Guide for dumpster rental companies ยท checked 21 November 2026

Dumpster rental software built around the can, the scale ticket and the street permit

A roll-off company sells three things at once: a steel box for a number of days, a truck haul, and a number of tons at the landfill. Nobody knows the tons until the truck crosses the scale, which is days after the price was quoted. This guide covers how the work runs from order to final pull, the street permit rules in Chicago, New York, San Francisco, Philadelphia and Boston, the truck weight and driver rules, what cannot go in the box, why a 30 yard of mixed debris blows through its included tons, and what software haulers use.

See your own jobs set up this way

A 30-minute call. We show you dumpster rental companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Dumpster rental companies need software that tracks every container by number and where it is sitting, counts days on site against the rental period, dispatches deliveries, swaps and final pulls, captures the landfill scale ticket for each haul, and bills overage tons, extra days and trip fees from that data. Docket, CurbWaste, Hauler Hero and CRO Software are built for roll-off haulers; larger multi-line haulers run AMCS or Routeware. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each can carries its permit, its included tons and its rental clock, and the final invoice is built from the scale ticket photo rather than typed in a week later.

484 lb

Average weight of a cubic yard of mixed C&D debris, from 171 weighed loads at 10 Florida facilities

source: Florida DEP, Converting C&D Debris from Volume to Weight (fact sheet for facility operators)

34,000 lb

Federal tandem axle limit on Interstates, the number that decides how heavy a loaded can may be

source: 23 CFR 658.17, Weight (federal Interstate axle and gross limits)

5 days, 9 ft

NYC: a container permit lasts five consecutive days and the box may sit no more than 9 feet from the curb

source: NYC DOT, Commercial Refuse Container Permit overview (Highway Rules 2-03 and 2-14(f))

$195 to $350

What Dumpsters.com says most trip fees cost when the truck arrives and cannot deliver or pull

source: Dumpsters.com, What is a dumpster trip fee?

How a job runs

One dumpster rental job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Take the order and ask what is going in

    The size question is really a material question. Ask what debris (roofing, concrete, household cleanout, mixed C&D), roughly how much, and where the box will sit. Dumpsters.com steers concrete, brick, dirt and shingles into a 10 yard filled only partway, and Republic puts concrete and dirt in a 10 or 15 yard. A customer who orders a 30 yard for a driveway demolition is ordering a load the truck cannot legally carry.

  2. 2

    Quote the box, the days and the tons

    A roll-off price bundles delivery, pickup, a rental period and a tonnage allowance. Dumpsters.com lists 1 to 2 tons with a 10 yard, 2 to 3 with a 20 yard and 4 to 5 with a 40 yard, and typical rentals of 7 to 10 days. Republic's standard rental is 9 days. State the overage rate per ton, the per day extension rate and the trip fee on the quote, because those three lines are where the disputes come from.

  3. 3

    Decide whether it needs a street permit

    On a driveway or private lot, usually no permit. On the street, sidewalk or alley, the city decides who applies. In Chicago and New York the hauler holds the permit; in New York the carting company, not the property owner, must secure it. In Boston the applicant needs a letter of authorization from the container owner and has to apply at least seven business days ahead. The delivery cannot be promised before the permit dates are known.

  4. 4

    Check the site before the truck rolls

    Dumpsters.com gives the space a roll-off delivery needs: about 10.5 feet wide, 60 feet long and 25 to 30 feet of overhead clearance. Record the surface (asphalt, pavers, new concrete, gravel, grass), overhead wires and branches, gate codes, and exactly where the customer wants the door end. Both big resellers tell customers to lay plywood under the box to protect the driveway.

  5. 5

    Deliver and record the can

    The driver records the container number, size, the exact spot, a photo of the placement and of the surface before the rollers touch it, and the time. From that moment the can is an asset on rent: its day count starts, and if it is on the street the permit number and expiry travel with it. Chicago requires the provider's name and phone in letters at least three inches high on both long sides, and reflective sheeting on all four corners.

  6. 6

    Manage days on site and swaps

    Each day the office needs one list: cans past their rental period, cans whose street permit expires this week, and cans that have not moved in 30 days. A swap (also called dump and return or switch-out) pulls the full box and sets an empty one in the same spot; in New York a swap inside the five days needs no new permit. An extension is billed per day: Budget Dumpster publishes $15 to $50 a day.

  7. 7

    Pull the box and check the load first

    Before hooking up, the driver checks the load is at or below the fill line, looks for prohibited items on top, and tarps it. California requires a load of refuse to be totally covered on a highway, and Chicago requires the dumpster tarped in transit. If the box is overfilled, blocked by a parked car or loaded with tires and paint, the driver photographs it and the job becomes a trip fee, not a pull.

  8. 8

    Weigh in, tip and weigh out

    At the landfill, transfer station or C&D recycler the truck is weighed in and out. The scale ticket carries the facility, ticket number, date and time, gross, tare and net weight, material class and the charge. That ticket is the only evidence of the tonnage on the customer's invoice and, on a recycling job, the only evidence of diversion. Photograph it in the cab before it ends up on the dashboard.

  9. 9

    Bill the final from the ticket

    Net tons minus included tons is the overage, at the quoted rate (Budget Dumpster publishes $50 to $250 per ton, prorated by the pound). Add extension days, any trip fee and per item charges for mattresses or appliances. Attach the scale ticket to the invoice. For contractor accounts, roll the month's hauls into one statement by job site with the ticket for each haul.

  10. 10

    Close out permits and recycling reports

    Return the can to available stock, close the street permit, and for jobs under a diversion rule give the contractor the tonnage report. Austin's ordinance makes the general contractor file a report with the tonnage data from haulers and facilities when the final inspection is requested, and requires weight tickets to be kept.

What to record

The fields every dumpster rental job should capture

Container (the can)

  • Container number, size in cubic yards (10, 12, 15, 20, 30, 40), outside dimensions, door type, hook or cable style
  • Tare weight if known, condition (floor, door latch, rollers), last repair and repaint date
  • Company name and phone lettering present, reflective corner markers present, state or city decal or medallion number where required
  • Current status: In yard, Scheduled out, On site, Full awaiting pull, In transit, At facility, Out for repair
  • Current address, exact placement (driveway, street, alley), GPS pin and placement photo
  • Days on site this rental and days idle in the yard

Rental order

  • Customer, job site, contractor PO or job number, who may order swaps
  • Declared material: mixed C&D, roofing shingles, clean concrete, dirt, yard waste, household cleanout
  • Size, included tons, rental period in days, per day extension rate, overage rate per ton, trip fee
  • Placement surface, plywood required yes/no, overhead clearance, space for the truck, gate code
  • Street placement yes/no; permit authority, permit number, start and end dates, who applied
  • Prohibited items acknowledged by the customer, with date and name

Each haul (delivery, swap, pull, relocation, dry run)

  • Job type, truck, driver, arrival and departure time
  • Before and after photos of the surface; photo of the load at pickup showing the fill line
  • Overfilled yes/no, prohibited items seen (tires, batteries, paint, refrigerant appliances, mattresses), blocked access yes/no
  • Load tarped yes/no
  • Facility, scale ticket number, time in and out, gross, tare and net weight, material class, disposal charge
  • Scale ticket photo; diversion percentage if the facility reports one

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
Chicago 10-28-799: the provider holds the permitSince 1 January 2001, companies providing dumpsters that occupy the public way must hold a CDOT permit; none is needed on private property. Class A is 30 cubic yards or less, Class B is larger. The application lists $50 for a Class A for 1 to 3 days or $100 a month outside the central business district, doubled inside it, and doubled again for Class B. The provider carries at least $1,000,000 of insurance naming the City and posts a $5,000 letter of credit. source: Chicago DOT, Application for Permit for Dumpster(s) Occupying the Public Way (Municipal Code 10-28-799)
Chicago marking, graffiti and finesThe provider's name and telephone number go on both long sides in letters at least three inches high. Retro-reflective sheeting at least three feet long and two inches wide goes on each of the four corners. Graffiti must be removed within three business days of notice and the load tarped in transit. Fines for placing a dumpster without a permit run $250 to $1,500 per offense ($500 to $3,000 in the central business district), each day is a separate offense, and the City may remove the box at the provider's cost. source: Chicago DOT, Application for Permit for Dumpster(s) Occupying the Public Way (Municipal Code 10-28-799)
New York City DOT: five days, the carter appliesOne permit covers one container at one location for up to five consecutive days, and swapping a full container inside those days needs no new permit. Construction debris container permits run 30 to 90 days and go only to registered general contractors on sites that need a DOB or DOT construction permit. The permit gives no parking privileges. source: NYC DOT, Commercial Refuse Container Permits
NYC placement rules (Highway Rules 2-14(f))DOT's handout says the carting company, not the property owner, secures the permit (it gave the fee as $30 in 2010; check the current schedule). The container sits parallel to the curb, no more than 9 feet into the street, on a protective covering, marked with high intensity reflective paint or reflectors and the owner's name, address and telephone number. It may not sit in No Stopping, No Standing or No Parking Anytime zones, in crosswalks or pedestrian ramps, or within 15 feet of a hydrant. source: NYC DOT, Commercial Refuse Container Permit overview (Highway Rules 2-03 and 2-14(f))
NYC Business Integrity Commission: Class 2 registrationA company that removes only construction, demolition, alteration or excavation waste needs a Class 2 Registration from BIC, also called an exemption from licensing requirements. It expires every two years. The application fee is $3,500 plus $500 per vehicle, and approved applicants get trade waste plates for each vehicle. source: NYC Business Integrity Commission, Registration for the Removal of Construction and Demolition Debris (Class 2)
San Francisco: a permit on every debris boxSince 1 January 2022, each debris box carrying mixed C&D needs its own annual or temporary 7-day permit from the Environment Department, displayed even on private property. This replaced the old Public Works debris box permits; a Public Works street space permit is still needed in the right of way. Mixed C&D must go to a registered facility. Project recovery rates are 65%, or 75% for full demolition. source: San Francisco Environment Department, mixed C&D debris transporter permit
San Francisco fines for 2026Transporting mixed C&D in a debris box without a permit costs $559 for a first offense, $1,118 for a second and $1,676 for a third. Hauling to an unregistered facility costs $1,118, $2,235 and $3,353. source: San Francisco Environment Department, C&D Debris Transporter Fine Schedule 2026
Philadelphia: licence and RFID medallionThe company that leases or maintains construction dumpsters holds the licence: $75 for every three dumpsters or part of three, renewed annually. Each dumpster carries an RFID medallion ($25 to replace if damaged, $75 if lost or stolen). Street or sidewalk placement needs a separate right-of-way permit from the Streets Department. source: City of Philadelphia L&I, Get a Construction Dumpster License
Boston street occupancy permitThe base fee is $50, plus $0.10 per square foot per day for the first 500 square feet. Metered spaces cost $20 per meter per day and signs $4 each. Apply at least seven business days ahead, with a letter of authorization from the container owner and a $5,000 occupancy surety bond. source: City of Boston Public Works, How to get a street occupancy permit
New Jersey: A-901 licence, decals and lettering on every containerHauling waste generated by someone else in New Jersey needs an A-901 licence and transporter registration; NJDEP's guide uses a contractor placing containers for other people's construction waste as its example. Registration is biennial. Each vehicle and container carries a decal, and the NJDEP number, registered company name and capacity are lettered at least three inches high in contrasting colors (N.J.A.C. 7:26-3.4(h)). An origin and disposal form is completed before hauling to an in-state disposal site. source: NJDEP, Solid and Hazardous Waste Transporter Quick Access Guide (N.J.A.C. 7:26-3, N.J.S.A. 27:5I-1)
New Jersey roll-offs on roadways (N.J.S.A. 27:5I-1)A roll-off left on a roadway needs written consent from the authority with jurisdiction and reflective diamond markers at least 18 by 18 inches on both ends. The guide lists a fine of not more than $100 per violation. source: NJDEP, Solid and Hazardous Waste Transporter Quick Access Guide (N.J.A.C. 7:26-3, N.J.S.A. 27:5I-1)
Federal weight limits: 23 CFR 658.17On Interstates and reasonable access routes, the maximum is 20,000 pounds on any one axle, 34,000 pounds on a tandem and 80,000 pounds gross, lower where the bridge formula requires. A roll-off truck is a short straight truck, so the tandem limit and the bridge formula bite long before 80,000. Heavy debris therefore goes in small cans, and Dumpsters.com lists a load of 10 tons or more as a trip fee trigger. source: 23 CFR 658.17, Weight (federal Interstate axle and gross limits)
CDL Group B: 49 CFR 383.91Any single vehicle with a GVWR of 26,001 pounds or more is a Group B heavy straight vehicle, which is where a tandem roll-off truck sits. Pulling a trailer with a GVWR over 10,000 pounds, such as a pup trailer carrying a second can, moves the driver into Group A when the combination reaches 26,001 pounds. source: 49 CFR 383.91, Commercial motor vehicle groups (CDL Group A and B)
Short-haul exception: 49 CFR 395.1(e)A driver who works within 150 air miles of the normal reporting location and is released within 14 consecutive hours is exempt from duty-status logs, provided the carrier keeps time records showing report time, total hours on duty and release time each day for 6 months. A yard-to-site-to-landfill day fits this, until a distant facility or a long queue at the scale pushes the day past 14 hours. source: 49 CFR 395.1(e), Short-haul operations
Driver vehicle inspection reports: 49 CFR 396.11The driver reports defects found at the end of each day's work on each vehicle, covering items such as service brakes, tires, horn, wipers and coupling devices. No report is required when no defect is found. Reports are kept three months. source: 49 CFR 396.11, Driver vehicle inspection report(s)
Cover the load: California Vehicle Code 23115A vehicle carrying garbage, refuse, trash, rubbish or anything being transported for disposal or recycling may not move on a highway unless the load is totally covered. source: California Vehicle Code 23115, covering loads of refuse
Cover the load: Florida 316.520Vehicles hauling dirt, sand, gravel, trash and similar materials need a close-fitting tarpaulin or other appropriate cover. A violation is a noncriminal nonmoving infraction; a willful violation that causes serious injury or death is a second-degree misdemeanor. source: Florida Statutes 316.520, Loads on vehicles
Massachusetts waste bans: 310 CMR 19.017No person may dispose of, transfer for disposal, or contract for the disposal or transport of banned materials. For a roll-off hauler the list includes asphalt pavement, brick and concrete, metal, wood (all since 1 July 2006), clean gypsum wallboard (1 July 2011), and mattresses and textiles (1 November 2022). Collecting banned material in a way that ends in disposal counts as contracting for disposal. source: 310 CMR 19.017, Massachusetts Waste Bans (Cornell LII)
Appliances with refrigerant: 40 CFR 82.155The final processor, such as a scrap recycler or landfill, must either recover the refrigerant or verify with a signed statement or contract that it was recovered, and keep those records three years. The signed statement names who recovered the refrigerant and when. A refrigerator tossed in a roll-off arrives with no such statement, which is why haulers surcharge or refuse it. source: 40 CFR 82.155, Safe disposal of appliances
CALGreen: 65% diversion on California building permitsCALGreen sections 4.408.1 (residential) and 5.408.1 (non-residential) require at least 65% of construction waste to be diverted. The builder files a waste management plan or uses a waste management company with verifiable documentation. The alternative is a disposal cap, for example no more than 2 pounds per square foot on non-residential work. source: CalRecycle, CALGreen Construction Waste Management Requirements (2019, 2022 and 2025 codes)
Austin C&D recycling ordinanceBuilding permits for more than 5,000 square feet and all commercial and multifamily demolition must divert at least 50% of debris or landfill less than 2.5 pounds per square foot of permitted floor area. The general contractor reports online when the final inspection is requested, using tonnage data from haulers and facilities; weight tickets must be kept. Violations are a Class C misdemeanor with fines up to $500 per day, per offense. source: City of Austin, Construction and Demolition Recycling Ordinance
ANSI Z245 equipment standardsThe National Waste & Recycling Association is secretariat for the ANSI Z245 standards: Z245.1 covers mobile collection, transportation and compaction equipment, Z245.30 covers waste container safety and Z245.60 covers container compatibility dimensions, which is what lets one maker's can ride on another maker's hoist. source: National Waste & Recycling Association, ANSI Z245 standards
The injury recordBLS counted 36 deaths among refuse and recyclable material collectors in 2024, a rate of 37.4 per 100,000 full-time equivalent workers against 3.3 for all workers. On BLS's chart of selected occupations only logging, fishing and hunting, roofing and structural iron and steel work were higher. source: BLS, Census of Fatal Occupational Injuries: fatal work injury rates in selected occupations, 2024

Rules vary by state, council and contract. Checked 21 November 2026; confirm against the source for your area before relying on it.

Numbers

Sizes, included tons, fees and what a full can really weighs

Sizes and fees are what the named companies publish; your market will differ. The weight rows multiply the can's volume by EPA's average density for that material, so treat them as worked examples: real loads vary and a level-loaded can is rarely packed solid.

ItemNumberBasis
10 yard14 x 7.5 x 3.5 ft, 1 to 2 tons includedDumpsters.com sizes
20 yard22 x 7.5 x 4.5 ft, 2 to 3 tons includedDumpsters.com sizes
30 yard22 x 7.5 x 6 ft, 2 to 4 tons includedDumpsters.com sizes
40 yard22 x 7.5 x 8 ft, 4 to 5 tons includedDumpsters.com sizes
Rental period7 to 10 days typical; Republic 9 daysDumpsters.com FAQ, Republic Services
Extension per day$15 to $50Budget Dumpster fees page
Overage per ton$50 to $250, prorated by the poundBudget Dumpster fees page
Trip or dry run fee$195 to $350Dumpsters.com, Budget Dumpster
Per item disposal (appliance, mattress, electronics)$25 to $200 eachBudget Dumpster fees page
Delivery space10.5 ft wide, 60 ft long, 25 to 30 ft overheadDumpsters.com FAQ
Mixed C&D density484 lb per cubic yard (0.24 tons)Florida DEP, 171 loads weighed
Worked example: 30 yard level full of mixed C&D30 x 484 lb = 14,520 lb, 7.3 tons against 2 to 4 includedEPA and Florida DEP factor
Worked example: 20 yard of asphalt shingles20 x 731 lb = 14,620 lb, 7.3 tons against 2 to 3 includedEPA conversion factors
Worked example: 10 yard of broken concrete10 x 860 lb = 8,600 lb, 4.3 tons against 1 to 2 includedEPA conversion factors
Worked example: 20 yard of drywall20 x 467 lb = 9,340 lb, 4.7 tonsEPA conversion factors
Landfill tip fee, national average$62.28 per ton in 2024; $56.80 unweighted in 2023, Northeast $84.44EREF via Waste Dive and BioCycle

source: Dumpsters.com, Dumpster sizes (dimensions and included tons)source: Dumpsters.com, Dumpster rental FAQssource: Dumpsters.com, What is a dumpster trip fee?source: Budget Dumpster, Dumpster rental feessource: Republic Services, Dumpster rental sizes and how it workssource: US EPA, Volume-to-Weight Conversion Factors (April 2016)source: Florida DEP, Converting C&D Debris from Volume to Weight (fact sheet for facility operators)source: BioCycle, 2023 U.S. landfill tip fees (EREF analysis), 9 July 2024source: Waste Dive, Northeast disposal capacity loss (cites EREF 2024 tip fees), 18 May 2026

Where it breaks

Where spreadsheets and generic software fall over

Nobody knows where the cans are. The whiteboard says 62 boxes are out, the yard count says 9 are in, and the fleet is 80. The missing ones are behind a contractor's fence, billing nothing, since a job that ended in August.

Make the container a numbered record with a status and an address that only changes when a driver closes a delivery, swap or pull, and report cans on site past their rental period every morning.

The scale ticket reaches the office a week later, crumpled, or not at all. The invoice goes out at the flat price, and 3 tons of overage at the landfill's rate comes straight out of the margin.

Require a scale ticket photo and net weight before a pull can close, and build the final invoice from net tons minus the tons included on that order.

The street permit expired on day five and the box is still there on day nine. In Chicago every day is a separate offense and the provider, not the customer, holds the permit.

Put the permit number, authority and end date on the rental, block street deliveries with no permit on file, and raise a renew-or-pull task before the end date.

The customer ordered a 30 yard for "construction debris" and filled it with a broken-up patio. The truck cannot lift it legally, the driver leaves, and the customer disputes the trip fee because nobody told them.

Record the declared material at order time, limit heavy materials to the sizes you allow for them, and send the heavy debris and fill line rules with the confirmation.

Trip fees and prohibited item charges are argued from memory. The driver says the box was heaped a foot over the rails with two tires on top; the customer says it was not.

Make the load photo at pickup mandatory, with overfilled and prohibited item checkboxes, so every charge has a timestamped picture behind it.

A contractor asks for diversion tonnage for a CALGreen or Austin report at final inspection, and the hauler has to dig through six months of paper tickets from three facilities.

Tag each haul with the job site and facility, store net tons and material class from the ticket, and produce the per project tonnage report from the data.

Checklist

The dumpster rental operations checklist

Print it, or hand it to whoever runs the office side.

  • Every container numbered, sized and on file with its current status and address
  • Company name, phone and reflective markers on each can to the strictest city you work in (three inch letters in Chicago and New Jersey)
  • City and state credentials current: hauler licence or registration, container decals or medallions, insurance certificates naming the city
  • Declared material recorded on every order and checked against the sizes allowed for heavy debris
  • Included tons, rental days, extension rate, overage rate and trip fee stated on the quote and the confirmation
  • Prohibited items list sent to the customer and acknowledged
  • Street placement checked on every order; permit number and dates on file before delivery
  • Surface, overhead clearance and truck access noted; plywood sent on driveways
  • Placement photo and surface photo at delivery; load photo at pickup
  • Load at or below the fill line and tarped before it moves
  • Scale ticket photographed with ticket number, gross, tare and net weight entered
  • Final invoice built from net tons, days on site and logged trip fees, with the ticket attached
  • Daily list of cans past rental period, permits expiring within 3 days, and cans idle over 30 days
  • Driver time records kept 6 months and defect reports 3 months for short-haul operations

Software options

What software dumpster rental companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

Docket

Roll-off dumpster rental companies and small trash route haulers

Drops, swaps and pickups on one dispatch board, a driver app that works offline, dumpster identification by PIN or QR scan at drop-off with days at each location, an online shopping cart on every plan, and QuickBooks Online and Xero sync. Priced per truck with office staff free; no dollar figures are published. ServiceCore announced it had acquired Docket in May 2023.

source: Docket

CurbWaste

Roll-off and commercial haulers who want billing driven by days and tons

Container and days-on-site tracking, drop, swap, pull and final job types, a weight ticket photo at the scale, and included days and tons applied automatically with the difference billed at final. Has embedded online ordering and a QuickBooks integration. Priced per driver per month plus a percentage of payments; no figure published.

source: CurbWaste

Hauler Hero

Private and municipal haulers of all sizes

Tracks each container by serial number, location and deployment status, bills rental duration alongside haul and disposal fees, and has drivers enter disposal ticket number, material and tonnage on a tablet. Delivery, dump and return, swap and final each carry their own price. Integrates with QuickBooks. No price published.

source: Hauler Hero

CRO Software

Single truck owner-operators up to large waste firms

A RapidWorks product with real-time container tracking, idle asset and container aging reports, a driver app with photos, a customer portal for requesting swaps, and two-way QuickBooks sync. The site states no contracts and no training or setup fees; no price is published.

source: CRO Software

AMCS Platform and Routeware

Multi-line haulers running roll-off beside residential and commercial routes

Enterprise waste systems. TRUX is now part of AMCS Platform after AMCS bought TRUX Route Management Systems in 2020. Routeware describes its dispatch as a good fit for roll-off operators, with service orders sent to in-cab tablets. Worth it when roll-off is one line of a larger hauling business with scale houses and route billing.

source: AMCS Platform and Routeware

Published prices, compared:source: Docket, software for roll-off dumpster rental and trash routessource: PRWeb, ServiceCore announces acquisition of Docket (1 May 2023)source: CurbWaste, waste hauling and dumpster rental software FAQsource: Hauler Hero, roll-off softwaresource: CRO Software (RapidWorks), roll-off and dumpster softwaresource: AMCS, Trux is now AMCS Platformsource: Routeware, dispatch for collection operations

Questions to ask any vendor

  • Is each container its own numbered record with a status and location, and does that only change when a driver closes a delivery, swap or pull?
  • Can each order carry its own included tons, rental days, extension rate and overage rate, and is the final invoice calculated from the scale ticket's net weight?
  • Can a street permit, with its authority, number and end date, be attached to a rental, and will the system stop a street delivery that has none?
  • Can the driver be forced to take a load photo and tick overfilled or prohibited items before a pull or a trip fee can be recorded?
  • Can I limit which sizes may be ordered for concrete, dirt and shingles, by yard and by truck?
  • Can a contractor see every can on every job site, days on site and tons hauled, and download the tickets for a diversion report?

Bring one real dumpster rental job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Dumpster rental on Fieldproxy: built around how you already work

A Fieldproxy setup for a dumpster rental company is built around the can, not the customer: every container has a number, a status and an address, and every rental carries its included tons, its day count and, if it is on the street, its permit. Drivers close deliveries, swaps and pulls on an offline app with the placement photo, the load photo and the scale ticket, and the final invoice, the permit close-out and the contractor's tonnage report come out of those records.

Module 1

Container register

The cans are the inventory. A box nobody can find earns nothing and still has to be bought, painted and insured.

  • Record: Container, with number, size (10, 12, 15, 20, 30, 40 yd), dimensions, door type, tare weight, purchase date, condition and last repaint
  • Compliance fields per container: company lettering yes/no, reflective markers yes/no, decal or medallion number and expiry (e.g. Philadelphia RFID medallion, NJDEP container decal, San Francisco debris box permit)
  • Status: In yard, Scheduled out, On site, Full awaiting pull, In transit, At facility, Out for repair, Lost or stolen
  • Location and status change only when a driver closes a delivery, swap, pull or relocation, never by office edit without a reason
  • Views: cans by size available today, cans on site by days, cans idle in the yard over e.g. 30 days
How this works

Module 2

Order intake and price rules

The overweight dispute is created at order time, when nobody asked what was going in the box.

  • Record: Rental order, with customer, job site, declared material, size, placement (driveway, lot, street, alley), requested delivery window and who may order swaps
  • Price book by zone and size: base price, included tons, rental days, extension per day, overage per ton, trip fee, per item charges (mattress, refrigerant appliance, tire)
  • Rule: heavy materials (clean concrete, dirt, brick, shingles) can only be booked in the sizes you allow, e.g. 10 or 15 yd, with a partial fill instruction on the confirmation
  • Confirmation document from your own template: price, included tons and days, fees, fill line rule, prohibited items, plywood advice and space needed for the truck
  • Customer acknowledgment of prohibited items and fees captured before the order can be scheduled
How this works

Module 3

Street permits and city rules

In several cities the hauler, not the customer, holds the permit and takes the fine, and each city counts days differently.

  • Record: City rule table, with who applies (hauler, contractor, owner), lead time (e.g. 7 business days in Boston), maximum days (e.g. 5 in New York), fee basis, marking rules and placement limits (e.g. 9 ft from curb, 15 ft from a hydrant)
  • Record: Permit, linked to the rental, with authority, number, start date, end date, fee, document and status (To apply, Applied, Issued, Expiring, Expired, Closed)
  • Block: an order with street placement cannot be scheduled for delivery until a Permit is Issued or the placement is changed to private property
  • Permit fee passed through to the invoice as its own line
  • Company credentials tracked with expiry: city hauler licence or registration, insurance certificates, bonds and letters of credit
How this works

Module 4

Dispatch board by job type

A roll-off truck carries one can at a time, so the day is a chain of yard, site and landfill legs, not a list of stops.

  • Job types: Delivery, Swap (dump and return), Final pull, Relocation on site, Dry run; each with its own duration and price
  • Record: Truck, with hoist type, the can sizes it can carry and its legal payload; Driver, with CDL group and medical card expiry
  • Board chains legs so a truck pulling a full can near the landfill tips it and delivers the empty to the next order without returning to the yard
  • Blocks: a truck cannot be given a can size it cannot carry; a declared heavy load cannot be assigned to a truck whose payload it would exceed
  • Facility hours and last weigh-in time held per landfill, transfer station and C&D recycler
How this works

Module 5

Driver app: delivery, swap and pull

Every later argument, driveway damage, overfill, a trip fee, is settled by what the driver recorded on the spot.

  • Works offline; opens on the day's legs with placement notes, gate codes and the customer's marked spot
  • Delivery: scan or enter container number, surface photo before placement, plywood used yes/no, placement photo, GPS pin, time
  • Pull: load photo required, at or below fill line yes/no, prohibited items seen (checklist), tarped yes/no
  • Cannot complete: reason (blocked by vehicle, overfilled, overweight, locked gate, overhead obstruction, no permit posted) with photo, which creates a Dry run charge for office review
  • End of day defect report per truck, and report, release and total hours for the short-haul time record
How this works

Module 6

Scale tickets and disposal costs

The ticket is both the cost of the haul and the basis of the customer's bill.

  • Record: Scale ticket, linked to the haul, with facility, ticket number, date, time in and out, gross, tare, net weight, material class, rate and charge, and the ticket photo
  • Rule: a Swap or Final pull cannot be closed without a ticket or a recorded reason (e.g. load held overnight on the truck)
  • Facility rate table by material so the expected charge can be compared with the ticket and the month-end statement
  • Net tons compared with the truck's legal payload, with overweight hauls listed for the owner
  • Margin per haul: price billed minus disposal charge, minus an e.g. per hour truck cost
How this works

Module 7

Rental clock and final billing

Days and tons are the two meters on every rental, and both run after the price was agreed.

  • Days on site counted from delivery close to pull close, against the rental period on that order
  • Final invoice lines generated, not typed: base price, extension days x daily rate, (net tons minus included tons) x overage rate, trip fees, per item charges, permit fee
  • Card on file or deposit taken at order for residential; contractor accounts billed per haul or on a monthly statement by job site
  • Scale ticket and load photo attached to the invoice; dispute status on any line (Open, Photo sent, Adjusted, Upheld)
  • Sync to QuickBooks or Xero
How this works

Module 8

Contractor portal and diversion reports

Builders under CALGreen, Austin or San Francisco rules need tonnage by project, and they pick the hauler who hands it over without a chase.

  • Portal per contractor: every can on every job site with size, days on site and permit end date; buttons to request a swap or final pull
  • Haul history per job site with net tons, facility, material class and the ticket image
  • Project tonnage report from your own template: total tons, tons by facility and material, diversion percentage where the facility reports it
  • Property managers and homeowners get a simple status page: delivered, days left, how to order pickup
How this works

Module 9

Yard, repairs and can utilization

Buying another twenty cans is the wrong answer when a quarter of the fleet is idle or lost.

  • Record: Repair, linked to Container, with fault (floor rusted through, door latch, rollers, hook or cable point), photos, cost and status
  • Yard count sheet on the phone: scan what is physically there and list the differences from the register
  • Utilization by size: days on rent over days owned, average days per rental, turns per month
  • Graffiti and repaint tasks with a due date where a city sets one (e.g. three business days in Chicago)
How this works

Module 10

Owner dashboard

The owner's questions are the same every morning: where are the cans, what is overdue, and which hauls lost money.

  • Cans out by size against fleet, and cans past their rental period with the uncollected extension value
  • Permits expiring in the next 3 days and credentials expiring in the next 60
  • Overage tons billed against overage tons paid to the facility
  • Dry runs by reason and by customer; revenue and margin per truck per day
How this works

The AI agents, set up for dumpster rental companies

AgentWhenWhat it doesWhat you get
Vision agentA driver photographs the scale ticket in the cab, or the load before a pullReads facility, ticket number, gross, tare and net weight and material class from the ticket; on the load photo, checks whether debris is above the railsThe Scale ticket record filled and matched to the haul, and an Overfilled flag on the pull for the driver to confirm before hooking up
Watcher agentA can passes its rental period, a street permit is 2 days from its end date, or a can has not changed status in e.g. 30 daysReads the rental's days on site, permit dates and last haul, and separates billable extensions from cans that were forgottenA morning list for dispatch: extend and bill, renew the permit, or schedule the pull, with the daily extension value at stake
Calling agentA customer phones outside office hours to order a box, a swap or a pickupAsks what material, how much and where it will sit, checks the size rules for heavy debris and whether the placement is on the street, and looks up the caller's open rentalsA draft Rental order or Swap request on the board for the morning, with street placements marked permit needed
Document intelligence agentA contractor emails a PO or site schedule, a city emails an issued permit PDF, or a landfill sends its monthly statementReads job site, sizes and dates from the PO; permit number and dates from the permit; and ticket numbers and charges from the statement, matching each to its recordRental orders created against the PO, the Permit set to Issued with its end date, and a list of statement lines with no matching scale ticket
Dispatch agentTomorrow's deliveries, swaps and pulls are released to the boardChains legs by truck using can size, declared material against payload, facility hours and distance, so a pulled can is tipped and reused instead of dead-heading to the yardDraft run sheets per truck, and a list of orders with no available can of that size
AutopilotA final invoice with overage or a trip fee is unpaid past terms, or a customer has not answered an extend-or-pickup question for 2 daysDrafts the message with the scale ticket, the included tons from the confirmation and the load photo attachedA draft email or text that a person approves before it is sent

Straight answers

Dumpster rental: FAQ

What software do dumpster rental companies use?

Most roll-off haulers use software built for the trade, such as Docket, CurbWaste, Hauler Hero or CRO Software, which track containers, dispatch deliveries, swaps and pulls, and bill days and tons. Larger haulers with route collection as well tend to run AMCS or Routeware. Fieldproxy is configured around each can, its rental clock, its street permit and the scale ticket.

How much weight can a dumpster hold?

It depends on the size and the price plan. Dumpsters.com lists 1 to 2 tons included with a 10 yard, 2 to 3 tons with a 20 yard, 2 to 4 with a 30 yard and 4 to 5 with a 40 yard, and says containers hold up to 10 tons in total. The hard limit is the truck: federal rules cap a tandem axle at 34,000 pounds on Interstates.

Why did my dumpster go over its weight limit?

Because volume is a poor guide to weight. Florida DEP measured mixed C&D debris at an average of 484 pounds per cubic yard. As a worked example, a 30 yard filled level at that density weighs about 7.3 tons, well over the 2 to 4 tons usually included. Shingles (731 pounds per cubic yard in EPA's table) and concrete are heavier still.

Do you need a permit to put a dumpster on the street?

In most cities, yes, and none on private property. In Chicago the dumpster provider must hold a CDOT permit. In New York City the carting company applies and the permit lasts five consecutive days. Boston requires a street occupancy permit applied for at least seven business days ahead, and Philadelphia needs a right-of-way permit on top of the dumpster licence.

What is a dumpster trip fee or dry run fee?

It is the charge when the truck arrives and cannot deliver or pick up. Dumpsters.com says most trip fees cost between $195 and $350 and lists the triggers: blocked access, overhead obstructions, soft or steep ground, snow or ice, a missing street permit, debris above the fill line, a load of 10 tons or more, or prohibited items.

What cannot go in a dumpster?

Rules vary by hauler and landfill. Budget Dumpster lists oil, asbestos, gasoline, tires, household chemicals, flammables and hazardous waste; WM lists batteries, asbestos, harmful chemicals and flammable liquids. Appliances containing refrigerant are a federal issue: under 40 CFR 82.155 the final processor must recover the refrigerant or hold a signed statement that it was recovered.

How long can you keep a rented dumpster?

Dumpsters.com and Budget Dumpster describe 7 to 10 days as typical, and Republic Services uses 9 days. After that an extension is charged per day; Budget Dumpster publishes a range of $15 to $50 a day. On the street the permit can be shorter than the rental: five days in New York City.

Can you put concrete or dirt in a dumpster?

Yes, but in a small can and usually only partway full. Dumpsters.com recommends a 10 yard for concrete with a typical limit of 10 tons and no wet concrete or slurry, and Republic puts concrete and dirt in a 10 or 15 yard. EPA's conversion table puts broken concrete at 860 pounds per cubic yard and dirt at 929.

Do dumpster companies have to recycle construction debris?

It depends on the place. California's CALGreen code requires 65% of construction waste to be diverted, Austin requires 50% on permits over 5,000 square feet, and San Francisco requires mixed C&D to go to a registered facility. Massachusetts bans the disposal of asphalt pavement, brick, concrete, metal, wood and clean gypsum wallboard outright.

What licence does a roll-off driver need?

A single vehicle with a GVWR of 26,001 pounds or more needs a Group B commercial driver's licence under 49 CFR 383.91, which covers most roll-off trucks. Drivers who stay within 150 air miles and are released within 14 hours can use the short-haul exception, so the carrier keeps time records for 6 months instead of logbooks.

What does it cost to dump a roll-off load at a landfill?

Landfills charge per ton. Waste Dive, citing the Environmental Research & Education Foundation, reported a national average of $62.28 per ton in 2024. BioCycle reported EREF's 2023 unweighted average as $56.80, with the Northeast highest at $84.44. C&D facilities and transfer stations set their own rates.

Related guides

All sources on this page (43)

Run dumpster rental work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.