Guide for backflow testing companies · checked 31 October 2026
Backflow testing, run to the water purveyor's deadline
A backflow test is ten minutes with a differential gauge and an hour of paperwork that a water purveyor, a fire marshal and the property owner will each read. This guide covers the pass marks for RP, DC, PVB and SVB assemblies, gauge calibration rules, the notice ladders purveyors use, the portals and per-report filing fees, fire line forward flow tests, and how to run a book of thousands of devices.
See your own jobs set up this way
A 30-minute call. We show you backflow testing companies workflows running in Fieldproxy, built around how you work.
Short answer
Backflow testing companies use software that keeps every assembly at every property with its own purveyor due date, records the psid readings for each check valve, relief valve or air inlet against the tester's certification and a gauge calibrated within the last 12 months, and files the report in the format each water purveyor accepts, often through a portal such as BSI Online, VEPO or SwiftComply that charges a fee per report. Syncta (from Watts) is built for testers; generic field service tools like Jobber or ServiceTitan handle scheduling and invoicing but not purveyor forms. Fieldproxy is set up around your own assemblies, forms and purveyors.
≥ 2.0 psid
Minimum relief valve opening point on a reduced pressure (RP) assembly; each check on a double check must hold at 1.0 psid or more
source: PNW AWWA, Appendix B test procedures: RPBA/RPDA reporting and DCVA/DCDA tests
12 months
Texas: annual tests of health-hazard assemblies and of the tester's differential gauge must fall no more than 12 months after the last one
$9.95
Raleigh Water's filing fee for each test report a tester submits through VEPO (Piqua, OH charges $15.95 per report through BSI Online)
source: Raleigh Water, letter to certified testers on the VEPO go-live (July 2022)
30 / 15 / 5 days + 48 h
One California district's notice ladder before it shuts off water for an untested assembly
source: Olivenhain Municipal Water District, Cross-Connection Control Plan (CCCPH compliance)
How a job runs
One backflow testing job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Take the notice, find the device
Most work starts with the purveyor's letter to the property owner, not a call from you. Get the notice: it carries the purveyor's device or account number (Raleigh prints a VEPO CrossConnex number on the reference line), the assembly location and the due date. Match it to the assembly already on file, or create a new one with make, model, size and serial.
- 2
Check the window, not just the due date
Purveyors set when a test counts. Raleigh accepts domestic and fire containment reports up to two months before the annual date and irrigation reports up to five months before 1 July. Olivenhain (CA) rejects tests done more than 45 days early. Book inside the window or the test is wasted.
- 3
Book by street and by purveyor
Route by location, but group by purveyor too: each one has its own form, portal, fee and submission deadline. Irrigation PVBs cluster in spring; fire line DCDAs often need the sprinkler contractor and the building engineer on site, and a forward flow test if NFPA 25 work is in the contract.
- 4
Confirm the gauge and the tester before leaving
The tester's certification and the gauge's accuracy test must both be current on the test date. Texas wants the gauge make, model, serial and date tested for accuracy on the form, and gauges used on potable assemblies must never test non-potable ones. Washington requires the kit checked by an independent lab within the 12 months before the test.
- 5
Inspect and test the assembly
Confirm it is the assembly on the notice (serial, size, orientation, installed as approved). Run the field test with a differential pressure gauge: RP relief valve opening point (≥ 2.0 psid), check 2 tight, check 1 pressure drop; DC each check holding at ≥ 1.0 psid; PVB or SVB check at ≥ 1.0 psid and air inlet opening at ≥ 1.0 psid and opening fully. Record the shutoff valve condition and line pressure.
- 6
Repair and retest on the same report
A failed assembly gets cleaned or rebuilt with manufacturer parts (rubber kit, springs, relief valve module) and retested. The TCEQ form has an initial test row, a repairs and materials row, and a test-after-repair row; if the initial test passes, the repair rows stay empty. A retest by a different tester goes on a separate form.
- 7
Restore water and leave proof
Open both shutoffs slowly, confirm water is restored, tag the assembly, and leave the owner a copy. Some forms ask who received the report on site.
- 8
File with the purveyor on time
Olivenhain wants passing results within 10 days and failing results within 5. Most cities now take reports only through a portal: BSI Online, VEPO, SwiftComply, BRYCER's Compliance Engine or the city's own. Each charges its own per-report fee or none; some waive the fee for failed tests or brand-new assemblies.
- 9
Invoice and set next year
Invoice the owner or property manager for the test, the filing fee if you pass it through, and any repair. The next due date comes from the purveyor's annual date, not from today's visit, so set it from the notice.
What to record
The fields every backflow testing job should capture
Assembly (one record per device, not per property)
- Property, service address, purveyor and purveyor's device or account number
- Type: RP, RPDA (Type II), DC, DCDA (Type II), PVB, SVB; main and bypass make, model, size and serial
- Service: domestic, fire line or irrigation; containment (after the meter) or isolation (inside the premises)
- Exact location: meter pit, mechanical room, fire riser, backflow cage, height above grade
- Hazard served and whether it is on a non-potable (auxiliary) supply
- Install date, purveyor's annual due date and the earliest date a test counts
- Detector meter reading on DCDA and RPDA fire lines
Each test
- Reason: new, existing, replacement (old model and serial if replaced)
- Installed per manufacturer and local code: yes or no
- Line pressure; shutoff valve 1 and 2 condition
- RP: relief valve opened at __ psid or did not open; check 2 closed tight or leaked; check 1 held at __ psid; buffer (check 1 minus relief opening) where the purveyor asks
- DC: check 1 and check 2 each held at __ psid, closed tight or leaked
- PVB / SVB: check held at __ psid; air inlet opened at __ psid; did it fully open
- Repairs and materials used (manufacturer parts only, per TCEQ), retest readings, final pass or fail
- Gauge make, model, serial, potable or non-potable, date tested for accuracy
- Tester name, certification or license number and expiry, signature, date and time
Office and filing
- Notice received date, appointment, purveyor test window
- Portal used, submission date, filing fee paid, accepted or rejected
- Calibration certificate per gauge and certification card per tester, uploaded to each purveyor that asks
- Records kept for at least three years (Texas) or five years (Washington purveyors)
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| USC Manual, Tenth Edition field test procedures | Most programs test to the University of Southern California Foundation's Manual of Cross-Connection Control, Tenth Edition. Texas bases tester licensing on it. The direction-of-flow test for check 2 on an RP sits in Appendix A.2.2, not in the field procedure, so each authority decides whether to require it. source: USC Foundation for Cross-Connection Control and Hydraulic Research, Cross Talk Winter 2013 (direction of flow test, Tenth Edition) |
| Pass marks per assembly type | RP and RPDA: relief valve opens at ≥ 2.0 psid, check 2 holds tight, check 1 pressure drop recorded (5.0 psid on the PNW AWWA form). DC and DCDA: each check drip-tight in the direction of flow at ≥ 1.0 psid (AWWA C510 4.3.2.1). SVB: check holds at ≥ 1.0 psid, air inlet opens at ≥ 1.0 psid and continues to open fully. source: PNW AWWA, Appendix B test procedures: RPBA/RPDA reporting and DCVA/DCDA tests |
| Texas: TCEQ-20700 test and maintenance report | One form per assembly, completed on site, printed and signed by the licensed tester unless TCEQ-approved electronic records are used. The original goes to the public water system under 30 TAC 290.44(h)(4)(c). Use only manufacturer replacement parts. Keep test records at least three years. The form only fits a Type II assembly with a single check bypass. source: TCEQ, Form TCEQ-20700 Backflow Prevention Assembly Test and Maintenance Report (with instructions) |
| Texas: gauges | Differential pressure gauges are tested for accuracy annually, no more than 12 months after the last test, and the date and serial go on the form. Gauges used on potable assemblies must not be used on non-potable ones. source: TCEQ, Form TCEQ-20700 Backflow Prevention Assembly Test and Maintenance Report (with instructions) |
| Washington: when to test | Purveyors must make sure assemblies are tested by a certified Backflow Assembly Tester (BAT) on installation, repair, reinstallation or relocation, after a backflow incident, and annually thereafter, or more often for high hazard premises or assemblies that repeatedly fail. source: Washington WAC 246-290-490, Cross-connection control requirements |
| Washington: test kit and validation card | A BAT's field test kit must be pressure-tested and checked for accuracy by an independent laboratory within the 12 months before the test date, using USC Manual Appendix A.7 procedures. The BAT sends the purveyor the lab document and a copy of their Department of Health validation card. source: Washington WAC 246-292-034, Backflow assembly tester duties (test kit accuracy, validation card) |
| Washington: purveyor quality control | Each purveyor's program must document BAT certification and test kit calibration, test report contents and time frames for submitting completed test reports. Test records are kept five years or the life of the assembly, whichever is shorter. source: Washington WAC 246-290-490, Cross-connection control requirements |
| California: Cross-Connection Control Policy Handbook | Adopted by the State Water Board on 19 Dec 2023, in effect 1 July 2024, replacing the Title 17 rules. Water systems had to file a Cross-Connection Control Plan by 1 July 2025 and keep testing assemblies at least annually. source: Palmdale Water District, notice of the SWRCB Cross-Connection Control Policy Handbook |
| California: who may test | CCCPH section 3.4.1 requires testers certified by an organization the State Water Board recognizes. In 2025 the Board confirmed ASSE 5110 meets the requirement. source: IAPMO, California State Water Board recognizes ASSE 5110 certification for backflow testers |
| A real CCCPH notice ladder | Olivenhain MWD: first notice gives 30 days, second 15, third 5, then a 48-hour disconnection notice. Tests more than 45 days early are rejected; passing results due within 10 days, failing within 5; repairs within 30 days of failure. source: Olivenhain Municipal Water District, Cross-Connection Control Plan (CCCPH compliance) |
| Containment vs isolation | Raleigh only wants reports for containment assemblies (the first assembly after a domestic or irrigation meter, or at the right of way on fire lines). Isolation assemblies inside the building are not reported to Raleigh Water. Single-family irrigation reports are due by 1 July every three years; all others annually. source: Raleigh Water, letter to certified testers on the VEPO go-live (July 2022) |
| Fire lines: NFPA 25 adds more than the purveyor test | The 2020 edition requires a weekly check that an RP relief port is not discharging, a quarterly main drain test where the assembly is on the sole supply, an internal inspection every five years, and an annual forward flow test at system demand, or the maximum flow possible where no means was installed. source: PHCP Pros, Inspecting and testing backflow preventers used in fire protection systems (NFPA 25) |
| Portals and per-report filing fees | Piqua, Ohio moved annual reports to BSI Online on 15 Jan 2024: testers register and upload licenses and gauge calibrations, reports were free for the first month, then $15.95 per report from 15 Feb 2024, paid by card or prepaid. source: Piqua (OH) joins the BSI Online backflow community, Jan 2024 |
| Portals change under you | Seattle Public Utilities takes test reports, BAT card updates and test kit calibration certificates through its tester portal, and is migrating to a new database, SAMS Cross-connection from NJBSoft, with its own tester portal. source: Seattle Public Utilities, Backflow assembly testing (tester portal and submissions) |
Rules vary by state, council and contract. Checked 31 October 2026; confirm against the source for your area before relying on it.
Numbers
Pass marks, deadlines and fees backflow testers work to
Field thresholds follow the USC Tenth Edition procedures as printed by PNW AWWA; your state or purveyor may add a buffer rule. Deadlines and fees are from the named purveyor and change, so check yours.
| Item | Value | Where it comes from |
|---|---|---|
| RP relief valve opening point | ≥ 2.0 psid | PNW AWWA Table B-2 |
| RP check 1 pressure drop | 5.0 psid (recorded) | PNW AWWA Table B-2 |
| RP buffer (check 1 minus relief opening) | 3 psi recommended on some city forms | Medical Lake, WA report form |
| DC / DCDA each check | Tight at ≥ 1.0 psid | PNW AWWA; AWWA C510 4.3.2.1 |
| PVB / SVB check and air inlet | ≥ 1.0 psid each; inlet opens fully | PNW AWWA SVB procedure |
| Gauge accuracy test | Every 12 months; independent lab in WA | TCEQ-20700; WAC 246-292-034 |
| Earliest a test counts | 2 months (Raleigh domestic/fire); 45 days (Olivenhain) | Purveyor rules |
| Submit after testing | Pass 10 days, fail 5 days | Olivenhain CCCPH plan |
| Repair a failed assembly | Within 30 days | Olivenhain CCCPH plan |
| Filing fee per report | $9.95 Raleigh (VEPO); $15.95 Piqua (BSI) | City notices |
| Fire line forward flow | Annually at system demand | NFPA 25 (2020) |
| Keep test records | 3 years (TX); 5 years or assembly life (WA) | 30 TAC 290.46; WAC 246-290-490 |
source: PNW AWWA, Appendix B test procedures: RPBA/RPDA reporting and DCVA/DCDA testssource: PNW AWWA, SVBA test procedures (check valve and air inlet)source: City of Medical Lake (WA), Backflow Assembly Test Report formsource: TCEQ, Form TCEQ-20700 Backflow Prevention Assembly Test and Maintenance Report (with instructions)source: Washington WAC 246-292-034, Backflow assembly tester duties (test kit accuracy, validation card)source: Raleigh Water, letter to certified testers on the VEPO go-live (July 2022)source: Olivenhain Municipal Water District, Cross-Connection Control Plan (CCCPH compliance)source: Piqua (OH) joins the BSI Online backflow community, Jan 2024source: PHCP Pros, Inspecting and testing backflow preventers used in fire protection systems (NFPA 25)source: Washington WAC 246-290-490, Cross-connection control requirementssource: Syncta Help Center, Backflow test kit recalibration
Where it breaks
Where spreadsheets and generic software fall over
The due date is set from your last visit. The purveyor's date is different, so the owner gets a 15-day second notice for a device you think is not due.
Store the purveyor's annual date and test window on each assembly, take it from the notice, and generate the next visit from it, not from the completion date.
One commercial property has a domestic RP, a fire line DCDA and three irrigation PVBs, under two purveyors. A job-per-address system can't keep five due dates, five forms and two portals apart.
Each assembly is its own record under the property, with its own type, purveyor, form and due date; one visit can test all five and produce five reports.
A tester submits with a gauge whose calibration lapsed last week. The purveyor rejects the report, the owner gets another notice, and you retest for free.
Keep a register of gauges and tester certifications with expiry dates; the test form pulls the gauge's last accuracy date and won't close if it is over 12 months old or the tester's card has expired.
Fail, repair, retest becomes two rows in a spreadsheet, and the report filed shows the failed initial test as the final result.
One test record with initial readings, repairs and parts, and retest readings, exactly like the TCEQ-20700 layout, and a final result that drives the report.
Every purveyor has its own form and portal and fee. The office retypes the same readings into BSI, VEPO and SwiftComply at night and loses track of which reports are filed.
A filing status per test (To file, Filed, Fee paid, Rejected, Accepted) with the portal and deadline from the purveyor, and the report generated in that purveyor's layout.
Fire line work is sold as 'annual backflow test' but NFPA 25 also wants the forward flow test at system demand and a five-year internal inspection, which nobody scheduled.
Fire line assemblies carry the NFPA 25 tasks as separate scheduled items, and the quote says which ones are included.
Checklist
The backflow testing operations checklist
Print it, or hand it to whoever runs the office side.
- Every assembly recorded with type, size, serial, service (domestic, fire, irrigation) and containment or isolation
- Purveyor, device ID, annual due date and the earliest date a test counts on each assembly
- Purveyor's form, portal, fee and submission deadline (pass and fail) on file
- Each tester's certification number and expiry; each purveyor's copy of the card uploaded
- Each gauge's serial, potable or non-potable, last accuracy test date and certificate
- Notice from the owner matched to the right assembly before booking
- Shutoff valve condition and line pressure recorded before the test
- Readings per check, relief valve and air inlet in psid, with tight or leaked
- Failed assemblies repaired with manufacturer parts and retested on the same report
- Water restored, assembly tagged, owner's copy left
- Report filed in the purveyor's format within its deadline; fee paid; acceptance confirmed
- Fire line NFPA 25 items (forward flow, five-year internal) scheduled separately
- Next year's visit set from the purveyor's date
- Records kept for the longest period any of your states requires
Software options
What software backflow testing companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
Syncta (Watts)
Testing companies and testers, the purveyor-facing side of the job
Launched by Watts in 2018 for testers, purveyors and property owners: customer and device records on phone, tablet or laptop, results submitted on water purveyor-required forms, reminders, online scheduling and routing.
BSI Online
Not tester job software: a program-management service water purveyors hire, where testers file reports
Testers register, upload licenses and gauge calibrations, and pay a per-report filing fee set by each city (for example $15.95 in Piqua, OH). If your purveyors use it, your own system needs to get each report in on time.
SwiftComply
Water utilities running a backflow program, with a tester login for submitting reports
Built for the purveyor: assembly inventory, notices and compliance rates, with a tester help area for account setup and report submission. Says it is used by 700+ organizations.
The Compliance Engine (BRYCER)
Water purveyors and municipalities, plus the certified testers reporting to them
The same company many fire departments use for sprinkler and hood reports also runs backflow programs: scheduling, reporting and follow-ups. Useful if you already file fire reports there.
VEPO CrossConnex
Purveyor portal with a tester mobile app
Raleigh Water moved testers to it in 2022: register the company, enter tests in the app or on the web, pay $9.95 per report by card. Testers search by VEPO number, address or meter number.
Jobber or ServiceTitan
Plumbing or irrigation companies where backflow is one service line
Good at scheduling, recurring visits, quotes and invoicing. Neither publishes native purveyor test forms or portal filing, so readings, gauge records and per-purveyor reports are on you to set up.
Leaving Syncta? Our step-by-step guide covers why backflow testersswitch, what to export, what doesn't export and how to run both during cutover: how to switch from Syncta.
Questions to ask any vendor
- Can each assembly (not each property) carry its own purveyor, due date, test window and form?
- Does the test form follow the TCEQ-20700 layout: initial test, repairs and materials, test after repair, in one record?
- Will the app block a test from closing when the gauge's accuracy test is over 12 months old or the tester's card has expired?
- Can you produce each purveyor's own report format, and track which reports are filed, fee paid and accepted on BSI, VEPO or SwiftComply?
- Can a property manager with 200 sites see every assembly, last result and next due date without emailing us?
- Can fire line assemblies carry NFPA 25 forward flow and five-year internal inspections as their own scheduled tasks?
Bring one real backflow testing job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Backflow testing on Fieldproxy: built around how you already work
A Fieldproxy setup for a backflow testing company is built around the assembly and the purveyor, not the address: every RP, DC, PVB and detector assembly carries its purveyor's device number, due date, test window, form and portal, and every test is checked against a current tester certification and a calibrated gauge before it can close. Testers work from an offline app that walks them through the readings for that exact assembly type, and the office sees which reports are filed, paid and accepted per purveyor.
Module 1
Assembly register
Purveyors track devices, not customers, and a property can have five assemblies under two water systems.
- Record: Assembly, under Property and Owner or Property manager; fields: type (RP, RPDA Type II, DC, DCDA Type II, PVB, SVB), main and bypass make, model, size, serial; service (domestic, fire line, irrigation); containment or isolation; location text and photo; hazard served; non-potable supply yes/no
- Purveyor link with the purveyor's device or account number (for example VEPO CrossConnex number) and meter number
- Annual due date from the purveyor, earliest valid test date (e.g. due date minus 60 or 45 days, from the purveyor record)
- QR tag on the assembly opens its history and the right test form
- Assembly status: Active, Failed awaiting repair, Removed, Replaced (old serial kept), Non-testable flagged for replacement
Module 2
Purveyor rulebook
Every water system has its own window, form, portal, fee and deadline, and the office should not have to remember them.
- Record: Purveyor; fields: state program (TCEQ, WA DOH, CA CCCPH), report form template, portal (BSI Online, VEPO, SwiftComply, Compliance Engine, email), filing fee per report, fee waived for failed tests yes/no
- Submission deadline after test (e.g. pass 10 days, fail 5 days), repair deadline after failure (e.g. 30 days), early-test limit
- What the purveyor wants on file from you: tester certification copy, gauge calibration certificate, company registration, with expiry
- Which assemblies to report: containment only (Raleigh) or containment and isolation
Module 3
Notices, intake and booking
The purveyor's letter starts most jobs, and a wrong match wastes a test.
- Owners send a photo or PDF of the notice; the device number, address and due date are matched to the Assembly
- Booking blocked before the purveyor's earliest valid test date
- Visit groups every assembly due at a property and nearby properties for one trip
- Visit status: Notice received, Booked, Confirmed, Tested, Repair needed, Retested, Filed, Invoiced
Module 4
Tester and gauge register
A report with an expired card or an out-of-date gauge is rejected, and the retest is on you.
- Tester: certification body and number (ASSE 5110, state BAT, TCEQ BPAT license), expiry, purveyor registrations and orientation training dates
- Gauge: make, model, serial, potable or non-potable, last accuracy test date, lab, certificate PDF
- Blocks: a tester can't be dispatched to a purveyor where their card is expired; a test can't close with a gauge tested more than 12 months before the test date; a potable gauge can't be used on an assembly flagged non-potable
- Calibration due list 30 days ahead, so kits go to the lab between seasons
Module 5
Field test app
The report is only as good as the readings, and the form must match the assembly type.
- Opens the form for the scanned assembly's type; offline in meter pits and basements
- Pre-test: serial and size confirmed, installed per manufacturer and code yes/no, line pressure, shutoff valve 1 and 2 condition
- RP: relief valve opened at __ psid (flagged under 2.0), check 2 tight or leaked, check 1 held at __ psid, buffer calculated where the purveyor asks
- DC: check 1 and 2 held at __ psid (flagged under 1.0); PVB/SVB: check and air inlet opening point, inlet fully opened yes/no
- Repair section: parts from the van stock list (manufacturer parts only), then retest readings in the same record; photo of the assembly and data plate; water restored yes/no; owner signature
Module 6
Repairs, rebuilds and replacements
A failed test is revenue and a deadline at the same time.
- Failed assembly creates a Repair job with the purveyor's repair deadline
- Quote lines: rubber kit, springs, relief valve module, check module, full replacement by size
- Van stock per tester for common kits; parts used deducted on the job
- Replacement keeps the old serial on the Assembly and starts a new test as reason 'Replacement'
Module 7
Purveyor filing
Filing is where tests get lost: right format, right portal, right fee, inside the deadline.
- Report PDF in each purveyor's own layout (TCEQ-20700 for Texas systems) generated from the test
- Filing task per test with portal, deadline and fee; status To file, Filed, Fee paid, Rejected, Accepted
- Rejected reason captured (expired gauge, wrong device number, too early) so it can be fixed and refiled
- Daily list of reports due today by purveyor
Module 8
Fire line and NFPA 25 tasks
Fire line assemblies carry obligations beyond the purveyor's annual test.
- Per fire line assembly: annual forward flow test (flow gpm, inlet and outlet psi), five-year internal inspection date, detector meter reading
- Quote says which NFPA 25 tasks are included; excluded ones show on the report
- Shared with the customer's sprinkler contractor where they do the flow
Module 9
Invoicing and property manager portal
Property managers with many sites want one place to see every assembly and pay once.
- Invoice per visit with each test, filing fee pass-through and repair lines; QuickBooks or Xero sync
- Portal per owner or manager: every assembly, last result, readings PDF, next due date, open repair quotes to approve
- Dashboards: assemblies due in 60 days by purveyor, failed awaiting repair past deadline, reports filed late, fee spend per portal
The AI agents, set up for backflow testing companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Document intelligence agent | An owner emails or uploads a purveyor test notice (PDF or photo) | Reads the purveyor, device or VEPO number, service address, assembly type and due date, and matches them to the Assembly record, or proposes a new one | A visit request on the right assembly with the purveyor's test window filled in |
| Watcher agent | A test is about to close with a gauge last tested over 12 months ago, an RP relief reading under 2.0 psid is marked pass, or a filed report passes the purveyor deadline without Accepted | Checks the gauge register, the readings against the assembly type's pass marks, and the purveyor's deadline | A block on the phone with the reason, or an overdue filing alert to the office |
| Vision agent | A tester photographs the data plate on a new or unknown assembly | Reads make, model, size and serial and works out the assembly type | The Assembly record filled in and the right test form opened |
| Autopilot | An assembly fails and the repair quote sits unapproved 7 days before the purveyor's repair deadline | Drafts a follow-up to the owner with the failed readings, the deadline and what the purveyor does next (for example the 48-hour disconnection notice) | A draft email or text a person approves before it sends |
| Text agent | An owner texts 'I got a backflow letter' or asks when their test is due | Finds the property and its assemblies, reads due dates and open slots | A booked visit inside the purveyor's window, or the answer from the real record |
| Scheduler agent | Every Monday at 7 am | Pulls assemblies due in the next 60 days by purveyor, reports still to file, rejections, gauges and tester cards expiring in 30 days | A weekly briefing to the operations manager |
Straight answers
Backflow testing: FAQ
What software do backflow testing companies use?
Many use Syncta from Watts, which is built for testers and produces purveyor-required forms. Others run Jobber or ServiceTitan for scheduling and invoicing and file reports by hand. Whatever they use, reports usually end up in the purveyor's own portal, such as BSI Online, VEPO, SwiftComply or BRYCER's Compliance Engine. Fieldproxy is set up around your assemblies, purveyors and forms.
What readings pass a backflow test?
Under the USC Tenth Edition procedures as printed by PNW AWWA: an RP relief valve must open at 2.0 psid or more with check 2 tight; each check on a double check must hold at 1.0 psid or more; a PVB or SVB check must hold at 1.0 psid and the air inlet must open at 1.0 psid or more and open fully. Some purveyors also ask for a buffer of about 3 psi between RP check 1 and the relief opening point.
How often must a backflow test gauge be calibrated?
Typically every 12 months. Texas requires the accuracy test no more than 12 months after the last one, recorded on the TCEQ-20700. Washington requires an independent lab check within the 12 months before the test date. Syncta's help center notes heavily used kits may need six months.
How early can I test before the purveyor's due date?
It depends on the purveyor. Raleigh accepts domestic and fire reports up to two months before the annual date. Olivenhain MWD in California rejects tests done more than 45 days early. Check the purveyor's notice.
What happens if a backflow test isn't done on time?
Purveyors escalate, then shut off water. Under California's Cross-Connection Control Policy Handbook, Olivenhain sends 30-day, 15-day and 5-day notices and then a 48-hour disconnection notice.
Do testers pay to file backflow test reports?
Often. Raleigh charges $9.95 per report through VEPO and Piqua, Ohio $15.95 through BSI Online. Some portals waive the fee for failed tests or for assemblies new to the system.
What is the TCEQ-20700?
The Texas Backflow Prevention Assembly Test and Maintenance Report. It records the assembly, initial test, repairs and materials, test after repair, and the gauge's make, serial and accuracy test date. It is filled in on site, signed by the licensed tester, and the original goes to the public water system. Keep records three years.
Who can test backflow assemblies in California now?
Since the CCCPH took effect on 1 July 2024, testers must hold certification from an organization the State Water Board recognizes. The Board has confirmed ASSE 5110 meets that requirement.
Is a fire line backflow test the same as the NFPA 25 test?
No. The purveyor wants the differential test. NFPA 25 also requires an annual forward flow test at system demand, a five-year internal inspection, a weekly check on RP relief ports and, where the assembly is the sole supply, a quarterly main drain test.
Do isolation assemblies inside a building get reported?
Depends on the purveyor. Raleigh only takes reports for containment assemblies, the first one after the meter or at the right of way. Other programs track isolation assemblies too.
Related guides
All sources on this page (29)
- source: PNW AWWA, Appendix B test procedures: RPBA/RPDA reporting and DCVA/DCDA tests
- source: TCEQ, Form TCEQ-20700 Backflow Prevention Assembly Test and Maintenance Report (with instructions)
- source: Raleigh Water, letter to certified testers on the VEPO go-live (July 2022)
- source: Olivenhain Municipal Water District, Cross-Connection Control Plan (CCCPH compliance)
- source: USC Foundation for Cross-Connection Control and Hydraulic Research, Cross Talk Winter 2013 (direction of flow test, Tenth Edition)
- source: Washington WAC 246-290-490, Cross-connection control requirements
- source: Washington WAC 246-292-034, Backflow assembly tester duties (test kit accuracy, validation card)
- source: Palmdale Water District, notice of the SWRCB Cross-Connection Control Policy Handbook
- source: IAPMO, California State Water Board recognizes ASSE 5110 certification for backflow testers
- source: PHCP Pros, Inspecting and testing backflow preventers used in fire protection systems (NFPA 25)
- source: Piqua (OH) joins the BSI Online backflow community, Jan 2024
- source: Seattle Public Utilities, Backflow assembly testing (tester portal and submissions)
- source: PNW AWWA, SVBA test procedures (check valve and air inlet)
- source: City of Medical Lake (WA), Backflow Assembly Test Report form
- source: Syncta Help Center, Backflow test kit recalibration
Run backflow testing work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.