Guide for commercial window cleaning companies ยท checked 21 November 2026
Commercial window cleaning software built around the building, the anchors and the drop
A storefront route and a 30-story rope descent are both window cleaning, and they need different records. On the tower, nobody may hang from an anchor until the building owner has said in writing that it was inspected in the last year and certified in the last 10. This guide covers OSHA 1910.27, the California OPOS, New York Part 21, powered platform inspection intervals, water-fed pole practice, scratched tempered glass and what to log on every drop.
See your own jobs set up this way
A 30-minute call. We show you commercial window cleaning companies workflows running in Fieldproxy, built around how you work.
Short answer
Small route and residential window cleaners mostly use Housecall Pro, Jobber, The Customer Factor or, in the UK, Squeegee and CleanerPlanner, often with ResponsiBid for quoting. None of those pages mention anchor certification, drop records or building work plans, so high-rise firms usually pair a scheduling tool with a rope access equipment register such as Papertrail or Scannable and keep the owner's anchor letters in a folder. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each building holds its roof anchors, davits, the owner's written assurance and its expiry, the work plan or OPOS and the access method per elevation, and a drop cannot be scheduled on an anchor whose inspection has lapsed.
5,000 lb
Load each rope descent anchorage must hold in any direction, per employee attached, under 1910.27(b)(1)(i)
source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systems
1 yr / 10 yr
Anchorages inspected annually and certified at least every 10 years by a qualified person; the owner confirms it in writing before use
source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systems
300 ft vs 130 ft
Federal rope descent height limit, against California's 130 ft cap on controlled descent apparatus without written acceptance
36 ft
California building height from which an Operating Procedures Outline Sheet (OPOS) can be required before cleaning
source: California Code of Regulations, Title 8 ยง3282 Window cleaning, general
How a job runs
One commercial window cleaning job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Walk the building and pick the access method per elevation
Go to the roof before you price anything. Each elevation gets its own method: squeegee from the ground, water-fed pole (the longest carbon poles reach about 65 to 68 ft), boom lift, rope descent, boatswain's chair, swing stage or the building's own powered platform. Note setbacks, overhangs, atriums, sloped glazing, parapet height, where ropes cross an edge, and what is under each drop: an entrance, a patio, a power line, a car park.
- 2
Ask the owner for the anchor paperwork
For any rope descent in the US, the building owner must tell you in writing that each anchorage has been identified, tested, certified and maintained to hold 5,000 lb per attached worker, based on an annual inspection and a certification no more than 10 years old. You may not use the anchors until you have it, and you keep it for the length of the job. In California ask for the written assurance and, where it applies, the OPOS.
- 3
Take off the glass and bid
Count panes by size, type and reach, not just square feet. Separate inside from outside, ground from height, routine from first clean or construction clean. Flag tempered and coated glass, hard water staining and anything already scratched. State the frequency the price assumes and what is excluded: screens, tracks, frames, skylights, post-construction debris.
- 4
Write the work plan for the building
Washington requires a written site plan by a qualified person kept on site, and Minnesota a written plan reviewed with the workers and the owner for suspended work more than 14 ft above grade. Write one everywhere: anchors used per drop, rope protection points, stabilization for descents over 130 ft, public protection below, rescue method and who performs it.
- 5
Schedule around weather, tenants and the street
Book drops by elevation and by sun and wind, give the property manager the tenant notice with dates per side, arrange roof access and any sidewalk closure or cones. Route work is the opposite problem: fixed weekly, fortnightly or monthly stops packed into a tight loop, with rain days rolling forward.
- 6
Inspect gear and anchors at the start of the shift
The rope descent system is inspected at the start of each workshift, and personal fall protection before first use each shift. Check ropes, descenders, seat board, harness, rope grab and the anchors you are about to load, and confirm each anchor on the roof matches the one named in the owner's letter and your plan.
- 7
Set up, barricade and run the drops
Rig the working line and a separate, independent fall arrest line to its own anchorage, pad every edge the rope touches, secure tools, cordon the ground below and post signs. Log each drop as it is done: elevation, drop number, anchors used, worker, start and finish, and any glass that was already damaged before the squeegee touched it.
- 8
Stop when the weather says stop
The federal rope descent rule bans use in hazardous weather such as storms or gusty or excessive wind but gives no speed. The 25 mph figure many crews quote is the powered platform limit in 1910.66. Put your own wind limit in the work plan, record the reading and the time when a drop is called off, and bill or rebook according to the contract.
- 9
Inspect the glass with the customer
Walk the lobby and a sample of floors with the property manager or the general contractor. On construction cleans, get the daily sign-off and the photos the IWCA checklist recommends before, during and after. Log missed panes, inaccessible panes and why, and any scratch or seal failure claims the same day.
- 10
Invoice, file the log, schedule the next cycle
Invoice by elevation or by visit against the contract, attach the drop log and the completion report, file the day's inspection records, and generate the next visit from the contract frequency. Then look at the anchor dates: if the annual inspection lapses before the next cycle, tell the owner now.
What to record
The fields every commercial window cleaning job should capture
Building profile
- Height in feet and stories, and the access method for each elevation (ground, water-fed pole, lift, rope descent, boatswain's chair, swing stage, powered platform)
- Every roof anchor, davit base and tie-back by ID, with location on a roof plan, type (adhesive or mechanical) and the drops it serves
- Owner's written assurance: date received, who signed, date of last annual inspection, date of last certification, qualified person or firm
- State rule set that applies (federal, California Title 8, New York Part 21, Washington WAC 296-878, Minnesota 5205.0730) and any OPOS or site plan on file
- Glass schedule: pane counts by size, tempered or coated glass, known scratched or failed units, hard water staining
- Roof access, key holder, parapet height, what is below each drop, nearest overhead power line and its distance
Each drop or route stop
- Date, elevation, drop number, anchors used for working line and for fall arrest line
- Worker name and certification (SPRAT or IRATA level, employer rope descent training date)
- Pre-use inspection of rope, descender, seat board, harness and rope grab: pass or fail per item, initials
- Wind reading and time at start, and at any stop; reason a drop was called off
- Ground protection in place: cones, barricade tape, signs, spotter
- Pre-existing damage photos per pane before cleaning; panes not cleaned and why
- For water-fed pole work: TDS reading of the pure water in ppm at the start of the day
Paperwork that leaves the job
- Completion report by elevation with drop log and photos
- Scratch or fabricating debris waiver signed by the general contractor or owner on construction cleans
- Daily sign-off sheet on multi-day jobs
- Daily log signed by the competent person where the state asks for one (Minnesota: kept on site, then retained one year)
- Reminder to the owner when an anchor inspection or 10-year certification is about to lapse
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| OSHA 1910.27(b)(1): the owner's written anchorage information | Before a rope descent system is used, the building owner must inform the employer in writing that each anchorage has been identified, tested, certified and maintained so it can support at least 5,000 lb (2,268 kg) in any direction for each employee attached. This rests on an annual inspection by a qualified person and certification as necessary and at least every 10 years. The employer must not use the anchorage until it has that information and keeps it for the duration of the job. source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systems |
| OSHA 1910.27(b)(2): how a rope descent system is used | No use above 300 ft (91 m) unless other access is not feasible or is more hazardous; training under 1910.30; inspection at the start of each workshift; a separate, independent personal fall arrest system; components rated 5,000 lb and seat boards 300 lb; prompt rescue; rope padding at edges; stabilization for descents over 130 ft (39.6 m); no use in hazardous weather; tools secured. source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systems |
| Dates, and where the 300 ft limit came from | The Walking-Working Surfaces final rule was published 18 Nov 2016 and took effect 17 Jan 2017; the anchorage certification date was 20 Nov 2017. OSHA says the 300 ft limit came from ANSI/IWCA I-14.1-2001 and that rope descent systems do not include industrial rope access. source: OSHA, Walking-Working Surfaces final rule FAQ (dates, 300 ft limit, I-14.1 origin) |
| OSHA's 2017 enforcement memo on anchors | On 20 Nov 2017 OSHA told its offices to consider, case by case, not citing where the owner and employer can show due diligence, such as a written agreement with a qualified person and planned inspection dates. A cleaner still needs the paper trail to show it. source: OSHA enforcement memo, rope descent system anchorages, 20 Nov 2017 |
| ANSI/IWCA I-14.1 is evidence, not law | In a 2005 letter OSHA said it does not cite employers under ANSI standards it has not adopted, but may use one as evidence of a recognized hazard under the general duty clause. Building owners and insurers still write I-14.1 into contracts, so record which edition a contract names. source: OSHA letter of interpretation, 28 Mar 2005 (status of ANSI/IWCA I-14.1) |
| California Title 8 ยง3282(p): written assurance and the OPOS | The owner gives written assurance before the equipment is used, and the devices it covers are inspected at least every 12 months. Buildings 36 ft or more in height need an Operating Procedures Outline Sheet when there is no established compliant system, when procedures have changed or when the building has extreme architectural features. The employer may not use the devices before it has the assurance and the OPOS. source: California Code of Regulations, Title 8 ยง3282 Window cleaning, general |
| California ยง3286: controlled descent capped at 130 ft | Controlled descent apparatus is not used where the suspension height is above 130 ft unless the Division accepts it in writing. An independent safety line goes to a separate approved anchorage, training includes self-rescue, and the system is inspected before and during each use. source: California Code of Regulations, Title 8 ยง3286 Boatswain's chairs and controlled descent apparatus |
| California ยง3296: 12-month and 30-day inspections | Building maintenance equipment gets a periodic inspection and test every 12 months and maintenance inspections every 30 days. Load testing is for when damage is suspected, and roof tie-backs are not tested above 50% of rated capacity. source: California Code of Regulations, Title 8 ยง3296 Inspections and tests |
| New York 12 NYCRR Part 21: five authorized methods | Part 21 lists five authorized means: working from safe surfaces, from sills or ledges, ladders, boatswain's chairs and scaffolds. Anchors must be approved and used only with an approved safety belt, and the employer inspects belts, ladders, scaffolds and chairs monthly. A boatswain's chair above 75 ft needs approval for that specific building. OSHA's FAQ says the federal rule preempts state rules for private-sector workers, so check both with your counsel. source: New York 12 NYCRR 21.4, authorized means and methods of window cleaning |
| Washington WAC 296-878: written site plan | A qualified person writes a site plan that is kept on site. Rope descent is limited to 300 ft with stabilization above 130 ft, ropes and carabiners are rated 5,000 lb, a boatswain's chair is limited to 75 ft (130 ft with specified braking features), and training records are signed by trainer and student. source: Washington WAC 296-878, Window cleaning |
| Minnesota Rules 5205.0730: plan, anchor documents and a daily log | Applies to suspended work more than 14 ft above grade. A written plan is reviewed with the workers and the building owner, the owner gives written documentation of identified and certified anchorages, rope descent is prohibited above 300 ft unless a qualified individual shows there is no safe alternative, and a daily log signed by the competent person is kept on site and retained for one year. source: Minnesota Rules 5205.0730, Window cleaning and building maintenance |
| OSHA 1910.66: powered platforms and building maintenance units | Building supporting structures and equipment get a periodic inspection at intervals not exceeding 12 months, a maintenance inspection and test every 30 days (or before each work cycle if longer), wire rope is checked before every use and thoroughly inspected monthly, and platforms are not operated in winds above 25 mph. The owner gives written assurance of inspection and testing before use. source: OSHA, 29 CFR 1910.66 Powered platforms for building maintenance |
| OSHA 1910.140 and 1910.28: fall arrest numbers | Fall protection applies from 4 ft (1.2 m). Anchorages hold 5,000 lb per employee or are designed with a safety factor of two; maximum arresting force is 1,800 lb, deceleration distance 3.5 ft and free fall 6 ft. Systems are inspected before first use each workshift and the employer provides prompt rescue. source: OSHA, 29 CFR 1910.140 Personal fall protection systems |
| Suspended scaffolds (swing stages), 1926.451 | A competent person inspects ropes before each workshift and the scaffold before each shift. Suspension rope holds at least 6 times the intended load, tiebacks match suspension rope strength, and work stops in storms or high winds unless a competent person decides it is safe. source: OSHA, 29 CFR 1926.451 Scaffolds, general requirements |
| Overhead power lines: 10 ft | Unqualified persons and anything conductive they hold, including a carbon water-fed pole, stay at least 10 ft from overhead lines at 50 kV or below, plus 4 in for every 10 kV above that. The same clearance applies to lifts and other mechanical equipment. source: OSHA, 29 CFR 1910.333 Selection and use of work practices (overhead lines) |
| Heat-treated glass and scrapers | The National Glass Association says glass fines and other particles can fuse to heat-treated glass in the tempering furnace, that ASTM C1036 does not treat this as a reason to reject the glass, and that scrapers, abrasives and harsh chemicals are not recommended on any glass product because a scraper can dislodge particles and drag them across the surface. source: National Glass Association, FB02-02 Heat-Treated Glass Surfaces Are Different (2023) |
| IWCA Glass Protection Checklist for construction cleans | The 2025 checklist recommends test cleaning or mock-ups with written approval, liability waivers from the general contractor before debris removal, a daily sign-off, photos before, during and after, and care, custody and control insurance. source: IWCA, Glass Protection Checklist (23 Jun 2025) |
| Wash water and storm drains | Portland's city code prohibits wash water from cleaning a building or sidewalk entering the stormwater system; it must be collected for offsite disposal or sent to the sanitary sewer. Plain water rinsing with no chemicals, soaps, detergents, steam or heated water is allowed after sweeping. Check each city: pure water pole work usually falls on the allowed side, restoration chemicals do not. source: City of Portland Environmental Services, Cleaning your building or sidewalk |
| Boom lifts and descent devices | Aerial lift controls are tested each day before use, only authorized persons operate the lift, and a lanyard is attached to the boom or basket (1926.453(b)(2)). In a 1998 letter on descent control devices OSHA asked for training, inspection before each day's use and an independent fall arrest system with its own lifeline and anchorage. source: OSHA, 29 CFR 1926.453 Aerial lifts |
| Insurance: scratched glass is often excluded | A standard commercial general liability form excludes damage to 'that particular part of real property' on which the insured is working, so a claim for glass scratched while it was being cleaned is likely not covered. Some carriers sell care, custody or control endorsements, often with a small sublimit. UK brokers ask cleaners to declare working height and access method. source: PropertyCasualty360, Glass Damage and the CGL Form |
| UK: work at height hierarchy and LOLER | HSE's order for window cleaning is: avoid work at height (water-fed poles, cleaning from inside), use an existing safe place, provide suitable access equipment, then minimize fall distance. Rope access and powered access need a safe working method statement. Under LOLER, equipment that lifts people, such as cradles, is thoroughly examined every 6 months. BS 7883:2019 covers anchor systems and adds a System Technical File and an Examination Scheme. source: HSE (UK), Working at height whilst window cleaning |
| Australia: rope access and anchor testing | The national falls code says rope access operators must be competent, never work alone and use two independently anchored ropes, and that elevating work platforms or building maintenance units should be considered first. SafeWork NSW says inspection programs based on AS/NZS 1891.4, including annual load testing of chemical and friction anchors, should continue. source: SafeWork NSW, Fall arrest anchors |
Rules vary by state, council and contract. Checked 21 November 2026; confirm against the source for your area before relying on it.
Numbers
Limits, intervals and benchmarks window cleaners work to
Regulatory rows are from the rule named. The estimating rows are from a 2013 trade article and are old, so treat them as a starting ratio to check against your own job costing, not as today's prices.
| Item | Figure | Basis |
|---|---|---|
| Rope descent anchorage capacity | 5,000 lb in any direction per employee | OSHA 1910.27(b)(1)(i) |
| Anchorage inspection / certification | Annually / at least every 10 years | OSHA 1910.27(b)(1)(i) |
| Adhesive anchor recertification (one inspection firm's practice) | Every 5 years; non-adhesive every 10 | Pro-Bel inspection services |
| Rope descent height limit | 300 ft federal, WA, MN; 130 ft California | 1910.27(b)(2)(i); Title 8 ยง3286 |
| Stabilization required | Descents over 130 ft | OSHA 1910.27(b)(2)(x) |
| Boatswain's chair in New York | Above 75 ft needs building-specific approval | 12 NYCRR 21.8 |
| California OPOS trigger | Buildings 36 ft or more, in listed cases | Title 8 ยง3282(p)(1)(C) |
| Powered platform wind limit | 25 mph | OSHA 1910.66(i)(2)(v) |
| Powered platform inspections | 12 months periodic; 30 days maintenance | OSHA 1910.66(g) |
| UK cradle thorough examination | Every 6 months | LOLER, per HSE |
| SPRAT Level II / Level III | 500 hours and 6 months at each step; certification valid 3 years | SPRAT Certification Requirements |
| IRATA Level 2 / Level 3 | 1,000 logged hours and 12 months at each step | IRATA |
| Longest water-fed pole | 65 ft pole, 68 ft working reach | Unger brochure, Oct 2025 |
| Pure water for spot-free glass | TDS 10 ppm or less; change DI resin above it | Window Cleaning Supply |
| Power line clearance | 10 ft at 50 kV or below | OSHA 1910.333(c)(3) |
| Production: large pane glass | About 1 hour per 1,000 sq ft, inside and out | CMM, 2013 |
| Construction clean | 3 to 4 times a routine clean | CMM, 2013 |
| DC government buildings | Exterior annually, interior twice a year | DC DGS Attachment J.1 |
source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systemssource: New York 12 NYCRR 21.3, general provisions (anchors, monthly inspection)source: OSHA letter of interpretation, 9 Nov 1998 (descent control devices)source: Independent Agent magazine, care, custody or control coverage for contractorssource: Everywhen (UK broker), Window cleaning insurancesource: Vitro Architectural Glass, Clarity on proper glass cleaningsource: CleanLink, Window Care: Fabricating Debris On Tempered Glasssource: GANA bulletin, Proper Procedures for Cleaning Architectural Glass Products (Haworth reprint)source: BSI, BS 7883:2019 Personal fall protection equipment, anchor systemssource: Australia, Managing the Risk of Falls at Workplaces Code of Practice 2015source: OHS Online, Annual Fall Protection Inspections and What Building Owners Need to Know (16 Jan 2026)source: OSHA, 29 CFR 1910.28 Duty to have fall protectionsource: OSHA, 29 CFR 1910.30 Training requirementssource: Federation of Window Cleaners, Safety in window cleaning using water-fed pole systems (hosted by HSE)source: California Code of Regulations, Title 8 ยง3286 Boatswain's chairs and controlled descent apparatussource: California Code of Regulations, Title 8 ยง3282 Window cleaning, generalsource: New York 12 NYCRR 21.8, boatswain's chairssource: OSHA, 29 CFR 1910.66 Powered platforms for building maintenancesource: HSE (UK), Thorough examinations of lifting equipment (LOLER)source: SPRAT, Certification Requirements for Rope Access Work (v20A)source: IRATA, Technician step-by-step guidesource: Unger, Telescopic Pole Brochure (Oct 2025)source: Window Cleaning Supply, When and which filters to change (TDS thresholds)source: J. Racenstein, Water Fed Pole DI vs. RODI Systemsource: OSHA, 29 CFR 1910.333 Selection and use of work practices (overhead lines)source: Cleaning & Maintenance Management, Working Up Window Cleaning Estimates (9 Sep 2013)source: DC Department of General Services, Attachment J.1 Standard Planned Services Schedulesource: Iowa Department of Administrative Services, custodial services frequency tablesource: Pro-Bel, Fall protection inspection services (anchor recertification, logbook)
Where it breaks
Where spreadsheets and generic software fall over
The owner's anchor letter sits in an email from two property managers ago. The crew rigs to anchors whose annual inspection lapsed in spring, and nobody knows until an inspector or an insurer asks for the written information 1910.27 requires.
Hold the written assurance on the building with its inspection and certification dates, and block any rope descent visit from being scheduled when either date has passed.
One job type called 'window clean' covers a storefront, a pole job and a 20-story drop. The same checklist prints for all three, so the high-rise crew ticks boxes about ladders and the route tech is asked for a rescue plan.
Make the access method a field on each elevation and let it drive the checklist, the crew qualification rule and the price.
A general contractor says the cleaner scratched 40 tempered units. The cleaner knows it was fabricating debris, but has no test clean approval, no waiver and no before photos.
On construction cleans, the job cannot move to In progress without a signed waiver, a recorded test pane and before photos, as the IWCA checklist recommends.
A California building needs an OPOS and the New York one bans rope descent in Part 21, but the office uses the federal 300 ft rule for everything because that is what the template says.
Store the rule set on the building and show the limits that apply (130 ft, 300 ft, 75 ft chair approval, OPOS required) on the bid and the work plan.
Wind calls are made by feel and never written down. The customer disputes the standby charge, and after an incident there is no record of what the reading was.
Log a wind reading and time at the start of each drop and whenever work stops, with the limit from the work plan beside it.
Rope, harness and descender inspections live in a paper book in the van. A rope stays in service past the date the company's own program retires it.
Give every rope, harness, descender and seat board a serial record with in-service date and pre-use checks, and flag overdue items before a crew is dispatched.
Checklist
The commercial window cleaning operations checklist
Print it, or hand it to whoever runs the office side.
- Access method recorded for every elevation of every building
- Owner's written anchorage information on file before any rope descent, with annual inspection and 10-year certification dates
- State rule set identified: California OPOS and 130 ft, New York Part 21, Washington site plan, Minnesota plan and daily log
- Written work plan per building: anchors per drop, edge protection, stabilization over 130 ft, rescue, public protection
- Rope descent training under 1910.30 recorded per worker; SPRAT or IRATA level and expiry where held
- Rope descent system and fall arrest gear inspected at the start of each workshift, result logged
- Separate, independent fall arrest line to its own anchorage on every drop
- Wind limit written in the plan; reading and time logged at start and at any stop
- Ground below each drop cordoned and signed; poles and lifts kept 10 ft from overhead lines
- Powered platform and swing stage inspections current (12 months, 30 days, each shift)
- Pure water TDS checked at 10 ppm or less before pole work
- Pre-existing glass damage photographed before cleaning; no scrapers on tempered glass without a signed waiver
- Wash water kept out of storm drains where detergents or restoration chemicals are used
- Drop log and completion report sent with the invoice; next cycle generated from the contract frequency
Software options
What software commercial window cleaning companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Housecall Pro
Residential and light commercial window cleaners with a crew
Its window cleaning page describes estimates itemized by panes, stories, screens and hard water removal, recurring weekly, monthly or seasonal visits with rain-delay rescheduling, routing that groups nearby stops and progress billing for larger commercial jobs. The page does not mention high-rise work, rope access or anchor inspection.
ResponsiBid
Window cleaners who want online instant quoting on top of a scheduling tool
Quoting from your website, by phone or in person, automated follow-up by email, text and postcard, and integrations with Jobber and Housecall Pro. Its pricing page showed a free Startup plan and paid plans from $179 a month in Nov 2026. It is a sales tool, not a job or compliance system.
The Customer Factor
Owner-operators and small residential crews
Long used in the trade: tracks when each customer is next due, calendars for estimates and jobs, invoices, card payments and drip emails. Forum users praise the price for multiple users and call the look dated. No routing, commercial contract or high-rise features on its page.
Squeegee and CleanerPlanner (UK)
UK round-based window cleaners
Both are built around the round: Direct Debit through GoCardless, an invoice when a job is marked done, worksheets per day and VAT exports. CleanerPlanner listed plans at ยฃ19, ยฃ29 and ยฃ49 a month in Nov 2026. Neither page mentions commercial contracts, cradles or rope access.
Papertrail
High-rise and rope access operators, for equipment records only
Pre-use, interim and detailed inspections in line with the IRATA code of practice, serial history per item by NFC or QR code, manufacturer checklists and technician competency tracking. It is not a scheduling or billing tool and its page does not mention building records or drop logs.
Scannable
Rope access and height safety teams that want an equipment register
NFC-tagged kit, inspection records with shareable PDF reports, thorough examinations by a named competent person and recall alerts. Its pricing page showed a free tier up to 200 items in Nov 2026. Like Papertrail, it covers the gear, not the building, the anchors' certification or the job.
Published prices, compared:source: Window Cleaning Resource community, Favorite / best CRM software thread (Dec 2019 to Jan 2020)source: Window Cleaning Resource community, What software do you use to manage your business (Jul 2018)
Questions to ask any vendor
- Can each building hold its roof anchors and davits by ID, with the owner's written assurance, the annual inspection date and the 10-year certification date?
- Will the system stop a rope descent job being scheduled when the anchor inspection has lapsed, or does it only store the PDF?
- Can each elevation carry its own access method, and can that method change the checklist, the crew rule and the price?
- Can my crew log each drop with the anchors used, a wind reading and pre-existing damage photos, offline on a roof?
- Can a California building show its OPOS and the 130 ft limit while a Texas building shows the federal 300 ft rule?
- Can a property manager with 30 buildings see each one's last clean, next clean, drop log and anchor dates without emailing us?
Bring one real commercial window cleaning job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Commercial window cleaning on Fieldproxy: built around how you already work
A Fieldproxy setup for a commercial window cleaning company starts with the building, not the customer: its elevations, the access method on each, its roof anchors and davits, and the owner's written assurance with the dates that make it valid. Route stops and tower drops run from the same schedule but open different screens, so a storefront tech sees a 6-stop loop and a rope crew sees the work plan, the gear check and a drop log. The completion report, the scratch waiver and the anchor renewal reminder all come out of the same records.
Module 1
Building and elevation profile
The access method decides the price, the crew, the paperwork and the risk, and it differs by side of the same building.
- Record: Building, linked to Owner and Property manager; fields: height in ft, stories, state rule set (Federal 1910.27, California Title 8, New York Part 21, Washington WAC 296-878, Minnesota 5205.0730), roof access, key holder, parapet height
- Child record: Elevation (North, South, East, West, atrium, podium); fields: access method (ground squeegee, water-fed pole, boom lift, rope descent, boatswain's chair, swing stage, powered platform), drop count, suspension height, what is below, nearest power line distance
- Glass schedule per elevation: pane count by size band, tempered yes/no, coated yes/no, known scratched or failed units with photos
- Rule shown on the record from the state and height: for example 'California, 142 ft: controlled descent needs written Division acceptance, OPOS required'
- Survey status: Requested, Walked, Roof checked, Priced
Module 2
Anchor, davit and platform register
Under 1910.27 the cleaner may not use an anchorage until the owner has put its condition in writing, and those dates expire.
- Record: Anchorage, linked to Building and Elevation; fields: anchor ID as tagged on the roof, type (adhesive, mechanical, davit base, tie-back), drops served, location on roof plan image
- Record: Written assurance; fields: date received, signed by, qualified person or firm, last annual inspection date, last certification date, document PDF
- Calculated fields: inspection valid until (inspection date + 12 months), certification valid until (certification date + 10 years, or e.g. 5 years for adhesive anchors if that is your program)
- Block: a visit with access method rope descent or boatswain's chair cannot be set to Scheduled while the building has no written assurance or either date has passed
- For powered platforms: last 12-month periodic inspection, last 30-day maintenance inspection and the owner's written assurance under 1910.66
- Status per building: No documents, Requested from owner, Valid, Expiring in 60 days, Lapsed
Module 3
Takeoff and bid
Window cleaning is priced by pane, reach and frequency, and the excluded items cause most disputes.
- Estimate lines built from the glass schedule: per pane by size band, inside and outside priced separately, uplift for glass not reachable from the ground, per drop for rope work, lift hire days
- Frequency discount field (e.g. 10 to 30% for a regular schedule) and a first-clean or construction-clean multiplier (e.g. 3 to 4 times routine)
- Standard exclusion lines the customer accepts or buys: screens, tracks, frames, skylights, hard water stain removal, post-construction debris removal
- Standby terms on the quote: who pays when wind stops the day, and the minimum callout
- Quote status: Draft, Sent, Viewed, Approved, Declined; approval creates the contract with its frequency per elevation
Module 4
Contracts and frequency schedule
The lobby glass is weekly, the podium monthly and the tower twice a year, on one contract.
- Record: Contract per building with a line per elevation or area and its own frequency (weekly, fortnightly, monthly, quarterly, twice a year, annual)
- Route lines generate route stops; tower lines generate a project visit with a target month, e.g. April and October
- Next visit generated from the last completed visit, so a rained-off clean stays due instead of rolling over
- PO number, billing contact, insurance certificate expiry and the safety standard the contract names (e.g. ANSI/IWCA I-14.1 edition) held on the contract
- Visit status: Due, Scheduled, Tenant notice sent, In progress, Weather hold, Partial, Completed, Disputed
Module 5
Work plan and OPOS per building
Washington and Minnesota require a written plan, California an OPOS in listed cases, and a rescue plan nobody can find is not a plan.
- Record: Work plan, versioned, linked to Building; sections: drops per elevation with the working and fall arrest anchors for each, edge protection points, stabilization method above 130 ft, wind limit in mph, public protection, rescue method and rescuer
- OPOS attached as a document for California buildings, with the date and who prepared it
- Sign-off fields: reviewed with crew (names, date), reviewed with owner or manager (name, date)
- The crew app opens the current version on site; a visit cannot start if the plan has no crew review for this cycle
Module 6
Crew qualifications and gear register
The wrong person on a rope or a rope past its retirement date is the failure everything else exists to prevent.
- Technician record: rope descent training date under 1910.30, trainer, SPRAT or IRATA level and expiry (both run 3 years), swing stage and lift operator training, first aid
- Gear record: rope, harness, descender, rope grab, seat board, carabiners; fields: serial, in-service date, retirement date per your program, last detailed inspection
- Pre-use check form per shift: pass or fail per item with a photo on fail; a failed item is set to Quarantined and cannot be picked on the next job
- Dispatch rule: a rope descent visit needs at least two technicians with current rope training
Module 7
Scheduling, weather holds and routes
Route work fails on drive time and rain days; tower work fails on wind, tenants and roof access.
- Route board: fixed-frequency stops grouped by area per technician, rain day pushes the whole day forward and texts the affected sites
- Tower board: visits planned by elevation per day, with roof access contact, lift delivery and sidewalk closure tasks attached
- Tenant notice generated from the plan: dates per elevation, sent to the property manager to forward
- Weather hold status with reason and reading; hold hours feed the standby line on the invoice where the contract allows it
Module 8
Field app: drop log and route stop
The drop log is the proof of what was cleaned, from which anchor, by whom and in what conditions.
- Opens differently by access method: a route stop shows panes, notes and a photo; a rope visit shows the work plan, the gear check and the drop list
- Per drop: anchors scanned or picked from the building's register, worker, start and finish time, wind reading, ground protection confirmed, panes not cleaned and why
- Pre-existing damage capture: photo per pane with elevation and floor before cleaning starts
- Water-fed pole day: TDS reading in ppm with a warning above 10
- Works offline on roofs and in basements and syncs later; manager or site contact signature on completion
Module 9
Construction cleans, waivers and glass claims
Scratched tempered glass claims can exceed the value of the contract, and general liability often will not pay.
- Project record for a construction clean with phases by floor or elevation and a daily sign-off sheet
- Block: the project cannot start until a waiver signed by the general contractor or owner and a test pane result with photos are attached
- Record: Glass claim; fields: panes, location, alleged cause, before photos found yes/no, glass type, fabricator if known, status (Reported, Investigating, Denied with evidence, Settled)
- Insurance fields on the company record: care, custody and control cover yes/no, sublimit, height or method restrictions in the policy
Module 10
Invoicing, reports and the property manager portal
A portfolio manager wants one place to see every building, and gets paid attention when the proof arrives with the invoice.
- Invoice per visit or per elevation completed, with standby hours, PO number and the completion report attached; sync to QuickBooks or Xero
- Completion report PDF from your template: elevations cleaned, drop log, panes not cleaned and why, pre-existing damage photos
- Portal per property manager: each building's last and next clean, reports, open glass claims, and the anchor inspection and certification dates with days remaining
- Dashboards: buildings with lapsed or expiring anchor documents, weather hold days by month, revenue per drop, partial cleans by reason
The AI agents, set up for commercial window cleaning companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | A building owner or their engineer emails the anchor inspection report or certification letter as a PDF | Reads the building address, the anchor IDs covered, the inspection date, the certification date and the qualified person's name, and compares the anchor list with the building's register | A written assurance record filled in on the right building, with a note listing any anchor on the roof plan that the letter does not cover |
| Watcher agent | An anchor inspection date is within 60 days of lapsing (e.g.), a 10-year certification is within 12 months, or a rope descent visit is booked on a building with no valid assurance | Checks every building with a rope descent or chair elevation against its dates and its next scheduled visit | An expiring list for the office, and the affected visit held at Due with the reason shown |
| Autopilot | The Watcher agent flags a building as Expiring or Lapsed, or a quote sits in Sent for 7 days | Drafts the request to the owner quoting 1910.27(b)(1) and the dates on file, or the quote follow-up with the frequency and price | A draft email a person approves before it goes to the owner or property manager |
| Voice agent | A technician finishes a drop and speaks a note instead of typing with gloves on | Turns 'north elevation drop four, anchors A12 and A13, wind 14, two cracked units on nine' into fields on the drop record | A completed drop log line with anchors, wind reading and a pre-existing damage entry awaiting its photo |
| Vision agent | A technician photographs a roof anchor tag or a pane before cleaning | Reads the anchor ID and inspection date from the tag and matches it to the register, or marks visible scratches, chips and failed seals on the pane photo | The anchor selected on the drop with a warning if the tag date is older than the letter on file, or a pre-existing damage record with location |
| Scheduler agent | Every Monday at 7 am | Pulls the week's tower visits, the buildings with expiring anchor documents, gear due for detailed inspection and last week's weather hold hours | A one-page briefing emailed to the operations manager and the safety lead |
Straight answers
Commercial window cleaning: FAQ
What software do commercial window cleaning companies use?
Route and residential window cleaners commonly use Housecall Pro, Jobber or The Customer Factor in the US and Squeegee or CleanerPlanner in the UK, often with ResponsiBid for quoting. High-rise firms usually add a rope access equipment register such as Papertrail or Scannable, because none of the scheduling tools' pages mention anchor certification or drop records. Fieldproxy is set up around the building: its anchors, the owner's written assurance, the work plan and a drop log.
Who is responsible for certifying roof anchors, the building owner or the window cleaner?
Under OSHA 1910.27(b)(1) the building owner must inform the cleaning employer in writing that each anchorage has been identified, tested, certified and maintained to hold 5,000 lb per attached employee. The employer's duty is not to use the anchorage until it has that written information, and to keep it for the duration of the job.
How often do window cleaning anchors need to be inspected and certified?
Under the federal rule, anchorages are inspected annually by a qualified person and certified as necessary and at least every 10 years. California requires the devices in the owner's written assurance to be inspected at least every 12 months. Some inspection firms recertify adhesive anchors every 5 years.
What is the height limit for rope descent window cleaning?
Federal OSHA prohibits rope descent systems above 300 ft unless other access is not feasible or is more hazardous, and Washington and Minnesota use the same figure. California does not allow controlled descent apparatus above 130 ft of suspension height without written acceptance from the Division. Descents over 130 ft need stabilization under the federal rule.
What is an OPOS in California window cleaning?
An Operating Procedures Outline Sheet describes how a specific building is to be cleaned. Title 8 ยง3282(p) requires one for buildings 36 ft or more in height when there is no established compliant window cleaning system, when procedures have changed or when the building has extreme architectural features. The employer may not use the building's devices until it has the owner's written assurance and the OPOS.
At what wind speed must high-rise window cleaning stop?
The rope descent rule, 1910.27(b)(2)(xi), bans use in hazardous weather such as storms or gusty or excessive wind but sets no number. The 25 mph limit is in 1910.66 and applies to powered platforms. Most companies write their own limit into the building's work plan and log the reading when a drop is called off.
Is rope descent window cleaning allowed in New York?
New York's Industrial Code Part 21 lists five authorized methods: safe surfaces, sills or ledges, ladders, boatswain's chairs and scaffolds, and a boatswain's chair above 75 ft needs approval for the specific building. OSHA's FAQ says the federal rule preempts state rules for private-sector workers. Get advice on which applies to your job before you bid.
Who pays when tempered glass is scratched during a construction clean?
It is often disputed. The National Glass Association says particles can fuse to heat-treated glass during tempering and that scrapers can dislodge and drag them, and it does not recommend scrapers on any glass. Standard general liability policies often exclude damage to the part of the property being worked on. The IWCA checklist recommends a test clean with written approval, a liability waiver from the general contractor and photos before, during and after.
How high can a water-fed pole reach?
Unger's longest carbon pole is 65 ft with a working reach of about 68 ft, roughly five floors. The Federation of Window Cleaners' guidance refers to poles up to 80 ft (24 m), recommends cordoning an area as wide as the pole is high, and says not to use poles in high winds, near overhead lines or in thunder and lightning.
What TDS reading do you need for spot-free pure water cleaning?
Supplier guidance is 10 parts per million or less, and to change deionization resin when the reading goes above 10. A reverse osmosis stage ahead of the resin is advised when tap water is above about 150 ppm, because it removes most dissolved solids and makes the resin last much longer.
Do rope descent window cleaners need SPRAT or IRATA certification?
OSHA requires training under 1910.30 by a qualified person, including rigging and use of the system, but does not name a certification body. Many building owners and contracts ask for SPRAT or IRATA anyway. SPRAT Level II needs 500 hours and 6 months as a Level I; IRATA Level 2 needs 1,000 logged hours and 12 months. Both certifications run for three years.
How often are commercial building windows cleaned?
It depends on the contract. Public specifications give a floor: the District of Columbia's standard schedule cleans exterior windows annually and interior windows twice a year, and Iowa's state schedule cleans exterior ground-level windows twice a year with lobby and entrance glass attended to daily as needed.
Related guides
All sources on this page (57)
- source: OSHA, 29 CFR 1910.27 Scaffolds and rope descent systems
- source: California Code of Regulations, Title 8 ยง3286 Boatswain's chairs and controlled descent apparatus
- source: California Code of Regulations, Title 8 ยง3282 Window cleaning, general
- source: OSHA, Walking-Working Surfaces final rule FAQ (dates, 300 ft limit, I-14.1 origin)
- source: OSHA enforcement memo, rope descent system anchorages, 20 Nov 2017
- source: OSHA letter of interpretation, 28 Mar 2005 (status of ANSI/IWCA I-14.1)
- source: California Code of Regulations, Title 8 ยง3296 Inspections and tests
- source: New York 12 NYCRR 21.4, authorized means and methods of window cleaning
- source: Washington WAC 296-878, Window cleaning
- source: Minnesota Rules 5205.0730, Window cleaning and building maintenance
- source: OSHA, 29 CFR 1910.66 Powered platforms for building maintenance
- source: OSHA, 29 CFR 1910.140 Personal fall protection systems
- source: OSHA, 29 CFR 1926.451 Scaffolds, general requirements
- source: OSHA, 29 CFR 1910.333 Selection and use of work practices (overhead lines)
- source: National Glass Association, FB02-02 Heat-Treated Glass Surfaces Are Different (2023)
- source: IWCA, Glass Protection Checklist (23 Jun 2025)
- source: City of Portland Environmental Services, Cleaning your building or sidewalk
- source: OSHA, 29 CFR 1926.453 Aerial lifts
- source: PropertyCasualty360, Glass Damage and the CGL Form
- source: HSE (UK), Working at height whilst window cleaning
- source: SafeWork NSW, Fall arrest anchors
- source: New York 12 NYCRR 21.3, general provisions (anchors, monthly inspection)
- source: OSHA letter of interpretation, 9 Nov 1998 (descent control devices)
- source: Independent Agent magazine, care, custody or control coverage for contractors
- source: Everywhen (UK broker), Window cleaning insurance
- source: Vitro Architectural Glass, Clarity on proper glass cleaning
- source: CleanLink, Window Care: Fabricating Debris On Tempered Glass
- source: GANA bulletin, Proper Procedures for Cleaning Architectural Glass Products (Haworth reprint)
- source: BSI, BS 7883:2019 Personal fall protection equipment, anchor systems
- source: Australia, Managing the Risk of Falls at Workplaces Code of Practice 2015
- source: OHS Online, Annual Fall Protection Inspections and What Building Owners Need to Know (16 Jan 2026)
- source: OSHA, 29 CFR 1910.28 Duty to have fall protection
- source: OSHA, 29 CFR 1910.30 Training requirements
- source: Federation of Window Cleaners, Safety in window cleaning using water-fed pole systems (hosted by HSE)
- source: New York 12 NYCRR 21.8, boatswain's chairs
- source: HSE (UK), Thorough examinations of lifting equipment (LOLER)
- source: SPRAT, Certification Requirements for Rope Access Work (v20A)
- source: IRATA, Technician step-by-step guide
- source: Unger, Telescopic Pole Brochure (Oct 2025)
- source: Window Cleaning Supply, When and which filters to change (TDS thresholds)
- source: J. Racenstein, Water Fed Pole DI vs. RODI System
- source: Cleaning & Maintenance Management, Working Up Window Cleaning Estimates (9 Sep 2013)
- source: DC Department of General Services, Attachment J.1 Standard Planned Services Schedule
- source: Iowa Department of Administrative Services, custodial services frequency table
- source: Pro-Bel, Fall protection inspection services (anchor recertification, logbook)
- source: Window Cleaning Resource community, Favorite / best CRM software thread (Dec 2019 to Jan 2020)
- source: Window Cleaning Resource community, What software do you use to manage your business (Jul 2018)
Run commercial window cleaning work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.