Guide for retail fixture rollout companies ยท checked 22 November 2026
Software for retail fixture rollout and multi-store installation companies: one program, hundreds of store nights
A fixture rollout is the same job repeated in 50 to 900 stores, each with its own freight delivery, its own overnight window and its own store manager who has to sign before the crew leaves. The program is won or lost on small things: a pallet signed for without the word damaged, a gondola run built over 5 ft 9 in in a city that wants a permit at that height, a closeout photo set that is one angle short. This guide covers how the work runs, the load, anchoring, sprinkler and access rules that shape it, and the software, with a source on every figure.
See your own jobs set up this way
A 30-minute call. We show you retail fixture rollout companies workflows running in Fieldproxy, built around how you work.
Short answer
Retail fixture rollout companies mostly run on a stack, not one product. The largest firms build their own program platforms (DAVACO's ClearThread is one that has been made public). Merchandising-led firms use retail execution tools such as Movista. Many installers track the store list in Smartsheet, use a punch list app such as Fieldwire, fill crews in thin markets through Field Nation, and check in and invoice through whatever facilities platform the retailer mandates, most often ServiceChannel. What generic field service software misses is the shape of the work: one scope repeated across hundreds of stores, each store night blocked by freight, access and paperwork, and each one paid only when a fixed photo set and a manager's signature exist. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: a program holds the store list, the scope and the closeout standard, every store night inherits them, and the crew lead closes the store from a phone before leaving the building.
5 ft 9 in
The height up to which nonfixed, movable fixtures, cases, racks and counters are exempt from a building permit in the California Building Code, as published by the City of Sebastopol
source: City of Sebastopol, Work Exempt from Permits (California Building Code, rev. 12-10-20)
18 in
Minimum vertical clearance between sprinklers and material below (OSHA 1910.159(c)(10)); OSHA treats it as a horizontal plane across the room
4,500 lb
Maximum load on one section of Lozier display shelving, from the manufacturer's installation instructions
source: Lozier, Display Shelving Installation Instructions, 01-13F Rev. BF, 02/2016 (PDF)
5 days
From delivery: Lozier's deadline for photos of freight damage, and the NMFC window for reporting concealed damage to an LTL carrier
source: Lozier, Terms and Conditions of Sale: freight claims and returns
How a job runs
One retail fixture rollouts job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Take the program: store list, scope and closeout standard
A retailer, a brand or a fixture manufacturer awards a program: a store list with addresses and store numbers, a scope per store type (say 24 ft of new wall system and two 4 ft end caps), a fixture bill of materials, the planogram or elevation drawings, the install window, and the closeout standard (which photos, which form, whose signature). Price per store by store type, with trip charges and return visits priced separately. Marketplace pay models work the same way: a fixed rate for the visit, and a fixed rate does not rise if the work runs long.
- 2
Survey the stores that need it
A survey answers whether the scope fits this building. Trade guidance on installation audits says every job should have one, and lists what to capture: heights and widths, photos, wall substrate, paint condition, corners, lighting and exposed ductwork, and obstructions. Display makers add floor level, power and network at the set location. For shelving, add the ceiling and sprinkler deflector height over the run, the existing fixture count to remove, and the path from the receiving door to the floor.
- 3
Sort out licences, permits, insurance and landlord rules
Before a date is offered, check four things per store: whether the state licenses the work (California classes store fixtures under C-61 / D-34), whether the fixture height triggers a permit or seismic anchorage in that city, what the landlord's contractor rules require, and whether the certificate of insurance is on file with the retailer and the shopping center. One national landlord requires certificates for the contractor and every subcontractor before work starts.
- 4
Order, kit and ship the fixtures
Fixtures ship less-than-truckload direct to the store, or to a consolidation point and then out as one kit per store. The store usually receives it, not your crew, so the receiving instructions matter: count pallets against the bill of lading, write damaged or short on the delivery receipt, photograph it. Madix pallet labels show TL or LTL, the pallet number, the PO and the item quantities, which is what the receiver counts against.
- 5
Schedule the store night
Each store gets a night (or several) that fits the retailer's window, the landlord's delivery and noise hours, the crew's route and the confirmed arrival of freight. Crew size follows the scope: Premium Retail Services reported over six hours and a team of four per store on a 900-store display program. The store manager is told who is coming and when, and confirms the area will be cleared of product.
- 6
Check in the way the retailer requires
On arrival the lead checks in through the retailer's facilities platform and with the manager on duty. One ServiceChannel guide for work at Walmart and CVS says check-in must be completed before or at the estimated arrival time, check-out before the technician leaves the site, and the store manager must be told on arrival and departure. Payment can be withheld if the steps are skipped.
- 7
Receive, stage and build in the manufacturer's order
Count the freight again, open cartons in the numbered order (Lozier boxes run 1 uprites and base parts, 2 backs, 3 trim, 4 base decks, 5 shelves), snap a chalkline, stand the first two uprites, and get a back panel in before the frame stands alone. Level to a string line from the highest uprite, anchor where required, then finish backs, trim, decks and shelves. Keep exit routes clear the whole night.
- 8
Close the store before leaving
Walk the work against the scope: level, plumb, anchored where required, shelf heights to the planogram, 18 in clear below sprinklers, aisles at width, debris out and not in the center's dumpsters. Shoot the required photo set. Log every open item as a punch item with a photo and a cause. The manager on duty signs the completion form, with exceptions written on it, and the lead checks out.
- 9
Clear punch items and return visits
Punch items are sorted into what a return trip must fix (a missing end cap, a damaged back panel on reorder) and what the store can live with. Each return visit is tied to its cause: freight short, site not ready, retailer change, or installer error. The cause decides who pays for the trip.
- 10
Invoice per store and report the program
Invoice each store once its closeout package is complete: photos, signed form, punch list at zero or accepted. Where the retailer uses a facilities platform, the invoice goes through it against the work order number. The retailer gets a program report: stores scheduled, complete, complete with exceptions, and blocked, with the reason for each block.
What to record
The fields every retail fixture rollouts job should capture
Program and store
- Program name, client (retailer, brand or fixture manufacturer), scope by store type, install window and freeze dates
- Store number, address, mall or center and landlord, store manager and phone, receiving hours and dock or door type
- Retailer work order or tracking number per store, and the platform it lives in
- Jurisdiction flags: state licence class needed, permit height threshold, seismic anchorage required, union or prevailing wage area
- Landlord rules: work hours, delivery cut-off, loud-work hours, dumpster and container fees, shutdown notice period
Survey
- Wall lengths and heights of each run, with photos from both ends
- Wall substrate (drywall on steel stud, block, slatwall) and what is behind it at anchor points
- Floor finish and level along the chalkline; carpet or hard floor (it changes the unanchored height limit)
- Ceiling height and sprinkler deflector height over the run; lighting and ductwork that limit fixture height
- Power and data at each lit or powered fixture; existing fixtures to remove, with counts
- Path from receiving to the floor: door widths, ramps, elevator, where pallets can be staged overnight
Freight and fixtures
- Fixture bill of materials per store: sections by width (3 ft, 4 ft), uprite height, base depth, shelf depths and counts
- Carrier, PRO number, bill of lading, pallet count shipped and received, delivery date and who signed
- Delivery receipt notation (clean, damaged, short) with a photo of the receipt
- Damage photos by pallet and part number; date the manufacturer and the carrier were notified
- Replacement order number and its expected date; salvage held for the carrier
Install night and closeout
- Crew, lead, arrival time, platform check-in and check-out times, manager on duty at each
- Anchoring done: where, fastener type, and whether a permit or engineer's detail applied
- Clearance to sprinkler deflectors over the tallest fixture, measured
- Required photo set by shot name (each run straight on, each end, anchors, base, signage, area left clean)
- Punch items: description, photo, cause (freight, site, client change, installer), owner, due date
- Manager sign-off: name, title, time, exceptions written; return visits with cause and who pays
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| Building permit: the 5 ft 9 in line | The California Building Code's list of work exempt from a permit includes nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height, as published by the City of Sebastopol. The same handout warns that an exemption does not authorize work that violates the code. The wording comes from the model building code's Section 105.2, so the same height appears in many cities, but each city adopts and amends its own version. source: City of Sebastopol, Work Exempt from Permits (California Building Code, rev. 12-10-20) |
| Reconfiguring low fixtures must keep the egress path | The 2021 International Existing Building Code, section 704.2, says the addition, alteration or reconfiguration of non-fixed and movable cases, counters and partitions not over 5 feet 9 inches must maintain the required means of egress path. A reset that needs no permit can still be a code violation if it narrows the way out. source: ICC, Significant Changes 2021: IEBC 704.2, reconfiguring movable cases and counters (PDF) |
| Sacramento: anchorage from 5 ft 9 in, engineering from 8 ft | Sacramento's guideline for steel storage racks and shelving (revised 1 January 2026) sets three bands: under 5 ft 9 in, no permit; between 5 ft 9 in and 8 ft, anchorage is required with design calculations to ASCE 7-22 section 15.5.3; from 8 ft to 12 ft, full engineering and special inspection. source: City of Sacramento CDD-0308, Steel Storage Racks and Shelving Guidelines (rev. 01-01-2026, PDF) |
| Fresno: a layout plan even below the permit height | Fresno's 2026 submittal guideline covers racks, shelving and fixtures. Up to 5 ft 9 in needs no permit but does need a layout plan; over 5 ft 9 in up to 8 ft needs a permit and seismic anchorage; over 8 ft needs structural plans, calculations and anchorage details from a licensed engineer. For storage racks in areas open to the public, such as warehouse retail stores, it applies an importance factor of 1.5. source: City of Fresno, Storage Racks Plan Submittal Guidelines (04.02.26; 2025 CBC, ASCE 7-22, PDF) |
| Washington: all racking anchored, engineer's stamp at 8 ft | Clark County, Washington cites IBC 105.2 for the exemption of nonfixed and movable cases, racks, counters and partitions not over 5 ft 9 in, states that all racking must be anchored to resist overturning, and requires an engineer's stamp and special inspection for racking 8 ft and over. source: Clark County, Washington: Racking permit requirements |
| FEMA guidance: shelving over 6 ft and shelving by exits | FEMA E-74 says permanent floor-supported shelving or storage cabinets over 6 feet tall must be designed as architectural components under ASCE/SEI 7-10, and advises against locating cabinets or racks next to doors or exits if their failure would block the exit. source: FEMA E-74, section 6.5.1.1 Light Duty Shelving |
| Manufacturer limit: unanchored height is six times the leveler spacing | Lozier's safety sheet says the height of the uprite, extensions included, should not exceed the leveler spacing times six unless the fixture is anchored, and that on carpet the maximum height is reduced by 12 inches. Its installation instructions put that at 54 in for a wall section on a 13 in base and 144 in on a 28 in base. Madix requires all gondola and wall fixtures exceeding 96 in to be securely anchored. source: Lozier, Product Safety Information: uprite height and leveler spacing (PDF) |
| Manufacturer limit: loads per shelf and per section | Lozier's instructions cap one section at 4,500 lb and a standard gondola at 12,000 inch-pounds of unbalanced load. Standard shelves are rated 300 lb at 7 in depth, 500 lb from 10 to 25 in, and 400 lb at 28 and 31 in, reduced by 30% when only the front half is loaded and by 50% if the shelf is less than 36 in wide. A planogram that puts heavy product on one side of a narrow section has to be checked against these. source: Lozier, Display Shelving Installation Instructions, 01-13F Rev. BF, 02/2016 (PDF) |
| Wall-mounted uprites: 450 lb pullout per fastener | Lozier's wall mount bracket instructions require a minimum of 450 lb of pullout force at each fastener location, forbid plastic or fiber anchors, concrete nails and regular nails, and say a structural engineer should be consulted before attaching to a building wall. This is why the survey records the wall substrate. source: Lozier, Wall Mount Bracket Installation Instructions, 85947 Rev B (PDF) |
| Sprinklers: 18 in clear, as a plane across the room | OSHA 1910.159(c)(10) sets a minimum vertical clearance of 18 inches between sprinklers and material below. A 2008 OSHA interpretation treats this as a horizontal plane throughout the storage area or room, and says materials stored on shelves against a wall are not subject to it. A new tall island run or a top shelf loaded with overstock is. source: OSHA Standard Interpretation, 29 Sept 2008: the 18 inch sprinkler clearance |
| Exit routes stay open during the install | OSHA 1910.37(a)(3) says exit routes must be free and unobstructed and that no materials or equipment may be placed in them, permanently or temporarily. 1910.37(d) adds that exit routes must be maintained during construction, repairs or alterations. Pallets staged in front of the rear exit at 2 a.m. are a violation even with the store closed, because the crew and the night staff are inside. source: OSHA 29 CFR 1910.37, Maintenance, safeguards and operational features for exit routes |
| ADA: 36 in clear on accessible routes | The 2010 ADA Standards require the clear width of walking surfaces on an accessible route to be 36 inches minimum (403.5.1), with a reduction to 32 inches allowed only for a length of 24 inches. A new end cap or a floor display set into a main aisle is measured against this. source: U.S. Access Board, 2010 ADA Standards, Chapter 4: 403.5.1 clear width |
| ADA: store shelves must sit on an accessible route | Self-service shelves, which the advisory says include store shelves, must be located on an accessible route but need not meet the reach ranges (225.2.2). Table 227.2 sets how many check-out aisles must be accessible: 1 of 1 to 4, 2 of 5 to 8, 3 of 9 to 15. source: U.S. Access Board, 2010 ADA Standards, Chapter 2: 225.2.2 and Table 227.2 |
| Blocking access during the work | 28 CFR 36.211 requires a business to maintain its accessible features in operable working condition, and says the rule does not prohibit isolated or temporary interruptions in service or access due to maintenance or repairs. An overnight install is temporary; pallets left in the accessible route at opening time are not. source: 28 CFR 36.211, Maintenance of accessible features (Cornell LII) |
| ADA: checkout and service counters | At an accessible check-out aisle the counter surface is 38 inches maximum above the floor, with edge protection no more than 2 inches above it (904.3). A sales or service counter with a parallel approach needs a portion 36 inches long minimum and 36 inches high maximum (904.4.1). A cash wrap rollout that ships one counter design to every store has to carry these dimensions. source: U.S. Access Board, 2010 ADA Standards, Chapter 9: 904.3 and 904.4 counters |
| Aisle width in stores follows occupant load | Under section 1018.3 of the 2022 California Building Code, which carries the model code text, the minimum clear aisle width in mercantile occupancies is set by the occupant load served and is not less than the width required for corridors. Nonpublic aisles serving fewer than 50 people and not required to be accessible need not exceed 28 inches. source: 2022 California Building Code 1018.3, Aisles in Groups B and M (Corada) |
| California licence: C-61 / D-34 names store fixtures | The California Contractors State License Board's D-34 Prefabricated Equipment classification covers installing prefabricated products and equipment, and lists store fixtures and display cases, prefabricated or modular. A national installer needs the class, or a licensed subcontractor, for every California store on the list. source: California CSLB, C-61 / D-34 Prefabricated Equipment Contractor |
| California: the $1,000 exemption does not cover a crew | The Contractors State License Board's bulletin on AB 2622 says the minor work exemption rose from $500 to $1,000 on 1 January 2025, but the work cannot require a permit and the unlicensed person cannot employ anyone for the project. A two-person install crew is outside it at any price. source: CSLB Industry Bulletin 24-07, AB 2622 implementation, 31 Dec 2024 (PDF) |
| Union jurisdiction and prevailing wage | One carpenters' agreement covering southern Illinois lists the unloading, handling, building and erecting of store, office, bank or other fixtures, racks and shelves, of wood, metal or other materials, as carpenters' work. Check the local agreement before quoting labor for a union building. source: Carpenter Agreement, Southern Illinois Builders Association and Carpenters' District Council of Greater St. Louis (via Illinois DOT, PDF) |
| Prevailing wage: which classification is a fixture installer | California's prevailing wage scope for Modular Furniture Installer (Carpenter) in 12 southern counties covers the installation of modular and other shelving units, but states that it does not apply to the installation of any type of fixture which is not a pre-manufactured modular office system. On a public project such as a university bookstore, ask which classification the awarding body applies before pricing. source: California DIR, Scope of Work Provisions 23-31-16, Modular Furniture Installer (Carpenter) (PDF) |
| Freight: sign damaged or short, then 5 days | Lozier's terms, for freight Lozier arranges, say the customer must sign for the shipment as damaged or short in order to file a freight claim, must not refuse the order, must send photos within 5 days from delivery and must hold salvage for the carrier, or pay for replacements itself. source: Lozier, Terms and Conditions of Sale: freight claims and returns |
| Concealed damage: 5 days to tell the carrier | The National Motor Freight Classification rule on concealed damage changed on 18 April 2015: the time to report it to an LTL carrier was cut from 15 days to 5. Fixtures delivered to a store on Monday and first opened by the crew the following Tuesday are already past it. source: Trinity Logistics, time to report concealed damage on LTL shipments cut from 15 days to 5 |
| Freight claims: nine months is the floor | Under the Carmack Amendment, 49 U.S.C. 14706(e)(1), a carrier may not set a period of less than 9 months for filing a claim, or less than 2 years for bringing a civil action. source: 49 U.S.C. 14706, Liability of carriers under receipts and bills of lading (Cornell LII) |
| Late notice hurts a claim but does not kill it | Writing about the 2015 NMFC revisions, transportation lawyer Brent Wm. Primus notes that if five business days, or the period the carrier specifies, pass before notice, it adds to the shipper's burden of proof but cannot act as a bar to filing a claim for damage. Carrier tariffs can set their own period, so read the carrier's rules for the lane. source: PARCEL, Revisions to the NMFC Which Shippers Need To Know (Brent Wm. Primus, 21 Sept 2015) |
| Lit fixtures: UL 65, UL 962 and the group of six | UL evaluates wired cabinets such as showcases to UL 65 and commercial displays to UL 962, according to UL's column in IAEI Magazine, and cord-and-plug connected wired cabinets are limited to groups of six or less. Anything hard-wired is electrical work under the state's licensing rules, so the survey has to say whether a receptacle exists where each lit fixture lands. source: IAEI Magazine, UL Question Corner: display cases and commercial displays (UL 65, UL 962) |
| Ladders on a night shift | OSHA 1910.23 requires ladders to be inspected before initial use in each work shift and bars using the cap or top step of a stepladder as a step. It also requires a metal spreader or locking device on stepladders and one hand on the ladder when climbing. source: OSHA 29 CFR 1910.23, Ladders |
| Powered pallet jacks are powered industrial trucks | OSHA 1910.178 covers motorized hand trucks along with fork trucks, which takes in a powered pallet jack borrowed from the store's back room. The employer must ensure each operator is competent, and an evaluation of each operator's performance must be conducted at least once every three years. source: OSHA 29 CFR 1910.178, Powered industrial trucks |
| Laminate and MDF fixtures: TSCA Title VI labels | EPA says that after 22 March 2019 composite wood products must be labeled as TSCA Title VI compliant, and the rule reaches finished goods containing them. Custom cash wraps and display tables built from particleboard or MDF should arrive with that label; a retailer's receiving audit may ask for it. source: EPA, Formaldehyde Emission Standards for Composite Wood Products (TSCA Title VI) |
| Landlord rules: insurance, shutdowns and dumpsters | Brixmor's contractor rules (West Region packet) ask for commercial general liability of not less than $2,000,000 per occurrence, employer's liability and auto of at least $1,000,000 each, two business days' notice of any utility shutdown, a Red Tag permit for sprinkler or fire alarm shutdowns at $500 for the first day and $250 each day after, and no construction debris in the center's dumpsters. A storage container on the lot is charged at $350 a week. source: Brixmor Property Group, Rules for Your Contractor (tenant packet, PDF) |
| Landlord rules: hours, deliveries and barricades | Shea Properties' contractor rules for its retail centers give typical site hours of 6:00 a.m. to 6:00 p.m. Monday to Saturday, require deliveries through the front of the premises to be pre-approved and finished before 8:00 a.m., and limit a barricade to 3 ft in front of the lease line. Every center publishes its own version, and the store's lease binds the retailer to it. source: Shea Properties handbook, Contractor Rules and Regulations (retail centers) |
| Retailer check-in rules decide whether you are paid | A ServiceChannel provider guide written for technicians working at Walmart and CVS says check-in must be completed before or at the estimated arrival time, check-out must be completed before the tech leaves the site, and the store manager must be notified of arrival and departure. It reserves the right to withhold payment from service partners who do not follow the procedure. source: Daktronics, ServiceChannel Provider quick guide for technicians and service partners, DD3414324 Rev4 (PDF) |
| Trade guidance: audit every site | PRINTING United Alliance's guidance on installation site audits says every job should have one, and lists what to capture: height and width, photos, type of substrate, paint condition, corners, radii, lighting and HVAC duct exposure. It is written for graphics installers, and the list transfers directly to wall systems and fixtures. source: PRINTING United Alliance, The Importance of Installation Site Audits (16 Oct 2019) |
Rules vary by state, council and contract. Checked 22 November 2026; confirm against the source for your area before relying on it.
Numbers
Fixture limits from the manuals, published program figures, and a worked store night
The first rows come from manufacturer documents and named company or landlord pages. Company figures are self-reported and describe one program each. The last rows are a worked example of planning one store night; use your own production rates from past stores.
| Item | Figure | Basis |
|---|---|---|
| Section widths and uprite heights | 3 ft and 4 ft sections; uprites 36 in to 144 in; backs from 78 in are two-piece | Lozier installation instructions |
| Shelf capacity, standard shelves | 300 lb at 7 in deep, 500 lb at 10 to 25 in, 400 lb at 28 and 31 in | Lozier installation instructions |
| Capacity reductions | Less 30% if only the front half is loaded; less 50% if the shelf is under 36 in wide | Lozier installation instructions |
| Maximum load, one section | 4,500 lb; 12,000 in-lb unbalanced on a standard gondola | Lozier installation instructions and 01-199 |
| Leveling leg extension | Uprite leg no more than 1 in; base bracket leg no more than 1 7/16 in | Lozier installation instructions |
| Unanchored height, wall section | 54 in on a 13 in base, up to 144 in on a 28 in base; 12 in less on carpet | Lozier installation instructions and safety sheet |
| Anchoring by height | All gondola and wall fixtures over 96 in anchored | Madix assembly manual |
| Commissary shelving spec | 4 ft standard length, sections 48 to 90 in high, minimum rated capacity 15,000 in-lb | DeCA purchase description 2G14 |
| One display program | 900 stores in 50 states in two weeks; over six hours and a team of four per store | Premium Retail Services case study |
| One gondola program | 4,000 4 ft bays and 120 end caps installed, 100-plus 12 ft bays anchored, in three weeks | DAVACO, Fleet Farm |
| Time on site per location | 1 day to 3 weeks; 188 Burlington stores since 2014 | H.J. Martin and Son |
| One rollout firm's workforce | About 3,425 people at 31 Dec 2024, of whom about 2,446 were field specialists supplied by an independent vendor | SPAR Group Form 10-K, FY2024 |
| On-site container staging | Storage containers dropped at stores for a fixture change-out across 76 outlets | PODS for Business, 2018 |
| Display survey checks | Site dimensions, floor level, power, network and structure, with photos | Frank Mayer and Associates |
| Marketplace return-trip term, one example | 10% bonus for finishing in one hour, 10% penalty if the technician has to come back | Field Nation pricing guide |
| Turnover package contents | Punch-list status and certificate of occupancy or final approvals, among others | REBusinessOnline, Retail Contractors Association |
| Trade body | Shop!, formed October 2015 when A.R.E. (founded 1956 as NASFM) merged with POPAI | Shop! Association |
| Carpenter wage, the closest BLS occupation | Median $27.09 per hour, May 2023 (SOC 47-2031) | BLS |
| Worked example: scope | Say 60 ft of 4 ft wall sections (15 sections) and two end caps, and your history says 0.75 crew-hours per section and 1 per end cap | Worked example |
| Worked example: the night | 13.25 build hours, plus 3 for receiving and staging and 2 for closeout and cleanup = 18.25 crew-hours; a crew of 3 needs about 6 hours | Worked example |
| Worked example: the cost of a short pallet | If one pallet is missing, the return trip repeats travel, check-in and closeout for perhaps 4 sections of work | Worked example |
source: Lozier, Display Shelving Installation Instructions, 01-13F Rev. BF, 02/2016 (PDF)source: Lozier 01-199 Rev L (04/2025), Capacity and Unbalanced Load Information for HD Shelving (PDF)source: Lozier, Product Safety Information: uprite height and leveler spacing (PDF)source: Madix, Maxiline Gondola and Wall General Assembly, ASY-046 Rev. 02 (distributor-hosted PDF)source: Defense Commissary Agency, purchase description 2G14: gondola shelving (DOCX)source: Premium Retail Services case study: smart-home displays in 900 Best Buy storessource: DAVACO, Fleet Farm project: gondola and fixture installationsource: H.J. Martin and Son, National Installation: Rolloutssource: SPAR Group, Form 10-K for fiscal year 2024 (SEC)source: PODS for Business, The importance of streamlining fixture change-outs (30 Aug 2018)source: Frank Mayer and Associates, The Importance of Site Surveys for Kiosk and Display Deployments (4 Oct 2023)source: Field Nation, Pricing work for contractorssource: REBusinessOnline, Finish Strong: retail construction closeout (Justin Elder, Retail Contractors Association)source: Shop! Association, history: NASFM (1956), A.R.E. (2007), merger with POPAI (Oct 2015)source: BLS Occupational Employment and Wages, May 2023: 47-2031 Carpenters
Where it breaks
Where spreadsheets and generic software fall over
The program lives in one spreadsheet with a row per store and a status column. It cannot say why store 412 is blocked: freight not confirmed, certificate not accepted by the landlord, or the manager never replied.
Give each store night its own blockers (freight delivered, COI on file, permit or licence check, manager confirmed) and let the status come from them, so a blocked store names its reason.
The store's receiver signs the delivery receipt clean at 10 a.m. The crew opens the pallets at 10 p.m. and finds bent uprites. The manufacturer's terms needed the word damaged on the receipt and photos within 5 days, and nobody has the receipt.
A receiving record per shipment with the receipt photo and notation, captured by the store from a link on delivery day, and a claim clock that starts at the delivery date.
Closeout photos arrive by text message three days later, unlabeled. Someone in the office matches 14 photos to the retailer's required shot list by eye, finds one missing, and the store cannot be invoiced without a return trip.
A required shot list on the lead's phone, each shot named and checked before the store can be marked complete, while the crew is still in the building.
Generic field service software treats every visit as a separate work order. Nothing ties 300 visits to one scope, one price per store type and one client report, so program reporting is rebuilt by hand each Friday.
A Program record that owns the store list, the scope by store type and the closeout standard, with every store night created under it and rolled up automatically.
A run is built at 84 in because the planogram says so. The city wants anchorage and calculations from 5 ft 9 in, and nobody checked, because the last 40 stores were in a state that did not ask.
Jurisdiction flags on the store record (permit height, anchorage band, licence class), checked against the tallest fixture in the scope before a date can be offered.
Return trips are logged as new jobs with no cause. At the end of the program the retailer disputes paying for 31 revisits and there is no record of which were freight shortages and which were installer error.
Every return visit is linked to the punch item that caused it, with a cause code and the party responsible, so the revisit invoice writes itself.
Checklist
The retail fixture rollouts operations checklist
Print it, or hand it to whoever runs the office side.
- Store list loaded with store numbers, landlords, receiving hours and the retailer's work order number per store
- Scope by store type, fixture bill of materials and planogram or elevations attached to the program
- Closeout standard written down: named photo shots, completion form, who may sign
- Survey done where the scope needs one: wall substrate, floor, ceiling and sprinkler height, power, path from receiving
- State licence class and local permit and anchorage thresholds checked against the tallest fixture
- Certificates of insurance on file with the retailer and the landlord, including subcontractors
- Freight tracked per store: shipped, delivered, receipt notation, pallet count
- Store manager confirmed the night, the cleared area and the receiving location
- Crew assigned with the right badges, ladders inspected, powered pallet jack operators evaluated
- Platform check-in on arrival and manager notified
- Frame never left standing without a back panel; leveled to a string line; anchored where required
- 18 in clear below sprinkler deflectors and exit routes open, checked before closeout
- Required photo set complete; punch items logged with cause and photo
- Manager's signature with exceptions, platform check-out, debris removed from site
Software options
What software retail fixture rollout companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Movista
Merchandising service organizations and retail service providers running store visits at scale
A retail execution and workforce platform: its site lists store tasking, scheduling and workforce, a mobile app, dashboards and vendor collaboration. Movista bought Natural Insight's parent in 2019. Strong where the work is recurring merchandising visits; ask how it handles fixture freight, anchoring and permit checks, and a per-store punch list. Pricing is not published.
ServiceChannel (the retailer's platform)
Any installer working for a retailer that mandates it
Not a system you choose. Many retailers issue work orders through ServiceChannel, and the provider app handles GPS check-in and check-out, photos and invoicing against the work order. ServiceChannel charges providers 1.5% of the pre-tax amount of approved invoices, to a maximum of $4 per invoice. Your own system still has to hold the work order number and plan the program.
Field Nation
Rollout firms that need hands in markets where they have no crew
An on-demand marketplace of independent field technicians. You post each store as a work order and approve it when done; technicians pay 10 percent of work order value. Its roots are retail technology (point of sale, kiosks, digital signage), so check the depth of fixture and carpentry skills in each market. Buyer plan prices are not published.
Smartsheet
Most small and mid-size installers, as the program tracker
A spreadsheet-style work management tool with forms, dashboards and automations. List prices seen 22 November 2026: Pro $9 and Business $19 per member per month billed yearly. It holds a store list well. It does not run a crew's night on a phone, enforce a photo set or know a freight claim deadline unless you build that yourself.
Fieldwire or Procore
Installers and general contractors doing store remodels with formal punch lists
Construction tools with punch lists you create and assign from the jobsite with photos and due dates. Fieldwire lists Basic at $0 and Pro at $39 per user per month billed annually (seen 22 November 2026); Procore prices by annual construction volume. Both are built around one project and its plans, so a 300-store program is 300 small projects unless you template it.
An in-house program platform
The largest national rollout firms
DAVACO announced its ClearThread platform in 2019 with dashboards, store profiles, photos, survey responses and exception reports for clients. It shows what the top of the market thinks a rollout system must do. It is not for sale, and building one is a software project of its own.
Spreadsheets, email and a group chat
Many regional installers today
A store list in Excel, bills of lading in email, photos in a text thread and paper sign-off sheets. It works for a 20-store program run by the owner. It breaks when two programs overlap, or when the retailer asks on a Tuesday why 37 stores are behind.
Published prices, compared:source: Movista, retail execution and workforce platformsource: ServiceChannel, Usage Fees for service providerssource: Field Nation, Retail technology rollout guidesource: Smartsheet, pricing (seen 22 Nov 2026)source: Fieldwire by Hilti, pricing (seen 22 Nov 2026)source: DAVACO press release, ClearThread reporting platform (19 Jan 2019)
Questions to ask any vendor
- Can one program hold the store list, the scope by store type and the closeout standard, with every store visit created under it?
- Can a store night be blocked from scheduling until freight is confirmed delivered and the certificate of insurance is accepted, and does the block show its reason?
- Can the required photo set be defined per program, shot by shot, and can a store be stopped from closing until every shot exists?
- Does a freight delivery have its own record with the receipt notation, damage photos and a claim deadline counted from the delivery date?
- Can each store carry its own permit height, anchorage and licence flags, checked against the fixture heights in the scope?
- Is every return visit linked to a punch item with a cause and a responsible party, and can the client see program status without calling?
Bring one real retail fixture rollouts job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Retail fixture rollouts on Fieldproxy: built around how you already work
Fieldproxy is set up as a rollout company's program board: each program carries its store list, its scope by store type and its closeout standard, and each store night is held back until its freight, paperwork and access are confirmed. The crew lead receives freight, builds from the checklist, shoots the named photo set and gets the manager's signature on a phone before leaving the store. Fieldproxy builds the screens, statuses and templates around your process, and you are live within a day: your first crew runs real store nights the day after the call.
Module 1
Programs and store lists
The unit of sale is the program, and everything a store night needs is decided once at that level.
- Records: Program (client, type: new fixture, reset, remodel, store-in-store, decommission; install window; freeze dates) with Store nights underneath
- Store types on the program (e.g. A, B, C by footprint), each with its scope lines, fixture bill of materials, crew size and price
- Closeout standard on the program: named photo shots, completion form template, who may sign, punch categories
- Store list import from the client's spreadsheet: store number, address, type, the client's work order number
- Statuses per store: Loaded โ Surveyed โ Cleared to schedule โ Scheduled โ Freight on site โ Installed โ Closed โ Invoiced, plus Blocked with a reason
Module 2
Store records and jurisdiction flags
The same fixture is legal without paperwork in one city and needs anchorage calculations in the next.
- Store record kept across programs: landlord, center rules, receiving hours, door and dock type, manager contacts, past surveys and photos
- Jurisdiction fields: state licence class required, permit height threshold (e.g. 5 ft 9 in), anchorage band, union or prevailing wage flag, each with a source link and Last checked date
- Rule: if the tallest fixture in the store's scope is over the store's permit threshold, the store cannot move to Cleared to schedule until a permit or a written waiver is attached
- Landlord rule fields: work hours, delivery cut-off, loud-work hours, shutdown notice days, dumpster and container fees
Module 3
Site surveys
A survey is cheaper than a crew of four standing in front of a wall the scope does not fit.
- Survey form on the phone: run lengths and heights, wall substrate, floor finish and level, ceiling and sprinkler deflector height, power and data, existing fixtures to remove, path from receiving
- Required photos per run, from both ends and straight on
- Result: Fits as drawn, Fits with changes (listed), Does not fit; anything but the first raises a question to the client with the photos attached
- Survey answers carry onto the store night: carpet reduces the unanchored height limit, block wall changes the anchor
Module 4
Compliance and access paperwork
A crew turned away at the door for a missing certificate still costs a night and a trip.
- Certificates of insurance per client and per landlord: limits required, additional insureds, expiry, accepted date; subcontractors' certificates held the same way
- Crew credentials: retailer badges, background check dates, powered industrial truck evaluation date, state licence held
- Rule: a store night cannot be confirmed with an expired certificate or a crew member missing the retailer's badge
- Manager confirmation: a link the store manager opens to confirm the night, the cleared area and where freight is held
Module 5
Freight, kitting and receiving
Freight is the most common reason a store night fails, and the claim deadline starts before the crew arrives.
- Shipment record per store: carrier, PRO, bill of lading, pallets shipped, ship date, delivery appointment, direct to store or via a consolidation point
- Receiving link for the store: pallets counted, receipt notation (clean, damaged, short), photo of the signed receipt
- Damage record: part number, photo, quantity, manufacturer notified date, carrier notified date, replacement order and expected date
- Claim clock: e.g. day 3 and day 5 reminders from the delivery date; salvage marked Hold for carrier
- Rule: a store night stays Blocked until every shipment is delivered, or the missing parts are marked as not needed that night
Module 6
Night scheduling, crews and subcontractors
Crews travel a route of stores, and one slipped night moves the rest of the week.
- Store nights on a calendar and a map, by crew and by region, inside the program's window and each landlord's hours
- Crew records: lead, size, home base, skills (gondola, millwork, graphics, lit fixtures), licences and badges
- Subcontractor crews accept store nights in their own portal, with the same checklist and photo standard
- A slipped store shows the knock-on effect on the crew's following nights before it is moved
- Travel, hotel and per diem attached to the route, not to one store
Module 7
The crew lead's install app
The lead is the only witness to what the store looked like at 5 a.m.
- Works offline in the back of a store: arrival, the client platform's check-in time recorded, manager on duty named
- Receiving recount against the bill of materials before a carton is opened
- Build checklist from the manufacturer's sequence: chalkline, first two uprites, back panel in before the frame stands alone, level to string line, anchor, backs, trim, decks, shelves
- Measured checks typed in: leveling leg extension, clearance below sprinkler deflectors, aisle widths, anchor type and count
- Voice notes on anything unusual, attached to the store night
Module 8
Closeout, punch list and sign-off
A store is paid when its closeout package exists, not when the shelves are up.
- Required photo set by shot name from the program; the store cannot be marked Installed with a shot missing
- Punch items: description, photo, category, cause (freight, site, client change, installer), owner, due date
- Manager sign-off on the lead's phone or from a link: name, title, time, exceptions typed in; a refusal records the reason
- Closeout package generated as a PDF from your template: scope, photos, punch list, signature
- Return visit created from open punch items, carrying the cause and the party who pays
Module 9
Client program portal
The retailer's project manager reports upward every week and will call the lead at 6 a.m. if there is no other way to know.
- Program view for the client: stores by status, blocked stores with reasons, completed stores with their closeout packages
- Photos and signed forms by store number, searchable
- Change requests: scope change per store or per store type, price effect, approved by and when
- Questions from surveys answered by the client in the portal, with the answer written back to the store
Module 10
Invoicing, revisits and program reporting
Margin on a rollout is the per-store price less the nights that had to be done twice.
- Invoice per store or per batch once the closeout package is complete, carrying the client's work order number; sync to QuickBooks or Xero
- Revisit invoices built from return visits whose cause is freight, site or client change
- Subcontractor pay from the same closed store nights
- Reports: stores per week against plan, first-visit completion rate, return visits by cause, crew-hours per store type against estimate, open claims and their deadlines
- Open API and MCP server so Claude or ChatGPT can answer questions such as which stores next week still have no delivered freight
The AI agents, set up for retail fixture rollout companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | The client's store list, statement of work, fixture bill of materials or a carrier's bill of lading is uploaded or emailed in | Reads store numbers, addresses, store types, scope lines, fixture heights and quantities, the install window and the closeout requirements, and matches bills of lading to stores by store number and PO. | A draft Program with its store nights and scope by store type, shipment records attached to the right stores, and a list of stores whose tallest fixture is over that store's permit threshold. |
| Watcher agent | A store night is e.g. 3 days out with freight not delivered, a certificate expiring before the night, or no manager confirmation; or a damaged delivery reaches day 3 with no notice sent | Checks each scheduled store's blockers and each shipment's claim clock against the program's dates. | An alert to the program manager naming the store, the blocker and the date, with the store moved to Blocked and the crew's route flagged. |
| Vision agent | The store receiver photographs the delivery receipt and pallets, or the crew lead shoots the closeout set | Reads the receipt notation and pallet labels against the shipment record, and checks each closeout photo is the shot it is named as, in focus and showing the whole run. | Pallets marked received, short or damaged on the shipment, and a list of closeout shots to retake while the crew is still on site. |
| Dispatch agent | A batch of stores reaches Cleared to schedule | Groups stores into routes by region and landlord hours, and matches crews by size needed for the store type, skills, the state licence and retailer badges held, and travel cost. | A proposed week of store nights per crew for the program manager to confirm, with stores no crew is qualified for listed separately. |
| Autopilot | A store manager has not confirmed e.g. 5 days before the night, a survey question has sat with the client for 2 days, or a closed store's invoice is past due | Drafts the message with the store number, the date, the specific question or the closeout package attached. | A drafted email or text a person approves before it sends. |
| Scheduler agent | Every morning at 7 a.m. during a program, and every Friday | Pulls last night's stores (closed, closed with exceptions, failed and why), tonight's stores and their blockers, and the week's count against plan with return visits by cause. | A morning program report to the client's project manager and your operations lead, and a weekly summary with the stores at risk. |
Straight answers
Retail fixture rollouts: FAQ
What software do retail fixture rollout companies use?
Usually several tools. The largest national firms run platforms they built themselves; DAVACO announced one called ClearThread in 2019. Merchandising-led firms use retail execution software such as Movista. Many installers keep the store list in Smartsheet, use Fieldwire or Procore for punch lists on remodels, fill thin markets through Field Nation, and check in and invoice through the retailer's own platform, often ServiceChannel. Some run it in one configurable platform such as Fieldproxy. The test is whether the program, each store's freight and paperwork, the crew's night and the signed closeout package sit on one record.
What is a retail fixture rollout?
One scope of fixture work repeated across many stores on a schedule: new gondola runs, wall systems, cash wraps, displays or a branded shop inside a store. SPAR Group's annual report describes the category as store remodels, department resets, fixture and banner installations, pop-up store services and store closings. H.J. Martin and Son says a location takes from 1 day to 3 weeks.
Do you need a building permit to install store shelving?
It depends on the height and the city. California's building code exempts nonfixed and movable fixtures, cases, racks and counters not over 5 ft 9 in. Above that, Sacramento requires anchorage with calculations up to 8 ft and full engineering from 8 ft to 12 ft, and Fresno requires a permit over 5 ft 9 in and a layout plan even below it. Check each store's city before the fixture height is fixed.
When does gondola shelving have to be anchored?
Three tests apply. The manufacturer's: Lozier limits unanchored uprite height to six times the leveler spacing (54 in on a 13 in wall base), less 12 in on carpet, and Madix requires anchoring over 96 in. The city's: several California cities require seismic anchorage from 5 ft 9 in. And guidance: FEMA E-74 says permanent floor-supported shelving over 6 ft must be designed as an architectural component.
How much weight can a gondola shelf hold?
For Lozier standard shelves the installation instructions give 300 lb at 7 in depth, 500 lb from 10 to 25 in and 400 lb at 28 and 31 in, evenly loaded. Reduce by 30% when only the front half is loaded and by 50% for shelves under 36 in wide. One section must not exceed 4,500 lb. Other makers publish their own figures, so use the manual for the product installed.
How close to the sprinklers can shelving and stock go?
OSHA 1910.159(c)(10) requires at least 18 inches of vertical clearance between sprinklers and material below, and OSHA treats that as a flat plane across the room. Its 2008 interpretation says materials on shelves against a wall are not subject to the requirement. Tall island fixtures and stock on top shelves are the usual problem.
Do fixture installers need a contractor's licence?
In some states, yes. California's C-61 / D-34 Prefabricated Equipment classification names store fixtures and display cases. The state's exemption for minor work is $1,000 from 1 January 2025, but it does not apply if the work needs a permit or the installer employs anyone. Check each state on the store list before pricing the program.
What should a crew do when fixtures arrive damaged?
Accept the delivery and write damaged or short on the carrier's receipt before signing. Lozier's terms require exactly that, plus photos sent within 5 days of delivery and the damaged parts held for the carrier; otherwise the customer pays for replacements. For damage found after unpacking, the freight classification rule since April 2015 is to tell the carrier within 5 days. Both manufacturers' manuals say never to install damaged parts.
How do installers check in at a store?
Where the retailer uses a facilities platform, through its app. A ServiceChannel guide for work at Walmart and CVS requires check-in before or at the estimated arrival time, check-out before leaving, and telling the store manager on arrival and departure, and warns that payment can be withheld if the steps are missed. Your own records should hold the same times.
Why are rollouts scheduled around the holidays?
Retailers avoid disruption in their biggest weeks. Field Nation's rollout guide, citing the National Retail Federation, notes that November and December average about 19% of annual U.S. retail sales. Each retailer sets its own freeze dates, so the program record should carry them and no store night should be offered inside them.
What goes in a store closeout package?
Whatever the client's standard says, and it should be written into the program before the first store. Typically the named photo set, the punch list with each item's status, and the store manager's signed completion form with any exceptions. A retail contractors' association article lists punch-list status and final approvals among turnover package contents. Without the package the store usually cannot be invoiced.
How long does it take to set up Fieldproxy for a rollout company?
Fieldproxy does the setup: programs and store lists, store records with jurisdiction flags, surveys, freight and receiving, the crew lead's install and closeout screens, the client portal and your invoice and closeout templates. You are live within a day, with unlimited users, so every crew lead, subcontractor and client project manager is included.
Related guides
All sources on this page (57)
- source: City of Sebastopol, Work Exempt from Permits (California Building Code, rev. 12-10-20)
- source: OSHA 29 CFR 1910.159, Automatic sprinkler systems
- source: Lozier, Display Shelving Installation Instructions, 01-13F Rev. BF, 02/2016 (PDF)
- source: Lozier, Terms and Conditions of Sale: freight claims and returns
- source: ICC, Significant Changes 2021: IEBC 704.2, reconfiguring movable cases and counters (PDF)
- source: City of Sacramento CDD-0308, Steel Storage Racks and Shelving Guidelines (rev. 01-01-2026, PDF)
- source: City of Fresno, Storage Racks Plan Submittal Guidelines (04.02.26; 2025 CBC, ASCE 7-22, PDF)
- source: Clark County, Washington: Racking permit requirements
- source: FEMA E-74, section 6.5.1.1 Light Duty Shelving
- source: Lozier, Product Safety Information: uprite height and leveler spacing (PDF)
- source: Lozier, Wall Mount Bracket Installation Instructions, 85947 Rev B (PDF)
- source: OSHA Standard Interpretation, 29 Sept 2008: the 18 inch sprinkler clearance
- source: OSHA 29 CFR 1910.37, Maintenance, safeguards and operational features for exit routes
- source: U.S. Access Board, 2010 ADA Standards, Chapter 4: 403.5.1 clear width
- source: U.S. Access Board, 2010 ADA Standards, Chapter 2: 225.2.2 and Table 227.2
- source: 28 CFR 36.211, Maintenance of accessible features (Cornell LII)
- source: U.S. Access Board, 2010 ADA Standards, Chapter 9: 904.3 and 904.4 counters
- source: 2022 California Building Code 1018.3, Aisles in Groups B and M (Corada)
- source: California CSLB, C-61 / D-34 Prefabricated Equipment Contractor
- source: CSLB Industry Bulletin 24-07, AB 2622 implementation, 31 Dec 2024 (PDF)
- source: Carpenter Agreement, Southern Illinois Builders Association and Carpenters' District Council of Greater St. Louis (via Illinois DOT, PDF)
- source: California DIR, Scope of Work Provisions 23-31-16, Modular Furniture Installer (Carpenter) (PDF)
- source: Trinity Logistics, time to report concealed damage on LTL shipments cut from 15 days to 5
- source: 49 U.S.C. 14706, Liability of carriers under receipts and bills of lading (Cornell LII)
- source: PARCEL, Revisions to the NMFC Which Shippers Need To Know (Brent Wm. Primus, 21 Sept 2015)
- source: IAEI Magazine, UL Question Corner: display cases and commercial displays (UL 65, UL 962)
- source: OSHA 29 CFR 1910.23, Ladders
- source: OSHA 29 CFR 1910.178, Powered industrial trucks
- source: EPA, Formaldehyde Emission Standards for Composite Wood Products (TSCA Title VI)
- source: Brixmor Property Group, Rules for Your Contractor (tenant packet, PDF)
- source: Shea Properties handbook, Contractor Rules and Regulations (retail centers)
- source: Daktronics, ServiceChannel Provider quick guide for technicians and service partners, DD3414324 Rev4 (PDF)
- source: PRINTING United Alliance, The Importance of Installation Site Audits (16 Oct 2019)
- source: Lozier 01-199 Rev L (04/2025), Capacity and Unbalanced Load Information for HD Shelving (PDF)
- source: Madix, Maxiline Gondola and Wall General Assembly, ASY-046 Rev. 02 (distributor-hosted PDF)
- source: Defense Commissary Agency, purchase description 2G14: gondola shelving (DOCX)
- source: Premium Retail Services case study: smart-home displays in 900 Best Buy stores
- source: DAVACO, Fleet Farm project: gondola and fixture installation
- source: H.J. Martin and Son, National Installation: Rollouts
- source: SPAR Group, Form 10-K for fiscal year 2024 (SEC)
- source: PODS for Business, The importance of streamlining fixture change-outs (30 Aug 2018)
- source: Frank Mayer and Associates, The Importance of Site Surveys for Kiosk and Display Deployments (4 Oct 2023)
- source: Field Nation, Pricing work for contractors
- source: REBusinessOnline, Finish Strong: retail construction closeout (Justin Elder, Retail Contractors Association)
- source: Shop! Association, history: NASFM (1956), A.R.E. (2007), merger with POPAI (Oct 2015)
- source: BLS Occupational Employment and Wages, May 2023: 47-2031 Carpenters
- source: Movista, retail execution and workforce platform
- source: ServiceChannel, Usage Fees for service providers
- source: Field Nation, Retail technology rollout guide
- source: Smartsheet, pricing (seen 22 Nov 2026)
- source: Fieldwire by Hilti, pricing (seen 22 Nov 2026)
- source: DAVACO press release, ClearThread reporting platform (19 Jan 2019)