EV charger installation software: from load study to energized and closed out

A commercial charger project is two days of electrical work wrapped in months of waiting: on the utility's service design, the permit, the switchgear, the manufacturer's commissioning engineer and the rebate inspector. The contractor who gets paid on time is the one who knows, for every site, which of those clocks is running and whose move it is. This guide covers the load calculation rules in NEC Articles 220 and 625, utility make-ready programs and service requests, the NEVI installation standard as it stands in November 2026, commissioning, metering rules and the closeout pack, with a source on every rule.

See your own jobs set up this way

A 30-minute call. We show you EV charger installation contractors workflows running in Fieldproxy, built around how you work.

Book your demo

A video call with our team

Number of employees

Short answer

EV charger installation contractors mostly run a patchwork: Kopperfield or a spreadsheet for load calculations and single-line diagrams, a plan set service such as GreenLancer for permit drawings, the charger network's installer portal (for example AmpUp's Field Console) to activate units, general electrical software such as ServiceTitan or BuildOps for the job and invoice, and a tracker spreadsheet for the utility application, permit and rebate status per site. Developers rolling out hundreds of sites use Sitetracker. What breaks is the waiting: nobody can see which sites are stuck at the utility, the permit desk or the commissioning visit, and the closeout pack is assembled from photos on phones. Fieldproxy is one option. It is set up as a site pipeline with a gate at each stage, required photos and test results, an electrician certification check, and a closeout pack generated from the record.

125%

Overcurrent device rating for a branch circuit or feeder supplying EV charging equipment, as a share of the equipment's maximum load (NEC 625.41)

source: EC&M, Code quiz: sizing overcurrent protective devices for feeders or branch circuits supplying EVSE (625.41, 2023 NEC)

7,200 VA

Minimum load to count per charger in a service or feeder calculation, or the nameplate rating if larger (NEC 220.57, new in 2023)

source: Larimer County, 2023 NEC significant code changes (new 220.57: EVSE load at 7,200 VA or nameplate) (PDF)

182 days

Average calendar days California's regulator set as the target for utilities to energize a new EV service request under Rule 29 or 45; the maximum is 335

source: CPUC, Energization timelines workshop slides (D.24-09-020 average and maximum targets) (PDF)

4 x 150 kW

Minimum for a NEVI-funded corridor station: four network-connected DC fast charging ports that can each deliver 150 kW at the same time

source: 23 CFR 680.106, Installation, operation and maintenance by qualified technicians of EV charging infrastructure (Cornell LII)

How a job runs

One EV charger installation job, from first call to paid

The order the work really happens in, and what has to be written down at each step so nothing is argued about later.

  1. 1

    Qualify the site and the money

    Before a survey, record who owns the property, who the utility is, whether the project is tied to a utility make-ready program, a state grant or NEVI funds, and what that program demands: an approved contractor, an approved product list, a pre-approved cost estimate, or a deadline. National Grid in Massachusetts, for example, pays the lesser of the pre-approved amount or the actual invoiced cost at closeout, so a quote that was never pre-approved is a quote that may not be rebated.

  2. 2

    Survey power, route and signal

    Photograph the service equipment, the main breaker rating, the panel schedule and the meter. Walk the conduit route and measure it, note surface types for trenching or boring, and mark the charger and accessible space layout. Take a cellular reading at each charger's exact mounting spot with a signal meter, not a phone: ChargePoint's guide for the CT4000 asks for LTE RSRP of -90 dBm or better and RSRQ of -12.5 dB or better.

  3. 3

    Calculate the load and decide on load management

    Count each charger at 7,200 VA or its nameplate, whichever is larger (NEC 220.57), and size overcurrent devices at 125% of maximum load (625.41). For an existing service, NEC 220.87 lets you use a year of maximum demand data, or a 30-day recording, at 125% plus the new load. If the answer is a service upgrade, price the alternative: an energy management system that caps the charger load, which 625.42(A) lets you use as the calculated load.

  4. 4

    Quote with the utility and civil unknowns split out

    Price chargers, electrical, civil work, striping and signage, networking and commissioning as separate lines, and state what is excluded: utility fees, transformer or service upgrade costs, rock, and after-hours work. Give the customer the option with load management and the option with a new service side by side, each with its likely wait.

  5. 5

    File the utility service request

    Where new or upgraded service is needed, submit the utility's package. PG&E's pre-assessment asks for the address, preliminary panel size and voltage, a map of the meter location, the load per charger and charger count, charger cut sheets and whether load-limiting software will be used, then an AutoCAD site plan, single-line diagram and load schedule, with a $3,500 engineering advance per site. Track the utility's project number, designer and each date.

  6. 6

    Get the permit

    Submit the site plan, single-line diagram, load calculation and manufacturer's instructions to the building department. Record the submission date, the completeness deadline and every correction notice. In New Jersey, for instance, an EV charger application is deemed complete if the municipality sends no notice of incompleteness within 20 days.

  7. 7

    Order long-lead equipment and locate utilities

    Order switchgear, transformers where customer-owned, chargers and pedestals against the approved drawings, and record promised dates. Before any trench or bore, call 811: California requires notice at least 2 working days and not more than 14 calendar days before excavation, with the area marked out first.

  8. 8

    Build: civil, electrical, set the chargers

    Trench or bore, lay conduit, pour pads and set bollards, pull conductors, land terminations to the manufacturer's torque, and install the disconnects. Photograph open trenches with a tape for depth before backfill, and every torque mark. Log the crew each day with each electrician's EVITP number where the funding requires it.

  9. 9

    Inspect, energize and commission

    Pass the authority's rough and final inspections, get the utility to set the meter and energize, then commission. Level 2 units are usually activated by the installer through the network's portal. Many DC fast chargers are not: ABB's Terra manual says only the manufacturer's service engineer may commission, with the installer present, AC power on, internet available and a compatible vehicle on site.

  10. 10

    Close out and claim

    Assemble the pack the owner and the funder asked for: as-built one-lines and conduit routing, commissioning reports, the final inspection card, photos, warranty and training records, and for funded sites the electrician certification list and Buy America report. Submit the rebate claim with itemized invoices, then bill the retention.

What to record

The fields every EV charger installation job should capture

Site, funding and utility

  • Property owner, site host, landlord consent or easement signer, years left on any lease
  • Utility, account and meter number, rate schedule, utility project number and assigned designer
  • Funding program, application number, pre-approved amount, approved contractor and product list status, program deadline
  • Utility milestones with dates: application accepted, design issued, contract signed, fees paid, construction scheduled, meter set, energized
  • Permit number, authority, submission date, completeness deadline, correction notices, approval date, inspection results

Electrical design

  • Service voltage, phase, main breaker and bus rating, available fault current
  • Existing load basis: 12 months of maximum demand data or a 30-day recording, with the peak figure
  • Charger count, model, output amps, breaker size, connected load at 7,200 VA or nameplate
  • Load management: yes or no, system make, site cap in amps, where the setting is restricted and labelled
  • Conduit route length, conductor size, voltage drop for the longest run

Construction and commissioning

  • 811 ticket number, notice date, valid-until date, marks photographed
  • Trench depth photos before backfill, pad and bollard photos, torque values and torque mark photos per termination
  • Daily crew list with license and EVITP certificate numbers and expiry dates
  • Per charger: serial, firmware, station ID in the network, breaker or ampere setting programmed, cellular reading at the mount
  • Tests: insulation resistance, ground fault trip, test charge per connector, payment test, network status online
  • Manufacturer commissioning visit: requested date, pre-visit checklist complete, engineer name, signed report

Closeout and claim

  • Final inspection card, utility energization date, written notice of intent to operate where required
  • As-built single-line diagram, site layout and conduit routing
  • Photo set to the funder's count and resolution, before and after
  • Buy America report, signage report, accessibility check, weights and measures registration where energy is sold
  • Warranty start date and term, training record, itemized invoice, rebate claim date and amount paid

Rules and standards

The rules that shape the work, with their sources

RuleWhat it means on the job
NEC 625.41: size overcurrent protection at 125%Overcurrent devices for feeders or branch circuits supplying EV charging equipment must be rated at not less than 125% of the equipment's maximum load. That is why a 48 A charger needs a 60 A breaker and an 80 A charger needs 100 A, as manufacturer manuals for the Tesla Wall Connector and ChargePoint CP6000 show. source: EC&M, Code quiz: sizing overcurrent protective devices for feeders or branch circuits supplying EVSE (625.41, 2023 NEC)
NEC 220.57: count each charger at 7,200 VA or nameplateNew in the 2023 NEC. For service and feeder calculations, the EV charging load is 7,200 VA or the nameplate rating of the equipment, whichever is larger. A 48 A unit on 240 V counts at 11,520 VA, not 7,200. source: Larimer County, 2023 NEC significant code changes (new 220.57: EVSE load at 7,200 VA or nameplate) (PDF)
NEC 220.87: existing load from real demand dataInstead of recalculating a whole building, you may use its actual maximum demand: one year of maximum demand data, or by exception the highest 15-minute demand continuously recorded over at least 30 days. 125% of that demand plus the new load must not exceed the feeder ampacity or service rating. The source article is based on an older edition; check your adopted edition. source: EC&M, Code Q&A: calculating feeder or service loads (220.87, existing loads from maximum demand data)
NEC 625.42: load management instead of a bigger serviceEV charging is a continuous load. Where an energy management system manages the charging load, the maximum load on the service and feeder is the maximum the system permits (625.42(A)). Equipment with an adjustable ampere setting may be rated at the adjusted setting only if access to the adjusting means is restricted, and the adjusted rating must appear on the rating label (625.42(B)). source: Electrical License Renewal, NEC 625.42 Rating: (A) energy management system, (B) EVSE with adjustable settings
NEC 625.43 and 625.54: disconnect and GFCIEquipment rated more than 60 A or more than 150 V to ground needs a disconnecting means in a readily accessible location that can be locked open. Receptacles installed to connect EV charging equipment need GFCI protection for personnel. Coupling means sit at least 18 in. above the floor indoors and 24 in. above grade outdoors unless the equipment is listed otherwise. source: EC&M, NEC requirements for EV equipment (625.42 load management, 625.43 disconnect, 625.54 GFCI, mounting heights)
2026 NEC: qualified persons, field marking and an emergency shutoffWhere the 2026 edition is adopted: new 625.4 requires installation by qualified persons, new 625.5 requires field marking of supply voltage, phases, frequency, full-load current and short-circuit current rating, and 625.43(D) requires an emergency shutoff for permanently connected equipment (not one- and two-family dwellings), located 20 to 100 ft from the equipment and within sight, labelled EVSE EMERGENCY DISCONNECT. source: IAEI Magazine, EV infrastructure 2.0 and the 2026 NEC (625.4 qualified persons, 625.5 field marking, 625.43(D) emergency shutoff)
23 CFR 680.106: the NEVI installation standardA NEVI-funded corridor station needs at least four network-connected DC fast charging ports able to charge four vehicles at once, each at 150 kW or more, each with a permanently attached CCS Type 1 connector; AC Level 2 ports need at least 6 kW and a J1772 connector. Payment must be contactless by major debit and credit card with no membership. Electricians need EVITP certification or a registered apprenticeship certificate with charger training; with more than one electrician on the job, at least one must meet that standard and at least one must be an enrolled apprentice. source: 23 CFR 680.106, Installation, operation and maintenance by qualified technicians of EV charging infrastructure (Cornell LII)
NEVI status in November 2026FHWA rescinded its earlier NEVI guidance in February 2025 and issued Interim Final Guidance on 11 Aug 2025. FHWA's program page, updated in February 2026, lists the August 2025 guidance and the February 2023 minimum standards rule (23 CFR Part 680) as the governing documents, so the installation standard below still applies. Check your state DOT's current solicitation before quoting. source: FHWA, National Electric Vehicle Infrastructure (NEVI) Formula Program: governing documents
23 CFR 680.108: OCPP 2.0.1 and ISO 15118NEVI chargers must conform to ISO 15118-3 with hardware capable of ISO 15118-2 and 15118-20, and since 28 Feb 2024 must conform to OCPP 2.0.1 with networks supporting OCPI 2.2.1. Record the protocol version at commissioning: a charger shipped on older firmware fails the funder's check, not the electrical inspection. source: 23 CFR 680.108, Interoperability of EV charging infrastructure: ISO 15118, OCPP 2.0.1, OCPI 2.2.1 (Cornell LII)
23 CFR 680.118: Davis-Bacon and Buy America on NEVI jobsNEVI projects are treated as if on a Federal-aid highway, so Davis-Bacon prevailing wages apply to any NEVI-funded project, along with ADA and Buy America. source: 23 CFR 680.118, Other Federal requirements: Davis-Bacon, ADA, Buy America (Cornell LII)
California AB 841: EVITP on the crewFor charging infrastructure funded or authorized by the state on the customer side of the meter, at least one electrician on each crew must hold EVITP certification at any given time, and where a port supplies 25 kW or more, at least 25% of the electricians on the crew must. EVITP itself is a 20-hour course and exam. source: California Public Utilities Code s. 740.20 (AB 841): EVITP-certified electricians on funded charger projects
US Access Board design recommendationsRecommended accessible charging space: at least 11 ft wide and 20 ft long with a 5 ft access aisle, a 30 by 48 in. clear ground space at the charger, operable parts no higher than 48 in., and no more than 5 lb of force. These are recommendations: the Board's proposed rule of September 2024 was placed in inactive status on 4 Sept 2025, so the enforceable requirement is whatever the funder and the local authority apply. source: US Access Board, Design recommendations for accessible electric vehicle charging stations
NIST Handbook 44 Section 3.40: chargers that sell energy are metersWhere a charger bills by the kWh, it is a commercial measuring device. Energy must be indicated in kWh. AC tolerance is 1.0% on acceptance and 2.0% in maintenance; DC equipment placed in service from 2025 has the same tolerances. source: NIST Handbook 44 (2026), Section 3.40 Electric Vehicle Fueling Systems (tolerances, kWh indication)
National Grid Massachusetts: pre-approval, 6 months, 4 yearsPrograms trade infrastructure money for long commitments. The site host and installer submit a cost estimate for pre-approval, and the rebate is the lesser of that amount or actual eligible invoiced costs at closeout, paid after activation and inspection. National Grid requires customer-side construction to finish within 6 months of the offer letter and 4 years of operation and monthly data, or the host repays. source: National Grid Massachusetts, EV charging site host agreement and terms (pre-approval, 6 months, 4 years of data) (PDF)
New York Joint Utilities make-ready programNew York's Joint Utilities make-ready program required every customer to use an Approved Contractor and chargers from the EPRI Vetted Product List, and closed to new applications on 21 April 2026. The incentive covered up to 100% of eligible infrastructure costs. Sites already enrolled still have to be built and closed out to the program's rules. source: Joint Utilities of New York, EV Make-Ready Program (approved contractors, vetted product list, closed to new applications)
SCE Charge Ready participant termsMinimums are 4 ports for Level 2 and 2 for DC fast charging, and the participant must operate the chargers for at least 10 years. SCE designs, installs and maintains the utility side. It also builds the customer side at no cost, or the participant self-installs for a rebate of up to 80% of SCE's estimated cost. Chargers must come from the approved product list with an approved network provider, DC make-ready must support at least 150 kW, and a non-owner applicant needs the owner's consent to grant easements. source: Southern California Edison, Charge Ready Program Guidelines, 16 Nov 2023 (PDF)
Utility service application documentsPG&E's EV application asks at pre-assessment for the address, preliminary panel size and voltage, meter location map, load per charger, charger count, phasing, cut sheets and whether load-limiting software will be used; then an AutoCAD site plan, single-line diagram and load schedule. The engineering advance is $3,500 per site, loads of 2 MW or more may need a Large Load Study from $30,000, and the assessment is valid for 90 calendar days. source: PG&E, EV customer pre-assessment and application requirements (documents, $3,500 engineering advance) (PDF)
New Jersey: chargers are a permitted accessory useNew Jersey's P.L. 2021, c.171 makes EV charging equipment a permitted accessory use in every zoning district with no variance; at existing buildings approval is by zoning permit with no site plan review, and an application is deemed complete if no notice of incompleteness issues within 20 days. source: New Jersey DCA, Model statewide municipal EV ordinance under P.L. 2021, c.171 (DOCX)
811 before trenching or boringCalifornia Government Code 4216.2 requires an excavator to notify the regional notification center at least 2 working days, and not more than 14 calendar days, before excavating, after marking out the area. Other states set their own notice periods, so store the rule per state. source: California Government Code s. 4216.2: excavation notice at least 2 working days and not more than 14 calendar days ahead
Manufacturer-only commissioning on DC fast chargersABB's Terra 94/124/184 installation manual (CE edition) tells the installer not to commission: only the manufacturer's service engineer is qualified. Before the visit the charger must be installed with AC power available, the installer present to energize, internet by cellular or Ethernet, and a compatible vehicle on site, one for each connector type. The same manual gives a torque of 33 to 44 Nm for the protective earth and phase fasteners. Use the manual for your model and market. source: ABB, Terra 94/124/184 installation manual, CE edition V002 (commissioning by manufacturer only, clearances, torque) (PDF)
Cellular signal at the mounting locationChargePoint's CT4000 guide asks for LTE RSRP of -90 dBm or better and RSRQ of -12.5 dB or better, measured at each station's exact mounting location with a dedicated signal meter rather than a phone. Weak or single-carrier results go to its solutions engineers, and a repeater is likely. source: ChargePoint, CT4000 cellular signal reading guide (RSRP and RSRQ thresholds, survey at the mounting location)
California weights and measures for chargers that billCalifornia's Division of Measurement Standards says only a sealer or a registered service agency may place a commercial charger in service, the device needs type approval (NTEP or CTEP), and the county sealer must be notified in writing. DC units installed from 1 January 2023 and AC units installed from 1 January 2021 must comply on installation. source: California DMS, EVSE and registered service agency FAQ (revised 10/2025) (PDF)
Funder closeout: California NEVI scope of workThe California Energy Commission's NEVI solicitation requires the recipient to pass final inspection, commission each station against its site drawings and installation plan, submit the station to the Alternative Fuels Data Center, and file a written notification of intent to operate. Products include an AB 841 certification, EVITP certification numbers for every installing electrician, a Buy America report, a signage report, training materials and at least six photos of 1300 by 500 pixels or more, before and after. source: California Energy Commission, GFO-25-606 NEVI solicitation, Attachment 15 Scope of Work (commissioning and closeout products) (DOCX)
Owner closeout: Oklahoma contractor specificationsOklahoma's EVOK program lists as-built electrical one-lines, site layout and conduit routing; commissioning reports covering load testing, network connectivity and payment system validation; Buy America certification, ADA verification and utility interconnection approval; on-site owner training; and a minimum 5-year charger warranty. source: Oklahoma EVOK, Contractor specifications (as-builts, commissioning reports, warranty, training)
Buy America: the 55% component testUnder FHWA's EV charger waiver, chargers manufactured on or after 1 July 2024 need final assembly in the US and US-made components worth at least 55% of component cost; housings that are mainly iron or steel must meet the standing iron and steel rule. On 12 February 2026 FHWA proposed raising the threshold to as much as 100%, and its page shows no final action. Get the manufacturer's certification with the order, not at closeout. source: FHWA, Buy America: EV charger waiver terms and the February 2026 proposal to raise the 55% threshold
Section 30C tax credit ended for new installsThe IRS states no credit is allowed for alternative fuel vehicle refueling property placed in service after 30 June 2026. Proposals that priced in the credit need to be reissued. source: IRS, FAQs on changes to sections 25C, 25D, 25E, 30C, 30D, 45L, 45W and 179D under Public Law 119-21
EVITP certification termsThe exam is online and live proctored with a 70% minimum pass, and certification expires three years after completion; renewal is by the full or a condensed course. Eligibility is a state electrician license or certification, or 8,000 documented hours of electrical construction experience where the state does not license. source: EVITP, Frequently asked questions (proctored exam, 70% pass, three-year certification)

Rules vary by state, council and contract. Checked 20 November 2026; confirm against the source for your area before relying on it.

Numbers

The numbers that size the circuit and the schedule

Two sets of numbers decide a commercial charger job: the electrical ones that say whether the existing service will carry it, and the calendar ones that say when it will be energized. Rows marked worked example are arithmetic on the rule, not market data.

ItemFigureWhere it comes from
48 A Level 2 charger60 A breaker, 11.5 kW at 240 V, minimum 6 AWG copperTesla Gen 3 Wall Connector manual
80 A Level 2 port100 A breaker; 40 A port needs 50 AChargePoint CP6000 design guide
Recommended voltage drop3% on the branch, 5% combined with the feederChargePoint CP6000 design guide
Worked example: 12 chargers at 48 A, no load management576 A of charging load; 720 A at 125%NEC 625.41 arithmetic
Worked example: same site with load management capped at 200 A200 A counts as the charging load on the serviceNEC 625.42(A)
Worked example: existing peak demand 310 A on an 800 A service387.5 A at 125%, leaving 412.5 A for new loadNEC 220.87 arithmetic
California EV service request (Rule 29 or 45)182 calendar days average target, 335 maximumCPUC D.24-09-020 workshop slides
If a new or upgraded circuit is needed upstreamUp to 684 calendar days maximum targetCPUC D.24-09-020 workshop slides
Typical project durationLevel 2 with power available: 1 day to 6 months. DC fast: 6 months to over 2 yearsUS DOE, citing IREC
Distribution transformer lead timeUp to 2 years, about four times pre-2022NREL, Feb 2024
Con Edison service rulingUsually 30 to 40 calendar days after complete documentsCon Edison PowerReady
Installation cost per connectorPublic Level 2 about $2,500; DC fast $20,000 to $60,000, before equipmentUS DOE AFDC

source: Tesla, Gen 3 Wall Connector installation manual (breaker to output table, torque, commissioning, power sharing) (PDF)source: ChargePoint, CP6000 site design guide: electrical design, North America (breaker sizes, voltage drop)source: EC&M, Code quiz: sizing overcurrent protective devices for feeders or branch circuits supplying EVSE (625.41, 2023 NEC)source: Electrical License Renewal, NEC 625.42 Rating: (A) energy management system, (B) EVSE with adjustable settingssource: EC&M, Code Q&A: calculating feeder or service loads (220.87, existing loads from maximum demand data)source: CPUC, Energization timelines workshop slides (D.24-09-020 average and maximum targets) (PDF)source: US DOE, Understanding soft costs of EV charging (timelines by charger type, citing IREC)source: NREL, Major drivers of long-term distribution transformer demand, TP-6A40-87653, Feb 2024 (OSTI record)source: Con Edison, PowerReady program (service ruling time, contractor certification at closeout, status)source: US DOE Alternative Fuels Data Center, Electricity infrastructure development: equipment and installation cost per connectorsource: EVITP, Training: eligibility, 20-hour course and exam, fee

Where it breaks

Where spreadsheets and generic software fall over

The tracker has one status column, 'In progress', for forty sites, and nobody can say which are waiting on the utility, the permit desk, the switchgear or the customer's landlord.

Give each site parallel tracks (utility, permit, procurement, funding) each with its own stage, date entered and next action owner, and report days in stage. A site that has sat at 'Utility design' for 90 days is a phone call, not a surprise.

The load calculation lives in one estimator's spreadsheet, the permit set shows a different charger count after a redesign, and the inspector finds the mismatch.

Hold the design on the site record: charger count, model, output amps, breaker size, load management cap and existing-load basis. Any change to those fields after permit submission flags the permit and the utility application for revision.

A crew is sent to a funded job and nobody on it holds a current EVITP certificate, which the grant requires on the crew at all times.

Keep license and EVITP numbers with expiry on each electrician, mark the job with the funder's rule (for example AB 841's 25% for ports of 25 kW or more), and block dispatch when the assigned crew does not meet it.

The manufacturer's commissioning engineer arrives and the site is not ready: no AC power, no internet, no test vehicle. The visit is rebooked weeks out and often billed.

Make the manufacturer's pre-commissioning list a required checklist with photos, and do not let the commissioning request go out until every item is ticked: power on, communications tested, torque marks photographed, vehicle arranged, owner available.

Chargers are mounted, then found to have no usable cellular signal in the parking structure, so they cannot be activated.

Make the signal reading at each mounting location a required survey field with the meter screenshot, and flag any reading below the manufacturer's threshold before the quote goes out, so the repeater or Ethernet run is priced.

The rebate is short-paid because the invoice does not split utility-side, customer-side and charger costs the way the program wants, or the photos are missing.

Set up cost codes per funding program on the estimate and carry them through purchase orders and the invoice, and attach the program's closeout checklist to the site so the claim cannot be marked ready until each document is on the record.

Trenching starts on an expired or missing 811 ticket.

Store the ticket number, notice date and valid-until date on the civil task, and block the task from starting outside that window.

Checklist

The EV charger installation operations checklist

Print it, or hand it to whoever runs the office side.

  • Funding program, application number, pre-approved amount and deadline on every site
  • Approved contractor and approved product list status confirmed before quoting
  • Survey photos: service equipment, main breaker rating, panel schedule, meter, route, charger and accessible space layout
  • Cellular reading at each mounting location with a signal meter, not a phone
  • Load calculation with the 220.57 figure per charger and the existing-load basis stated
  • Load management decision recorded with the site cap and where the setting is restricted and labelled
  • Utility application package complete: site plan, single-line diagram, load schedule, cut sheets, easement signer
  • Utility milestones dated, with the designer's name and project number
  • Permit submission, completeness deadline, corrections and approval dated
  • Long-lead equipment ordered against approved drawings, with promised dates
  • 811 ticket number and validity window on the civil task
  • Crew list each day with license and EVITP numbers
  • Torque values and photos, trench depth photos before backfill
  • Pre-commissioning checklist complete before the manufacturer visit is requested
  • Per charger: serial, firmware, protocol version, station ID, ampere setting, test charge and payment test
  • Closeout pack: as-builts, commissioning reports, inspection card, photos, warranty, training, compliance reports

Software options

What software EV charger installation contractors actually use

Judge each one on whether it fits the way your jobs run, not on the feature list. Bring a real job to every demo.

Kopperfield

Electricians and estimators who need load calculations, single-line diagrams and panel schedules

Load calculation and diagram software with an NEC assistant. Published annual-billing prices run from $34.99 a month (Residential, 1 user) to $79.99 a month (Commercial Pro, 3 users, with three-phase 208Y and 480Y and fault current). It does the design documents, not the project, permit or crew tracking.

source: Kopperfield

GreenLancer

Contractors who outsource the permit plan set

A design service for Level 2 and DC fast charging contractors: site plan, conduit and trench plans, electrical diagrams, NEC load calculations, placards and an engineering stamp, with a stated 14 business day turnaround. No published price. You still track the permit and the utility yourself.

source: GreenLancer

AmpUp (Field Console)

Installers activating chargers on AmpUp's network

A charging network with an installer tool for job tracking, charger configuration and activation across 15 or more hardware brands, and help with utility rebate programs. It is tied to the network you commission onto, so most contractors who install several networks also need something neutral.

source: AmpUp (Field Console)

Sitetracker

Charging networks and developers rolling out many sites

A deployment platform with standard workflows for site evaluation, permitting, construction and commissioning, used by large charging operators. It is built for programs of hundreds of sites and their owners; a regional electrical contractor should check cost and setup effort against its volume.

source: Sitetracker

Qmerit

Electrical contractors who want install work referred to them

Not software you buy: an installer network, part of Schneider Electric, that matches certified contractors to charger installs including automaker referrals. You work in its portal for its jobs and still need your own system for everything else.

source: Qmerit

General electrical contractor software (ServiceTitan, BuildOps)

Electrical contractors for whom chargers are one line of work

Strong on quotes, dispatch, purchasing and invoicing across all electrical work. BuildOps' electrical page targets commercial contractors and does not mention EV charging. Test any of them on parallel utility and permit stages per site, a crew certification block, and a closeout pack built from the record.

Published prices, compared:source: Kopperfield, Pricing (load calculations, single-line diagrams, panel schedules)source: GreenLancer, EV charging permit design (plan set contents, 14 business day turnaround)source: AmpUp, For installers (Field Console, charger activation, rebate support)source: Sitetracker, EV charging deployment (site evaluation, permitting, construction, commissioning workflows)source: Qmerit, For contractors (installer network)

Questions to ask any vendor

  • Can one site carry separate stages for the utility request, the permit, procurement and the funding claim, each with its own dates and owner?
  • Can a job be blocked from dispatch when the crew does not include an electrician with a current EVITP certificate, or does not meet a percentage rule?
  • Can the commissioning request be blocked until the manufacturer's pre-visit checklist and photos are complete?
  • Can the design fields (charger count, amps, load management cap) flag the permit and utility records when they change?
  • Can the closeout pack, with as-builts, test reports, photos and certificates, be generated from the record in the funder's order?
  • Can estimate lines carry the program's cost categories through to the invoice and the rebate claim?

Bring one real EV charger installation job. We show it running in Fieldproxy.

Get Demo

How Fieldproxy is set up for this

EV charger installation on Fieldproxy: built around how you already work

A Fieldproxy setup for charger installation is a site pipeline, not a job list. Each site holds its design, its utility request, its permit, its equipment orders, its crews and its funding claim as separate tracks with their own stages and dates, and each stage has a gate you define. It is built around your own survey, pre-commissioning and closeout checklists, live within a day, with one price per company and unlimited users, and assisted migration from your current tracker at no charge.

Module 1

Site and funding record

Every later decision depends on who owns the site, which utility serves it and what the funding program demands.

  • Site record: owner, site host, landlord consent or easement signer, lease years remaining, utility, account and meter number
  • Funding record per site: program, application number, pre-approved amount, deadline, approved contractor and product list status
  • Program rule fields, e.g. 'EVITP on crew', 'EVITP 25% for 25 kW and above', 'Davis-Bacon', 'Buy America report', 'operate for N years'
  • Rule, e.g. a site cannot move to 'Quoted' until the funding record is filled or marked 'No program'
How this works

Module 2

Survey with power, route and signal

A missed panel photo or signal reading becomes a change order or a charger that cannot be activated.

  • Survey checklist on the phone with required photos: service equipment, main breaker rating, panel schedule, meter, route, charger layout, accessible space
  • Required fields: service voltage and phase, bus and main rating, route length by surface type (asphalt, concrete, landscape, bore)
  • Cellular reading per mounting location with the meter screenshot, and a pass or fail against the threshold you set per charger model (e.g. RSRP -90 dBm)
  • Works offline in parking structures and syncs later
How this works

Module 3

Design record and load calculation

The charger count, amps and load management cap drive the permit, the utility application and the quote, and they change.

  • Design fields: charger model, count, output amps, breaker size, load per charger at 7,200 VA or nameplate, total connected load
  • Existing-load basis: 12-month demand data or 30-day recording, peak figure, 125% result, spare capacity
  • Load management: system, site cap in amps, how the setting is restricted, label photo
  • Attached load calculation, single-line diagram and panel schedule from your design tool
  • Rule, e.g. changing a design field after 'Permit submitted' or 'Utility application submitted' opens a revision task on each
How this works

Module 4

Utility service request track

The utility is the longest wait on the job and the one a contractor has least visibility of.

  • Stages you define, e.g. Package in progress, Submitted, Accepted, Design issued, Contract signed, Fees paid, Construction scheduled, Meter set, Energized
  • Fields: utility project number, designer name and contact, engineering advance paid, each stage date
  • Document checklist per utility (site plan, single-line diagram, load schedule, cut sheets, signed agreement, easement)
  • Days-in-stage on every site, compared with the target you enter (e.g. 182 days)
How this works

Module 5

Permit and inspection track

Crews booked ahead of a permit or a failed inspection are paid to wait.

  • Stages: Pack in progress, Submitted, Corrections, Approved, Rough inspection, Final inspection, Card received
  • Fields: authority, permit number, submission date, completeness deadline calculated from the rule you set per authority (e.g. 20 days), correction notices
  • Rule, e.g. no construction task can be scheduled until the permit stage is Approved
  • Inspection results with the inspector's notes and re-inspection tasks
How this works

Module 6

Procurement and long-lead equipment

Switchgear and chargers arrive on their own calendar, and the build date depends on the latest of them.

  • Purchase orders per site for chargers, pedestals, switchgear, conduit and wire, with promised and received dates
  • Serial numbers captured at receipt and carried to the commissioning record
  • Site 'ready to build' only when permit is approved and every long-lead item is received or dated
  • Estimate lines coded to the funding program's cost categories (utility-side, customer-side, charger, soft costs)
How this works

Module 7

Crews, subcontractors and certifications

Funded jobs carry rules about who is on the crew, and civil work is usually a sub.

  • Each electrician: license number, EVITP certificate number and expiry, apprentice status
  • Dispatch block when the assigned crew does not meet the site's program rule
  • Daily crew log per site with hours, for certified payroll backup on prevailing wage jobs
  • Civil and striping subcontractors work from a link to their own task with required photos, and see nothing else
  • 811 ticket number, notice date and valid-until date on the civil task, with a block outside the window
How this works

Module 8

Installation and pre-commissioning checklists

The manufacturer's engineer and the inspector both look for evidence, and it has to exist before they arrive.

  • Checklist per charger model from the manufacturer's manual: clearances, anchor and termination torque with photos of torque marks
  • Trench depth photo with tape before backfill, pad and bollard photos
  • Pre-commissioning items, e.g. AC power available, communications tested, test vehicle arranged, owner available
  • Rule, e.g. the commissioning request task cannot be opened until every pre-commissioning item is complete
How this works

Module 9

Commissioning record and charger register

This is the proof the station worked on day one, and the start of the warranty and the asset history.

  • Per charger: make, model, serial, firmware, protocol version, station ID in the network, ampere setting programmed
  • Tests: insulation resistance, ground fault trip, test charge per connector, payment test, network status
  • Manufacturer's commissioning report attached, with engineer name and date
  • Each charger becomes an asset on the site with install date, warranty start and term, ready for a maintenance contract
  • Weights and measures: type approval reference, service agency, date the county sealer was notified, where energy is sold by the kWh
How this works

Module 10

Closeout pack, claim and billing

Retention and rebates are released on paperwork, and the paperwork is scattered unless the record builds it.

  • Closeout checklist per funder: as-built one-lines, site layout and conduit routing, commissioning reports, final inspection card, photo set, warranty, training record
  • Compliance documents: electrician certification list from the crew log, Buy America report, signage report, accessibility check
  • Closeout pack PDF generated from the record in your own template
  • Progress invoices by milestone, retention, and the rebate claim with itemized costs by program category
  • Customer portal per site host or developer showing every site's stage across utility, permit, build and closeout
How this works

The AI agents, set up for EV charger installation contractors

AgentWhenWhat it doesWhat you get
Document intelligence agentAn email or PDF arrives from the utility, the building department or the funding program: a design package, a correction notice, an offer letterReads the project or permit number, the document type, any deadline and any amount, and matches it to the site.The right track moved to its next stage with the date and document attached, and a task for the project manager if a response is due.
Vision agentA survey or installation photo is uploadedReads the main breaker and bus rating from the service equipment label, the serial plate on each charger, and the signal meter screenshot; checks a trench photo shows a tape.Rating, serial and signal fields filled on the record, and a note back to the technician when a required photo does not show what it should.
Watcher agentA site passes the days-in-stage limit you set (e.g. 60 days at Utility design), a permit completeness deadline passes with no notice, a funding deadline is within 30 days (e.g.), or an 811 ticket is about to expireChecks every site's track dates, program deadlines and ticket windows each day against your rules.An alert to the project manager naming the site, the track, the days waiting and the next action owner.
Dispatch agentA site becomes ready to buildRanks crews by distance, availability and certification, and rejects any combination that fails the site's program rule on EVITP or apprentices.A proposed crew and dates the coordinator approves, with the rule it satisfied shown.
AutopilotA utility track, permit or landlord consent has had no update for the period you set (e.g. 10 working days)Drafts the follow-up to the utility designer, the plan checker or the property owner, quoting the project number and what was last sent.A drafted email a person approves before it sends, logged on the track.
Scheduler agentEvery Monday morningPulls each open site's stage on every track, days in stage, equipment dates, and claims submitted but unpaid.A pipeline report by customer and by blocker (utility, permit, equipment, commissioning, claim), emailed to operations and to each developer for their sites.

Straight answers

EV charger installation: FAQ

What software do EV charger installation contractors use?

Most use several tools. Kopperfield or a spreadsheet for load calculations and single-line diagrams, a plan set service such as GreenLancer for permit drawings, the charger network's installer portal to activate units, general electrical software such as ServiceTitan or BuildOps for jobs and invoices, and a spreadsheet for utility, permit and rebate status per site. Large developers use Sitetracker. The test for any tool is whether one site can hold separate utility, permit, procurement and funding tracks with dates, and produce the closeout pack.

How do you size a breaker for an EV charger?

NEC 625.41 requires the overcurrent device to be rated at not less than 125% of the charger's maximum load, because charging is a continuous load. A 48 A charger therefore needs a 60 A breaker, a 40 A charger 50 A, and an 80 A charger 100 A. Manufacturer manuals such as Tesla's Wall Connector and ChargePoint's CP6000 give the same pairs.

How do you calculate EV charger load on an existing service?

Count each charger at 7,200 VA or its nameplate rating, whichever is larger (NEC 220.57, 2023 edition). For the building's existing load, NEC 220.87 allows actual maximum demand from a year of data, or a 30-day continuous recording, multiplied by 125%. If that plus the charger load exceeds the service rating, the choices are a service upgrade or a load management system.

Can load management avoid a service upgrade?

Often, yes. Under NEC 625.42(A), where an energy management system controls the charging load, the load on the service and feeder is the maximum the system permits, not the sum of the chargers. Adjustable chargers may be rated at their reduced setting if access to the setting is restricted and the adjusted rating is on the label. In California, the utilities regulator in February 2026 also directed PG&E and SCE to offer flexible service connections, where a site accepts a capacity limit to get service sooner.

What is make-ready in EV charging?

The electrical infrastructure up to, but not including, the charger. Southern California Edison splits it into utility-side (from the distribution system to a new panel for the chargers) and customer-side (from that panel to the charger's connection point). Utility programs have paid for some or all of it in exchange for commitments such as operating the chargers for 4 to 10 years and sharing usage data.

Which utility make-ready programs are still open?

Fewer than two years ago. As checked in November 2026: New York's Joint Utilities make-ready program stopped taking new applications on 21 April 2026, SCE's Charge Ready is no longer accepting applications and requires agreements signed by 31 December 2026, and PG&E's EV Fleet is fully subscribed. Sites already in those programs still have to be built and closed out to the program's rules. Check the utility's page for the current status before quoting a rebate.

How long does it take a utility to energize an EV charging site?

It depends on what is upstream. California's regulator set targets of 182 calendar days on average and 335 at most for EV service requests, and up to 684 days where a new or upgraded circuit is needed. The US Department of Energy, citing developers surveyed by IREC, gives 1 day to 6 months for Level 2 where power is available and 6 months to over 2 years for DC fast charging.

Is NEVI still funding EV charging stations in 2026?

Yes, with changes. FHWA suspended state plans in February 2025, issued new interim guidance in August 2025, and a federal court ruled in January 2026 that the freeze was unlawful. FHWA's page still lists the 2023 minimum standards rule, 23 CFR Part 680, as in force. Congress repurposed part of the charging money in the 2026 appropriations. Each state runs its own solicitation, so the current state documents are what bind a contractor.

Do electricians need EVITP certification to install EV chargers?

Not everywhere, but on most funded work. NEVI requires EVITP or a registered apprenticeship certificate with charger training. California's AB 841 requires at least one EVITP-certified electrician on each crew for state-funded or authorized projects, and at least 25% of the crew's electricians where a port supplies 25 kW or more. EVITP is a 20-hour course and proctored exam with a 70% pass mark, valid for three years.

Who commissions a DC fast charger?

Usually the manufacturer, not the installer. ABB's Terra manual, for example, says only the manufacturer's service engineer is qualified to commission, and lists what must be ready: the charger installed with AC power available, the installer present to energize it, an internet connection, a compatible vehicle on site and the owner available. Level 2 units are normally activated by the installer through the network's tool.

What goes in an EV charger closeout package?

It varies by owner and funder. Oklahoma's contractor specification asks for as-built one-lines, site layout and conduit routing, commissioning reports covering load testing, network connectivity and payment validation, Buy America and ADA documentation, utility approval and on-site training. California's NEVI scope adds the final inspection card, EVITP numbers for every installing electrician, a signage report and at least six photos before and after.

Is the federal 30C tax credit still available for charger installs?

No, not for new installs. The IRS states that no credit is allowed for alternative fuel refueling property placed in service after 30 June 2026. Proposals written before that date that count on the credit should be re-priced.

Related guides

All sources on this page (47)

Run EV charger installation work the way it actually runs.

A 30-minute call. We set up one of your real jobs in Fieldproxy so you can judge it on your own work.

Get a walkthrough

One price per company. Unlimited users.