Guide for home energy upgrade and weatherization providers ยท checked 29 November 2026

Weatherization software for eligibility, audits, deferrals and rebate files

A weatherization job is a file before it is a house. The household has to be at or under 200% of the poverty guidelines (or the state's 60% of median income LIHEAP limit), the unit cannot have been weatherized in the last 15 years, every unit reported complete needs a final inspection signed by a certified Quality Control Inspector with a certification number, and the program year's average cost per unit is $8,813 for PY 2026. This guide covers how the work runs, the health and safety rules that defer a home, the diagnostics, the 2025 and 2026 changes to federal credits and rebates, and what to look for in software.

See your own jobs set up this way

A 30-minute call. We show you home energy upgrade and weatherization providers workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

DOE weatherization agencies mostly run on Hancock Software (intake, audit, invoicing) or a state system, with the DOE Weatherization Assistant (NEAT, MHEA, MulTEA in WAweb) or another DOE-approved audit tool. Home performance contractors in utility and IRA HOMES programs model in BPI-2400 compliant tools such as Snugg Pro or OptiMiser, take photos in CompanyCam, and run jobs in a general field service app. The deciding features are income eligibility, deferral tracking, test-in and test-out diagnostics, QCI final inspection sign-off, photo files per measure and one home funded by several programs. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: it is built around your programs, forms and file checklist.

200% FPG

DOE WAP income ceiling; some states use the LIHEAP limit of 60% of state median income instead

source: US DOE, How to Apply for Weatherization Assistance (200% of poverty, 60% SMI option, priority groups, renters)

$8,813

PY 2026 allowable average cost per dwelling unit (ACPU), now averaged over the grant life cycle

source: US DOE, WPN 26-4, Recovered WAP funding, grant extension and grant life cycle ACPU (30 Oct 2026)

15 years

A unit weatherized under WAP or another federal program waits 15 years before more WAP work

source: 42 U.S.C. 6865, Limitations on financial assistance (15-year reweatherization rule), Cornell LII

31 Dec 2025

Federal 25C credit ends for property placed in service after this date; 25D for expenditures after it

source: IRS, FAQs for modification of sections 25C, 25D and others under Public Law 119-21 (OBBB)

How a job runs

One home energy and weatherization job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Take the application and prove income

    DOE WAP serves households at or below 200% of the federal poverty guidelines; households on Supplemental Security Income qualify, and some states use the LIHEAP limit of 60% of state median income instead. The household sends proof of prior-year income such as pay stubs or Social Security statements, and is then placed on a waitlist. Priority goes to the elderly, families with a member with a disability, families with children, high energy users and households with a high energy burden. IRA rebates use a different yardstick: area median income tiers at 80% and 150%.

  2. 2

    Check the house, the owner and the funding stack

    Renters can apply, but the landlord has to give permission before work begins, and the file needs proof of ownership or a signed rental agreement. Check whether the unit was weatherized before: a unit done under WAP or another federal program cannot get WAP money again for 15 years after that work was completed. Then decide which money pays for what: WAP, a utility program such as Focus on Energy or Mass Save, and HOMES or HEAR where the state has launched.

  3. 3

    Audit and test in

    The auditor collects field data, runs a blower door test (airflow in CFM at 50 pascals, converted to ACH50 as CFM50 x 60 / house volume), tests every combustion appliance for CO, draft and spillage under worst-case depressurization, and models the house. WAP agencies audit in a DOE-approved tool such as NEAT or MHEA in WAweb; every measure must pay for itself over its life at present value unless it fixes a health and safety hazard. HOMES projects use a BPI-2400 calibrated model trued up to the utility bills.

  4. 4

    Screen for health and safety, and defer if needed

    WPN 22-7 decides what stops a job. Vermiculite is assumed to contain asbestos unless tested. Knob and tube wiring is inspected and needs over-current protection and damming before insulation goes over it. Mold cleanup and mold testing cannot be paid with DOE health and safety funds. A home is deferred if the occupant refuses ASHRAE 62.2 ventilation, if no safe primary heat can be left in place, or if occupant risk cannot be mitigated. The occupant gets the hazard in writing and a way to appeal.

  5. 5

    Write the work order and sign the consents

    The work order lists the measures that passed the cost test plus health and safety items. The client file gets signed forms: the pre-existing health condition screening, the hazard identification notification, the radon informed consent with EPA's Citizen's Guide to Radon, and the Renovate Right pamphlet for pre-1978 homes. In a HOMES project the customer sees the modeled savings, since rebates start at 20% modeled savings.

  6. 6

    Install to the field guide

    Crews air seal, insulate, fix ducts, add ventilation and CO alarms, and swap equipment to the state's DOE-approved field guide, which must meet or exceed the Standard Work Specifications (SWS). Pre-1978 homes are worked under EPA's RRP rule unless testing shows the area is lead free, with the Certified Renovator's certificate in the file. Rebate programs often require specific installers: in Wisconsin, HOMES and most HEAR work must be done by an IRA Registered Contractor.

  7. 7

    Test out

    After the work the blower door and combustion tests run again. Tightening a house changes the pressure in the combustion appliance zone, so worst-case CAZ depressurization is compared with the limit for that venting type (BPI's table runs from -2 Pa for an orphan natural draft water heater to -50 Pa for sealed combustion), any vented appliance that spills past 60 seconds fails, and ambient CO over 35 ppm stops the test.

  8. 8

    Final inspection by a certified QCI

    Every DOE WAP unit reported complete gets a final inspection, led by a certified Quality Control Inspector, confirming the work meets the field guide and reviewing the audit's field data, software inputs and measure choices. The client file needs a form with the QCI's printed name, signature, certification number and date. State monitoring of the same unit must be done by a different QCI.

  9. 9

    Close the file, bill each funder, report

    Each program gets its own invoice or rebate claim, cost against the ACPU, and the photo and test evidence it asks for. WAP files should tell the story of every decision. HEAR caps a household at $14,000; HOMES rebates scale with income and modeled savings. In Wisconsin the customer gets a HOMES installation certificate listing the improvements.

What to record

The fields every home energy and weatherization job should capture

Household and eligibility

  • Household size, prior-year income with proof, SSI or categorical eligibility, poverty percentage and state median income percentage, AMI tier (under 80%, 80% to 150%, over 150%) for IRA rebates
  • Priority flags: elderly, disability, children, high energy burden or high energy use; waitlist date
  • Owner or renter, deed or rental agreement, landlord permission date, State Historic Preservation correspondence if any
  • Prior weatherization date and program (15-year rule), utility accounts and 12 months of usage for modeling

Test in and test out

  • Blower door: house volume, CFM50 pre and post, ACH50 pre and post, test conditions, photo of the manometer
  • Per combustion appliance: type and venting, CO in undiluted flue gas (ppm), spillage time in seconds, draft, worst-case CAZ depressurization (Pa) against the limit
  • Ambient CO during testing, CO and smoke alarms installed, ASHRAE 62.2 required ventilation (CFM) and fan installed
  • Modeled savings (HOMES: 20% to 34% or 35% plus), SIR per measure (WAP), model calibration status (BPI-2400)

Safety, work and sign-off

  • Hazards found: vermiculite, knob and tube, mold or moisture, unvented heater, pre-1978 paint, asbestos siding, pests; deferral reason, letter date, appeal
  • Signed forms: health condition screening, hazard notification, radon informed consent, Renovate Right receipt
  • Measures installed with quantities, installer and RRP Certified Renovator, pre and post photos per measure with GPS and time
  • Final inspection: QCI name, signature, certification number, date; monitoring QCI if sampled; cost by funding source against ACPU and rebate caps

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
WAP income eligibility: 200% of poverty or 60% of state median incomeHouseholds at or below 200% of the poverty income guidelines qualify, and SSI recipients qualify. Some states use the LIHEAP criterion of 60% of state median income. Priority goes to the elderly, people with disabilities, families with children, high energy users and households with a high energy burden. Renters need landlord permission before work begins. source: US DOE, How to Apply for Weatherization Assistance (200% of poverty, 60% SMI option, priority groups, renters)
Where the 200% figure, the 15-year rule and the 15% admin cap came fromThe American Recovery and Reinvestment Act of 2009 raised the ceiling from 150% to 200% of poverty. The Energy Act of 2020 set reweatherization at 15 years and raised the administrative cap from 10% to 15%. The Infrastructure Investment and Jobs Act added $3.5 billion for WAP in FY2022. source: Congressional Research Service R46418, The Weatherization Assistance Program Formula (Sept 2025)
Reweatherization: 15 years (42 U.S.C. 6865)A dwelling unit weatherized under WAP or other federal programs may not receive further WAP assistance until 15 years after the earlier weatherization was completed. Intake needs the prior job date before an audit is booked. source: 42 U.S.C. 6865, Limitations on financial assistance (15-year reweatherization rule), Cornell LII
Cost-effective measures and audit approval (10 CFR 440.21)Each weatherization material or package must return lifetime energy cost savings, discounted to present value, at least equal to its cost, unless it abates a health and safety hazard. The audit assigns priorities and drops measures that stop being cost-effective after interaction. States resubmit audit procedures and priority lists to DOE every five years. source: 10 CFR 440.21, Weatherization materials standards and energy audit procedures, Cornell LII
Average cost per unit, now over the grant life cycle (WPN 26-4)Issued 30 October 2026. DOE now measures ACPU compliance as an average over the whole grant life cycle instead of each year. Estimated limits: PY 2025 $8,547, PY 2026 $8,813, PY 2027 $9,077, with a life cycle average of about $9,083. Annual amounts rise by CPI or 3%, whichever is less. source: US DOE, WPN 26-4, Recovered WAP funding, grant extension and grant life cycle ACPU (30 Oct 2026)
Final inspection by a certified QCI on every unit (WPN 22-4)Every DOE WAP unit reported complete gets a final inspection, led by a QCI, against the DOE-approved field guide, including a check of the audit's field data and software inputs. The client file form carries the QCI's printed name, signature, certification number and date. Grantee monitoring may not be done by the QCI who did that unit's audit or final inspection. source: US DOE, Weatherization Program Notice 22-4, SWS, Quality Control Inspections and Final Inspections
Field guides meet the SWS, updated every five years (WPN 22-4)Each state's field guide must meet or exceed the Standard Work Specifications and is updated on a five-year cycle. Agencies using the QCI mentorship option get quality assurance reviews on at least 10% of completed units. source: US DOE, Weatherization Program Notice 22-4, SWS, Quality Control Inspections and Final Inspections
Health and safety: deferral triggers (WPN 22-7)A home must be deferred if the occupant refuses ASHRAE 62.2 ventilation, if a safe primary heating system cannot be left in place where heat is needed, or if occupant health risk cannot be mitigated. No DOE-funded work may leave an unvented combustion heater as the primary heat source. The occupant is told in writing when code issues cause a deferral. source: US DOE, WPN 22-7 Health and Safety Guidance, Table of Issues (June 2022)
Knob and tube, vermiculite and mold (WPN 22-7)Inspect knob and tube wiring and evaluate it for safety before work; provide over-current protection and damming before insulating around it. Treat vermiculite as asbestos unless testing says otherwise, with a written policy for blower door testing where it is present. DOE health and safety funds may not pay for mold cleanup or mold testing; the occupant gets written notice of mold or moisture hazards. source: US DOE, WPN 22-7 Health and Safety Guidance, Table of Issues (June 2022)
Alarms, ventilation and lead (WPN 22-7)Install CO alarms where missing or inoperable per ASHRAE 62.2-2016 (which references NFPA 720), and smoke alarms where the authority having jurisdiction requires them. Follow EPA's RRP rule in pre-1978 housing unless testing shows the work area is lead free, with the Certified Renovator's certificate in the client file. source: US DOE, WPN 22-7 Health and Safety Guidance, Table of Issues (June 2022)
Combustion safety action levels (BPI Building Analyst standard)Abort testing if ambient CO goes over 35 ppm. Vented appliances that spill for more than 60 seconds after startup fail. Flue CO 0 to 25 ppm with a pass: proceed. Over 400 ppm with a failed draft: emergency, shut off fuel. CAZ limits run from -2 Pa (orphan natural draft water heater) to -50 Pa (sealed combustion). Check the action levels your state field guide adopts. source: Building Performance Institute, Technical Standards for the Building Analyst Professional (v1/4/12)
Client file: required health and safety forms (DOE checklist, Sept 2024)Signed and dated by the occupant (and landlord) and agency staff: pre-existing health condition screening, hazard identification notification, radon informed consent with EPA's Citizen's Guide to Radon, lead paint notification (Renovate Right), mold and moisture assessment, and any deferral letter. The checklist also lists the auditor's field data form with its required photo documentation. source: US DOE, WAP Client File Checklist (optional), September 2024
Federal 25C and 25D credits ended (OBBB, Public Law 119-21)The 25C energy efficient home improvement credit is not allowed for property placed in service after 31 December 2025, and the 25D residential clean energy credit is not allowed for expenditures after that date. For 25D an expenditure counts when installation is completed, so paying early does not help. Quotes that still promise these credits are out of date. source: IRS, FAQs for modification of sections 25C, 25D and others under Public Law 119-21 (OBBB)
HOMES and HEAR (IRA 50121 and 50122): launched state by state$8.8 billion to state energy offices: HOMES $4.3 billion for whole-house rebates (20% modeled or 15% measured savings), HEAR (HEEHR) $4.5 billion for point-of-sale rebates capped at $14,000 per household. As of June 2026, 12 states and DC had launched. DOE's 1 June 2026 guidance limits replacing non-electric appliances under HEEHR; launched states had until 31 August to comply. source: Building Performance Association, State Home Energy Rebate Programs factsheet (June 2026)
Wisconsin HOMES: modeled savings and BPI-2400 calibrationFocus on Energy pays 100% of cost up to $5,000 (20% to 34% savings) or $10,000 (35% or more) under 80% AMI, less above that. Work is submitted by an IRA Registered Contractor. The August 2024 modeling guidance requires 12 months of utility data, strict BPI-2400 calibration (within 5%, 500 kWh or 5 MMBtu of normalized use), and leaves the improved blower door number at the default unless measured. source: Focus on Energy, HOMES Program Energy Modeling Guidance (effective 1 Aug 2024)
Wisconsin HEAR: measure caps and the 1 Sep 2026 changeUnder 80% AMI, 100% of project cost; 80% to 150% AMI, 50%; over 150% not eligible; $14,000 per household. Heat pump up to $8,000, panel up to $4,000, wiring up to $2,500, insulation, ventilation and air sealing up to $1,600, through a Registered Contractor. From 1 September 2026 retail coupons are no longer accepted for equipment replacing fossil fuel appliances. One address cannot get HOMES and HEAR for the same upgrade type. source: Focus on Energy (Wisconsin), IRA HEAR rebates
Mass Save sponsors: insulation incentives and barrier mitigationCape Light Compact lists 75% off insulation and 100% off air sealing at the standard tier, 100% for income qualified customers, and barrier mitigation (knob and tube wiring, vermiculite) covered 100% for income eligible, up to $7,000 enhanced, up to $5,000 for market rate renters, after a required assessment. source: Cape Light Compact (Mass Save sponsor), Air sealing and insulation incentives and barrier mitigation

Rules vary by state, council and contract. Checked 29 November 2026; confirm against the source for your area before relying on it.

Numbers

The numbers on a weatherization file

Prices vary by state and program, so this table shows the limits, caps and test thresholds that decide whether a job qualifies, passes and gets paid.

ItemFigureWhere
WAP income ceiling200% of poverty, or 60% SMI where the state uses LIHEAPDOE WAP
Reweatherization wait15 years after prior federal weatherization42 U.S.C. 6865
ACPU, PY 2025 / PY 2026 / PY 2027$8,547 / $8,813 / $9,077 (estimated)WPN 26-4
QA reviews when using QCI menteesAt least 10% of completed unitsWPN 22-4
Ambient CO during testingOver 35 ppm: abort and ventilateBPI BA standard
Spillage after startupOver 60 seconds: failBPI BA standard
CAZ limit, orphan natural draft water heater-2 PaBPI BA standard
CAZ limit, individual natural draft furnace or water heater-5 PaBPI BA standard
CAZ limit, sealed combustion-50 PaBPI BA standard
Blower door test pressure50 Pa; ACH50 = CFM50 x 60 / volumeGreen Building Advisor
HEAR household cap$14,000BPA factsheet; Focus on Energy
Wisconsin HEAR heat pump / panel / insulationUp to $8,000 / $4,000 / $1,600Focus on Energy HEAR
Wisconsin HOMES, under 80% AMIUp to $5,000 (20% to 34%), $10,000 (35% plus)Focus on Energy HOMES
HOMES model calibrationWithin 5%, 500 kWh or 5 MMBtuFocus on Energy guidance

source: US DOE, How to Apply for Weatherization Assistance (200% of poverty, 60% SMI option, priority groups, renters)source: 42 U.S.C. 6865, Limitations on financial assistance (15-year reweatherization rule), Cornell LIIsource: US DOE, WPN 26-4, Recovered WAP funding, grant extension and grant life cycle ACPU (30 Oct 2026)source: US DOE, Weatherization Program Notice 22-4, SWS, Quality Control Inspections and Final Inspectionssource: Building Performance Institute, Technical Standards for the Building Analyst Professional (v1/4/12)source: Green Building Advisor, Blower Door Basics (CFM50 and ACH50)source: Building Performance Association, State Home Energy Rebate Programs factsheet (June 2026)source: Focus on Energy (Wisconsin), IRA HEAR rebatessource: Focus on Energy (Wisconsin), IRA HOMES rebatessource: Focus on Energy, HOMES Program Energy Modeling Guidance (effective 1 Aug 2024)

Where it breaks

Where spreadsheets and generic software fall over

An auditor drives an hour to a house, sets up the blower door, and finds vermiculite in the attic. The test cannot run depressurized and the job stalls with no letter to the client.

Intake asks about attic insulation type and the year built; a vermiculite answer routes the audit to the agency's written vermiculite procedure and pre-fills the hazard notification.

A house was deferred in March for a roof leak. The roof gets fixed in June, nobody is told, and the client sits on the deferral list for a year.

Every deferral has a reason, a remedy and an owner; when the remedy is logged the home goes back to the scheduling queue and the client gets a letter with the next step.

A unit is reported complete, then state monitoring finds the final inspection form has a signature but no QCI certification number. The unit is a finding.

Completion is blocked until the final inspection form carries the QCI's printed name, signature, certification number and date, and monitoring assignments exclude the QCI who did the audit or final.

One house is funded by WAP, a utility program and a HEAR heat pump rebate. Costs are in three spreadsheets, and the same insulation shows up on two claims.

Each measure line carries its funding source; one line can only be claimed once, ACPU counts only WAP costs, and HEAR totals stop at $14,000 per household.

Post-work photos are on a crew lead's phone. The utility program asks for the attic depth photo with the ruler, and it was never uploaded.

Each measure has required photos (before, during, after, depth ruler, nameplate) taken in the field app with GPS and time, and the measure cannot be marked done without them.

A sales sheet still tells homeowners about the 30% federal credit on a heat pump installed in 2026.

Quote templates are tied to program rules with an effective date; 25C and 25D text ended 31 December 2025 and the rebate lines show only programs live in that state.

Checklist

The home energy and weatherization operations checklist

Print it, or hand it to whoever runs the office side.

  • Income proof, household size and poverty or SMI percentage on file before the audit
  • Prior weatherization date checked against the 15-year rule
  • Ownership proof or rental agreement, and landlord permission signed for renters
  • Funding sources chosen per measure (WAP, utility, HOMES or HEAR) with caps noted
  • Blower door CFM50 and ACH50 recorded at test in
  • Every combustion appliance tested for CO, spillage, draft and worst-case CAZ pressure
  • Hazards screened: vermiculite, knob and tube, mold and moisture, unvented heaters, pre-1978 paint
  • Signed health screening, hazard notification, radon consent and Renovate Right receipt
  • Deferral letter with reason, remedy and appeal route where needed
  • Measures pass the cost test or are listed as health and safety
  • Installed to the state field guide and SWS, with before and after photos per measure
  • Test out repeated, ASHRAE 62.2 ventilation and CO alarms in place
  • Final inspection signed by a certified QCI with certification number and date
  • Costs posted by funder, ACPU checked, rebate claims filed

Software options

What software home energy upgrade and weatherization providers actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

Hancock Software (Hancock Cloud, HEAT)

Community action agencies, state WAP offices and utilities running income-eligible weatherization

Program management built for DOE WAP: eligibility, DOE-approved energy modeling, geo-located photos of installed measures, several funding sources on one project, and an offline mobile audit tool. Hancock says more than 450 community action agencies and 30 utilities use it; some states (for example Maryland and Kentucky) run their programs on it.

source: Hancock Software (Hancock Cloud, HEAT)

Weatherization Assistant (WAweb: NEAT, MHEA, MulTEA, Health and Safety Audit)

WAP agencies that need a DOE-approved audit tool

Maintained by Oak Ridge National Laboratory for DOE. NEAT covers site-built homes, MHEA manufactured homes, MulTEA multifamily, plus a Health and Safety Audit. The desktop WAv8 lost support on 30 June 2024. It is an audit tool, not a job or crew system.

source: Weatherization Assistant (WAweb: NEAT, MHEA, MulTEA, Health and Safety Audit)

Snugg Pro

Home performance contractors in utility and IRA HOMES programs

Cloud energy audit, modeling, reports and proposals with HPXML export, live rebate calculations and program job templates; priced per job. On BPI's BPI-2400 compliant tools list and named in Focus on Energy's HOMES modeling guidance.

source: Snugg Pro

OptiMiser, Clarity HPTK, Beacon

Contractors who need a BPI-2400 calibrated model for HOMES

The other tools on BPI's December 2025 BPI-2400 compliant list (AkWarm is approved in Alaska). Check which ones your state's HOMES program accepts.

source: OptiMiser, Clarity HPTK, Beacon

CompanyCam

Crews that need before and after photos per job

Photo app with GPS and timestamps on each photo, offline capture, and a ghost-overlay before and after camera. It holds photos, not eligibility, diagnostics or the QCI sign-off, so it usually sits beside another system.

source: CompanyCam

General field service software (Jobber, Housecall Pro, ServiceTitan)

Market-rate insulation and HVAC contractors doing some program work

Good for quotes, scheduling, invoices and payments. Income tiers, deferrals, test-in and test-out readings, ACPU and QCI sign-off would be custom fields and manual steps.

Published prices, compared:source: Hancock Software press release: support for Home Efficiency Rebates (EIN Presswire)source: US DOE, WAP Memorandum 113, Weatherization Assistant suite of tools and transition (29 Aug 2023)source: Snugg Pro, energy auditing and productivity platformsource: Building Performance Institute, BPI-2400 compliant modeling tools list (Dec 2025)source: CompanyCam, before and after camera (GPS and timestamp on each photo)source: Focus on Energy, HOMES Program Energy Modeling Guidance (effective 1 Aug 2024)

Questions to ask any vendor

  • Can it hold household income, size and the poverty, SMI and AMI percentages, and refuse an audit when the 15-year rule or landlord permission is missing?
  • Does the field app record blower door CFM50 and ACH50 and per-appliance CO, spillage seconds and CAZ pascals, offline in a basement, and flag a value past the limit?
  • Can a deferral carry a reason, remedy, letter and appeal, and come back into the queue when the remedy is done?
  • Can it block completion until the final inspection has the QCI's name, signature, certification number and date?
  • Can one home carry WAP, utility and HOMES or HEAR funding per measure, with ACPU and the $14,000 HEAR cap tracked?
  • Can it export what my state's WAP system or rebate portal needs, and import a model result from Snugg Pro, OptiMiser or WAweb?

Bring one real home energy and weatherization job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Home energy and weatherization on Fieldproxy: built around how you already work

A Fieldproxy setup for a weatherization agency or home energy contractor is built around the client file: the household and its income, the house and its prior work, the audit and its test numbers, the hazards and deferrals, the measures by funder, the photos and the QCI's signature. The program rules (200% FPG or 60% SMI, the 15-year rule, WPN 22-7 deferrals, ACPU, HEAR caps) become statuses and blocks, so a unit cannot be reported complete ahead of its paper.

Module 1

Household intake and eligibility

Every program starts with income, and each one measures it differently.

  • Records: Household > Applicant and members > Dwelling > Project (one per program year) > Measures
  • Fields: household size, prior-year income by source, SSI yes or no, poverty %, SMI %, AMI tier, priority flags (elderly, disability, child under e.g. 6, high energy burden), waitlist date
  • Documents: pay stubs, Social Security letters, deed or lease, landlord permission form, utility bills
  • Status: Applied, Docs missing, Eligible, Waitlisted, Audit booked, Deferred, Work order, In progress, Test out, Final inspection, Complete, Monitored, Closed
How this works

Module 2

Funding stack and program rules

One house can be paid by three programs with three sets of rules.

  • Program records: DOE WAP (grant year, ACPU), LIHEAP, utility program (e.g. Focus on Energy, Mass Save sponsor), HOMES, HEAR, landlord contribution
  • Rules: 15-year reweatherization check on the dwelling; HEAR total stops at $14,000 per household; a measure line can be claimed by one program only; in Wisconsin one address cannot take HOMES and HEAR for the same upgrade type
  • Rule effective dates so templates stop offering 25C and 25D after 31 December 2025 and HEAR fossil replacement after the state's change date
How this works

Module 3

Audit and diagnostics app

The test numbers decide the work scope, and they are re-checked at final inspection.

  • Blower door: house volume, CFM50, ACH50 calculated, test conditions, manometer photo
  • Combustion: per appliance type, venting, flue CO ppm, spillage seconds, draft, worst-case CAZ Pa compared with the limit for that venting type; ambient CO over 35 ppm stops the form
  • Attic, wall and floor data with insulation type and depth, ASHRAE 62.2 required CFM, model result imported from WAweb, Snugg Pro or OptiMiser (savings %, SIR per measure)
  • Works offline; test in and test out on the same screen so the change shows
How this works

Module 4

Health, safety and deferral

WPN 22-7 hazards decide whether work can start at all.

  • Hazard checklist: vermiculite (presumed asbestos), knob and tube (live or not, over-current protection, damming), mold or moisture, unvented heaters, pre-1978 paint, pests, asbestos siding
  • Signed forms: health condition screening, hazard notification, radon informed consent, Renovate Right receipt
  • Deferral record: reason, remedy, who fixes it, letter date, appeal date; remedy logged sends the home back to scheduling
How this works

Module 5

Work order and measures

The scope has to show why each measure is there.

  • Measure lines: air sealing hours, attic insulation sq ft and R-value, dense-pack walls, duct sealing, bath fan, CO and smoke alarms, furnace or heat pump, water heater, panel
  • Each line tagged cost-effective (SIR) or health and safety, with funder and rebate amount
  • Work order PDF from your template for client and landlord signature
How this works

Module 6

Crews, subcontractors and credentials

Who may audit, install, renovate a pre-1978 home and sign a final inspection is set by certification.

  • Per person: BPI Building Analyst Technician or Professional, HEP Energy Auditor, HEP QCI with number and expiry, EPA RRP Certified Renovator, IRA Registered Contractor status for HOMES and HEAR
  • Subs (HVAC, electrical, insulation) with insurance and license expiry; jobs blocked for expired credentials
  • Scheduling by crew, zone and van; pre-1978 jobs need a Certified Renovator on the crew
How this works

Module 7

Photo and document file

Programs pay on evidence, and the client file has to tell the story.

  • Required photos per measure: before, during, after, insulation depth with ruler, equipment nameplates, CO alarm, ventilation fan
  • Every photo stamped with GPS, time and the measure it belongs to; measure cannot close without its set
  • File checklist that mirrors your state's client file order, ready for monitoring
How this works

Module 8

Final inspection and monitoring

A unit is not complete until a certified QCI signs it.

  • Final inspection form: each measure pass or fail against the field guide, audit inputs checked, test out numbers reviewed
  • Block: Complete status needs QCI printed name, signature, certification number and date
  • Monitoring sample (e.g. 10% where mentees inspect) assigned to a QCI who did not audit or final that unit; findings open a callback

Module 9

Claims, invoices and program reporting

Each funder wants its own claim, and WAP wants the ACPU.

  • Claims per program with the measures, photos and test data each needs; rebate status (Submitted, Returned, Paid)
  • ACPU tracked on WAP costs against the grant life cycle figure (PY 2026 $8,813)
  • Dashboards: units by status, deferrals by reason, days from application to complete, CFM50 reduction per unit; QuickBooks or Xero sync
How this works

The AI agents, set up for home energy upgrade and weatherization providers

AgentWhenWhat it doesWhat you get
Document intelligence agentAn applicant emails or uploads pay stubs, a Social Security award letter, a lease or 12 months of utility billsReads income by source and period, household members, landlord name and monthly usage, and computes poverty, SMI and AMI percentagesThe household record filled, with a flag if income is over the program limit or a document is missing
Vision agentThe auditor photographs the blower door manometer, the combustion analyzer printout or an equipment nameplateReads CFM50, flue CO ppm, the appliance make, model and input ratingDiagnostics fields filled on the audit or test out form, with any reading past its action level highlighted
Watcher agentA unit moves to Complete, a deferral passes e.g. 60 days with no remedy, HEAR totals near $14,000, or WAP costs push the ACPU over the life cycle figureChecks the file against the QCI sign-off, deferral, funding cap and ACPU rulesA blocked status change with the missing item, or an alert to the program manager
AutopilotAn application has been in Docs missing for e.g. 14 days, a landlord has not signed, or a deferral remedy is loggedDrafts the chase for the missing document, the landlord permission request, or the letter that the home is back in lineA draft a coordinator approves before it sends
Voice agentThe auditor talks through the attic, basement and hazards while walking the houseTurns the notes into insulation depths, hazard checklist answers and measure linesAudit form and draft work order filled from the voice notes
Scheduler agentEvery Monday at 7 amLists units awaiting final inspection, deferrals by reason, applications missing documents, rebate claims returned and credentials expiringA weekly briefing emailed to the program director

Straight answers

Home energy and weatherization: FAQ

What software do home energy upgrade and weatherization providers use?

WAP agencies mostly use Hancock Software or a state system for intake, audits and invoicing, with the DOE Weatherization Assistant (NEAT, MHEA, MulTEA in WAweb) or another approved audit tool. Contractors in utility and HOMES programs model in BPI-2400 tools such as Snugg Pro or OptiMiser, keep photos in CompanyCam, and run jobs in a field service app. Fieldproxy is set up around your own programs, forms and client file.

Who qualifies for the Weatherization Assistance Program?

Households at or below 200% of the federal poverty guidelines, households on SSI, and in some states households under the LIHEAP limit of 60% of state median income. Priority goes to the elderly, people with disabilities, families with children and high energy burden households. Renters qualify with landlord permission.

Can a home be weatherized twice?

Not with WAP money within 15 years. 42 U.S.C. 6865 says a unit weatherized under WAP or another federal program cannot get more WAP assistance until 15 years after that work was completed. The Energy Act of 2020 set the 15-year rule.

Why would a weatherization job be deferred?

Under WPN 22-7: the occupant refuses ASHRAE 62.2 ventilation, a safe primary heating system cannot be left in place, occupant health risk cannot be mitigated, or pests cannot reasonably be removed. DOE health and safety funds may not pay for mold cleanup or major electrical repairs. The client gets the reason in writing.

What does a QCI do in weatherization?

A certified Quality Control Inspector leads the final inspection that every DOE WAP unit needs before it is reported complete. They check the work against the state field guide and review the audit's data and measure choices, and sign a form with their printed name, signature, certification number and date.

What is CAZ depressurization testing?

Worst-case testing of the combustion appliance zone: exhaust fans and the air handler on, doors set for the most negative pressure, then each appliance is fired and checked for spillage, draft and CO. BPI's Building Analyst standard sets limits by venting type, from -2 Pa for an orphan natural draft water heater to -50 Pa for sealed combustion, and fails spillage past 60 seconds.

Is the 25C energy efficiency tax credit still available?

No. The IRS says the 25C credit is not allowed for property placed in service after 31 December 2025, and the 25D credit is not allowed for expenditures after that date, under Public Law 119-21. For 25D, an expenditure counts when installation is completed, so a 2025 payment for a 2026 install does not qualify.

Are the IRA HOMES and HEAR rebates live?

Only in some states. The Building Performance Association counted 12 states and DC launched as of June 2026. DOE issued new guidance on 1 June 2026 that limits replacing non-electric appliances under HEAR, and launched states had until 31 August to comply. Wisconsin runs both through Focus on Energy; check your state energy office.

What is the difference between HOMES and HEAR?

HOMES pays for whole-house projects by modeled (at least 20%) or measured (at least 15%) savings, for any income. HEAR pays point-of-sale rebates for heat pumps, heat pump water heaters, panels, wiring and insulation to households under 150% of area median income, capped at $14,000 per household. In Wisconsin HOMES models must be BPI-2400 calibrated.

Which BPI certification does a home energy auditor need?

BPI now offers the Building Analyst Technician (field data and diagnostic testing) and Building Analyst Professional (modeling and analysis); the old Envelope Professional is listed as retired. WAP work uses the Home Energy Professional certifications, including Energy Auditor and Quality Control Inspector. Rebate programs set their own contractor rules.

What is a HERS rating and does weatherization need one?

A RESNET HERS Index scores a home against a reference home built to the 2006 IECC, which scores 100; a net zero home scores 0. It is mainly used for new homes and code compliance. WAP uses DOE-approved audit tools instead, and HOMES uses BPI-2400 calibrated models.

Related guides

All sources on this page (37)

Run home energy upgrade and weatherization providers work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.