Guide for underground storage tank testing companies ยท checked 24 November 2026

Underground storage tank testing software built around the component, the 3-year clock and the state form

A UST tester's real schedule is not a list of gas stations. It is a list of spill buckets, sumps, line leak detectors, ATG probes and anodes, each on its own clock: annual, every 3 years, every 60 days. This guide covers how a compliance visit runs, the 40 CFR 280 tests and their pass numbers, Class A, B and C operators, state twists in California, Texas and Pennsylvania, and what software testers and owners use.

See your own jobs set up this way

A 30-minute call. We show you underground storage tank testing companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

UST testing companies need software that tracks every tank component on its own federal or state clock (spill buckets and interstitial sumps every 3 years, ATG and line leak detector operability every year, cathodic protection every 3 years, impressed current rectifiers every 60 days), records the readings each test form asks for, and turns a failure into a repair, retest and, when needed, a 24-hour release report. Large testers run their own portals (Tanknology's TANCS); owners use compliance binders such as PASS Tools and ATG monitoring such as Veeder-Root Insite360; petroleum equipment contractors often use ECI Davisware or Aptora. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each component carries its rule and due date, the tech's app runs the state's own test form, and a failed test cannot be closed without its retest.

3 years

How often spill buckets and sumps used for interstitial piping monitoring must be tested for liquid tightness, and overfill devices inspected

source: 40 CFR 280.35, Periodic testing of spill prevention, containment sumps and overfill prevention (Cornell LII)

3 gph at 10 psi

What an automatic line leak detector must catch within 1 hour, checked by a simulated leak at the annual operability test

source: 40 CFR 280.44, Methods of release detection for piping (Cornell LII)

62.9%

National UST technical compliance rate EPA reported for fiscal year 2025

source: US EPA, UST Performance Measures, end of fiscal year 2025 (Dec 2025)

24 hours

Federal deadline to report a suspected release, including a failed test or unexplained alarm

source: 40 CFR 280.50, Reporting of suspected releases (Cornell LII)

How a job runs

One underground storage tank testing job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Build the facility file before the first visit

    Pull the state registration and last test results. For each tank record capacity, product, wall type and install date; for each line, pressurized or suction and whether it was installed before or after 11 April 2016, because that date decides whether annual line tightness testing is still an option under 40 CFR 280.41. List every spill bucket (single or double walled), every sump and whether it is used for interstitial monitoring, the overfill device, the ATG model, sensors, line leak detectors and the corrosion protection type.

  2. 2

    Work out what is due, by component

    Spill buckets, interstitial sumps and the overfill inspection run on a 3-year cycle from the last pass, release detection operability on 12 months, line tightness on 12 months for older pressurized piping (or 3 years for suction lines), cathodic protection every 3 years, and impressed current rectifiers every 60 days. The visit is whatever is due at that site in the next window, not a fixed package.

  3. 3

    Schedule around the store and the fuel drop

    Book with the site manager and the Class A or B operator. Avoid delivery windows: a spill bucket full of test water cannot take a drop. Ask for product levels high enough for the tank and line tests, and check whether the state wants advance notice of the test.

  4. 4

    Run the annual operability test

    Under 280.40(a)(3): test the ATG alarm, verify its configuration and battery backup; pull and inspect probes and sensors for residue, free floats, undamaged shafts and cable kinks; test each automatic line leak detector by simulating a leak; check vacuum pumps, pressure gauges and hand-held sampling equipment. PEI RP1200 is the code of practice EPA points to.

  5. 5

    Test the lines

    Line leak detectors must detect 3 gallons per hour at 10 psi within 1 hour. A line tightness test must detect 0.1 gallon per hour at one and a half times operating pressure. Record the method, the operating and test pressures, the start and end readings and the equipment's third-party certification.

  6. 6

    Test spill buckets and sumps

    Vacuum test a single-walled spill bucket and pass it if it holds at least 26 inches of water column after the hold (12 inches for a double-walled interstitial space) on the North Dakota and Minnesota forms; Georgia's form fails a bucket that drops more than 4 inches from 30. Hydrostatic sump tests fail at a drop of 1/8 inch or more over at least 1 hour, and any crack, hole or failed boot fails the sump on sight.

  7. 7

    Inspect overfill prevention and corrosion protection

    Inspect the overfill device on its 3-year cycle (flow restrictor, ball float or alarm). Survey cathodic protection: structure-to-soil readings for galvanic systems, and for impressed current the rectifier log, which the owner must read every 60 days.

  8. 8

    Handle a failure on the spot

    A failed spill bucket or sump is a repair and a retest. A failed line or tank tightness test, or an alarm that is not a false alarm, is a suspected release that the owner must report within 24 hours under 280.50. Write down who was told, when, and the incident number the state gives.

  9. 9

    Produce the state forms and the owner pack

    Fill each test on the state's own form (many states publish RP1200-based forms), attach the ATG printouts and photos, and sign. California wants its Secondary Containment Testing Report Form, with the technician's explanation if anything failed.

  10. 10

    Invoice and set the next due dates

    Invoice per test or per site under the contract, attach the reports, and set each component's next due date from today's pass. Owners must keep annual operability results 3 years, spill and sump test records 3 years, and tightness results until the next test.

What to record

The fields every underground storage tank testing job should capture

Facility and component register

  • State facility ID, registration status, delivery certificate or tag expiry (Texas delivery certificate, red or green tag states)
  • Tank: capacity, product, single or double wall, material, install date, release detection method (ATG, SIR, interstitial, tightness plus inventory)
  • Piping: pressurized or suction, installed before or after 11 April 2016, line leak detector make and model (mechanical or electronic)
  • Spill buckets: single or double walled, monitored interstitially yes/no; sumps: type and whether used for interstitial monitoring of piping
  • Overfill device type; cathodic protection: galvanic, impressed current or none (rectifier ID)
  • Class A, B and C operators named, with training certificate dates

Each test

  • Test type and method (vacuum, hydrostatic, low level, pressure decay), equipment serial and calibration date
  • Spill bucket: start and end vacuum in inches of water column, hold time; sump: start and end water level to 1/16 inch, duration
  • Line tightness: operating pressure, test pressure (1.5 x operating), measured leak rate in gph; LLD: simulated leak rate and trip result
  • ATG: alarm test, configuration verified, battery backup, each probe and sensor result; printout photo
  • Visual findings: cracks, holes, failed boots, debris, liquid in sump; photos before and after
  • Result pass or fail, technician name and certification number, signature

Failures and follow-up

  • Failure category: equipment repair, retest needed, suspected release
  • Who was told and when (owner, Class A or B operator), 24-hour reporting deadline and state incident number if reported
  • Repair quote, approval, repair date, retest date and retest result
  • Next due date per component, retention date per record

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
40 CFR 280.35: 3-year testing and inspectionSpill prevention equipment and containment sumps used for interstitial monitoring of piping are tested for liquid tightness at least once every 3 years, unless double walled with both walls monitored at walkthrough frequency. Overfill prevention equipment is inspected at least once every 3 years. Methods: the manufacturer's, a code of practice (the rule names PEI RP1200), or the state's. The first round was due by 13 October 2018 for systems in use by 13 October 2015. Records are kept 3 years. source: 40 CFR 280.35, Periodic testing of spill prevention, containment sumps and overfill prevention (Cornell LII)
40 CFR 280.36: 30-day and annual walkthroughsEvery 30 days: check spill prevention equipment (remove liquid and debris, fill cap secure) and release detection equipment (no alarms or unusual conditions, records current). Sites with deliveries more than 30 days apart may check before each delivery. Annually: containment sumps and hand-held release detection equipment such as gauge sticks and bailers. Keep walkthrough records 1 year. source: 40 CFR 280.36, Periodic operation and maintenance walkthrough inspections (Cornell LII)
40 CFR 280.40(a)(3): annual operability testAt least once a year: ATG and controllers (alarm, configuration, battery backup), probes and sensors (residue, floats, shafts, cables), automatic line leak detectors by simulated leak, vacuum pumps and pressure gauges, and hand-held electronic sampling equipment. Results are kept 3 years under 280.45. source: 40 CFR 280.40, General release detection requirements and annual operability test (Cornell LII)
40 CFR 280.41: which piping still gets a tightness testPressurized piping installed on or before 11 April 2016 needs an automatic line leak detector plus either an annual line tightness test or monthly monitoring. Suction piping can use a line tightness test every 3 years. Pressurized piping installed or replaced after 11 April 2016 is monitored at least every 30 days, with a line leak detector. source: 40 CFR 280.41, Release detection requirements for petroleum UST systems (Cornell LII)
40 CFR 280.43 and 280.44: the detection numbersTank tightness: 0.1 gph. ATG monthly test: able to detect 0.2 gph. SIR: 0.2 gph or 150 gallons in 30 days. Inventory control: 1% of flow-through plus 130 gallons. Line leak detector: 3 gph at 10 psi within 1 hour. Line tightness: 0.1 gph at 1.5 times operating pressure. All methods must reach 0.95 probability of detection and 0.05 probability of false alarm. source: 40 CFR 280.44, Methods of release detection for piping (Cornell LII)
40 CFR 280.31: cathodic protectionCorrosion protection is tested within 6 months of installation and at least every 3 years after. Impressed current systems are also inspected every 60 days. Records must show the last three 60-day inspections and the last two tests. source: 40 CFR 280.31, Operation and maintenance of corrosion protection (Cornell LII)
40 CFR 280.50 and 280.53: 24-hour reportingSuspected releases (released product found, sudden loss of product, monitoring results or alarms indicating a release) are reported to the implementing agency within 24 hours. Petroleum spills or overfills over 25 gallons, or causing a sheen on surface water, are also reported within 24 hours; smaller spills are cleaned up at once. source: 40 CFR 280.50, Reporting of suspected releases (Cornell LII)
Subpart J: Class A, B and C operatorsEach facility designates Class A (overall compliance), Class B (day-to-day operation, maintenance and records) and Class C (first response to alarms and spills) operators. Class A and B operators designated after 13 October 2018 are trained within 30 days of taking the role; Class C before taking it. An A or B operator at a site found out of compliance is retrained within 30 days unless annual refresher training is in place. source: 40 CFR 280.243, Operator training timing (Cornell LII)
Subpart H: financial responsibilityPetroleum marketers, and owners handling more than 10,000 gallons a month on average, carry $1 million per occurrence; others $500,000. Annual aggregate is $1 million for 1 to 100 USTs and $2 million for 101 or more. Many owners meet it through a state fund. source: 40 CFR 280.93, Financial responsibility amount and scope (Cornell LII)
Delivery prohibition: red tags and green tagsUnder the Energy Policy Act of 2005, states prohibit delivery to ineligible tanks, and anyone making or accepting a delivery to one faces the same daily penalty. Red tag states mark ineligible tanks; green tag states (EPA lists Florida, Georgia, Pennsylvania and Texas among them) mark eligible ones. A missed test can stop fuel drops. source: US EPA, State delivery prohibition programs (red tag and green tag)
California: 36-month secondary containment testing, ICC techniciansSecondary containment is tested at installation, 6 months after, and at least every 36 months, with results on the Secondary Containment Testing Report Form. Technicians who run these tests must be trained by the equipment manufacturer and renew their ICC California UST Service Technician certification by exam every 24 months. source: Cal. Code Regs. tit. 23, section 2715, UST certification and training (Cornell LII)
Texas: annual self-certification and the delivery certificateOwners of regulated USTs self-certify every year on form TCEQ-00724 to renew the facility's delivery certificate, attaching the current operator training certificate every third year. Installation, repair and removal must be done by a registered UST contractor with a licensed on-site supervisor. source: TCEQ, Renewing a PST delivery certificate
Pennsylvania USTIF: fees and deductiblePennsylvania's indemnification fund is paid for by a gallon fee collected at delivery and a capacity fee on tanks holding diesel, kerosene, heating oil or used oil. Claims carry a $5,000 per tank per occurrence deductible. Eligibility depends on the owner being in compliance, which is why test records matter at claim time. source: Pennsylvania USTIF, Owner and operator fees

Rules vary by state, council and contract. Checked 24 November 2026; confirm against the source for your area before relying on it.

Numbers

Test intervals and pass numbers a UST tester works to

Federal floor first; your state can be stricter and can name its own pass criteria. Pass numbers for buckets and sumps are from state forms that reproduce PEI RP1200.

Component or testInterval or pass numberBasis
Spill bucket and interstitial sump liquid tightnessEvery 3 years (unless double walled and monitored)40 CFR 280.35
Overfill prevention inspectionEvery 3 years40 CFR 280.35
ATG, probes, sensors, LLD operabilityEvery 12 months40 CFR 280.40(a)(3)
Line leak detectorDetect 3 gph at 10 psi within 1 hour40 CFR 280.44(a)
Line tightness test0.1 gph at 1.5 x operating pressure; annual (older pressurized) or 3 years (suction)40 CFR 280.41, 280.44(b)
Tank tightness / ATG monthly / SIR0.1 gph / 0.2 gph / 0.2 gph or 150 gal in 30 days40 CFR 280.43
Cathodic protectionWithin 6 months of install, then every 3 years; rectifier every 60 days40 CFR 280.31
Spill bucket vacuum, single wallHold at least 26 in water column (12 in for interstitial space)North Dakota and Minnesota RP1200-based forms
Spill bucket vacuum, GeorgiaFails if it cannot hold 30 in or drops more than 4 inGeorgia EPD form
Sump hydrostatic testFail at a drop of 1/8 inch or more over at least 1 hourMinnesota form; New Jersey low level procedure
California secondary containmentAt install, 6 months, then every 36 monthsState Water Board guide
Record retention (owner)Walkthroughs 1 yr; operability and 3-year tests 3 yrs; tightness until next test40 CFR 280.35, 280.36, 280.45

source: 40 CFR 280.35, Periodic testing of spill prevention, containment sumps and overfill prevention (Cornell LII)source: 40 CFR 280.40, General release detection requirements and annual operability test (Cornell LII)source: 40 CFR 280.41, Release detection requirements for petroleum UST systems (Cornell LII)source: 40 CFR 280.43, Methods of release detection for tanks (Cornell LII)source: 40 CFR 280.44, Methods of release detection for piping (Cornell LII)source: 40 CFR 280.31, Operation and maintenance of corrosion protection (Cornell LII)source: North Dakota, Spill bucket vacuum test form (SFN 62223)source: Minnesota PCA, Containment sump hydrostatic integrity test form (t-u5-12)source: Georgia EPD, UST 3-year spill bucket test formsource: New Jersey DEP, Low level sump test procedure (May 2019)source: California State Water Board, Secondary containment testing guidesource: 40 CFR 280.45, Release detection recordkeeping (Cornell LII)

Where it breaks

Where spreadsheets and generic software fall over

The schedule says "annual compliance, Shell on Route 9, March". The spill buckets there were last tested in a different month two years ago, on a 3-year cycle, and the 3-year date passes unnoticed. EPA's 2019 compliance advisories named late spill bucket tests, late sump tests and late overfill inspections as common violations.

Give every bucket, sump, overfill device, LLD and rectifier its own due date from its last pass, and build each visit from what is due at that site.

Piping is recorded as "pressurized" without an install date. A line installed after 11 April 2016 is quoted an annual tightness test it cannot use instead of 30-day monitoring, and the owner believes they are covered.

Make line type and install date required on the component, and let the rule (annual tightness, 3-year suction test or monthly monitoring) follow from them.

A tech writes "sump passed" with no start and end levels, no duration and no photos. When the state inspector asks for the 1/8 inch over 1 hour evidence, there is nothing to show.

Run the state's own form on the phone with required readings, timer, photos and the pass rule computed from the numbers.

A line tightness test fails on a Friday afternoon. The office finds out Monday, after the 24-hour window for reporting a suspected release has passed and the owner has kept selling fuel.

Treat a failed tightness test or confirmed alarm as a suspected release: alert the owner and Class A operator immediately, record who was told and when, and keep the job open until the state incident number or the false alarm finding is logged.

Failed buckets get a repair quote that sits in an inbox. Three months later nobody has retested, and the site is out of compliance on paper even though it was fixed.

Link every failure to a repair and a retest, and do not let the failure close until a passing retest is attached.

Results live in the tester's portal, the ATG history in another, and the walkthroughs on a clipboard at the store. A chain's environmental manager cannot answer "which of our 140 sites is due this quarter?"

One record per facility with every test, walkthrough, operator certificate and open failure, visible to the owner by site and by region.

Checklist

The underground storage tank testing operations checklist

Print it, or hand it to whoever runs the office side.

  • Every tank, line, spill bucket, sump, overfill device, LLD, sensor and CP system on file with type and install date
  • Line type and pre or post 11 April 2016 install date recorded for every run of piping
  • Each component's next due date set from its last pass (3-year, annual, 60-day)
  • State form for each test type loaded, including state-specific pass criteria (Georgia, California)
  • Test equipment serials and calibration or certification dates current
  • Technician certifications current (ICC every 24 months in California, manufacturer training for secondary containment)
  • Visits booked away from fuel deliveries, with product levels confirmed
  • Readings, durations, ATG printouts and photos captured on every test
  • Failures split into repair, retest and suspected release; 24-hour reporting clock started for releases
  • Retest attached before any failure is closed
  • State forms and owner report pack sent, with retention dates set
  • Class A, B and C operators named per facility with training dates
  • Delivery certificate or tag expiry tracked where the state uses one (Texas annual self-certification)
  • Impressed current rectifier 60-day logs collected or flagged as missing

Software options

What software underground storage tank testing companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

ECI Davisware

Petroleum equipment service and installation contractors

Field service software with petroleum equipment pages covering service agreements, core returns and regulatory compliance, aimed at companies that service dispensers, tanks and forecourt equipment.

source: ECI Davisware

Aptora (Total Office Manager)

PEI member contractors and fuel system service companies

Business and field service software marketed for petroleum equipment work: inventory, service contracts, equipment history, job costing and scheduling.

source: Aptora (Total Office Manager)

PASS Tools

UST and AST owners, operators and their service providers

Cloud compliance platform with a digital compliance binder for release detection results, monthly walkthroughs, functionality tests and operator training records; turns walkthrough answers into action items and work orders, with state-specific Smart Forms.

source: PASS Tools

Veeder-Root Insite360

Fuel retailers and fleets with Veeder-Root tank gauges

Remote ATG monitoring: tank gauge alarms, compliance test results polled per tank, line and sensor, and inventory reconciliation records. It watches the gauge; it does not run the 3-year bucket and sump tests.

source: Veeder-Root Insite360

Tester portals (Tanknology TANCS)

Customers of a large national testing company

Tanknology's TANCS portal shows its customers site details, services performed, schedules and test results. Useful if one tester does all your sites; it covers that tester's work only.

source: Tester portals (Tanknology TANCS)

Published prices, compared:source: ECI Davisware, Petroleum equipment service softwaresource: Aptora, Software for petroleum equipment (PEI) contractorssource: PASS Training & Compliance, PASS Tools for companiessource: Veeder-Root, Insite360 visibility across gas station networkssource: Tanknology, TANCS customer portal (Statement of Qualifications 2024)

Questions to ask any vendor

  • Can each spill bucket, sump, overfill device, line leak detector and rectifier carry its own due date and rule, not just the site?
  • Will the app run my state's test form with the readings it requires and compute pass or fail from them (26 inches water column, 1/8 inch in 1 hour, Georgia's 4 inch drop)?
  • Can piping install date (before or after 11 April 2016) drive which line test is offered?
  • When a tightness test fails, what tells the owner and Class A operator within minutes, and where is the 24-hour report recorded?
  • Can a failure stay open until a passing retest is attached?
  • Can a chain see every site's due tests, open failures and operator certificates without asking us for PDFs?

Bring one real underground storage tank testing job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Underground storage tank testing on Fieldproxy: built around how you already work

A Fieldproxy setup for a UST testing company is built around the component and its clock, not the customer: every spill bucket, sump, line, leak detector, probe and rectifier carries its federal or state rule and its next due date. Techs run the state's own test forms on an offline app with required readings and photos, a failure becomes a repair and retest that cannot close without a pass, and a suspected release starts a 24-hour clock that the office sees immediately.

Module 1

Facility and component register

The rule depends on the component: wall type, line type and install date decide which test applies and how often.

  • Record: Facility, linked to Owner and Chain; fields: state facility ID, registration status, delivery certificate or tag expiry, financial responsibility mechanism (e.g. state fund, insurance)
  • Records under each Facility: Tank (capacity, product, wall type, install date, release detection method), Line (pressurized or suction, install date before or after 11 April 2016), Spill bucket (single or double walled, interstitially monitored yes/no), Sump (used for interstitial monitoring yes/no), Overfill device, ATG, Sensor, Line leak detector, CP system
  • Operators: Class A, B and C named per facility with training certificate date and retraining due
  • Component status: In service, Temporarily closed, Failed awaiting repair, Removed
How this works

Module 2

Compliance calendar per component

A site's buckets, sumps, LLDs and rectifier each fall due in different months. The visit should be built from what is due.

  • Rule table: 3-year spill and sump test, 3-year overfill inspection, 12-month operability, 12-month or 3-year line tightness, 3-year CP survey, 60-day rectifier log, plus state overrides (e.g. California 36-month secondary containment)
  • Next due = last passing test + interval; a failed test keeps the component overdue until the retest passes
  • Due window view by facility, owner and state: due in 90 days, due in 30, overdue
How this works

Module 3

Visit planning and technician certifications

Not every tech may run every test, and the store's fuel drop decides the day.

  • Record: Technician certification: state license, ICC certificate and expiry, manufacturer training per equipment brand, line tester certification
  • Blocks: a tech without valid manufacturer training cannot be assigned a California secondary containment test; an expired certificate removes the tech from that test type
  • Visit fields: delivery window to avoid, product level requested, state notice sent yes/no, site contact and Class B operator
  • Test equipment record: serial, calibration or third-party certification date; expired equipment cannot be selected on a test
How this works

Module 4

Field app: the test forms

The reading is the evidence. A pass without numbers does not survive a state inspection.

  • Works offline in a forecourt with poor signal; opens on the facility's component list with what is due today
  • Spill bucket form: method, start and end vacuum in inches of water column, hold time, visual check; pass computed against the state's number
  • Sump form: start and end water level to 1/16 inch, built-in 1-hour timer, crack, hole and boot checks that fail it on sight
  • Line forms: LLD simulated leak and trip, line tightness operating and test pressure and leak rate; ATG form: alarm, configuration, battery backup, each probe and sensor
  • Required photos before and after, ATG printout photo, technician signature and certification number
How this works

Module 5

Failures, repairs and retests

A failure is the start of the job, not the end, and some failures are suspected releases.

  • Record: Failure, linked to Component and Test; category: Repair and retest, Suspected release, False alarm confirmed
  • Suspected release: owner and Class A operator notified with timestamp, 24-hour reporting deadline shown, state incident number field
  • Repair quote from the failure with parts (bucket, boot, LLD, probe); status: Open, Quoted, Approved, Repaired, Retested pass, Closed
  • Block: a Failure cannot reach Closed without a passing retest attached
How this works

Module 6

State forms and owner report pack

Each state wants its own layout, and the owner has to keep it for years.

  • PDF templates per state and test type from your own layouts (e.g. California Secondary Containment Testing Report Form, Georgia 3-year spill bucket form, RP1200-based forms)
  • Owner pack per visit: every test, readings, printouts, photos, failures and retest status
  • Retention date per record (e.g. 3 years for operability and 3-year tests, until next test for tightness)
How this works

Module 7

Walkthrough service for owners

Many owners pay testers or contractors to do the 30-day and annual walkthroughs too.

  • 30-day walkthrough form: spill buckets (liquid, debris, cap), release detection (no alarms, records current); annual: sumps and hand-held equipment
  • Any action-needed answer creates a work order with photo
  • 60-day impressed current rectifier reading logged with voltage and amperage; a missing reading is flagged
How this works

Module 8

Contracts and invoicing

Chains buy compliance programs per site per year; independents pay per test.

  • Contract per owner: sites covered, tests included, per-test rates for extras, retest and trip charges
  • Invoice per visit or monthly per region, with the report pack attached
  • Sync to QuickBooks or Xero
How this works

Module 9

Owner portal

An environmental manager with 140 sites needs to see the gaps before the inspector does.

  • Per site: every component with last test, result, next due, open failures and retest status, operator certificates
  • Regional view: sites with anything overdue, suspected releases open, delivery certificate or tag expiring
  • Download the report pack for any site and date range
How this works

The AI agents, set up for underground storage tank testing companies

AgentWhenWhat it doesWhat you get
Watcher agentA component comes within 60 days of its due date, a failure has no retest after 14 days (e.g.), or a test is saved as failed with category Suspected releaseReads the component's rule, last pass date and failure history, and separates scheduling gaps from open compliance riskA due and overdue list per owner for the office, and an immediate alert to the owner and Class A operator for a suspected release with the 24-hour deadline
Vision agentA tech photographs an ATG test printout or a line leak detector nameplateReads the tank number, test result and leak rate from the printout, or the make, model and serial from the nameplateThe test record or component record filled in, with a prompt on the phone if a field could not be read
Document intelligence agentAn owner forwards a state inspection report, notice of violation or previous tester's results PDFReads the facility ID, cited components, violation and deadline, and last test dates, and matches them to the right componentsComponents updated with last test dates, and a due visit or failure created against the violation deadline
Dispatch agentNext week's due components are released to the boardMatches visits to techs by state license, ICC and manufacturer training, calibrated equipment and distance, avoiding each site's delivery windowDraft visit plan per tech, and a list of tests no available tech is certified to run
AutopilotA repair quote for a failed bucket, sump or LLD sits unapproved for 7 days (e.g.)Drafts the follow-up with the failed reading, the rule it breaks and the photoA draft email to the owner that a person approves before it is sent
Scheduler agentFirst Monday of each monthPulls per owner: tests done, failures open, retests pending, components due in 90 days, operator training expiringA monthly compliance summary to each chain's environmental contact and an operations report to the owner of the testing company

Straight answers

Underground storage tank testing: FAQ

What software do underground storage tank testing companies use?

Petroleum equipment contractors often use field service software built for the trade, such as ECI Davisware or Aptora. Large testers run their own customer portals, like Tanknology's TANCS. Owners use compliance binders such as PASS Tools and ATG monitoring such as Veeder-Root Insite360. Fieldproxy is configured around each component's rule, the state's test forms and the failure, repair and retest chain.

How often do UST spill buckets need to be tested?

Under 40 CFR 280.35, spill prevention equipment is tested for liquid tightness at least once every 3 years, unless it is double walled and both walls are monitored at walkthrough frequency. It is also checked every 30 days during walkthroughs. California tests secondary containment every 36 months after the 6-month test.

What is the pass criterion for a spill bucket vacuum test?

State forms based on PEI RP1200, such as North Dakota's and Minnesota's, pass a single-walled bucket that holds at least 26 inches of water column after the hold, and a double-walled interstitial space at 12 inches. Georgia's form fails a bucket that cannot hold 30 inches or drops more than 4. Use your state's form.

How is a containment sump tested?

Usually hydrostatically: fill above the penetrations (or to a low level with the low liquid level method), wait at least 1 hour, and measure the level change. A drop of 1/8 inch or more fails, and any crack, hole or failed boot fails it on sight. Only sumps used for interstitial monitoring of piping need the 3-year federal test.

What does the annual UST operability test cover?

Section 280.40(a)(3): the ATG and controllers (alarm, configuration, battery backup), probes and sensors, automatic line leak detectors by simulated leak, vacuum pumps and pressure gauges, and hand-held electronic sampling equipment. Results are kept 3 years.

Do I still need an annual line tightness test?

Only for pressurized piping installed on or before 11 April 2016 that does not use monthly monitoring; it also needs an automatic line leak detector. Suction piping can be tightness tested every 3 years. Pressurized piping installed or replaced after 11 April 2016 must be monitored at least every 30 days.

What leak rates must UST tests detect?

Tank tightness 0.1 gph; ATG monthly test 0.2 gph; SIR 0.2 gph or 150 gallons in 30 days; line leak detectors 3 gph at 10 psi within 1 hour; line tightness 0.1 gph at 1.5 times operating pressure. All with 0.95 probability of detection and 0.05 probability of false alarm.

What happens if a UST test fails?

A failed bucket or sump is repaired and retested. A failed tank or line tightness test, or a monitoring result showing a release, is a suspected release that must be reported to the state within 24 hours under 40 CFR 280.50, followed by investigation. Spills or overfills over 25 gallons are also reported within 24 hours.

What are Class A, B and C UST operators?

Class A is responsible for overall compliance, Class B for day-to-day operation, maintenance and records, and Class C (often the cashier) for first response to alarms and spills. Each facility needs at least one A and one B. A and B operators are trained within 30 days of taking the role; C before.

How often is UST cathodic protection tested?

Within 6 months of installation and at least every 3 years after, under 40 CFR 280.31. Impressed current systems also need the rectifier inspected every 60 days, and records must show the last three 60-day inspections and the last two tests.

Can a state stop fuel deliveries over a missed test?

Yes. Under the Energy Policy Act of 2005 states run delivery prohibition: red tag states mark tanks ineligible for delivery, green tag states mark eligible ones. In Texas the owner renews the facility's delivery certificate each year by self-certifying compliance.

Related guides

All sources on this page (34)

Run underground storage tank testing work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.