Guide for cathodic protection testing companies ยท checked 24 November 2026
Cathodic protection testing software built around the test station, the rectifier and the 15-month clock
A CP company's real asset list is test stations, rectifiers, critical bonds, diodes, anodes and tank fills, each on its own federal or state clock. This guide covers how an annual survey and a UST evaluation actually run, the -850 mV and 100 mV criteria, PHMSA's 2022 close interval survey rule, who is qualified to sign, and what software CP testers and pipeline operators use.
See your own jobs set up this way
A 30-minute call. We show you cathodic protection testing companies workflows running in Fieldproxy, built around how you work.
Short answer
Cathodic protection testing companies need software that tracks every test station, rectifier, bond and tank on its own clock (pipeline CP every calendar year at intervals not over 15 months, rectifiers and critical bonds six times a year at intervals not over 2 1/2 months, UST systems every 3 years with impressed current checked every 60 days), captures on and instant-off potentials against the right criterion, and turns a low reading into a remediation job with a deadline. Pipeline operators often hold the master data in American Innovations PCS and remote monitors such as MOBILTEX CorView or Elecsys Connect; UST testers usually work on state forms. Fieldproxy is one option. Best for processes that don't fit a template, set up for you: each structure carries its rule and due date, the tech's app runs the survey or state form, and a failed reading cannot close without its retest.
-850 mV
Minimum potential to a saturated copper-copper sulfate half cell for steel under PHMSA Appendix D; a 100 mV polarization shift is the main alternative
source: 49 CFR Part 192 Appendix D, Criteria for cathodic protection (Cornell LII)
6 a year
Rectifier inspections each calendar year on gas pipelines, never more than 2 1/2 months apart, remote reads allowed since 2022 with one physical visit a year
source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII)
5 ft
Maximum close interval survey spacing PHMSA now requires both ways from a gas transmission test station that reads low
source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII)
3 years
UST cathodic protection test interval under 40 CFR 280.31, plus a 60-day check on impressed current systems
source: 40 CFR 280.31, Operation and maintenance of corrosion protection for USTs (Cornell LII)
How a job runs
One cathodic protection testing job, from first call to paid
The order the work really happens in, and what has to be written down at each step so nothing is argued about later.
- 1
Load the structure register, not just the customer
For a pipeline client: every test station (milepost, GPS, lead colors, which structures are connected), every rectifier (make, rated DC volts and amps, tap settings, target output), every bond (critical or not, foreign owner), diodes, reverse current switches, insulating joints and casings. For a UST client: each tank, run of piping, STP and flex connector, whether galvanic or impressed current, and the rectifier if there is one. The register is what the schedule is built from.
- 2
Work out what is due by asset class
Gas and liquid pipeline CP: once each calendar year, never more than 15 months apart. Rectifiers, reverse current switches, diodes and critical bonds: six times a year, never more than 2 1/2 months apart. Other bonds: annually. USTs: within 6 months of install, then every 3 years. Exposed gas pipe for atmospheric corrosion: every 3 calendar years (max 39 months), service lines every 5. Each due date runs from the last completed reading, not from the contract anniversary.
- 3
Check qualification before dispatch
On a pipeline, the operator decides which tasks are covered tasks under its operator qualification plan, and only qualified people (or someone directed and observed by a qualified person) may do them. On USTs, the federal rule asks for a cathodic protection tester; states name the credential: North Dakota's form takes an STI or NACE certification number, Texas wants a NACE-certified corrosion technician or someone under a corrosion specialist. Match the tech to the job before the truck rolls.
- 4
Run the annual survey station by station
At each test station, place the copper-copper sulfate reference cell over the pipe, read the on potential, and where the criterion needs it, read the instant-off with rectifiers interrupted on a synchronized cycle. Record the reading against the criterion the operator uses (-850 mV on, -850 mV polarized, or 100 mV shift), plus casing and foreign line readings where leads exist. Note damaged or missing test stations: the rule requires enough of them to judge adequacy.
- 5
Read and adjust rectifiers
Record DC volts, amps, tap settings (coarse and fine), hour meter and as-found versus as-left. If output has dropped, find out why (blown fuse, failed stack, cut anode header, lost AC) before turning taps up, because over-protection can damage coating. Where the rectifier has a remote monitor, the bi-monthly reading can come from it, but on gas lines each remote unit still gets one physical visit a year.
- 6
Chase low readings to a cause
On gas transmission lines a test station below Appendix D criteria now triggers a close interval survey both ways at about 5 feet or less, interrupted where practical, to find the extent. Elsewhere, look for a shorted casing, a failed insulating joint, a new foreign structure, a broken bond or simply an anode bed at end of life. For a UST, if the remote and local readings disagree (one passes, one fails) the result is inconclusive and goes to a corrosion expert.
- 7
Write the deficiency with its deadline
Pipeline deficiencies must be corrected promptly. For onshore gas transmission, the remedial plan and permit applications are due within 6 months, and the fix by the earliest of: the next test interval, 1 year (max 15 months), or 6 months after permits. North Dakota's UST form gives 30 days to retest or 60 days to repair. Put the date on the job, not in an email.
- 8
Remediate and prove it
Install supplemental anodes, repair or replace the rectifier, rebuild an anode bed, clear a casing short or replace a bond. Then retest. PHMSA requires confirming that adequate protection is restored after fixing a systemic cause on gas transmission lines; UST forms have a separate box for the re-evaluation after repair.
- 9
Deliver the forms and the data
Pipeline clients usually want readings loaded into their own system of record in their format, plus a deficiency list and maps. UST owners need the state's form signed by the tester (Kentucky DWM 4227, North Dakota SFN 60640, Washington ECY 070-339), with the site diagram and continuity survey, sent to the agency within the state's deadline (North Dakota: 30 days, all results including fails).
- 10
Invoice and roll the clocks forward
Invoice per station, per rectifier, per site or per survey mile under the contract, with remediation quoted separately. Set each asset's next due date from today's reading. Gas operators keep records of annual tests for the life of the pipeline and most other corrosion records at least 5 years, so the data you hand over has to be complete.
What to record
The fields every cathodic protection testing job should capture
Asset register
- Test station ID, milepost or address, GPS, lead colors and count, structures connected (pipe, casing, foreign line, coupon)
- Rectifier ID, make, model, serial, rated DC volts and amps, recommended output, coarse and fine tap settings, AC supply, remote monitor ID
- Bonds, diodes and reverse current switches: critical yes/no (decides 2 1/2-month vs annual), foreign operator and contact
- Insulating joints, casings and isolated services; anode beds with type, count and install date
- Applicable rule set: 49 CFR 192, 49 CFR 195, 40 CFR 280 plus the state program, SPCC buried piping
- Criterion used at this point: -850 mV on, -850 mV polarized (instant-off), 100 mV polarization, or other Appendix D criterion
Each reading
- Date, time, tech, qualification or certification number and expiry (AMPP CP1 to CP4, STI, OQ covered task)
- Reference cell type and placement (over pipe, remote earth more than 30 ft away, local), meter and cell calibration check
- On potential, instant-off potential, depolarized potential, calculated shift in mV
- Interruption cycle and sync method, rectifiers interrupted, waveform check
- Rectifier: DC volts, amps, tap settings, hour meter, as found and as left
- Photos of the test station, rectifier panel and meter display; condition notes (missing cap, broken lead, buried station)
Deficiencies and follow-up
- Deficiency type: below criterion, rectifier off or low, bond failed, casing short, isolation failed, interference, inconclusive
- Rule deadline (6-month plan for gas transmission, 15-month fix, state 30-day retest or 60-day repair) and who set it
- Close interval survey reference and extent of low area in feet
- Remedial work order, materials (anodes, rectifier parts, bonds), completion date, confirming retest reading
- Record retention date: life of pipeline for annual test records, at least 5 years for others
Rules and standards
The rules that shape the work, with their sources
| Rule | What it means on the job |
|---|---|
| 49 CFR 192.465(a): annual CP tests on gas pipelines | Each pipeline under cathodic protection is tested at least once each calendar year, at intervals not exceeding 15 months, against Appendix D. Short separately protected sections of 100 feet or less and separately protected service lines can be sampled instead: at least 10 percent each year, a different 10 percent each time, so the whole system is covered every 10 years. source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII) |
| 49 CFR 192.465(b) and (c): rectifiers, diodes and bonds | Each rectifier or impressed current source is inspected six times each calendar year, at intervals not exceeding 2 1/2 months, by remote measurement or on site. After 1 January 2022 each remotely read rectifier is also physically inspected once a year (max 15 months). Reverse current switches, diodes and bonds whose failure would jeopardize protection are checked six times a year; other interference bonds once a year. source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII) |
| 49 CFR 192.465(d) and (f): remediation deadlines and close interval surveys | Deficiencies are corrected promptly. For onshore gas transmission lines, the remedial action plan and permit applications are due within 6 months, and the fix by the earliest of the next test interval, 1 year (max 15 months), or 6 months after permits. A low annual reading on gas transmission triggers a close interval survey both ways from the station at about 5 feet or less, with current interrupted unless impractical. These were added by the August 2022 gas transmission rule (87 FR 52269). source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII) |
| Part 192 Appendix D: the criteria | For steel, cast and ductile iron: at least -0.85 V to a saturated copper-copper sulfate half cell with current applied; a 300 mV negative shift with current applied; a 100 mV polarization shift; the Tafel segment of the E-log-I curve; or net current into the structure at anodic points. Aluminum: 150 mV shift or 100 mV polarization, and not above 1.20 V. Copper: 100 mV polarization. source: 49 CFR Part 192 Appendix D, Criteria for cathodic protection (Cornell LII) |
| 49 CFR 195.571 and 195.573: hazardous liquid pipelines | Liquid lines use the criteria in NACE SP0169 paragraphs 6.2.2 to 6.2.5 and 6.3. They are tested at least each calendar year (max 15 months), or every 3 years (max 39 months) for short bare or poorly coated sections. Within 2 years of installing CP, the operator identifies where a close interval survey is practicable and necessary. Rectifiers, diodes, reverse current switches and critical bonds are checked six times a year; breakout tank bottoms follow API RP 651. source: 49 CFR 195.573, Monitoring external corrosion control on hazardous liquid pipelines (Cornell LII) |
| 49 CFR 192.473: interference and AC | Operators with stray current keep a continuing program. For onshore gas transmission, interference surveys are required when monitoring shows a significant increase or when new sources appear (co-located pipelines, new or uprated high voltage AC lines, new substations). A remedial plan is required where AC current density reaches 100 amps per square meter, with permits applied for within 6 months and the fix within 15 months. source: 49 CFR 192.473, External corrosion control: Interference currents (Cornell LII) |
| 49 CFR 192.467 and 192.469: isolation and test stations | Buried pipe is isolated from other metallic structures and from casings, and tests must show isolation is adequate. Pipe near power tower footings, ground cables or counterpoise needs fault current and lightning protection. Every protected pipeline needs enough test stations or contact points to judge whether CP is adequate. source: 49 CFR 192.467, External corrosion control: Electrical isolation (Cornell LII) |
| 49 CFR 192.491: what you must keep | Maps or records of protected piping, CP facilities, anodes and bonded foreign structures for the life of the pipeline. Records of each test, survey or inspection in enough detail to show corrosion control is adequate, kept at least 5 years; annual test records under 192.465(a) and (e) for the life of the pipeline. source: 49 CFR 192.491, Corrosion control records (Cornell LII) |
| 49 CFR 192 Subpart N: operator qualification | A covered task is an operations or maintenance task, identified by the operator, performed as a requirement of Part 192 that affects integrity. The operator must evaluate that individuals doing covered tasks are qualified, set re-evaluation intervals, and may only let an unqualified person do the task if directed and observed by a qualified one. Contract CP techs work under each operator's plan. source: 49 CFR 192.805, Qualification program (Cornell LII) |
| 40 CFR 280.31: UST cathodic protection | Tested by a qualified cathodic protection tester within 6 months of installation and at least every 3 years, using a code of practice such as NACE TM0101, TM0497, STI R051, SP0285 or SP0169. Impressed current systems are also inspected every 60 days. Records show the last three 60-day inspections and the last two tests. source: 40 CFR 280.31, Operation and maintenance of corrosion protection for USTs (Cornell LII) |
| 40 CFR 280.12: tester versus corrosion expert | A cathodic protection tester understands and has education and experience in soil resistivity, stray current, structure-to-soil potential and electrical isolation measurements. A corrosion expert is accredited by NACE (now AMPP) or is a registered professional engineer with corrosion certification, and is the one allowed to design systems and rule on hard cases. source: 40 CFR 280.12, Definitions of cathodic protection tester and corrosion expert (Cornell LII) |
| Texas 30 TAC 334.49: UST CP and who can test | Texas tests CP systems within 3 to 6 months of installation and at least every 3 years, and impressed current systems are inspected every 60 days. A field-installed system is designed by a corrosion specialist; testing is by a corrosion technician, defined in 334.2 as NACE certified, under a corrosion specialist's direct supervision, or certified as a CP tester by NACE or STI. source: 30 TAC 334.49, Texas UST corrosion protection (Cornell LII) |
| State UST forms: inconclusive results and deadlines | Kentucky DWM 4227 and North Dakota SFN 60640 mark a site inconclusive when remote and local readings disagree, and send it to a corrosion expert. North Dakota requires a retest within 30 days or repair within 60 days, and the form within 30 days whatever the result. Washington's galvanic checklist allows the local instant-off and 100 mV readings only if anodes can be disconnected, with remote earth more than 30 feet away. source: North Dakota DEQ, SFN 60640 UST Cathodic Protection System Evaluation, Impressed Current (Aug 2022) |
| PHMSA enforcement: what actually gets cited | PHMSA's 2019 warning letter to the City of Coalinga, California (CPF 5-2019-0013W) cited rectifiers not inspected for stretches including 16 September to 22 December 2015, and no prompt remedial action for test points below -850 mV: 33 points in May 2016, 29 in April 2017 and 31 in January 2018. The letter noted civil penalties of up to $209,002 per violation per day applied at the time. source: PHMSA Warning Letter CPF 5-2019-0013W to the City of Coalinga, CA (18 Mar 2019) |
| AMPP CP1 to CP4: who may do what | AMPP's roles guide maps CP1 Tester (0 to 24 months of CP experience) to basic testing, CP2 Technician (2+ years) to basic and intermediate testing, CP3 Technologist (3+ years with design) to most testing including troubleshooting, and CP4 Specialist (6+ years) to complex testing and design. Intermediate or complex work by a CP1 needs CP2 to CP4 oversight. Alabama's tester list shows how states lean on these and STI credentials, recognizing a tester's certification for 90 days after it expires. source: AMPP, Cathodic Protection Roles and Responsibilities (CP1 to CP4) |
| SPCC 40 CFR 112.8(d)(1): buried piping at oil facilities | Buried piping installed or replaced on or after 16 August 2002 at an SPCC facility is wrapped, coated and cathodically protected (or meets the Part 280 corrosion standards), and exposed sections are inspected for deterioration. This brings bulk plants and terminals, not just pipelines and gas stations, into the CP testing market. source: 40 CFR 112.8, SPCC requirements for onshore facilities, buried piping (Cornell LII) |
Rules vary by state, council and contract. Checked 24 November 2026; confirm against the source for your area before relying on it.
Numbers
Intervals and criteria a CP tester works to
Federal floor first. States and the operator's own procedures can be stricter, and the criterion at each point is the operator's choice within the rule.
| Asset or test | Interval or number | Basis |
|---|---|---|
| Gas pipeline CP test | Each calendar year, max 15 months apart | 49 CFR 192.465(a) |
| Short sections and service lines (sampling) | 10% a year, different 10%, full system in 10 years | 49 CFR 192.465(a) |
| Rectifier, critical bond, diode, reverse current switch | 6 times a year, max 2 1/2 months apart | 49 CFR 192.465(b), (c); 195.573(c) |
| Remotely read rectifier, physical visit | Once a year, max 15 months | 49 CFR 192.465(b)(2) |
| Other interference bonds | Once a year, max 15 months | 49 CFR 192.465(c) |
| Steel criterion | -850 mV to CSE, 300 mV shift, or 100 mV polarization | Part 192 Appendix D |
| Gas transmission low reading | Close interval survey both ways, about 5 ft spacing or less | 49 CFR 192.465(f) |
| Gas transmission remediation | Plan in 6 months; fix by next interval or 1 yr (max 15 mo) | 49 CFR 192.465(d) |
| AC interference remedial plan trigger | 100 A per square meter AC current density | 49 CFR 192.473(c) |
| Post-backfill coating survey (DCVG/ACVG) | Within 6 months of service; severe = over 60% IR (DCVG) or 70 dBuV (ACVG) | 49 CFR 192.319(d), (f) |
| Atmospheric corrosion, onshore gas | Every 3 calendar years, max 39 months (service lines 5 yrs) | 49 CFR 192.481 |
| UST CP test | Within 6 months of install, then every 3 years | 40 CFR 280.31 |
| UST impressed current check | Every 60 days | 40 CFR 280.31; 30 TAC 334.49 |
| UST failed test (North Dakota) | Retest in 30 days or repair in 60 days; form in 30 days | SFN 60640 |
source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII)source: 49 CFR Part 192 Appendix D, Criteria for cathodic protection (Cornell LII)source: 49 CFR 192.473, External corrosion control: Interference currents (Cornell LII)source: 49 CFR 192.319, Installation of pipe in a ditch, post-backfill coating surveys (Cornell LII)source: 49 CFR 192.481, Atmospheric corrosion control: Monitoring (Cornell LII)source: 40 CFR 280.31, Operation and maintenance of corrosion protection for USTs (Cornell LII)source: 30 TAC 334.49, Texas UST corrosion protection (Cornell LII)source: North Dakota DEQ, SFN 60640 UST Cathodic Protection System Evaluation, Impressed Current (Aug 2022)source: 49 CFR 195.573, Monitoring external corrosion control on hazardous liquid pipelines (Cornell LII)
Where it breaks
Where spreadsheets and generic software fall over
Rectifier reads go on a quarterly route because that is how the tech's week works. Quarterly is four a year; the rule is six, never more than 2 1/2 months apart. PHMSA's 2019 warning letter to the City of Coalinga listed gaps of three months and more between rectifier inspections.
Give every rectifier and critical bond its own due date of last reading plus 2 1/2 months, and warn at e.g. 60 days, so a missed week becomes a reschedule, not a violation.
A test station reads -780 mV, gets written into the annual report, and the next year it reads the same. The same Coalinga letter cites 29 to 33 test points failing -850 mV in three consecutive years without prompt remedial action.
Make any reading below the point's criterion open a deficiency with a rule-based deadline that stays open until a passing retest reading is attached.
The spreadsheet records one number per station with no column for on or off. An auditor asks whether -870 mV was an on reading with IR drop or a polarized instant-off, and nobody can say.
Store on, instant-off and depolarized as separate fields, record the criterion applied at that point, and compute the pass or fail from the numbers instead of letting the tech type it.
A UST galvanic survey passes on the remote reading but fails on the local one. The tech marks it pass because the site has to stay open, but the state form calls that inconclusive.
Run the state's own form logic in the app: when remote and local disagree, the result is inconclusive and the job is routed to a corrosion expert before it can close.
A contract tech with an expired operator qualification for the client's covered task runs a day of readings. The operator has to treat the data as unusable and pay for the day twice.
Hold each tech's OQ tasks, AMPP or STI certification and expiry dates on their profile, and block dispatch to a job whose tasks they are not current for.
A new high voltage line goes in beside a gas transmission line. Nobody tells the CP contractor, and nobody books the interference survey the 2022 rule requires.
Log nearby construction and new foreign structures against the segment, and create an interference survey job when one is recorded.
Checklist
The cathodic protection testing operations checklist
Print it, or hand it to whoever runs the office side.
- Every test station, rectifier, bond, diode, switch, insulating joint, casing and anode bed on file with GPS and ID
- Critical vs non-critical marked on every bond (2 1/2-month vs annual)
- Criterion recorded per test point (-850 on, -850 polarized, 100 mV shift)
- Due date per asset from its last reading (15 months, 2 1/2 months, 3 years, 60 days)
- Remotely read rectifiers have a physical visit booked within 15 months
- Tech OQ covered tasks and AMPP or STI certifications current before dispatch
- Reference cells checked against a calibration cell before each survey
- Interrupter sync confirmed with a waveform check at the start of the day
- On, instant-off and depolarized readings stored separately
- Missing, buried or damaged test stations logged as deficiencies
- Every low reading opens a deficiency with its rule deadline
- Remediation closed only with a passing confirming reading attached
- State UST forms submitted inside the state's deadline, including fails
- Records kept for life of pipeline for annual tests, 5 years minimum for the rest
Software options
What software cathodic protection testing companies actually use
Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.
American Innovations PCS (CPDM)
Gas transmission, distribution, liquids and gathering operators and their corrosion teams
Pipeline Compliance System with a Cathodic Protection Data Manager module: test points, rectifiers, bonds, anodes and tanks, schedules and inspection routes built around 49 CFR 192 and 195, field data collection on rugged tablets, and integration with Bullhorn remote monitors. Usually the operator's system of record that contractors feed.
MOBILTEX CorView
Operators with MOBILTEX CorTalk remote monitors on rectifiers, test stations and bonds
Cloud platform for two-way communication with CorTalk units: stores 3 years of measurement data, color-coded alarms, email alerts for abnormal readings and missed communications, and export to third-party compliance software.
Elecsys Connect (Lindsay)
Operators remotely monitoring rectifiers
Remote rectifier monitoring with voltage, current and potential measurements, GPS-synchronized interruption and compliance reporting, using Elecsys remote monitoring units such as Watchdog and Scout XP.
State UST forms plus a generic FSM
Small UST CP testers working gas stations and fleet fueling sites
Many testers fill the state's PDF (Kentucky DWM 4227, North Dakota SFN 60640, Washington ECY 070-339) and schedule in a general job tool. It works until you need due dates per tank, inconclusive routing and retest tracking across hundreds of sites.
Fieldproxy
CP contractors and in-house corrosion crews whose work spans pipelines, tanks and remediation
Set up for you around your asset register, survey forms and state forms, with per-asset due dates, deficiency deadlines and remediation jobs. It can sit beside an operator's PCS or remote monitoring platform rather than replace it.
Published prices, compared:source: American Innovations, PCS Cathodic Protection Data Manager (CPDM) datasheet (Aug 2026)source: Farwest Corrosion Control, MOBILTEX CorView cathodic protection remote monitoring platformsource: Lindsay, Elecsys Connect rectifier monitoring
Questions to ask any vendor
- Can each rectifier, bond and test station carry its own interval (2 1/2 months, 15 months, 3 years, 60 days) and due date from its last reading?
- Can a survey form store on, instant-off and depolarized potentials separately and compute pass or fail against the criterion set for that point?
- When a reading fails, does it automatically open a deficiency with the rule deadline, and can the deficiency close without a confirming reading?
- Can you block dispatch when a tech's OQ covered task or AMPP or STI certification has lapsed?
- Can you produce my state's UST form and my pipeline clients' import format from the same readings?
- Can field data come in offline from a test station with no signal, with GPS and photos, and sync later?
Bring one real cathodic protection testing job. We show it running in Fieldproxy.
Get DemoHow Fieldproxy is set up for this
Cathodic protection testing on Fieldproxy: built around how you already work
A Fieldproxy setup for a CP company starts from the structure, not the customer: every test station, rectifier, bond and tank carries the rule that governs it and its next due date. The tech's app runs the survey or the state form with the right readings and computes the result, a low reading opens a deficiency with its deadline, and remediation and the confirming retest live on the same asset.
Module 1
Asset register by structure
Due dates and criteria belong to the test station or rectifier, not to the client account.
- Records: Pipeline segment, Test station, Rectifier, Bond, Diode / switch, Insulating joint, Casing, Anode bed, UST site, Tank, Piping run
- Fields: GPS, milepost, lead colors, rule set (192, 195, 280, state, SPCC), criterion at this point, critical bond yes/no, foreign operator
- Rectifier fields: rated volts and amps, target output, coarse and fine taps, remote monitor ID, last physical visit date
- Map view of stations and rectifiers by segment for route planning
Module 2
Compliance clocks and route builder
Six rectifier reads a year and annual surveys at 15 months maximum only work if every asset has its own clock.
- Interval rules per asset class: 2 1/2 months, 15 months, 3 years, 60 days, 39 months atmospheric
- Status per asset: Current, Due soon (e.g. 60 days), Due, Overdue, Waived with reason
- Routes built from what is due on a segment this month, ordered by milepost
- Remote reads count toward the 2 1/2-month clock; a separate physical-visit clock runs at 15 months
Module 3
Tech qualifications and dispatch
Readings by an unqualified tech are worthless to the operator.
- Tech profile: AMPP CP1 to CP4, STI CP tester, state credentials, each operator's OQ covered tasks with evaluation dates and intervals
- Job types list the covered tasks and certification they need
- Can't be dispatched until the tech is current for every task on the job
- Meter and reference cell serials with calibration check dates on the truck
Module 4
Field survey app
The defensible record is the reading, the reference placement and the photo, captured at the station.
- Per station: on, instant-off, depolarized potentials, calculated shift, criterion, pass/fail computed
- Reference placement (over pipe, local, remote more than 30 ft), interruption cycle, waveform check yes/no
- Rectifier screen: DC volts, amps, taps, hour meter, as found and as left, photo of panel
- Works offline in a field with no signal, with GPS stamp; station condition (missing cap, broken lead) as a deficiency
Module 5
UST state form engine
Each state has its own form, its own inconclusive rule and its own submission deadline.
- Forms built from Kentucky DWM 4227, North Dakota SFN 60640, Washington ECY 070-339 and others as your states require
- Continuity survey and system survey tables, site diagram, rectifier data as found and as left
- Remote and local disagree: status Inconclusive, routed to a corrosion expert for sign-off
- Submission due date per state (e.g. 30 days in North Dakota) with sent date recorded
Module 6
Deficiencies and remediation
The regulators' complaint is not low readings, it is low readings that stay low.
- Deficiency types: Below criterion, Rectifier low or off, Bond failed, Casing short, Isolation failed, Interference, Inconclusive, Station damaged
- Deadline set from the rule: 6-month plan and 15-month fix (gas transmission), 30-day retest or 60-day repair (North Dakota UST)
- Statuses: Open, CIS needed, Plan written, Permit applied, Quoted, Approved, Work done, Retest passed
- Can't close until a passing confirming reading is attached
Module 7
Close interval and special surveys
CIS, DCVG/ACVG and interference surveys are projects with footage, crews and their own outputs.
- Project per survey: segment, start and end station, spacing (e.g. 5 ft), interrupted or not, crew, days
- Daily log of footage surveyed, interrupter sync checks and weather
- Results file attached; low areas in feet become deficiencies on the segment
- Coating anomalies classed severe (over 60% IR DCVG, 70 dBuV ACVG) get the 6-month repair clock
Module 8
Quotes, contracts and invoicing
Survey work is priced per station, per rectifier or per mile; remediation is quoted separately.
- Rate cards per client: per test station, per rectifier read, per UST site, per survey mile
- Remediation quotes built from the deficiency: anodes, rectifier parts, bonds, excavation, permits
- Invoice per route or per month with the readings and forms attached
- QuickBooks or Xero sync
Module 9
Client outputs and portal
Operators want data in their system; UST owners want a signed form and a next due date.
- Export of readings in the client's import format for their PCS or GIS
- Annual survey report PDF from your template: readings table, deficiencies, maps
- Owner portal: each site's last test, next due date, open deficiencies and forms to download
- Retention date per record (life of pipeline or 5 years)
The AI agents, set up for cathodic protection testing companies
| Agent | When | What it does | What you get |
|---|---|---|---|
| Watcher agent | A rectifier or critical bond passes e.g. 60 days since its last reading, a remote monitor misses its scheduled reading, or a deficiency is within 30 days of its rule deadline | Reads each asset's interval rule and last reading, separates remote-read gaps from physical-visit gaps, and checks open deficiencies against their deadlines | A daily list of assets about to break the 2 1/2-month or 15-month clock for the scheduler, and an alert to the client's corrosion lead for any deficiency near its deadline |
| Vision agent | A tech photographs a rectifier panel, meter display or rectifier nameplate | Reads the DC volts, amps and tap settings, or the make, model, serial and rated output, and compares output with the rectifier's target | Filled rectifier fields on the reading, with a flag when output has dropped more than e.g. 20% from the last reading |
| Dispatch agent | A route of due stations, a UST evaluation or a remediation job is ready to schedule | Matches the job's covered tasks and certification to techs who are current, and weighs distance and the reference cells and meters on each truck | An assigned crew per route, with techs whose OQ or AMPP/STI status has lapsed left off and named |
| Document intelligence agent | A client emails last year's survey PDF, a station list spreadsheet or a work order for a remediation | Extracts test station IDs, mileposts, last readings, rectifier settings and deficiency items | Asset records and last readings loaded into the register, or a new remediation job with its line items |
| Autopilot | A remediation quote is unanswered after e.g. 10 days, or a UST owner's 3-year test is 90 days out | Drafts a follow-up naming the site, the deficiency and its deadline, or the due date and the state form; a person approves before it sends | An approved chase email to the operator or owner, logged on the deficiency or site |
| Scheduler agent | First business day of each month (e.g.) | Counts per client the assets due this month and next, overdue assets, open deficiencies by age and readings captured last month | A monthly compliance summary emailed to each operator's corrosion lead and to your operations manager |
Straight answers
Cathodic protection testing: FAQ
What software do cathodic protection testing companies use?
Pipeline operators often keep CP data in American Innovations PCS and use remote monitoring platforms such as MOBILTEX CorView or Elecsys Connect on rectifiers and test stations. Contract testers and UST testers often work from state PDF forms and a general job tool. Fieldproxy is one option, set up around your asset register, survey forms and state forms with a due date on every station, rectifier and tank.
How often must a pipeline's cathodic protection be tested?
Gas (49 CFR 192.465) and hazardous liquid (195.573) pipelines are tested at least once each calendar year, with intervals not over 15 months. Rectifiers, diodes, reverse current switches and critical bonds are checked six times a year, never more than 2 1/2 months apart.
Can rectifiers be read remotely instead of visited?
Yes on gas pipelines. 192.465(b) allows remote measurement for the six-a-year inspection, but since 1 January 2022 each remotely inspected rectifier must also be physically inspected once a calendar year, no more than 15 months apart.
What does -850 mV mean in cathodic protection?
It is the main criterion for steel in Part 192 Appendix D: the structure is at least 0.85 volt negative relative to a saturated copper-copper sulfate reference cell. Appendix D also accepts a 300 mV shift with current applied or a 100 mV polarization shift, among others. Whether the -850 is read with current on or instant-off matters, and so does recording which.
When is a close interval survey required?
Since the 2022 gas transmission rule, a low annual reading at a test station on an onshore gas transmission line requires a close interval survey in both directions at about 5 feet or less, with current interrupted unless impractical. Liquid pipeline operators identify where a CIS is practicable and necessary within 2 years of installing CP.
How often are UST cathodic protection systems tested?
Within 6 months of installation and at least every 3 years after, by a qualified cathodic protection tester (40 CFR 280.31). Impressed current systems are also inspected every 60 days. States can be stricter and set their own forms and deadlines.
Who is qualified to test UST cathodic protection?
Federally, a cathodic protection tester with education and experience in soil resistivity, stray current, structure-to-soil potential and isolation measurements. States name the credential: North Dakota's form takes an STI or NACE certification number, and Texas requires a corrosion technician as defined in 30 TAC 334.2. Design and difficult evaluations go to a corrosion expert.
What happens if remote and local UST readings disagree?
On the Kentucky and North Dakota forms the result is inconclusive, not pass, and a corrosion expert must evaluate the system. Washington allows local instant-off and 100 mV readings on galvanic systems only if the anodes can be disconnected.
What are AMPP CP1, CP2, CP3 and CP4?
AMPP's cathodic protection certifications (formerly NACE): CP1 Tester, CP2 Technician, CP3 Technologist and CP4 Specialist. AMPP's roles guide maps them to experience from 0 to 24 months for CP1 up to 6 or more years for CP4, with more complex testing and design reserved for the higher levels.
How long must CP records be kept?
Under 49 CFR 192.491, records of annual pipeline CP tests and unprotected pipe re-evaluations are kept for the life of the pipeline, and other corrosion control records at least 5 years. UST owners keep records showing the last three 60-day impressed current inspections and the last two CP tests.
Related guides
All sources on this page (32)
- source: 49 CFR Part 192 Appendix D, Criteria for cathodic protection (Cornell LII)
- source: 49 CFR 192.465, External corrosion control: Monitoring and remediation (Cornell LII)
- source: 40 CFR 280.31, Operation and maintenance of corrosion protection for USTs (Cornell LII)
- source: 49 CFR 195.573, Monitoring external corrosion control on hazardous liquid pipelines (Cornell LII)
- source: 49 CFR 192.473, External corrosion control: Interference currents (Cornell LII)
- source: 49 CFR 192.467, External corrosion control: Electrical isolation (Cornell LII)
- source: 49 CFR 192.491, Corrosion control records (Cornell LII)
- source: 49 CFR 192.805, Qualification program (Cornell LII)
- source: 40 CFR 280.12, Definitions of cathodic protection tester and corrosion expert (Cornell LII)
- source: 30 TAC 334.49, Texas UST corrosion protection (Cornell LII)
- source: North Dakota DEQ, SFN 60640 UST Cathodic Protection System Evaluation, Impressed Current (Aug 2022)
- source: PHMSA Warning Letter CPF 5-2019-0013W to the City of Coalinga, CA (18 Mar 2019)
- source: AMPP, Cathodic Protection Roles and Responsibilities (CP1 to CP4)
- source: 40 CFR 112.8, SPCC requirements for onshore facilities, buried piping (Cornell LII)
- source: 49 CFR 192.319, Installation of pipe in a ditch, post-backfill coating surveys (Cornell LII)
- source: 49 CFR 192.481, Atmospheric corrosion control: Monitoring (Cornell LII)
- source: American Innovations, PCS Cathodic Protection Data Manager (CPDM) datasheet (Aug 2026)
- source: Farwest Corrosion Control, MOBILTEX CorView cathodic protection remote monitoring platform
- source: Lindsay, Elecsys Connect rectifier monitoring
Run cathodic protection testing work the way it actually runs.
A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.
Get a walkthroughOne price per company. Unlimited users.