was passed to the generator service contractor
- Spill yes/no, estimated volume, photos, spill kit used, report reference
What goes back to the carrier
- Per-site fuel ticket with photos, attached to the PO line
- Daily storm report: sites fueled, gallons, sites under 24 hours of runtime, sites inaccessible and why
- Monthly report: gallons per site, abnormal burn, fuel tests due and failed, deficiencies open
- For 72-hour sites: last confirmed runtime on hand, so the carrier can answer its regulator
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| California 72-hour backup power for wireless facilities | CPUC Decision D.20-07-011 requires facilities-based wireless providers to plan for 72 hours of backup power for facilities in Tier 2 and Tier 3 High Fire Threat Districts, as part of their Communications Resiliency Plans; D.21-02-029 does the same for wireline providers. The fuel to cover those 72 hours has to be in the tank, or someone has to be able to get it there. source: CPUC, Communications Resiliency Plans (D.20-07-011 wireless, D.21-02-029 wireline) |
| Why the CPUC rules exist | The CPUC fact sheet says the resiliency and emergency operations plan requirements came after widespread and prolonged outages during utility Public Safety Power Shutoff events and wildfires. A planned shutoff gives a fueler a date to pre-fill against; a wildfire usually does not. source: CPUC fact sheet, Resiliency and Service Quality Obligations of Communications Providers (rev. 12/2024) |
| SPCC applies at your yard, not usually at the site | 40 CFR 112 applies to a facility with more than 1,320 gallons of aggregate aboveground oil storage, counting only containers of 55 gallons or more. A single cell site tank is usually below that. A fueler's own yard with bulk tanks, fuel cubes and trailers often is not, and needs a written SPCC plan; a Tier I qualified facility (10,000 gallons or less, no container over 5,000) can self-certify instead of using a Professional Engineer. source: eCFR, 40 CFR part 112 subpart A (SPCC applicability, definitions, qualified facilities, secondary containment) |
| Mobile refuelers under SPCC | A mobile refueler is a bulk storage container onboard a vehicle or towed, used solely to store and transport fuel for transfer into other equipment or containers. The sized secondary containment rule for bulk storage installations (largest container plus precipitation) expressly excludes mobile refuelers and other non-transportation-related tank trucks, so where they park still needs general containment, but not a sized dike. source: eCFR, 40 CFR part 112 subpart A (SPCC applicability, definitions, qualified facilities, secondary containment) |
| Bulk versus non-bulk diesel on the truck | A liquid receptacle over 450 L (119 gallons) is bulk packaging. Diesel classed as a combustible liquid in non-bulk packaging is outside the Hazardous Materials Regulations unless it is a hazardous substance, waste or marine pollutant; in bulk it still needs shipping papers, package marking, ID numbers, placards and the training and incident reporting rules listed in 173.150(f)(3). source: eCFR, 49 CFR 173.150(f) combustible liquids |
| When the truck becomes a tank vehicle | For CDL purposes a tank vehicle carries liquid in tanks with an individual rated capacity over 119 gallons and an aggregate rated capacity of 1,000 gallons or more. That is the line between a pickup with a transfer tank and a truck that needs a driver with a tank endorsement, so the truck record should carry its tank capacities. source: eCFR, 49 CFR 383.5 definitions (tank vehicle: over 119 gal per tank and 1,000 gal aggregate) |
| Fuel for the truck itself is different | 49 CFR 392.51 lets small amounts of fuel for running the commercial vehicle and its auxiliary equipment travel as materials of trade: diesel packages up to 119 gallons, aggregate materials of trade up to 440 pounds. This is for the truck's own reserve fuel, not for product being delivered to generators. source: eCFR, 49 CFR 392.51 reserve fuel; materials of trade (diesel package 119 gal, 440 lb aggregate) |
| Emergency engine running hours | Under the RICE NESHAP, emergency stationary engines may run up to 100 hours per calendar year for maintenance checks and readiness testing, and up to 50 hours of non-emergency operation that count inside the 100. Existing emergency engines at area sources need a non-resettable hour meter, which is the reading your drivers should photograph at every visit. source: eCFR, 40 CFR part 63 subpart ZZZZ (RICE NESHAP: 63.6640(f) hour limits, Table 2c, hour meters) |
| Emergency CI engine maintenance intervals | Table 2c of subpart ZZZZ sets, for emergency and black start compression ignition engines: change oil and filter every 500 hours or within 1 year plus 30 days of the last change, inspect the air cleaner every 1,000 hours or 1 year plus 30 days, and inspect hoses and belts every 500 hours or 1 year plus 30 days. The fueler's hour meter photo is often the only regular evidence of hours between PM visits. source: eCFR, 40 CFR part 63 subpart ZZZZ (RICE NESHAP: 63.6640(f) hour limits, Table 2c, hour meters) |
| NFPA 110 testing benchmark | Where NFPA 110 applies, generators are exercised at least monthly for 30 minutes at not less than 30% of nameplate, or diesel units that cannot reach that load get an annual load bank test (25% for 30 minutes, 50% for 30 minutes, 75% for 60 minutes). Carrier PM specs often borrow these numbers; check the contract, not the code, for what you are paid to do. source: Kansas State Fire Marshal, Fire Fact 082 Generator Testing & Maintenance (NFPA 110 summary) |
| Annual fuel quality test | NFPA 110 section 8.3.7 calls for a fuel quality test at least annually using appropriate ASTM standards, with ASTM D975 as the diesel specification, and the annex points sampling at the bottom of the tank where water and microbial growth collect. source: Bell Performance, NFPA 110 generator fuel testing (section 8.3.7, ASTM D975, tank bottom sampling) |
| What ULSD allows and why stored fuel degrades | Generac's white paper notes that ASTM D975 diesel can contain up to 5% biodiesel and still be labelled ULSD No. 2, may carry up to 500 ppm of water and sediment, and has no minimum detergent requirement. Biodiesel blends hold more water and oxidize faster, which is why long-sitting generator tanks need testing, water removal and sometimes polishing and biocide. source: Generac Mobile Products / B3C, Today's Modern Diesel Fuel white paper |
| FCC Mandatory Disaster Response Initiative | When ESF-2 is activated, the FCC activates DIRS, or the FCC acts on a state request, facilities-based mobile wireless providers must provide reasonable roaming under disaster arrangements, keep mutual aid arrangements that share physical assets, and support municipal preparedness and restoration. Providers test roaming annually and may have to report within 60 days on how it went. It is the carrier's duty, but it is why carriers ask fuelers for daily site status during an activation. source: eCFR, 47 CFR 4.17 Mandatory Disaster Response Initiative |
| DIRS reporting during disasters | When the FCC activates the Disaster Information Reporting System, providers report daily on network status for the listed counties. Before Hurricane Helene, CRS notes carriers reported refueling generators and providing backup batteries at cell sites and switching centers as part of their preparation. source: Congressional Research Service IF12779, Restoration of Cell Phone Services: Hurricane Helene |
Rules vary by state, council and contract. Checked 23 November 2026; confirm against the source for your area before relying on it.
Numbers
Thresholds and intervals a cell site fueler plans around
Regulatory rows are from the cited sources. The runtime rows are worked examples to show the arithmetic, not figures for any real generator: use the burn rate from your own generator spec sheets at the site's measured load.
| Item | Number | Basis |
|---|---|---|
| Backup power target, CA wireless sites in Tier 2/3 HFTD | 72 hours | CPUC D.20-07-011 |
| SPCC plan required at a facility | Over 1,320 gal aboveground, 55 gal+ containers counted | 40 CFR 112.1(d)(2)(ii) |
| SPCC self-certify (Tier I qualified) | 10,000 gal or less, no container over 5,000 gal | 40 CFR 112.3(g) |
| Bulk packaging for liquids | Over 450 L (119 gal) per receptacle | 49 CFR 171.8 |
| Tank vehicle (CDL) | Any tank over 119 gal and 1,000 gal or more in total | 49 CFR 383.5 |
| Emergency engine maintenance and testing | 100 h per calendar year (50 non-emergency inside it) | 40 CFR 63.6640(f) |
| Emergency CI engine oil and filter | Every 500 h or 1 year + 30 days | 40 CFR 63 subpart ZZZZ Table 2c |
| Monthly exercise where NFPA 110 applies | 30 min at 30% of nameplate or more | NFPA 110 (Kansas SFM summary) |
| Fuel quality test where NFPA 110 applies | At least annually, ASTM methods | NFPA 110 8.3.7 |
| Worked example: 180 usable gal, burn 1.5 gal/h at site load | 120 h when full; 72 h needs 108 gal on hand | Arithmetic |
| Worked example: same tank at a 60% trigger | 108 gal = exactly 72 h, so trigger must sit higher for a 72-hour site | Arithmetic |
| Worked example: storm day, 40 sites, 6 trucks | Rank by (gallons left / burn rate) minus drive time to site | Arithmetic |
source: CPUC, Communications Resiliency Plans (D.20-07-011 wireless, D.21-02-029 wireline)source: eCFR, 40 CFR part 112 subpart A (SPCC applicability, definitions, qualified facilities, secondary containment)source: eCFR, 49 CFR 171.8 definitions (bulk packaging: liquid receptacle over 450 L / 119 gallons)source: eCFR, 49 CFR 383.5 definitions (tank vehicle: over 119 gal per tank and 1,000 gal aggregate)source: eCFR, 40 CFR part 63 subpart ZZZZ (RICE NESHAP: 63.6640(f) hour limits, Table 2c, hour meters)source: Kansas State Fire Marshal, Fire Fact 082 Generator Testing & Maintenance (NFPA 110 summary)source: Bell Performance, NFPA 110 generator fuel testing (section 8.3.7, ASTM D975, tank bottom sampling)
Where it breaks
Where spreadsheets and generic software fall over
The site list says 'Tank: 200 gal' and the fill trigger is a percentage. In a fire district the carrier needs 72 hours on hand, and at that site's load 60% of 200 gallons is not 72 hours.
Store usable gallons and a measured burn rate on each tank, compute hours of runtime from every reading, and set 72-hour sites' trigger in hours rather than percent.
Drivers phone the tower owner's NOC from the gate, the ticket number goes on a sticky note, and three weeks later the owner disputes an after-hours entry nobody can prove was authorized.
The access request and NOC reference live on the visit; the driver can't start the fuel ticket until there is one, and the call-out time is captured on close.
Fuel tickets are paper or a photo of a meter in a group chat. The carrier's AP team rejects invoices without before and after gauge photos, and billing slips a month.
One ticket per tank per visit, with required before and after photos, meter start and stop and gallons, attached automatically to the PO line on the invoice.
Nobody compares gallons delivered with hours run. A remote site that keeps taking 150 gallons a month on a generator that barely runs is being siphoned or leaking, and the carrier finds out from its own audit.
A weekly reconciliation per tank: gallons delivered against level change and hour meter delta, with an abnormal burn flag and photos for review.
On storm day the fuel list is a spreadsheet sorted by region. Trucks get sent to a site with three days of fuel while another runs dry two exits away.
Storm mode re-ranks every site in the affected counties by hours of runtime left minus drive time, and the board shows which truck can reach each one first.
The yard's bulk tanks, cubes and trailers crept over 1,320 gallons of storage and nobody wrote an SPCC plan, and the monthly inspection the plan would require was never done.
The yard is a site too: every container over 55 gallons is on it, the aggregate is computed, and the SPCC inspection is a recurring checklist with photos.
Checklist
The cell site generator fueling operations checklist
Print it, or hand it to whoever runs the office side.
- Every site carries the carrier ID, the tower owner ID and the NOC number
- Usable gallons, fuel type, gauge type and telemetry sensor ID on each tank
- Burn rate at the site's real load, so readings convert to hours of runtime
- 72-hour sites flagged (California Tier 2 and Tier 3 HFTD) with triggers set in hours
- Access ticket or NOC call logged before fueling, and call-out logged on leaving
- Before and after gauge photos, meter start and stop and hour meter reading on every ticket
- Fuel samples pulled from the tank bottom on the annual cycle, with results on the site
- Weekly reconciliation of gallons delivered against level change and hours run
- Truck and trailer records carry tank capacities, so bulk and tank vehicle rules are clear
- Drivers' CDL endorsements and hazmat training dates on file where trucks need them
- Yard storage totalled against 1,320 gallons; SPCC plan and inspections current where it applies
- Spill kits on every truck, restocked from the spill log
- Pre-storm top-off list built per county the moment a storm or shutoff is announced
- Daily storm report to each carrier: gallons, sites at risk, sites inaccessible
Software options
What software cell site generator fueling companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Sitetracker
Tower owners, carriers and their large contractors running sites, projects and O&M
Built for digital infrastructure: towers, wireless networks and fiber, with site and asset records, maintenance work and field mobile apps. It is usually the owner's system of record; a fueler is often a vendor working inside it rather than running its own business on it.
FleetPanda
Fuel distributors and jobbers delivering bulk fuel
Covers fuel orders, dispatch, recurring orders, a mobile driver app, billing and integration with tank monitors (it says 11 brands). Strong on the fuel business; it does not hold tower owner access rules, carrier site IDs or generator data unless you add them.
Westell remote generator monitoring
Carriers and tower operators who want to see generator status and fuel remotely
Telemetry, not job software: remote start and stop, maintenance runs, remote hour meter readings for compliance, and a map of generators running, fuel remaining and fuel theft for diesel, propane and natural gas.
DPS Telecom NetGuardian fuel sensors
Network operators who already run telecom alarm monitoring
Tank sensors (float, ultrasonic, gauge replacement or tank wrap) feed an RTU that sends low-fuel alarms to email, phone or an SNMP manager alongside the site's other alarms. Useful readings for a fuel list; the dispatching and tickets still happen elsewhere.
FuelCloud
Fuelers' own yards and fleets with bulk tanks
Controls and records who takes fuel from a bulk tank and how much, with inventory tracking and reports. Fits the fueler's yard tank, not the cell sites.
Questions to ask any vendor
- Can each tank hold usable gallons and a burn rate, and show every reading as hours of runtime, not just percent full?
- Can a visit require an access ticket or NOC reference before the driver starts the fuel ticket, with different rules per tower owner?
- Will each fuel ticket force before and after gauge photos, meter readings and the hour meter, and attach to the carrier's PO line on the invoice?
- Can you show me a storm day: 300 sites in the affected counties re-ranked by hours left and drive time, with my six trucks on the board?
- Can telemetry readings from Westell, DPS or our tank monitors update the tank record, and flag gallons delivered that don't match hours run?
- Can our own yard be a site with its tanks, SPCC inspections and spill kit log, and our trucks carry their tank capacities and driver endorsements?
Bring one real cell site generator fueling job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Cell site generator fueling on Fieldproxy: built around how you already work
A Fieldproxy setup for a cell site fueling company is built around the tank, not the customer: every site holds its generator, tank, usable gallons, burn rate and runtime, the tower owner's access rules and the carrier's PO, and California fire district sites are held to 72 hours. Drivers work from an offline app that will not start a fuel ticket without the access reference and the before photos, storm days re-rank the whole list by runtime left, and the carrier gets tickets, photos and a daily status report without anyone typing them up.
Module 1
Site, generator and tank register
The fuel list is only as good as the tank data. Usable gallons and burn rate decide when a site runs dry; the nameplate does not.
- Record: Site, linked to Carrier (customer), Tower owner and Region; fields: carrier site ID, owner site ID, structure type (monopole, self-support, guyed, rooftop, small cell cabinet, switch hut), coordinates, California HFTD tier, 72-hour site yes/no
- Child record: Generator (make, model, kW, serial, controller, hour meter type, service contractor) and Tank (fuel type diesel or propane, nameplate capacity, usable gallons, gauge type, telemetry sensor ID, fill point photo)
- Burn rate field in gal/h at measured site load, with the source (spec sheet, telemetry average, timed run) and date
- Computed fields: runtime at full, runtime at current reading, hours until trigger
- Site status: Active, Seasonal closed, Access suspended, Decommissioned
Module 2
Access rules and NOC check-in
Every tower owner and landlord has its own entry rules, and an unlogged entry is a dispute waiting to happen.
- Per tower owner: NOC phone, access method (online request, app, phone), notice required, call on entry and exit yes/no (for example Crown Castle 1-800-788-7011 for contractors)
- Per site: gate code, lock type and combination, key box, landlord contact, rooftop procedure, escort required, hours allowed
- Visit field: access ticket or call reference, required before the fuel ticket can be opened (e.g. hard block)
- Call-out time captured when the driver closes the visit; missing call-outs listed for the office each morning
Module 3
Top-off rules and the routine fuel list
Most of the year the job is routine. Getting the trigger right per tank is what makes storm week survivable.
- Per tank: refill trigger (percent or hours, e.g. hours for 72-hour sites), fill target (e.g. 90%), routine visit cycle for sites with no telemetry
- Daily fuel list built from latest readings: due now, due this week, below trigger, no reading in X days (e.g. 30)
- Routes grouped by region and truck capacity, so one load covers a run of sites
- Visit status: Due, Planned, Access requested, Access confirmed, On site, Fueled, Partial (truck ran out or tank issue), Failed access, Cancelled
Module 4
Driver app: the fuel ticket
The ticket is the invoice's proof and the only regular eyes on the generator. It has to be right first time, offline, at a gate in the woods.
- Works offline and syncs when signal returns; opens on today's sites in route order with gate codes and road notes
- Arrival checklist: access reference entered, before photo of the tank gauge, controller fuel reading, hour meter photo, containment basin (dry, water, product), cap, vent and spill bucket condition, alarms on the controller
- Fuel section: product (ULSD, dyed where permitted, propane), meter start, meter stop, gallons computed, truck or trailer ID; warning if gallons exceed usable capacity minus the before reading
- After photo at fill target, cap locked, gate as found; signature not required, GPS and time stamp on every photo
- Fault found: picklist (fuel leak, alarm active, battery charger fault, block heater off, damaged tank) with photo, routed to the generator service contractor
Module 5
Storm and shutoff mode
When power drops across a county, the question changes from 'who is due' to 'who runs dry first and who can get there'.
- Event record: Storm or PSPS event, affected counties, carriers involved, start time, pre-fill deadline
- Pre-fill list: every site in the event counties below the fill target, assigned to trucks before landfall or shutoff
- Live list ranked by runtime left (gallons left divided by burn rate) minus drive time from the nearest truck; sites on commercial power or confirmed full drop off
- Site flags: road closed, debris, flooded, curfew, owner access suspended; fuel cube or trailer left on site with its gallons tracked as a second tank
- Event dashboard: sites under 24 hours, under 12 hours, dry, inaccessible; gallons delivered per carrier per day
Module 6
Reconciliation and fuel loss
Remote tanks get siphoned and leak, and the carrier pays for every gallon.
- Weekly per tank: gallons delivered vs level change vs hour meter delta times burn rate
- Abnormal burn flag when the gap exceeds a set tolerance (e.g. 20%), with the photos from both visits side by side
- Telemetry drop with the generator not running listed as possible theft or leak
- Case record: Investigating, Leak found, Theft reported, Gauge fault, Cleared; carrier and owner notified fields
Module 7
Fuel quality
A full tank of wet, microbial diesel fails the same way an empty one does.
- Annual fuel test due date per diesel tank (NFPA 110 8.3.7 where the contract adopts it), bottom sample required
- Sample record: sample ID, date, lab, results (water, sediment, microbial, appearance), pass or fail
- Failed test creates a remediation job: water removal, polishing, biocide, or tank pump-out, quoted to the carrier
- Biodiesel blend recorded per delivery so a tank's fuel history is known when it fails
Module 8
Trucks, drivers and the yard
Bulk thresholds, tank vehicle rules and SPCC all hang off what each truck and the yard hold.
- Truck and trailer record: tank capacities, meter calibration date, placards carried, spill kit contents and last restock
- Driver record: CDL class, tank and hazmat endorsements where needed, hazmat training date, medical card expiry; a truck can't be assigned to a driver missing its endorsement
- Yard as a site: every container 55 gallons or more, aggregate capacity against 1,320 and 10,000 gallons, SPCC plan date, recurring inspection checklist
- Spill log: date, site, volume, cause, photos, report reference, kit used
Module 9
Carrier billing and reports
Carriers pay against POs and proof. Late or unsupported tickets sit in AP for months.
- Contract per carrier and tower owner: fuel price basis (e.g. index plus margin), delivery fee, storm surcharge, minimum delivery, PO rules
- Invoice built from fueled tickets: one line per site visit with gallons, price and the ticket PDF with photos
- Monthly carrier report: gallons per site, abnormal burn cases, tests due and failed, faults passed to the generator contractor
- Customer portal per carrier: every site's last fueling, runtime on hand, open cases and storm status
- Sync to QuickBooks or Xero; payment status back on the visit
The AI agents, set up for cell site generator fueling companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Watcher agent | A tank reading (telemetry or ticket) drops below its trigger, a 72-hour site falls under 72 hours of runtime, or a tank has had no reading for 30 days (e.g.) | Converts the reading to hours of runtime using the tank's usable gallons and burn rate, checks for an open visit, and separates routine top-offs from sites that are urgent | A visit created on the fuel list with its priority, and an alert to the dispatcher for any 72-hour site below target |
| Dispatch agent | A storm or shutoff event is opened, or the live list re-ranks during an event | Reads every site's runtime left, road and access flags, and each truck's location, product on board and driver endorsements, and assigns the next sites so no tank runs dry while a truck is near | A route per truck for the next few hours, re-issued to the drivers' apps when the ranking changes |
| Vision agent | A driver uploads the before and after gauge photos and the hour meter photo on a fuel ticket | Reads the gauge level and hour meter from the photos, compares them with the gallons entered and the tank's capacity, and checks the photo GPS matches the site | Readings filled on the ticket, and a recheck prompt on the phone if gallons and gauge disagree before the visit can close |
| Document intelligence agent | A carrier emails a PO, a pre-storm fuel request or a site list spreadsheet | Reads site IDs, addresses, PO numbers, requested dates and gallons, and matches them to existing sites or creates new ones for review | Visits created on the right sites with the PO attached, and a list of unmatched sites for the office |
| Scheduler agent | Every morning at 6:00 during a storm event (e.g.), and the first Monday of each month otherwise | Pulls gallons delivered, sites under 24 hours, dry and inaccessible sites by carrier; monthly, adds abnormal burn cases and fuel tests due | A daily storm status report and a monthly fuel report emailed to each carrier's operations contact |
| Autopilot | An invoice passes its terms, or a fuel test remediation quote sits unapproved for 7 days | Drafts the chase with the ticket PDFs and photos attached, or the quote follow-up with the failed lab result | A draft email that a person approves before it is sent |
Straight answers
Cell site generator fueling: FAQ
What software do cell site generator fueling companies use?
Usually several. The carrier or tower owner runs a site platform such as Sitetracker; the fueler may use a fuel delivery tool such as FleetPanda for orders and drivers; telemetry from Westell or DPS Telecom shows tank levels; and storm days run on spreadsheets and phone calls. Fieldproxy is one option that holds the site, tank, access rules, fuel tickets and carrier billing in one setup built around how the fueler works.
How much backup fuel does a cell site need?
There is no single federal number. In California, CPUC D.20-07-011 requires wireless providers to plan for 72 hours of backup power at facilities in Tier 2 and Tier 3 High Fire Threat Districts. Elsewhere it is set by the carrier's own standard and contract. Work it out per site from usable gallons and the generator's burn rate at the site's real load.
Does a cell site generator tank need an SPCC plan?
Usually not on its own. SPCC applies where aggregate aboveground oil storage is over 1,320 gallons, counting only containers of 55 gallons or more, and a single site tank is often below that. The fueler's own yard, with bulk tanks, cubes and trailers, frequently is over it.
Do our drivers need a tank endorsement?
It depends on the truck. Under 49 CFR 383.5 a tank vehicle has any tank over 119 gallons and 1,000 gallons or more in total. A pickup with a transfer tank under those numbers is not a tank vehicle; a tank wagon is. Hazmat rules for bulk packaging (over 119 gallons) apply to the product separately, and some states offer waivers, so check your state.
How do we prove a delivery to the carrier?
One ticket per tank per visit with the access reference, before and after gauge photos, meter start and stop, gallons, the hour meter reading, GPS and time stamps. Attach it to the PO line on the invoice so AP never has to ask.
How do we spot fuel theft at remote sites?
Compare gallons delivered with the change in tank level and the hours the generator ran since the last visit. Telemetry vendors such as Westell market fuel theft views; even without telemetry, a weekly reconciliation from your own tickets catches the sites that take far more fuel than their hours explain.
How often should generator diesel at a cell site be tested?
Where NFPA 110 is followed, at least annually using ASTM methods (section 8.3.7), sampling from the tank bottom. Fuel that sits for a long time picks up water and microbial growth, and biodiesel blends hold more water, so long-idle tanks are the ones to test first.
What changes during a hurricane or power shutoff?
Before it, carriers ask for every site in the affected counties to be topped off. After power drops, the list re-ranks by runtime left and drive time, trucks run around the clock, and carriers want daily status by site. The FCC may activate DIRS and the Mandatory Disaster Response Initiative, which is why carriers push fuelers for status so often.
Does the fueler have to track generator running hours?
The owner of the engine carries the RICE NESHAP limits (100 hours a year for maintenance and testing at emergency engines, with a non-resettable hour meter on existing area source engines). A photo of the hour meter on every fuel ticket is the cheapest regular evidence the owner can get, and it powers your own theft and leak checks.
Can Fieldproxy read our tank telemetry?
Fieldproxy has an open API, so readings from a telemetry platform or tank monitor can update each tank record and trigger visits. Which feeds are connected is set up per customer during the build.
Related guides
All sources on this page (25)
- source: CPUC, Communications Resiliency Plans (D.20-07-011 wireless, D.21-02-029 wireline)
- source: eCFR, 40 CFR part 112 subpart A (SPCC applicability, definitions, qualified facilities, secondary containment)
- source: eCFR, 49 CFR 383.5 definitions (tank vehicle: over 119 gal per tank and 1,000 gal aggregate)
- source: eCFR, 40 CFR part 63 subpart ZZZZ (RICE NESHAP: 63.6640(f) hour limits, Table 2c, hour meters)
- source: CPUC fact sheet, Resiliency and Service Quality Obligations of Communications Providers (rev. 12/2024)
- source: eCFR, 49 CFR 173.150(f) combustible liquids
- source: eCFR, 49 CFR 392.51 reserve fuel; materials of trade (diesel package 119 gal, 440 lb aggregate)
- source: Kansas State Fire Marshal, Fire Fact 082 Generator Testing & Maintenance (NFPA 110 summary)
- source: Bell Performance, NFPA 110 generator fuel testing (section 8.3.7, ASTM D975, tank bottom sampling)
- source: Generac Mobile Products / B3C, Today's Modern Diesel Fuel white paper
- source: eCFR, 47 CFR 4.17 Mandatory Disaster Response Initiative
- source: Congressional Research Service IF12779, Restoration of Cell Phone Services: Hurricane Helene
- source: eCFR, 49 CFR 171.8 definitions (bulk packaging: liquid receptacle over 450 L / 119 gallons)
Run cell site generator fueling work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.