Guide for aboveground storage tank inspection companies ยท checked 29 November 2026

Aboveground storage tank inspection software built around the thickness reading, the corrosion rate and the next due date

An AST inspector's real product is a number: the next inspection date, worked out from this year's ultrasonic readings, the last set, and the tank's minimum thickness. This guide covers how an API 653 or STI SP001 job runs, what the SPCC rule (40 CFR 112) actually requires, the Pennsylvania and West Virginia state rules on top, the interval maths, and what software inspectors and tank owners use.

See your own jobs set up this way

A 30-minute call. We show you aboveground storage tank inspection companies workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

Aboveground storage tank inspection companies need software that keeps every tank's thickness readings by location across inspections, computes corrosion rate and remaining life, and sets the next external, ultrasonic and internal due dates from the standard the owner's SPCC Plan names (API 653 for field-erected tanks, STI SP001 for shop-built ones). Refineries and terminals often keep integrity data in systems such as MISTRAS PCMS; owners of smaller tank farms use compliance tools such as PASS Tools or EHS software such as Ecesis for monthly checklists; fuel equipment contractors use trade software such as Aptora. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: tanks carry their category, standard and readings, the field app records UT grids and checklists offline, and the report pack and next due dates come out of the same job.

1,320 gal

Aggregate aboveground oil storage, counting only containers of 55 gallons or more, above which a facility can fall under the SPCC rule

source: 40 CFR 112.1, General applicability of the SPCC rule (Cornell LII)

3 years

How long signed records of SPCC inspections and tests are kept with the Plan

source: 40 CFR 112.7, General requirements for SPCC Plans, including inspection records (Cornell LII)

5 years max

Pennsylvania in-service interval for large ASTs, or 1/4 of the corrosion rate life if shorter

source: 25 Pa. Code 245.552, In-service inspections

How a job runs

One aboveground storage tank inspection job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Read the SPCC Plan before quoting

    The Plan decides the job. Under 40 CFR 112.8(c)(6) the owner must test or inspect each aboveground container for integrity on a regular schedule, with the frequency, type and inspector qualifications set by industry standards. The PE-certified Plan names the standard (API 653, STI SP001 or a hybrid) and the schedule. Ask for it, the last inspection report and the tank's nameplate data.

  2. 2

    Build the tank list and classify each tank

    For each tank: shop-built or field-erected, capacity, product, diameter and height, single or double wall, elevated or on grade, release prevention barrier under the bottom or not, and spill control. Shop-built tanks under STI SP001 fall into Category 1, 2 or 3 depending on spill control and continuous release detection; the category changes the interval more than the size does.

  3. 3

    Work out what is due

    EPA's inspector guidance gives the API 653 pattern: formal external visual every 5 years or 1/4 of the corrosion rate life, whichever is less; ultrasonic shell thickness within 15 years or 1/2 of the corrosion rate life, and every 5 years when the rate is unknown; first internal within 10 years of service. Its STI SP001 example puts a Category 3 shop-built 40,000 gallon tank on a 5-year formal external plus leak test and a 10-year formal internal, and a Category 1 10,000 gallon tank on a 20-year formal external only.

  4. 4

    Plan the outage or the in-service visit

    External and ultrasonic work is done with the tank in service. An internal (out-of-service) inspection means emptying, cleaning, gas freeing and permit-required confined space entry, so it is scheduled months ahead with the terminal's operations and a cleaning contractor. In Pennsylvania the floor scan must be statistically representative and use UT plus at least one other method such as magnetic flux or vacuum box testing of lap welds.

  5. 5

    Run the external inspection

    Walk the containment, foundation, shell, roof, appurtenances and piping. Appendix F of 40 CFR 112 lists what owners check monthly and what an inspector should see too: drip marks, discoloration, puddles, corrosion, cracks, localized dead vegetation, foundation settling and gaps, bowing pipe between supports, seepage at valves and seals.

  6. 6

    Take ultrasonic thickness readings

    Record readings at the same locations as last time (course, orientation, elevation), because the corrosion rate is a comparison: previous thickness minus current, divided by the years between them, per API's own exam body of knowledge. Remaining life is current thickness minus minimum thickness, divided by that rate.

  7. 7

    Check secondary containment, drainage and overfill

    Secondary containment must hold the largest single container plus freeboard for rain, and dikes must be sufficiently impervious. Rainwater drain bypass valves are normally sealed closed, opened under supervision and logged. At least one overfill device is required (high level alarm, pump cutoff, direct communication with the gauger or a fast-response level system) and level sensors are tested regularly.

  8. 8

    Assess fitness for service and write findings

    Compare readings to minimum thickness, note settlement, coating failures, nozzle and weld defects, and decide whether the tank is fit for continued service until the next inspection. Findings that need repair go to the owner with a deadline; a repair is a material repair under 112.8(c)(6) and triggers its own inspection.

  9. 9

    Deliver the report and the next due dates

    The report carries tank identification, inspection type and date, readings, corrosion rates, findings, recommendations and the next external, UT and internal dates. In Pennsylvania the in-service result goes to DEP on its form with the corrosion rate, calculated life and next schedule; in West Virginia the annual certification is uploaded to DEP's AST registration system.

  10. 10

    Invoice and set reminders

    Invoice per tank or per site, attach the report, and set reminders for each tank's next dates and for the owner's 5-year SPCC Plan review, which must be completed and any resulting amendment made within 6 months.

What to record

The fields every aboveground storage tank inspection job should capture

Tank register

  • Facility, SPCC Plan date, certifying PE or self-certified (Tier I or Tier II), standard named in the Plan and its edition
  • Tank ID, shop-built or field-erected, capacity, product, diameter, height, design standard (e.g. API 650, UL 142)
  • Single or double wall, elevated or on grade, release prevention barrier yes/no, cathodic protection yes/no, internal lining yes/no
  • STI SP001 category (1, 2 or 3) with the reason: spill control type, continuous release detection method
  • Minimum thickness per shell course and bottom, nominal thickness, corrosion allowance
  • State registration: Pennsylvania facility and tank ID, West Virginia AST registration, California tank facility statement in CERS

Each inspection

  • Inspection type: owner monthly or annual, formal external, ultrasonic, internal (out-of-service), leak test, post-repair
  • Inspector name, certification (API 653, STI SP001, PE, Pennsylvania DEP category) and expiry
  • UT readings by location ID (course, orientation, elevation), instrument serial and calibration date, couplant and temperature
  • Calculated per location: metal loss, corrosion rate, remaining life, next interval
  • Containment, foundation, shell, roof, appurtenances, piping, overfill device, drain valve seal checks with photos
  • Fit for service yes/no, findings with severity and deadline, signature

Plan, repairs and filings

  • SPCC 5-year review due date, amendments with PE certification date
  • Repair: description, standard used, contractor, completion date, post-repair inspection date
  • Rainwater drainage log: date, inspected for sheen, valve opened and resealed, by whom
  • State filing: Pennsylvania DEP form submitted date, West Virginia annual certification upload date

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
40 CFR 112.1: who is coveredNon-transportation facilities that could reasonably discharge oil to navigable waters are covered unless aggregate aboveground oil storage is 1,320 US gallons or less (counting only containers of 55 gallons or more) and completely buried storage is 42,000 gallons or less. Permanently closed containers are not counted. source: 40 CFR 112.1, General applicability of the SPCC rule (Cornell LII)
40 CFR 112.8(c)(6): integrity testing by industry standardTest or inspect each aboveground container for integrity on a regular schedule and whenever material repairs are made. Frequency, type of test and inspector qualifications come from industry standards and depend on size, configuration and design (shop-built, field-erected, skid-mounted, elevated, lined, double-walled, partially buried). Keep comparison records, inspect supports and foundations, and frequently inspect the outside for deterioration and oil in diked areas. Section 112.12(c)(6) says the same for animal fats and vegetable oils. source: 40 CFR 112.8, Requirements for onshore facilities, bulk storage containers (Cornell LII)
40 CFR 112.8(c)(2), (3), (8) and (10): containment, drainage, overfillSecondary containment for the entire capacity of the largest single container plus freeboard for precipitation. Drainage bypass valves kept sealed closed, rainwater inspected before release, valve resealed and the event recorded. At least one overfill device, with liquid level sensing devices tested regularly. Visible leaks corrected promptly and oil in diked areas removed promptly. source: 40 CFR 112.8, Requirements for onshore facilities, bulk storage containers (Cornell LII)
40 CFR 112.7(e): written procedures and 3-year recordsInspections and tests follow written procedures developed by the owner or the certifying engineer. The procedures and a record of each inspection, signed by the supervisor or inspector, are kept with the SPCC Plan for 3 years. Records kept under usual and customary business practices are acceptable. source: 40 CFR 112.7, General requirements for SPCC Plans, including inspection records (Cornell LII)
40 CFR 112.3: PE certification and qualified facilitiesA licensed Professional Engineer certifies the Plan, attesting among other things that procedures for required inspections and testing have been established. A Tier II qualified facility (10,000 gallons or less aggregate aboveground, and no single discharge over 1,000 gallons or two over 42 gallons in 12 months in the prior 3 years) may self-certify; Tier I also has no container over 5,000 gallons. source: 40 CFR 112.3, Requirement to prepare and implement an SPCC Plan, PE certification and qualified facilities (Cornell LII)
40 CFR 112.5(b): 5-year Plan reviewThe owner reviews and evaluates the SPCC Plan at least once every 5 years and amends it within 6 months of the review to include more effective, field-proven prevention technology. Technical amendments, such as a tank re-rating, need PE certification. source: 40 CFR 112.5, Amendment of SPCC Plans and the 5-year review (Cornell LII)
API 653 intervals, as summarized by EPAFormal external visual every 5 years or 1/4 of the corrosion rate life, whichever is less. Ultrasonic shell thickness within 15 years or 1/2 of the corrosion rate life, whichever is less, and every 5 years when the rate is unknown. First internal within 10 years of service; later internals by corrosion rate, capped at 20 years without a release prevention barrier and 30 years with one, or set by risk-based inspection. Owner inspections monthly. The PE makes the final call in the Plan. source: US EPA, SPCC Guidance for Regional Inspectors, Chapter 7: Inspection, Evaluation, and Testing (Dec 2013)
STI SP001: shop-built tanks by categoryCovers shop-fabricated tanks, small field-erected tanks, portable containers and their secondary containment. Category 1 has spill control and continuous release detection; Category 3 has neither. In EPA's worked example, Category 3 tanks get a formal external inspection and owner leak test at most every 5 years and a formal internal every 10; a Category 1 tank gets a formal external every 20 years and no internal or leak test. Owner inspections are monthly and annual. source: US EPA, SPCC Guidance for Regional Inspectors, Chapter 7: Inspection, Evaluation, and Testing (Dec 2013)
API 653 inspector certificationEligibility combines education with years of AST design, construction, repair, operation or inspection experience, at least one year of it in supervising or performing inspection under API 653. Certified inspectors apply for recertification every 3 years, from 90 days before expiry, with a 90-day grace period after. source: API, API 653 Aboveground Storage Tank Inspector certification (eligibility and 3-year recertification)
Pennsylvania: large ASTs, in-service and out-of-serviceDepartment-certified inspectors only. In-service inspections follow API 653 or API 570 and report the shell and piping corrosion rate, calculated life and next schedule: API 653 service life method or 1/4 of the corrosion rate life, maximum 5 years. Out-of-service inspections add the bottom (UT plus one other method such as magnetic flux or vacuum box), with the next one at 1/2 of the corrosion rate life, maximum 20 years. source: 25 Pa. Code 245.553, Out-of-service inspections
Pennsylvania: small ASTs (21,000 gallons or less)Small ASTs holding regulated substances over 5,000 gallons, or highly hazardous substances over 1,100 gallons, get in-service inspections by a Department-certified inspector every 5 years or more often when corrosion or other conditions call for it. Tanks installed after 22 December 2018 are first inspected within 5 years of installation. source: 25 Pa. Code 245.616, Inspection requirements for small aboveground storage tanks
West Virginia: annual certification and 14-day containment checksOwners of regulated ASTs submit an annual certification, uploaded to DEP's AST registration system, that the tank and its secondary containment meet the AST Rule. Integrity is certified by a PE, an API certified inspector or an STI certified inspector; in the years between, the owner certifies whether anything obvious changed. Level 1 systems get a secondary containment visual every 14 days and every system a monthly maintenance check. source: West Virginia DEP, Certification of annual inspection guidance for regulated ASTs
California: Aboveground Petroleum Storage ActAPSA covers facilities with 1,320 gallons or more of petroleum in aboveground tanks, 55-gallon drums included, administered by CUPAs under the State Fire Marshal. Facilities file a tank facility statement through CERS and keep an SPCC Plan; UCLA's EH&S notes CUPA inspections of its ASTs at least once every 3 years. source: UCLA EH&S, Aboveground storage tanks and California's Aboveground Petroleum Storage Act

Rules vary by state, council and contract. Checked 29 November 2026; confirm against the source for your area before relying on it.

Numbers

Intervals and thresholds an AST inspector works to

Federal SPCC thresholds, the industry-standard intervals EPA cites, and two state overlays. The Plan's PE sets the final schedule; use the edition your Plan names.

ItemInterval or numberBasis
SPCC applicabilityOver 1,320 gal aggregate aboveground (containers of 55 gal or more)40 CFR 112.1
Self-certified Plan10,000 gal or less aggregate (Tier II); Tier I also no container over 5,000 gal40 CFR 112.3(g)
SPCC Plan reviewEvery 5 years, amend within 6 months40 CFR 112.5(b)
Inspection recordsSigned, kept with the Plan 3 years40 CFR 112.7(e)
API 653 formal external5 years or 1/4 corrosion rate life, whichever is lessEPA SPCC guidance ch. 7
API 653 UT shell thickness15 years or 1/2 corrosion rate life; 5 years if rate unknownEPA SPCC guidance ch. 7
API 653 internalFirst within 10 years; then up to 20 (no RPB) or 30 (with RPB) or by RBIEPA SPCC guidance ch. 7
STI SP001 Category 3, shop-builtFormal external plus leak test 5 years; formal internal 10 yearsEPA SPCC guidance example
STI SP001 Category 1, shop-builtFormal external 20 years; no internal or leak testEPA SPCC guidance example
Pennsylvania large AST in-serviceService life method or 1/4 corrosion life, max 5 years25 Pa. Code 245.552
Pennsylvania large AST out-of-serviceService life method or 1/2 corrosion life, max 20 years25 Pa. Code 245.553
West VirginiaAnnual certification; containment visual every 14 days (Level 1)WV DEP; 47 CSR 63-5
Facility Response Plan triggerOver-water transfers and 42,000 gal or more, or 1 million gal plus criteria40 CFR 112.20

source: 40 CFR 112.1, General applicability of the SPCC rule (Cornell LII)source: 40 CFR 112.3, Requirement to prepare and implement an SPCC Plan, PE certification and qualified facilities (Cornell LII)source: 40 CFR 112.5, Amendment of SPCC Plans and the 5-year review (Cornell LII)source: 40 CFR 112.7, General requirements for SPCC Plans, including inspection records (Cornell LII)source: US EPA, SPCC Guidance for Regional Inspectors, Chapter 7: Inspection, Evaluation, and Testing (Dec 2013)source: 25 Pa. Code 245.552, In-service inspectionssource: 25 Pa. Code 245.553, Out-of-service inspectionssource: West Virginia DEP, Certification of annual inspection guidance for regulated ASTssource: W. Va. Code R. 47-63-5, AST operation and maintenance requirements (Cornell LII)source: 40 CFR 112.20, Facility Response Plans (Cornell LII)

Where it breaks

Where spreadsheets and generic software fall over

UT readings are kept as a table in last year's PDF report. This year a different inspector takes readings at different spots, so there is nothing to compare, the corrosion rate is unknown, and the interval falls back to the 5-year default the EPA guidance gives for an unknown rate.

Store readings by fixed location ID (course, orientation, elevation) on the tank, and open last time's grid on the inspector's tablet so each point is re-measured where it was measured before.

The schedule says "tank farm inspection, every 5 years". Two shop-built tanks are Category 1 (20-year external), one is Category 3 (5-year external plus leak test and a 10-year internal), and the field-erected tank's corrosion rate cuts its interval to 3 years. The short one is missed.

Give each tank its own standard, category and computed due dates, and build the visit from what is due at the site.

A spill control upgrade or new release detection changes a tank's STI category, or a re-rating changes its capacity, but the schedule is never recalculated and the SPCC Plan is not amended.

Make category and capacity changes events on the tank: they recalculate the due dates and open a Plan amendment task that needs PE certification.

The owner's monthly Appendix F checklist lives on a clipboard in the tank farm office. When EPA asks for 3 years of signed records, months are missing and the drainage valve log is blank.

Run the monthly checklist and the rainwater drainage log on a phone with signature, date and photos, and flag any month without a completed check.

A finding ("pitting on course 1 at 90 degrees, repair before next fill cycle") goes into the report and nowhere else. The repair is done but never inspected, and the record shows an open defect.

Turn every finding into a tracked action with a deadline, and close it only with the repair record and the post-repair inspection attached.

The inspector's API 653 certificate lapsed in the 90-day grace window, or a Pennsylvania job is assigned to someone without the right DEP category. The report is signed anyway and later rejected.

Hold each inspector's certifications with expiry dates and block assignment of an inspection type the inspector is not currently certified for.

Checklist

The aboveground storage tank inspection operations checklist

Print it, or hand it to whoever runs the office side.

  • SPCC Plan on file with the standard and edition it names, PE or self-certification, and 5-year review date
  • Every tank classified: shop-built or field-erected, STI category or API 653, RPB, lining, CP
  • Minimum thickness per shell course and bottom recorded before the first UT visit
  • UT locations fixed by ID so each reading compares to the last
  • Corrosion rate, remaining life and next external, UT and internal dates computed per tank
  • Inspector certifications (API 653, STI, PE, Pennsylvania DEP category) current for the inspection type
  • UT instrument serial and calibration date on every reading set
  • Containment capacity checked against the largest tank plus freeboard
  • Drain valves sealed, drainage events logged with sheen check
  • Overfill device identified and level sensor test recorded
  • Owner monthly and annual checklists signed, 3 years kept
  • Findings tracked to repair and post-repair inspection
  • State filings done: Pennsylvania DEP inspection form, West Virginia annual certification, California CERS statement
  • Internal inspections planned with cleaning, gas freeing and confined space entry well ahead

Software options

What software aboveground storage tank inspection companies actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

MISTRAS PCMS

Refineries, terminals and plants with large integrity programs

Inspection data management for piping, vessels, valves and tanks: tracks wall thickness, corrosion rates, next inspection and retirement dates, with an RBI module and mobile access. Built for an owner's integrity team rather than a small inspection firm's dispatch.

source: MISTRAS PCMS

PASS Tools

UST and AST owners and their service providers

Cloud compliance platform with a digital compliance binder, walkthrough inspections that create action items and work orders, and state-specific forms. Strongest on fuel retail and monthly owner checks.

source: PASS Tools

Ecesis SPCC software

EHS teams managing SPCC compliance across sites

EHS compliance software with an SPCC module; runs AST inspection checklists (shell, foundation, containment, piping) on phone or tablet with photos and automatic corrective actions.

source: Ecesis SPCC software

Aptora

Petroleum equipment (PEI) service contractors

All-in-one field and office software for fuel system contractors: tanks, parts, labor, maintenance contracts and keeping compliance testers on schedule. Suits contractors who install and service tank systems alongside inspections.

source: Aptora

Published prices, compared:source: MISTRAS Group, Plant Condition Management Software (PCMS)source: PASS Training & Compliance, PASS Tools for companiessource: Ecesis, Above ground storage tank inspection checklist and SPCC softwaresource: Aptora, Software for petroleum equipment (PEI) contractors

Questions to ask any vendor

  • Can each tank carry its own standard (API 653 or STI SP001), STI category and minimum thickness per course?
  • Are UT readings stored by fixed location so the next visit compares point to point and computes corrosion rate and remaining life?
  • Does the next due date recalculate when the corrosion rate, category or capacity changes?
  • Can a finding stay open until the repair and post-repair inspection are attached?
  • Can you block an inspector whose API 653, STI or state certification has lapsed from being assigned?
  • Can the tank owner see every tank's last inspection, open findings and next dates, and download the reports, without asking us?

Bring one real aboveground storage tank inspection job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

Aboveground storage tank inspection on Fieldproxy: built around how you already work

A Fieldproxy setup for an AST inspection company is built around the tank and its readings: each tank carries its standard, STI category or API 653 data, minimum thicknesses and a fixed grid of UT locations. Inspectors record readings and checklists offline on a tablet, the corrosion rate and next external, UT and internal dates are calculated from the numbers, and findings stay open until the repair is inspected.

Module 1

Facility, SPCC Plan and tank register

The Plan sets the standard and the schedule, and each tank's construction decides which rule applies.

  • Record: Facility, linked to Owner; fields: SPCC Plan date, certifying PE or Tier I or Tier II self-certified, standard and edition named, 5-year review due, state registration IDs
  • Record: Tank under each Facility: shop-built or field-erected, capacity, product, diameter, height, design standard, single or double wall, elevated, RPB, CP, lining
  • STI SP001 category field with reason (spill control type, continuous release detection); a change to either fields reopens the category
  • Tank status: In service, Out of service for inspection, Repair pending, Permanently closed (excluded from capacity)
How this works

Module 2

Thickness locations and readings

The corrosion rate only exists if this year's reading is taken where last year's was.

  • Record: UT location under each Tank: ID, shell course, orientation in degrees, elevation; bottom grid points for out-of-service work
  • Fields per location: nominal, minimum allowable (tmin), corrosion allowance
  • Record: Reading: location, thickness, date, instrument serial, calibration date, inspector
  • Calculated per location (e.g. formulas set to the standard in use): metal loss, corrosion rate, remaining life; tank uses its worst location

Module 3

Due dates by standard

Each tank on a farm can fall due in a different year for a different inspection type.

  • Rule table: API 653 external (5 years or 1/4 life), UT (15 years or 1/2 life, 5 if unknown), internal; STI SP001 by category; state overrides such as Pennsylvania 5-year in-service and 20-year out-of-service caps
  • Next due recalculates on every reading set and on category or capacity change
  • Views: due in 12 months, due in 90 days, overdue, by owner, state and inspection type
How this works

Module 4

Inspector certifications and job planning

Who may sign depends on the standard and the state.

  • Record: Certification: API 653 number and expiry, STI SP001, PE license and state, Pennsylvania DEP inspector category, confined space training
  • Block: an inspection type cannot be assigned to an inspector without a current matching certification
  • Out-of-service job fields: emptying date, cleaning contractor, gas free certificate, entry permit number, floor scan method (e.g. MFL plus UT)
How this works

Module 5

Field app: external, UT and internal forms

Tank farms often have no signal, and the evidence is the reading and the photo.

  • Works offline; opens on the facility's tanks with what is due today
  • External form: containment, foundation, shell, roof, appurtenances, piping, overfill device, drain valve seal, each with condition and required photo on any defect
  • UT form: last visit's grid pre-loaded by location, previous value shown, out-of-range reading flagged before save
  • Fit for service yes/no, findings with severity and deadline, inspector signature and certificate number
How this works

Module 6

Owner monthly and annual checks

Owners need 3 years of signed checks, and many pay the inspection firm or let it supply the forms.

  • Monthly checklist based on Appendix F: leaks, discoloration, puddles, corrosion, cracks, dead vegetation, foundation gaps, pipe bowing, valve seepage
  • Rainwater drainage log: sheen check, valve opened and resealed, by whom
  • West Virginia Level 1 sites: 14-day containment visual; a missed check is flagged
  • Any defect answer creates a finding for the inspector to review
How this works

Module 7

Findings, repairs and re-inspection

A material repair triggers its own inspection under 112.8(c)(6).

  • Record: Finding, linked to Tank and Inspection; status: Open, Quoted, Approved, Repaired, Inspected, Closed
  • Repair record: standard used, contractor, dates; post-repair inspection required
  • Block: a Finding cannot close without the post-repair inspection attached
  • Plan amendment task created when a repair changes capacity or containment, for PE certification
How this works

Module 8

Reports and state filings

Each report is the owner's evidence for 3 years and the input to the next interval.

  • PDF report from your own template: tank data, inspection type, readings table with corrosion rates, findings, fit for service, next external, UT and internal dates
  • State outputs: Pennsylvania DEP inspection form fields (corrosion rate, calculated life, next schedule), West Virginia annual certification pack with deficiency documentation
  • Retention date set per record (e.g. 3 years from signature)
How this works

Module 9

Contracts, invoicing and owner portal

Terminal owners buy programs across many tanks and want to see the gaps themselves.

  • Contract per owner: tanks covered, rates per inspection type, UT per point or per course, out-of-service day rates
  • Invoice per visit with the report attached, synced to QuickBooks or Xero
  • Portal per owner: each tank's last inspection, next dates, open findings and reports to download
How this works

The AI agents, set up for aboveground storage tank inspection companies

AgentWhenWhat it doesWhat you get
Watcher agentA new UT reading set cuts a tank's remaining life below the current interval, a tank comes within 12 months (e.g.) of a due date, or an owner monthly check is missingReads the tank's readings, standard, category and due dates, and separates scheduling reminders from a shortened intervalA due list per owner for the office, and an alert to the inspector and owner when a reading moves a tank's next inspection forward
Document intelligence agentAn owner sends a previous inspector's API 653 or SP001 report or an SPCC Plan PDFReads tank IDs, dimensions, minimum thicknesses, readings by location, findings and the standard named in the PlanTanks and UT locations created with last readings and dates, so the first visit already has a comparison grid
Vision agentAn inspector photographs a tank nameplate or a UT gauge screenReads manufacturer, design standard, capacity and year from the nameplate, or the thickness value from the gaugeThe tank record or the reading filled in, with a prompt when a value could not be read
Dispatch agentNext quarter's due inspections are releasedMatches jobs to inspectors by certification (API 653, STI, state category), calibrated equipment and distance, grouping tanks at the same siteA draft schedule per inspector and a list of jobs no available inspector is certified to sign
AutopilotA finding's repair quote sits unapproved for 14 days (e.g.)Drafts a follow-up with the reading, the location, the photo and the date the tank's interval depends onA draft email to the owner that a person approves before it is sent
Scheduler agentFirst Monday of each quarterPulls per owner: inspections done, tanks due in 12 months, open findings, SPCC 5-year reviews coming up, inspector certificates expiringA quarterly tank compliance summary to each owner's environmental contact

Straight answers

Aboveground storage tank inspection: FAQ

What software do aboveground storage tank inspection companies use?

Large owners keep integrity data in systems such as MISTRAS PCMS. Owners of fuel and smaller tank sites use compliance tools such as PASS Tools or EHS software such as Ecesis for checklists. Petroleum equipment contractors use trade software such as Aptora. Fieldproxy is configured around each tank's standard, its UT locations and readings, and the next due dates they produce.

How often does an aboveground storage tank need to be inspected?

The SPCC rule (40 CFR 112.8(c)(6)) leaves it to industry standards and the PE-certified Plan. EPA's guidance summarizes API 653 as a formal external every 5 years or 1/4 of the corrosion rate life, UT within 15 years or 1/2 the life, and a first internal within 10 years. STI SP001 depends on the tank's category: from a 5-year external plus leak test for Category 3 tanks to a 20-year external for Category 1 tanks in EPA's example. Owners also inspect monthly.

What is the difference between API 653 and STI SP001?

API 653 covers field-erected welded or riveted atmospheric tanks built to API 650 or 12C, with intervals driven by corrosion rate. STI SP001 covers shop-fabricated tanks, small field-erected tanks and portable containers, with intervals driven by size and category (spill control and continuous release detection).

How is the corrosion rate of a tank shell calculated?

Corrosion rate = previous thickness minus current thickness, divided by the years between the readings, at the same location. Remaining life = current thickness minus minimum thickness, divided by the rate. Say a shell course read 0.250 in in 2016 and 0.235 in in 2026: the rate is 0.0015 in per year, and with a minimum of 0.180 in the remaining life is about 37 years.

Who can perform an AST integrity inspection?

The standard and the state decide. API 653 inspections are done by API certified inspectors, who recertify every 3 years. STI SP001 formal inspections use STI certified inspectors. West Virginia accepts a PE, API or STI certified inspector for the integrity certification. Pennsylvania requires a Department-certified inspector in the right category.

Does my facility need an SPCC Plan?

If it could reasonably discharge oil to navigable waters and stores more than 1,320 gallons aboveground (counting only containers of 55 gallons or more) or more than 42,000 gallons completely buried. Facilities with 10,000 gallons or less aboveground and a clean spill history can self-certify as a qualified facility; others need a PE.

How long must AST inspection records be kept?

Under 40 CFR 112.7(e), signed records of inspections and tests are kept with the SPCC Plan for 3 years, along with the written procedures. Thickness history is worth keeping far longer, because every future corrosion rate is calculated from it.

What does Pennsylvania require for aboveground tanks?

Large ASTs (over 21,000 gallons) get in-service inspections at the API 653 service life or 1/4 of the corrosion rate life, maximum 5 years, and out-of-service inspections at 1/2 the life, maximum 20 years, by Department-certified inspectors. Small ASTs over 5,000 gallons of regulated substances get in-service inspections every 5 years.

What does West Virginia require for aboveground tanks?

An annual certification for each regulated AST and its secondary containment, uploaded to DEP's AST registration system, with integrity certified by a PE, API or STI certified inspector. Level 1 systems also get a secondary containment visual every 14 days, and all systems a monthly maintenance check.

How big does AST secondary containment need to be?

Under 40 CFR 112.8(c)(2), large enough for the entire capacity of the largest single container plus enough freeboard to hold precipitation, and sufficiently impervious to contain discharged oil.

Related guides

All sources on this page (31)

Run aboveground storage tank inspection work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.